Imperial Plaza
Deedo IDDP-PUN-5829It is due for completion in Dec 2026, with no extension on record; no MahaRERA orders on record.
Kothrud, Pune 411038 · Property rates in Kothrud · by Imperial Landmarks Sachi My Home Developers
Buying a flat here?
See every deed registered on it.
It is due for completion in Dec 2026, with no extension on record
- This projectRegistered 5 Apr 2021, completion promised 31 Dec 2026.
1 extension certificate on record.
1 registration · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales first, then rentals and mortgages matched to this project · the free view shows a price band
- Primary sale · Nov 2026
- Primary sale · Nov 2026
- Primary sale · Nov 2026
- Primary sale · Nov 2026
- Primary sale · Nov 2026
- Primary sale · Nov 2026
- Primary sale · Nov 2026
- Primary sale · Oct 2026
- Primary sale · Sep 2026
- Primary sale · Sep 2026
| Month | Flat | Kind | Area | Price | Record |
|---|---|---|---|---|---|
| Nov 2026 | Main building · 908 | Primary sale | 641 sq ft | View Primary sale, Nov 2026 | |
| Nov 2026 | Main building · 907 | Primary sale | 551 sq ft | View Primary sale, Nov 2026 | |
| Nov 2026 | Main building · 505 | Primary sale | 719 sq ft | View Primary sale, Nov 2026 | |
| Nov 2026 | Main building · 506 | Primary sale | 721 sq ft | View Primary sale, Nov 2026 | |
| Nov 2026 | Not on record | Primary sale | 4,438 sq ft | View Primary sale, Nov 2026 | |
| Nov 2026 | Not on record | Primary sale | 2,219 sq ft | View Primary sale, Nov 2026 | |
| Nov 2026 | Not on record | Primary sale | 2,219 sq ft | View Primary sale, Nov 2026 | |
| Oct 2026 | Main building · 507 | Primary sale | 1,116 sq ft | View Primary sale, Oct 2026 | |
| Sep 2026 | Main building · 608 | Primary sale | 949 sq ft | View Primary sale, Sep 2026 | |
| Sep 2026 | Main building · 1107 | Primary sale | 515 sq ft | View Primary sale, Sep 2026 |
3 buildings
Open a building to see every flat, floor by floor.
- Imperial Plaza A6 floors · 24 units100% booked
- Imperial Plaza B Phase 113 floors · 98 units13% booked
- Main buildingSize not on record
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrationP52100028889
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52100028889 | 5 Apr 2021 | 31 Dec 2026 | 31 Dec 2026 | Imperial Landmarks Sachi My Home Developers | Project page |
Documents217
2 documents held by Deedo, 215 filings listed on MahaRERA's project page
Finance
Show all 217 documentsShow fewer documents
Legal
Migrated
- 1 Copy of the legal title reportFormat A title report.pdf · uploaded 28 Mar 2021Source
- 1 Details of encumbrancesScan Encumbrance Letter.pdf · uploaded 28 Mar 2021Source
- 1 Copy of Layout Approval (in case of layout)PLAN LAYOUT .pdf · uploaded 28 Mar 2021Source
- 1 Building Plan Approval / NA Order for plotted developmentPLAN A .pdf · uploaded 28 Mar 2021Source
- 2 Building Plan Approval / NA Order for plotted developmentPLAN 4 .pdf · uploaded 28 Mar 2021Source
- 3 Building Plan Approval / NA Order for plotted developmentPLAN 3 .pdf · uploaded 28 Mar 2021Source
- 1 Commencement Certificates / NA Order for plotted developmentCC .pdf · uploaded 28 Mar 2021Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate Imperial Plaza .pdf · uploaded 29 Mar 2021Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate A wing .pdf · uploaded 29 Mar 2021Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)B wing Engineer Certificate.pdf · uploaded 29 Mar 2021Source
