Swapnali Co Op Hsg Soc
Deedo IDDP-PUN-RYK0Its promised completion date, Jun 2025, has passed and MahaRERA does not show it completed; no MahaRERA orders on record; 100% of its units are booked.
Kothrud, Pune 411038 · Property rates in Kothrud · by Vyas Buildcon Pvt. Ltd · 43% of its projects kept the RERA date
Buying a flat here?
See every deed registered on it.
Its promised completion date, Jun 2025, has passed and MahaRERA does not show it completed
- This projectRegistered 6 Mar 2023, completion promised 3 Jun 2025, and still not shown completed today.
No extension certificate on record.
1 registration · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales, rentals and mortgages matched to this project · the free view shows a price band
- Rental · Oct 2026
- Rental · Oct 2026
- Rental · 55 mo · Oct 2026
- Resale · Sep 2026
- Rental · 48 mo · Sep 2026
- Rental · 24 mo · Sep 2026
- Rental · 36 mo · Jul 2026
- Rental · 36 mo · Jul 2026
- Resale · Jul 2026
- Rental · Jul 2026
| Month | Flat | Kind | Area | Price | Record |
|---|---|---|---|---|---|
| Oct 2026 | Not on record | Rental | — | View Rental, Oct 2026 | |
| Oct 2026 | Unit 9 | Rental | — | View Rental, Oct 2026 | |
| Oct 2026 | Swapnali · 202 | Rental | — | View Rental, Oct 2026 | |
| Sep 2026 | Main building · 303 | Resale | 712 sq ft | View Resale, Sep 2026 | |
| Sep 2026 | Unit 601 | Rental | — | View Rental, Sep 2026 | |
| Sep 2026 | Wing B · 502 | Rental | — | View Rental, Sep 2026 | |
| Jul 2026 | Unit 06 | Rental | — | View Rental, Jul 2026 | |
| Jul 2026 | Unit 403 | Rental | — | View Rental, Jul 2026 | |
| Jul 2026 | Main building · 33 | Resale | 1,619 sq ft | View Resale, Jul 2026 | |
| Jul 2026 | Main building · 12 | Rental | — | View Rental, Jul 2026 |
4 buildings
Open a building to see every flat, floor by floor.
- Building (P52100049943)Size not on record100% booked
- Main buildingSize not on record
- Swapnali9 floors
- Wing BSize not on record
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrationP52100049943
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52100049943 | 6 Mar 2023 | 3 Jun 2025 | 3 Jun 2025 | Vyas Buildcon Pvt. Ltd. | Project page |
Documents121
2 documents held by Deedo, 119 filings listed on MahaRERA's project page
Show all 121 documentsShow fewer documents
Migrated
- 1 b Details of encumbrances concerned to LegalNo_Encumbrance.pdf · uploaded 7 Nov 2022Source
- 1 Copy of Layout Approval (in case of layout)Swapnali_Layout_KPrat.pdf · uploaded 7 Nov 2022Source
- 1 Declaration in FORM BForm B_Society.pdf · uploaded 7 Nov 2022Source
- 2 Declaration in FORM BForm B_Developer.pdf · uploaded 7 Nov 2022Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 _Architects certificate .pdf · uploaded 7 Nov 2022Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2_Engineers Certificate.pdf · uploaded 7 Nov 2022Source
- 1 CERSAI detailsCersai_Declaration.pdf · uploaded 7 Nov 2022Source
- 1 Proforma of Allotment letterProforma Allotement letter.pdf · uploaded 7 Nov 2022Source
- 1 Status of Formation of Legal Entity (Society/Co Op etc.)society reg certificate swapnali.pdf · uploaded 7 Nov 2022Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFormat A_SeparateBank ACC.pdf · uploaded 7 Nov 2022Source
- 1 Deviation Report with respect to Allotment letterDeviation Allotment Letter.pdf · uploaded 7 Nov 2022Source
- 1 Proforma of Agreement for saleAFS_Proforma2.pdf · uploaded 12 Nov 2022Source
- 1 Deviation Report with respect to model copy of Agreement2_Deviation_AFS_.pdf · uploaded 12 Nov 2022Source
- 1 Copy of the legal title reportLEGAL TITLE REPORT SWAPNALI.pdf · uploaded 17 Nov 2022Source
- 1 Building Plan Approval / NA Order for plotted developmentSWAPNALI PLAN 1.pdf · uploaded 30 Jan 2023Source
