Residential / Group Housing · 7 buildings · 144 unitsRERA P52100034658

Easterlia Phase 2

Deedo IDDP-PUN-NA3D

MahaRERA shows it completed; no MahaRERA orders on record.

Lohgaon, Pune 411047 · Property rates in Lohgaon · by Spacemint Realty Llp

DeliveryCompletedAs MahaRERA showsRegulatoryNo ordersNot in any MahaRERA list or order Deedo has readPrice₹7,120 /sq ft3.2% below Lohgaon · 117 registered sales

Buying a flat here?

See every deed registered on it.

MahaRERA shows it completed

  • This projectRegistered 20 Apr 2022, completion promised 31 Dec 2025.

No extension certificate on record.

1 registration · Source: MahaRERA registration and extension certificates

Latest registered deeds

Sales first, then rentals and mortgages matched to this project · the free view shows a price band

All 204 deeds →
Latest registered deeds in this project
MonthFlatKindAreaPriceRecord
Jun 2026Main building · 404Resale630 sq ftView Resale, Jun 2026
May 2026A-12 · 603Resale498 sq ftView Resale, May 2026
Mar 2026Main building · 404Primary sale630 sq ftView Primary sale, Mar 2026
Nov 2025Main building · 302Resale386 sq ftView Resale, Nov 2025
Sep 2024Main building · 603Primary sale562 sq ftView Primary sale, Sep 2024
May 2024Main building · 602Primary sale630 sq ftView Primary sale, May 2024
Jan 2024Main building · 201Primary sale630 sq ftView Primary sale, Jan 2024
Jan 2024Main building · 101Primary sale630 sq ftView Primary sale, Jan 2024
Jan 2024Main building · 401Primary sale640 sq ftView Primary sale, Jan 2024
Dec 2023Main building · 602Primary sale450 sq ftView Primary sale, Dec 2023

7 buildings

Open a building to see every flat, floor by floor.

Floors and units from the registration certificate annexures and MahaRERA's project page. Construction % is the average of the developer's own declared activity progress to MahaRERA, not an inspection.

Regulatory recordNone found

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

RERA registrationP52100034658
RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5210003465820 Apr 202231 Dec 202531 Dec 2025Spacemint Realty LLPProject page
Documents69

25 documents held by Deedo, 44 filings listed on MahaRERA's project page

Title report (2)

Encumbrance details

Layout plan

Allotment letter (2)

Form 5

Commencement certificate

Show all 69 documentsShow fewer documents

Form 1 (2)

Registration certificate

Form 2 (2)

Form 2A

Form 4

Occupancy / completion certificate (2)

  • Occupancy / completion certificate26 Jun 2024ViewSource
  • Occupancy / completion certificate26 Jun 2024ViewSource

Other (8)

Document library

  • Details of encumbrances0 Self Decelaration Encumberances.pdf · uploaded 18 Mar 2022View
  • Commencement Certificates / NA Order for plotted development0 Commencement1.pdf · uploaded 18 Mar 2022View
  • Declaration about Commencement Certificate0 Declaration of Commencement Certificate Form D.pdf · uploaded 18 Mar 2022View
  • Declaration in FORM B0 Form B-compressed.pdf · uploaded 18 Mar 2022View
  • Proforma of Allotment letter0 Easterlia Phase-2 Draft Agreement.pdf · uploaded 18 Mar 2022View
  • CERSAI detailsCERSAI_Search_Report.pdf · uploaded 23 Mar 2022View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 - PHASE 2-compressed.pdf · uploaded 28 Mar 2022View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 - PHASE 2-compressed_compressed.pdf · uploaded 28 Mar 2022View
  • Proforma of Allotment letterRera Allotment Letter Format.pdf · uploaded 28 Mar 2022View
  • Copy of Layout Approval (in case of layout)HPSCANNER5807x.pdf · uploaded 11 Apr 2022View
  • Building Plan Approval / NA Order for plotted developmentHPSCANNER5807x.pdf · uploaded 11 Apr 2022View
  • Copy of the legal title reportPt1.pdf · uploaded 12 Apr 2022View
  • Copy of the legal title reportDocument_0001x.pdf · uploaded 12 Apr 2022View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)FROM- 1.pdf · uploaded 19 Sep 2022View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM- 2.pdf · uploaded 19 Sep 2022View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM- 1.pdf · uploaded 10 Oct 2022View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM- 2.pdf · uploaded 10 Oct 2022View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM- 2.pdf · uploaded 21 Jan 2023View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM- 1.pdf · uploaded 21 Jan 2023View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM- 1.pdf · uploaded 22 Apr 2023View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM- 2.pdf · uploaded 22 Apr 2023View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)FORM- 2A.pdf · uploaded 22 Apr 2023View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM- 1.pdf · uploaded 4 Aug 2023View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM- 2.pdf · uploaded 4 Aug 2023View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)FORM- 2A.pdf · uploaded 4 Aug 2023View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)FORM- 2A.pdf · uploaded 4 Aug 2023View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Tribute Eastarlia phase 2 Form 5.pdf · uploaded 4 Oct 2023View
  • Proforma of Agreement for saleGetUserDocumentFileContent(30).pdf · uploaded 4 Oct 2023View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM- 1.pdf · uploaded 15 Dec 2023View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM- 2.pdf · uploaded 15 Dec 2023View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM- 1.pdf · uploaded 10 Jun 2024View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2.pdf · uploaded 10 Jun 2024View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM- 1.pdf · uploaded 10 Jun 2024View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM- 2.pdf · uploaded 10 Jun 2024View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)FORM- 2A.pdf · uploaded 10 Jun 2024View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentCOMPLETION CERTIFICATE-A9 TO A13-Part.pdf · uploaded 10 Jun 2024View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentPart Occupancy Certificate Spacemint A8.pdf · uploaded 26 Jun 2024View
  • Architect’s Certificate on Completion of Project (Form 4)FORM- 4_merged.pdf · uploaded 26 Jun 2024View