- 1 Declaration in FORM Bform B Imperial Plaza.pdf · uploaded 30 Mar 2021Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA certificate Imperial Plaza.pdf · uploaded 30 Mar 2021Source
- 1 Proforma of Allotment letterRERA Imperial Villa ATS draft .pdf · uploaded 30 Mar 2021Source
- 1 PAN CardIMPERIAL VILLA PAN CARD.pdf · uploaded 31 Mar 2021Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate Imperial Plaza July 21 .pdf · uploaded 24 Jul 2021Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate Imperial Plaza July 21 .pdf · uploaded 24 Jul 2021Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate 16 Dec 2021 .pdf · uploaded 17 Dec 2021Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate.pdf · uploaded 18 Dec 2021Source
- 2 Copy of Layout Approval (in case of layout)Layout Plan.pdf · uploaded 19 Feb 2022Source
- 4 Building Plan Approval / NA Order for plotted developmentA building .pdf · uploaded 19 Feb 2022Source
- 5 Building Plan Approval / NA Order for plotted developmentB Building.pdf · uploaded 19 Feb 2022Source
- 6 Building Plan Approval / NA Order for plotted developmentB building 4 of 5 .pdf · uploaded 19 Feb 2022Source
- 2 Commencement Certificates / NA Order for plotted developmentImperial Plaza Building CC .pdf · uploaded 19 Feb 2022Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARchitect Certificate.pdf · uploaded 9 Jun 2022Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate A Building_0001.pdf · uploaded 9 Jun 2022Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate B Building_0001.pdf · uploaded 9 Jun 2022Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3.pdf · uploaded 9 Jun 2022Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architech certificate July 22 .pdf · uploaded 11 Jul 2022Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineers certificate July 22 .pdf · uploaded 11 Jul 2022Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineers Cerfificate July 22 .pdf · uploaded 11 Jul 2022Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate Cost of the Project July 22 .pdf · uploaded 11 Jul 2022Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate Oct 22 .pdf · uploaded 7 Nov 2022Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineers certificate_0001.pdf · uploaded 7 Nov 2022Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)RERA CERTIFICATE SIGNED.pdf · uploaded 7 Nov 2022Source
- 3 Copy of Layout Approval (in case of layout)Layout.pdf · uploaded 25 Dec 2022Source
- 7 Building Plan Approval / NA Order for plotted development2nd and Fourth floor .pdf · uploaded 25 Dec 2022Source
- 8 Building Plan Approval / NA Order for plotted developmentfifth and sixth floor plan .pdf · uploaded 25 Dec 2022Source
- 9 Building Plan Approval / NA Order for plotted development7th and 8th Floor Plan .pdf · uploaded 25 Dec 2022Source
- 10 Building Plan Approval / NA Order for plotted development9th and 10th Floor plan .pdf · uploaded 25 Dec 2022Source
- 11 Building Plan Approval / NA Order for plotted developmentGround and first Floor Plan .pdf · uploaded 25 Dec 2022Source
- 3 Commencement Certificates / NA Order for plotted developmentIV CC Dec 22 .pdf · uploaded 25 Dec 2022Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)CA Form 5 202122 .pdf · uploaded 1 Feb 2023Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate Feb 23 .pdf · uploaded 9 Feb 2023Source