- 2 Building Plan Approval / NA Order for plotted developmentSWAPNALI PLAN 2.pdf · uploaded 30 Jan 2023Source
- 1 Commencement Certificates / NA Order for plotted developmentswapnali -cc_compressed.pdf · uploaded 30 Jan 2023Source
- 1 Declaration about Commencement CertificateCC_Declaration.pdf · uploaded 30 Jan 2023Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3_CA Certificate2.pdf · uploaded 30 Jan 2023Source
- 1 Disclosure of Interest in Other Real Estate OrganizationsDisclosure of Interest.pdf · uploaded 30 Jan 2023Source
- 2 a Details of encumbrances concerned to FinanceNo_Encumbrance.pdf · uploaded 13 Feb 2023Source
- 2 b Details of encumbrances concerned to LegalNo_Encumbrance.pdf · uploaded 13 Feb 2023Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Swapnali June 2023.pdf · uploaded 19 Aug 2023Source
- 2 Deviation Report with respect to model copy of AgreementSwapnali CHS Deviation Report.pdf · uploaded 26 Aug 2023Source
- 1 Disclosure of sold/ booked inventorysw-rera.pdf · uploaded 10 Oct 2023View
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Form5.pdf · uploaded 10 Oct 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)form-2A-SWAPNALI-ENGIEERS CERTIFICATE.pdf · uploaded 20 Oct 2023Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)SWAPNALI Architects Certificate.pdf · uploaded 21 Oct 2023Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)SWAPNALI Engineers Certificate.pdf · uploaded 21 Oct 2023Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)SWAPNALI CA Certificate.pdf · uploaded 21 Oct 2023Source
- 3 Building Plan Approval / NA Order for plotted developmentPlan1-2.pdf · uploaded 20 Dec 2023Source
- 4 Building Plan Approval / NA Order for plotted developmentPlan2-2.pdf · uploaded 20 Dec 2023Source
- 2 Commencement Certificates / NA Order for plotted developmentCC 2174.pdf · uploaded 20 Dec 2023Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)SWAP_Arch_CertificateQ3_23-24.pdf · uploaded 19 Jan 2024Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)SWAP_Engg_CertificateQ3_23-24.pdf · uploaded 19 Jan 2024Source
- 2 Disclosure of sold/ booked inventoryQ3_23-24_SOLD_UNSOLD.pdf · uploaded 19 Jan 2024Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)SWAP_CA_CertificateQ3_23-24.pdf · uploaded 19 Jan 2024Source
- 5 Building Plan Approval / NA Order for plotted developmentFinal Plan 1.pdf · uploaded 12 Mar 2024Source
- 6 Building Plan Approval / NA Order for plotted developmentFinal Plan 2.pdf · uploaded 12 Mar 2024Source
- 3 Commencement Certificates / NA Order for plotted developmentFinal CC.pdf · uploaded 12 Mar 2024Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)SWAPNALI Architects Certifticate.pdf · uploaded 23 Apr 2024Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)SWAPNALI Engineers Certificate.pdf · uploaded 23 Apr 2024Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Swapnali March 2024_compressed.pdf · uploaded 23 Apr 2024Source
- 3 Disclosure of sold/ booked inventorySwapnali Sold UnsoldQ4-23-24.pdf · uploaded 24 Apr 2024Source
- 4 Disclosure of sold/ booked inventorySOLD_UNSOLD_JUNE24.pdf · uploaded 11 Jul 2024Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Arch_Certificate_Q1-24.pdf · uploaded 16 Jul 2024Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engg_Certificate_Q1-24.pdf · uploaded 16 Jul 2024Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA_Certificate_Q1-24.pdf · uploaded 16 Jul 2024Source
- 1 Disclosure of sold/ booked inventorySOLD_UNSOLD_Q2-24.pdf · uploaded 7 Oct 2024View
- 1 Disclosure of sold/ booked inventorySOLD_UNSOLD_Q2-24.pdf · uploaded 7 Oct 2024View