Promoter documents

  • Declaration Form B0 Form B-compressed.pdf · uploaded 18 Mar 2022View
  • Legal Title reportPt1.pdf · uploaded 12 Apr 2022View
  • Legal Title reportDocument_0001x.pdf · uploaded 12 Apr 2022View

Technical documents

  • Layout ApprovalHPSCANNER5807x.pdfView
  • Building Plan ApprovalHPSCANNER5807x.pdfView

Proforma allotment letter

  • Proforma allotment letterRera Allotment Letter Format.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Land & approvalsCTS 250/5, 258/1/1

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Completed
Unit types
1.5 BHK, 1BHK, 2BHK, 2.5 BHK144 units in all
Address
CTS 250/5, S No. 258/1/1, Lohegaon, Khese ParkPIN 411047
Village
Lohgaon, Haveli taluka
Land area for this project
11,430 sq m (1,23,031 sq ft)
Permissible built-up area
12,003 sq m (1,29,198 sq ft)
Sanctioned built-up area
9,503 sq m (1,02,288 sq ft)
Recreational open space
575 sq m (6,189 sq ft)
Designated bank account
State Bank Of India
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared
Also registered as
Istaraliya Fej 2 Ya Imaratitil E-13 Bilding, ईस्टरलिया फेज 2 या इमारतीतील ए-13 बिल्डिंग, Istaraliya Fej 2 Ya Imaratitil E-11 Bilding, ईस्टरलिया फेज 2 या इमारतीतील ए-11 बिल्डिंग, ईस्टरलिया फेज 2 या इमारतीतील ए-10 बिल्डिंग, Istaraliya Fej 2 Ya Imaratitil E-10 Bilding, ईस्टरलिया फेज 2 या इमारतीतील ए-9 बिल्डिंग, Istaraliya Fej 2 Ya Imaratitil E-9 Bilding, Istaraliya Fej 2 Ya Imaratitil E-12 Bilding, ईस्टरलिया फेज 2 या इमारतीतील ए-12 बिल्डिंग, Istaraliya Fej 2 Ya Imaratitil E-8 Bilding, ईस्टरलिया फेज 2 या इमारतीतील ए-8 बिल्डिंग, Istaraliya Fej 2 Nantarache Nav Istaraliya, ईस्टरलिया फेज 2 नंतरचे नाव ईस्टरलिया, ईस्टरलिया फेज 2 नंतरचे नाव ईस्टरलिया को-ऑपरेटीव्ह, Istaraliya Phase 2 Ya Imaratitil E-13 Building, Istaraliya Phase 2 Ya Imaratitil E-11 Building, Istaraliya Phase 2 Ya Imaratitil E-10 Building, Istaraliya Phase 2 Ya Imaratitil E-9 Building, Istaraliya Phase 2 Ya Imaratitil E-12 Building, Istaraliya Phase 2 Ya Imaratitil E-8 Building, Istaraliya Phase 2 Nantarache Nav Istaraliya

Survey, CTS, gat or plot numbers

250/5258/1/1CTS 250/5S No. 258/1/1

Land as published on MahaRERA's project page

CTS 250/5, S No. 258/1/1

Boundaries

North
Reservation out of S No 258
South
D P Road
East
S No 258 Part
West
S No 259

Source: registration certificates and MahaRERA's project page, as stated there.