- 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate Feb 23 .pdf · uploaded 9 Feb 2023Source
- 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certicate Feb 23 .pdf · uploaded 9 Feb 2023Source
- 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)Imperial Plaza CA Certificate Feb 23 .pdf · uploaded 9 Feb 2023Source
- 2 Details of encumbrancesencumbrance letter.pdf · uploaded 10 May 2023Source
- 2 Declaration in FORM BIP Form B Rera May 23 .pdf · uploaded 11 May 2023Source
- 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCHITECTS CERTIFICATE May 23 .pdf · uploaded 25 May 2023Source
- 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)ENGINEERS CERTIFICATE May 23 .pdf · uploaded 25 May 2023Source
- 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA certificate May 23 .pdf · uploaded 25 May 2023Source
- 2 PAN CardPAN CARD - IMPERIAL LANDMARKS SACHI MY HOME DEVELOPERS.pdf · uploaded 13 Sep 2023Source
- 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)IP_Architect Certificate_ Aug 23 .pdf · uploaded 13 Sep 2023Source
- 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)IP_Engineers Certificate _Aug 23 .pdf · uploaded 13 Sep 2023Source
- 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)IP_CA Certificate_Aug23 .pdf · uploaded 13 Sep 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)IP_RERA_Form 05_FY 22-23.pdf · uploaded 20 Sep 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)IP_RERA_Form 05_FY 21-22.pdf · uploaded 20 Sep 2023Source
- 11 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Architect Certificate Nov 23 .pdf · uploaded 2 Dec 2023Source
- 11 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate Nov 23 .pdf · uploaded 2 Dec 2023Source
- 10 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 1 Architect Certificate Nov 23 .pdf · uploaded 14 Dec 2023Source
- 12 Architect’s Certificate of Percentage of Completion of Work (Form 1)RERA Architect Certificate March 24.pdf · uploaded 14 Mar 2024Source
- 12 Engineer’s Certificate on Cost Incurred on Project (Form 2)RERA Engineer's Certificate March 24.pdf · uploaded 14 Mar 2024Source
- 11 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate March 24 .pdf · uploaded 14 Mar 2024Source
- 13 Architect’s Certificate of Percentage of Completion of Work (Form 1)RERA Architect Certificate Mar 24.pdf · uploaded 29 Jun 2024Source
- 13 Engineer’s Certificate on Cost Incurred on Project (Form 2)RERA Engineer Certificate Mar 24 .pdf · uploaded 29 Jun 2024Source
- 12 CA Certificate on Project Cost & Fund withdrawal (Form 3)RERA CA Certifiate March 2024 .pdf · uploaded 29 Jun 2024Source
- 14 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architects Certificate July 24 .pdf · uploaded 20 Aug 2024Source
- 14 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineers Certificate July 2024.pdf · uploaded 20 Aug 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architects Certificate.pdf · uploaded 25 Nov 2024Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Imperial Plaza CA Certificate.pdf · uploaded 25 Nov 2024Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)RERA Engineer Certificate.pdf · uploaded 25 Nov 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form No 5 for 202324 .pdf · uploaded 25 Nov 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate.pdf · uploaded 11 Mar 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Imperial Plaza_CA Certificate Dec 24.pdf · uploaded 11 Mar 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)RERA Engineer Certificate Dec 24.pdf · uploaded 11 Mar 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architects Certificate Q4.pdf · uploaded 1 May 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Imperial Plaza_CA Certificate.pdf · uploaded 1 May 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)ENGINEER'S CERTIFICATE Q4.pdf · uploaded 1 May 2025Source