- 2 Disclosure of sold/ booked inventorySOLD_UNSOLD_Q2-24.pdf · uploaded 7 Oct 2024Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA_Certificate_Q2-24.pdf · uploaded 14 Oct 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Form 5 Swapnali FY23-24.pdf · uploaded 14 Oct 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form 5 Swapnali FY23-24.pdf · uploaded 14 Oct 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Arch_Certificate_Q2-24.pdf · uploaded 14 Oct 2024Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engg_Certificate_Q2-24.pdf · uploaded 14 Oct 2024Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA_Certificate_Q2-24.pdf · uploaded 14 Oct 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Form 5 Swapnali FY23-24.pdf · uploaded 14 Oct 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form 5 Swapnali FY23-24.pdf · uploaded 14 Oct 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Arch_Certificate_Q2-24.pdf · uploaded 14 Oct 2024Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engg_Certificate_Q2-24.pdf · uploaded 14 Oct 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Arch_Certificate_Q2-24.pdf · uploaded 14 Oct 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA_Certificate_Q2-24.pdf · uploaded 14 Oct 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engg_Certificate_Q2-24.pdf · uploaded 14 Oct 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Form 5 Swapnali FY23-24.pdf · uploaded 14 Oct 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form 5 Swapnali FY23-24.pdf · uploaded 14 Oct 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form 5 Swapnali FY23-24.pdf · uploaded 19 Oct 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form 5 Swapnali FY23-24.pdf · uploaded 19 Oct 2024Source
- 2 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form 5 Swapnali FY23-24.pdf · uploaded 19 Oct 2024Source
- 1 Disclosure of sold/ booked inventoryRERA SOLD UNSOLD (Q3 24-25)-Swapnali.pdf · uploaded 14 Jan 2025View
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Arch_Certificate_Q3-24.pdf · uploaded 14 Jan 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engg_Certificate_Q3-24.pdf · uploaded 14 Jan 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA_Certificate_Q3-24.pdf · uploaded 14 Jan 2025Source
- 1 Disclosure of sold/ booked inventoryRERA SOLD UNSOLD (Q3 24-25)-Swapnali.pdf · uploaded 14 Jan 2025View
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Arch_Certificate_Q3-24.pdf · uploaded 14 Jan 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engg_Certificate_Q3-24.pdf · uploaded 14 Jan 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA_Certificate_Q3-24.pdf · uploaded 14 Jan 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Arch_Certificate_Q3-24.pdf · uploaded 14 Jan 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA_Certificate_Q3-24.pdf · uploaded 14 Jan 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engg_Certificate_Q3-24.pdf · uploaded 14 Jan 2025Source
- 1 Disclosure of sold/ booked inventoryRERA SOLD UNSOLD (Q3 24-25)-Swapnali.pdf · uploaded 14 Jan 2025View
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Arch_Certificate_Feb-25.pdf · uploaded 28 Feb 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA_Certificate_Feb-25.pdf · uploaded 28 Feb 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engg_Certificate_Feb-25.pdf · uploaded 28 Feb 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Arch_Certificate_Q4-24.pdf · uploaded 24 Apr 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA_Certificate_Q4-24.pdf · uploaded 24 Apr 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engg_Certificate_Q4-24.pdf · uploaded 24 Apr 2025Source
- Form 5 (FY 2024-2025)Swapnali_Form 5_24-25 swapnali (1).pdf · uploaded 29 Sep 2025Source
Technical
- DocumentSwapnali_Layout_KPrat.pdf · uploaded 7 Nov 2022Source