Units & parking144 units · 144 parking spaces

144 units registered

1.5 BHK · 30 units1BHK · 30 units2BHK · 78 units2.5 BHK · 6 units
BuildingTypeCarpet areaUnits
A-101.5 BHK46.23 sq m · 498 sq ft6
A-101BHK35.85 sq m · 386 sq ft6
A-102BHK50.79 sq m · 547 sq ft12
A-111.5 BHK46.23 sq m · 498 sq ft6
A-111BHK35.85 sq m · 386 sq ft6
A-112BHK50.79 sq m · 547 sq ft12
A-121.5 BHK46.23 sq m · 498 sq ft6
A-121BHK35.85 sq m · 386 sq ft6
Show all 18 unit rowsShow fewer unit rows
BuildingTypeCarpet areaUnits
A-122BHK50.79 sq m · 547 sq ft12
A-132.5 BHK59.81 sq m · 644 sq ft6
A-132BHK50.79 sq m · 547 sq ft6
A-132BHK51.74 sq m · 557 sq ft12
A-81.5 BHK46.23 sq m · 498 sq ft6
A-81BHK35.85 sq m · 386 sq ft6
A-82BHK51.74 sq m · 557 sq ft12
A-91.5 BHK46.23 sq m · 498 sq ft6
A-91BHK35.85 sq m · 386 sq ft6
A-92BHK51.74 sq m · 557 sq ft12

Parking

BuildingTypeTwo-wheelerFour-wheelerBusVisitorTotal
A-10Closed/Covered000024
A-10Open Space00000
A-11Closed/Covered000024
A-11Open Space00000
A-12Closed/Covered000024
A-12Open Space00000
A-13Closed/Covered000024
A-13Open Space00000
Show all 12 parking rowsShow fewer parking rows
BuildingTypeTwo-wheelerFour-wheelerBusVisitorTotal
A-8Closed/Covered000024
A-8Open Space00000
A-9Closed/Covered000024
A-9Open Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress7 buildings and areas

Work completed, as the promoter reported it to MahaRERA (Form 1)

A-10

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

A-11

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

A-12

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Show all 7 buildings and common areasShow fewer buildings and common areas

A-13

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

A-8

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

A-9

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Common areas and amenities

  • Internal Roads & Footpaths0100%
  • Water Supply0100%
  • Sewerage (Chamber, Lines, Septic Tank , STP)0100%
  • Storm Water Drains0100%
  • Landscaping & Tree Planting0100%
  • Street Lighting0100%
Show all 15 activitiesShow fewer activities
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage Water0100%
  • Solid Waste Management And Disposal0100%
  • Water conservation /Rain water harvesting0100%
  • Energy managemcnt0100%
  • Fire protection and fire safety requirements0100%
  • Electrical meter room, sub-station, receiving station0100%
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Professionals3

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectCubix Architects & Associates—
Chartered accountantKailash Agarwal—
EngineerSuhas Alhat—

Source: MahaRERA project page. Contact details are not shown.

Other projects in Lohgaon

All 4,590 projects in Lohgaon · Compare Easterlia Phase 2 with another project

Easterlia Phase 2 in numbers

Registered deals, summarised

Deedo has 204 registered documents at Easterlia Phase 2, from Oct 2022 to Oct 2026: 117 sales, 84 leave and licence agreements, 1 mortgage. The median registered sale since Oct 2022 works out to about ₹7,100 per sq ft, at a median of ₹45 L a deal; 3% of sales were resales.

What is the price per sq ft at Easterlia Phase 2?
The median registered sale since Oct 2022 works out to about ₹7,100 per sq ft, at a median of ₹45 L a deal; 3% of sales were resales.
How many properties have been sold at Easterlia Phase 2?
117 sales are registered at Easterlia Phase 2, 3 of them resales.
Are properties at Easterlia Phase 2 rented out?
Yes: 84 leave and licence agreements are registered at Easterlia Phase 2, at a median rent since Oct 2022 of about ₹21,000 a month with a deposit of about ₹40,000.
Where does this data come from?
The figures come from registered documents (Index II) at the Maharashtra sub-registrar offices, matched at Easterlia Phase 2 by Deedo, last updated with deals registered in Oct 2026.

Latest deal · Resale · Jun 2026

₹25–50 L

Data through3 Nov 2026SourcesMahaRERA project search · registration certificates · MahaRERA project page · registered documents (Index II)Data through is when MahaRERA's project page was last read.Report a problemMethodology