- 1 a Details of encumbrances concerned to Finance1 Details of encumbrances.pdf · uploaded 18 May 2025Source
- 1 Declaration in FORM BForm B.pdf · uploaded 18 May 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3_11zon.pdf · uploaded 18 May 2025Source
- 1 Disclosure of sold/ booked inventoryCircular 29.pdf · uploaded 18 May 2025Source
- 1 Declaration about Commencement CertificateCC.pdf · uploaded 18 May 2025Source
- 1 Declaration about all RERA Designated Bank Accounts (Format A)Format A.pdf · uploaded 18 May 2025Source
- 1 b Details of encumbrances concerned to Legal1 Details of encumbrances.pdf · uploaded 18 May 2025Source
- 1 Other – TechnicalCPM.pdf · uploaded 18 May 2025Source
- 2 Other – TechnicalOC.pdf · uploaded 18 May 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Form 2A 21-22.pdf · uploaded 18 May 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form 2A 22-23.pdf · uploaded 18 May 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 2A 23-24.pdf · uploaded 18 May 2025Source
- Form 11 Arch certificate.pdf · uploaded 31 Dec 2025Source
- Form 12 Arch certificate.pdf · uploaded 31 Dec 2025Source
- Form 13 Arch certificate.pdf · uploaded 31 Dec 2025Source
- Form 14 Arch certificate.pdf · uploaded 31 Dec 2025Source
- Form 11 Arch certificate.pdf · uploaded 31 Dec 2025Source
- Form 12 Arch certificate.pdf · uploaded 31 Dec 2025Source
- Form 13 Arch certificate.pdf · uploaded 31 Dec 2025Source
- Form 14 Arch certificate.pdf · uploaded 31 Dec 2025Source
- Form 11 Arch certificate.pdf · uploaded 31 Dec 2025Source
- Form 12 Arch certificate.pdf · uploaded 31 Dec 2025Source
- Form 13 arch certificate.pdf · uploaded 31 Dec 2025Source
- Form 14 Arch certificate.pdf · uploaded 31 Dec 2025Source
- Form 11Arch certificate.pdf · uploaded 31 Dec 2025Source
- Form 12 Arch certificate.pdf · uploaded 31 Dec 2025Source
- Form 13 Arch certificate.pdf · uploaded 31 Dec 2025Source
- Form 14 Arch certificate.pdf · uploaded 31 Dec 2025Source
- Form 21 Er Certificate.pdf · uploaded 31 Dec 2025Source
- Form 22 Er Certificate.pdf · uploaded 31 Dec 2025Source
- Form 23 Er Certificate.pdf · uploaded 31 Dec 2025Source
- Form 24 Er Certificate.pdf · uploaded 31 Dec 2025Source
- Form 21Er Certificate.pdf · uploaded 31 Dec 2025Source
- Form 22 Er Certificate.pdf · uploaded 31 Dec 2025Source
- Form 23 Er Certificate.pdf · uploaded 31 Dec 2025Source
- Form 24 Er Certificate.pdf · uploaded 31 Dec 2025Source
- Form 21Er Certificate.pdf · uploaded 31 Dec 2025Source
- Form 22 Er Certificate.pdf · uploaded 31 Dec 2025Source
- Form 23Er Certificate.pdf · uploaded 31 Dec 2025Source
- Form 24Er Certificate.pdf · uploaded 31 Dec 2025Source
- Form 21 Er Certificate.pdf · uploaded 31 Dec 2025Source
- Form 22 Er Certificate.pdf · uploaded 31 Dec 2025Source
- Form 23 Er Certificate.pdf · uploaded 31 Dec 2025Source
- Form 24 Certificate.pdf · uploaded 31 Dec 2025Source
- Form 31 CA Cerfificate.pdf · uploaded 31 Dec 2025Source