- DocumentSWAPNALI PLAN 1.pdf · uploaded 30 Jan 2023Source
- DocumentSWAPNALI PLAN 2.pdf · uploaded 30 Jan 2023Source
- DocumentPlan1-2.pdf · uploaded 20 Dec 2023Source
- DocumentPlan2-2.pdf · uploaded 20 Dec 2023Source
- DocumentFinal Plan 1.pdf · uploaded 12 Mar 2024Source
- DocumentFinal Plan 2.pdf · uploaded 12 Mar 2024Source
Technical (Architect)
- DocumentArch_Certificate_Q1-24.pdf · uploaded 25 Sep 2024Source
- DocumentArch_Certificate_Q2-24.pdf · uploaded 14 Oct 2024Source
- DocumentArch_Certificate_Q2-24.pdf · uploaded 14 Oct 2024Source
- DocumentArch_Certificate_Q2-24.pdf · uploaded 14 Oct 2024Source
- DocumentArch_Certificate_Q3-24.pdf · uploaded 14 Jan 2025Source
- DocumentArch_Certificate_Q3-24.pdf · uploaded 14 Jan 2025Source
- DocumentArch_Certificate_Q3-24.pdf · uploaded 14 Jan 2025Source
- DocumentArch_Certificate_Feb-25.pdf · uploaded 28 Feb 2025Source
- DocumentArch_Certificate_Q4-24.pdf · uploaded 24 Apr 2025Source
Technical (Engineer)
- DocumentEngg_Certificate_Q1-24.pdf · uploaded 25 Sep 2024Source
- DocumentEngg_Certificate_Q2-24.pdf · uploaded 14 Oct 2024Source
- DocumentEngg_Certificate_Q2-24.pdf · uploaded 14 Oct 2024Source
- DocumentEngg_Certificate_Q2-24.pdf · uploaded 14 Oct 2024Source
- DocumentEngg_Certificate_Q3-24.pdf · uploaded 14 Jan 2025Source
- DocumentEngg_Certificate_Q3-24.pdf · uploaded 14 Jan 2025Source
- DocumentEngg_Certificate_Q3-24.pdf · uploaded 14 Jan 2025Source
- DocumentEngg_Certificate_Feb-25.pdf · uploaded 28 Feb 2025Source
- DocumentEngg_Certificate_Q4-24.pdf · uploaded 24 Apr 2025Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvalsLand parcel CTS NO 697C, PLOT NO 1
As registered with MahaRERA and published on its project page
- Project type
- Others
- Status on MahaRERA
- Certificate Signed
- Address
- Plot No 1, Cts No 697c, S No 17/1a, Late Ga Kulkarni Path, Opposite Karishma SocietyPIN 411038
- Village
- Kothrud, Haveli taluka
- Location
- 18.50153, 73.82181
- Land area for this project
- 574 sq m (6,174 sq ft)
- Permissible built-up area
- 2,530 sq m (27,233 sq ft)
- Sanctioned built-up area
- 1,051 sq m (11,309 sq ft)
- Designated bank account
- 85
- Developed in phases
- No
- Also registered as
- स्वप्नाली अपार्टमेंट, Svapnali, स्वप्ना, स्वप्नाली, Sadaphuli Co-Op.Hsg Soc, Sadaphuli, Sadaphuli Apartment
Survey, CTS, gat or plot numbers
Land as published on MahaRERA's project page
PLOT NO 1, CTS NO 697C, S NO 17/1A
Boundaries
- North
- Road
- South
- Sub Plot No 3
- East
- Road And S No 1
- West
- Sub Plot No 2
Source: registration certificates and MahaRERA's project page, as stated there.
Professionals4
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Nitin A Hardikar | — |
| Chartered accountant | Prasanna Kenjale | — |
| Engineer | Mahesh Konde | — |
| Engineer | Mrunali Bhairam Mahesh Konde | — |
Source: MahaRERA project page. Contact details are not shown.
Swapnali Co Op Hsg Soc in numbers
Registered deals, summarised
Deedo has 434 registered documents at Swapnali Co Op Hsg Soc, from Jan 2015 to Oct 2026: 74 sales, 291 leave and licence agreements, 28 mortgages. The median registered sale since Jan 2015 works out to about ₹12,100 per sq ft, at a median of ₹95 L a deal; 38% of sales were resales.
- What is the price per sq ft at Swapnali Co Op Hsg Soc?
- The median registered sale since Jan 2015 works out to about ₹12,100 per sq ft, at a median of ₹95 L a deal; 38% of sales were resales.
- How many properties have been sold at Swapnali Co Op Hsg Soc?
- 74 sales are registered at Swapnali Co Op Hsg Soc, 28 of them resales.
- Are properties at Swapnali Co Op Hsg Soc rented out?
- Yes: 291 leave and licence agreements are registered at Swapnali Co Op Hsg Soc, at a median rent since Jan 2015 of about ₹26,000 a month with a deposit of about ₹60,000.