- Form 32 CA Cerfificate.pdf · uploaded 31 Dec 2025Source
- Form 33 Form 3 CA Cerfificate.pdf · uploaded 31 Dec 2025Source
- Form 34 3 CA Cerfificate.pdf · uploaded 31 Dec 2025Source
- Form 31 Form 3 CA Cerfificate.pdf · uploaded 31 Dec 2025Source
- Form 32 Form 3 CA Cerfificate.pdf · uploaded 31 Dec 2025Source
- Form 33 Form 3 CA Cerfificate.pdf · uploaded 31 Dec 2025Source
- Form 34 Form 3 CA Cerfificate.pdf · uploaded 31 Dec 2025Source
- Form 31 Form 3 CA Cerfificate.pdf · uploaded 31 Dec 2025Source
- Form 32 Form 3 CA Cerfificate.pdf · uploaded 31 Dec 2025Source
- Form 33 Form 3 CA Cerfificate.pdf · uploaded 31 Dec 2025Source
- Form 3CA .pdf · uploaded 31 Dec 2025Source
- Form 31 CA FORM3.pdf · uploaded 31 Dec 2025Source
- Form 32 CA FORM.pdf · uploaded 31 Dec 2025Source
- Form 33 Form 3 CA Cerfificate.pdf · uploaded 31 Dec 2025Source
- Form 34 Form 3 CA Cerfificate.pdf · uploaded 31 Dec 2025Source
- Disclosure of Sold and Booked Inventory1 dis.pdf · uploaded 31 Dec 2025Source
- Disclosure of Sold and Booked Inventory2 dis.pdf · uploaded 31 Dec 2025Source
- Disclosure of Sold and Booked Inventory3dis.pdf · uploaded 31 Dec 2025Source
- Disclosure of Sold and Booked Inventory4 dis.pdf · uploaded 31 Dec 2025Source
- Disclosure of Sold and Booked Inventory1 dis.pdf · uploaded 31 Dec 2025Source
- Disclosure of Sold and Booked Inventory2 dis.pdf · uploaded 31 Dec 2025Source
- Disclosure of Sold and Booked Inventory3 dis.pdf · uploaded 31 Dec 2025Source
- Disclosure of Sold and Booked Inventory4 dis.pdf · uploaded 31 Dec 2025Source
- Disclosure of Sold and Booked Inventory1 dis.pdf · uploaded 31 Dec 2025Source
- Disclosure of Sold and Booked Inventory2 dis.pdf · uploaded 31 Dec 2025Source
- Disclosure of Sold and Booked Inventory3 dis.pdf · uploaded 31 Dec 2025Source
- Disclosure of Sold and Booked Inventory12 Q4 2023-24.pdf · uploaded 31 Dec 2025Source
- Disclosure of Sold and Booked Inventory1 dis.pdf · uploaded 31 Dec 2025Source
- Disclosure of Sold and Booked Inventory2 dis.pdf · uploaded 31 Dec 2025Source
- Disclosure of Sold and Booked Inventory3 dis.pdf · uploaded 31 Dec 2025Source
- Disclosure of Sold and Booked Inventory4 dis.pdf · uploaded 31 Dec 2025Source
- Form 2A (FY 2021-2022)Form 2A ER Certificate FY 2021-22.pdf · uploaded 2 Jan 2026Source
- Form 2A (FY 2022-2023)Form 2A ER Cerfificate FY 2022-23.pdf · uploaded 2 Jan 2026Source
- Form 2A (FY 2023-2024)Form 2A ER Cerfificate FY 2023-24.pdf · uploaded 2 Jan 2026Source
- Form 2A (FY 2024-2025)FORM -2A_2024-25.pdf · uploaded 2 Jan 2026Source
- Form 5 (FY 2021-2022)Form 5 CA Certificate FY 2021-22.pdf · uploaded 2 Jan 2026Source
- Form 5 (FY 2022-2023)form 5.pdf · uploaded 2 Jan 2026Source
- Form 5 (FY 2023-2024)Form 5 CA Certificate FY 2023-24.pdf · uploaded 2 Jan 2026Source
- Form 5 (FY 2024-2025)Form 5 CA Certificate FY 2024-25.pdf · uploaded 2 Jan 2026Source
- Withdrawal Update Form 1Architect Certificate_June 25.pdf · uploaded 14 Jan 2026Source
- Withdrawal Update Form 1Architect Certificate_SEP 25 (5).pdf · uploaded 14 Jan 2026Source
- Withdrawal Update Form 1Architect Certificate_Dec 25 (1).pdf · uploaded 14 Jan 2026Source
- Withdrawal Update Form 2Engineer certificate_June25.pdf · uploaded 14 Jan 2026Source
- Withdrawal Update Form 2ENGINEER CERTIFICATE SEP 25.pdf · uploaded 14 Jan 2026Source
- Withdrawal Update Form 2Engineer Certificate Dec 25.pdf · uploaded 14 Jan 2026Source
- Withdrawal Update Form 3Imperial Plaza_CA Certificate (4).pdf · uploaded 14 Jan 2026Source
- Withdrawal Update Form 3Imperial Plaza_CA Certificate_20250112_30 Sep_FINAL.pdf · uploaded 14 Jan 2026Source
- Withdrawal Update Form 3Imperial Plaza_CA Certificate_20250112_31 Dec_Final.pdf · uploaded 14 Jan 2026Source
- Withdrawal Update Form 1f1.pdf · uploaded 6 May 2026Source
- Withdrawal Update Form 2f2.pdf · uploaded 6 May 2026Source
- Withdrawal Update Form 3f3.pdf · uploaded 6 May 2026Source
- Withdrawal Update Form 1f1.pdf · uploaded 29 Jun 2026Source
- Withdrawal Update Form 2f2.pdf · uploaded 29 Jun 2026Source
- Withdrawal Update Form 3Form - 3 CA Certificate.pdf · uploaded 29 Jun 2026Source
- Form 5 (FY 2025-2026)FORM 5.pdf · uploaded 28 Sep 2026Source
- Withdrawal Update Form 1FORM 1.pdf · uploaded 7 Oct 2026Source
- Withdrawal Update Form 2FORM 2.pdf · uploaded 7 Oct 2026Source
- Withdrawal Update Form 3FORM 3 FINAL.pdf · uploaded 7 Oct 2026Source
- Form 2A (FY 2025-2026)FORM 2A ( 2025-2026 ).pdf · uploaded 7 Oct 2026Source
Technical
- DocumentPLAN LAYOUT .pdf · uploaded 28 Mar 2021Source
- DocumentPLAN A .pdf · uploaded 28 Mar 2021Source
- DocumentPLAN 4 .pdf · uploaded 28 Mar 2021Source
- DocumentPLAN 3 .pdf · uploaded 28 Mar 2021Source
- DocumentLayout Plan.pdf · uploaded 19 Feb 2022Source
- DocumentA building .pdf · uploaded 19 Feb 2022Source
- DocumentB Building.pdf · uploaded 19 Feb 2022Source
- DocumentB building 4 of 5 .pdf · uploaded 19 Feb 2022Source
- DocumentLayout.pdf · uploaded 25 Dec 2022Source
- Document2nd and Fourth floor .pdf · uploaded 25 Dec 2022Source
- Documentfifth and sixth floor plan .pdf · uploaded 25 Dec 2022Source
- Document7th and 8th Floor Plan .pdf · uploaded 25 Dec 2022Source
- Document9th and 10th Floor plan .pdf · uploaded 25 Dec 2022Source
- DocumentGround and first Floor Plan .pdf · uploaded 25 Dec 2022Source
- Other – TechnicalCPM.pdf · uploaded 18 May 2025Source
- Other – TechnicalOC.pdf · uploaded 18 May 2025Source
Technical (Architect)
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvalsLand parcel 2/2/12/2, 8/1/1/9
As registered with MahaRERA and published on its project page
- Project type
- Others
- Status on MahaRERA
- Certificate Signed
- Unit types
- Office space, studio, Studio, Conference Hall, Gym, Leisure Area, Shop, Showroom, store122 units in all
- Address
- S.no. 71 hissa no. 8/1/1/2, 8/1/1/9, 8/2/2/1, 8/2/2/12/1, 2/2/12/2, 8/2/2/12/3, 8/2/3/1, Bangalore Highway, Near chandani chowkPIN 411038
- Village
- Kothrud, Haveli taluka
- Location
- 18.47746, 73.80678
- Land area for this project
- 3,110 sq m (33,476 sq ft)
- Permissible built-up area
- 17,625 sq m (1,89,714 sq ft)
- Sanctioned built-up area
- 4,631 sq m (49,848 sq ft)
- Designated bank account
- 171
- Developed in phases
- Yes
- Also registered as
- Inmperiyal Plajha Bi, इंम्पेरियल प्लाझा बी, Inmperiyal Plaza B
Survey, CTS, gat or plot numbers
Land as published on MahaRERA's project page
S.no. 71 hissa no. 8/1/1/2, 8/1/1/9,8/2/2/1, 8/2/2/12/1, 2/2/12/2, 8/2/2/12/3, 8/2/3/1
Boundaries
- North
- 20 ft internal road
- South
- Wonder futura phase 2
- East
- Part sno 71 and 30 ft and 40 ft road
- West
- Wonder futura phase 2 and Ishani building
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking122 units
37 of 122 units booked (30%), as the promoter reported to MahaRERA
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| Imperial Plaza A | Office space | 51.79 sq m · 557 sq ft | 1 | 1 |
| Imperial Plaza A | Office space | 55.23 sq m · 594 sq ft | 1 | 1 |
| Imperial Plaza A | Office space | 55.8 sq m · 601 sq ft | 3 | 3 |
| Imperial Plaza A | Office space | 56.12 sq m · 604 sq ft | 4 | 4 |
| Imperial Plaza A | Office space | 56.12 sq m · 604 sq ft | 2 | 2 |
| Imperial Plaza A | Office space | 59.12 sq m · 636 sq ft | 3 | 3 |
| Imperial Plaza A | Office space | 59.82 sq m · 644 sq ft | 2 | 2 |
| Imperial Plaza A | Office space | 59.82 sq m · 644 sq ft | 4 | 4 |
Show all 61 unit rowsShow fewer unit rows
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| Imperial Plaza A | studio | 59.12 sq m · 636 sq ft | 2 | 2 |
| Imperial Plaza A | Studio | 55.8 sq m · 601 sq ft | 2 | 2 |
| Imperial Plaza B Phase 1 | Conference Hall | 429.46 sq m · 4,623 sq ft | 1 | 0 |
| Imperial Plaza B Phase 1 | Conference Hall | 480.68 sq m · 5,174 sq ft | 1 | 0 |
| Imperial Plaza B Phase 1 | Gym | 151.48 sq m · 1,631 sq ft | 1 | 0 |
| Imperial Plaza B Phase 1 | Gym | 192.51 sq m · 2,072 sq ft | 1 | 0 |
| Imperial Plaza B Phase 1 | Leisure Area | 213.65 sq m · 2,300 sq ft | 1 | 0 |
| Imperial Plaza B Phase 1 | Office space | 46.71 sq m · 503 sq ft | 3 | 0 |
| Imperial Plaza B Phase 1 | Office space | 47.87 sq m · 515 sq ft | 2 | 1 |
| Imperial Plaza B Phase 1 | Office space | 53.6 sq m · 577 sq ft | 1 | 0 |
| Imperial Plaza B Phase 1 | Office space | 55.85 sq m · 601 sq ft | 5 | 0 |
| Imperial Plaza B Phase 1 | Office space | 59.17 sq m · 637 sq ft | 1 | 1 |
| Imperial Plaza B Phase 1 | Office space | 64.91 sq m · 699 sq ft | 18 | 2 |
| Imperial Plaza B Phase 1 | Office space | 69.06 sq m · 743 sq ft | 4 | 0 |
| Imperial Plaza B Phase 1 | Office space | 73.53 sq m · 791 sq ft | 4 | 2 |
| Imperial Plaza B Phase 1 | Office space | 85.18 sq m · 917 sq ft | 1 | 1 |
| Imperial Plaza B Phase 1 | Office space | 85.62 sq m · 922 sq ft | 4 | 0 |
| Imperial Plaza B Phase 1 | Office space | 88.63 sq m · 954 sq ft | 2 | 1 |
| Imperial Plaza B Phase 1 | Office space | 91.89 sq m · 989 sq ft | 2 | 1 |
| Imperial Plaza B Phase 1 | Office space | 93.05 sq m · 1,002 sq ft | 1 | 1 |
| Imperial Plaza B Phase 1 | Office space | 93.86 sq m · 1,010 sq ft | 1 | 1 |
| Imperial Plaza B Phase 1 | Office space | 97.32 sq m · 1,048 sq ft | 4 | 0 |
| Imperial Plaza B Phase 1 | Office space | 97.32 sq m · 1,048 sq ft | 1 | 0 |
| Imperial Plaza B Phase 1 | Office space | 97.67 sq m · 1,051 sq ft | 1 | 0 |
| Imperial Plaza B Phase 1 | Office space | 106.23 sq m · 1,143 sq ft | 1 | 0 |
| Imperial Plaza B Phase 1 | Office space | 106.23 sq m · 1,143 sq ft | 5 | 0 |
| Imperial Plaza B Phase 1 | Office space | 120.23 sq m · 1,294 sq ft | 1 | 0 |
| Imperial Plaza B Phase 1 | Office space | 122.42 sq m · 1,318 sq ft | 1 | 0 |
| Imperial Plaza B Phase 1 | Office space | 122.85 sq m · 1,322 sq ft | 1 | 0 |
| Imperial Plaza B Phase 1 | Office space | 128.19 sq m · 1,380 sq ft | 1 | 1 |
| Imperial Plaza B Phase 1 | Office space | 128.23 sq m · 1,380 sq ft | 1 | 0 |
| Imperial Plaza B Phase 1 | Office space | 140.11 sq m · 1,508 sq ft | 1 | 1 |
| Imperial Plaza B Phase 1 | Office space | 147.3 sq m · 1,586 sq ft | 1 | 0 |
| Imperial Plaza B Phase 1 | Office space | 168.23 sq m · 1,811 sq ft | 1 | 0 |
| Imperial Plaza B Phase 1 | Office space | 172.25 sq m · 1,854 sq ft | 1 | 0 |
| Imperial Plaza B Phase 1 | Office space | 173.66 sq m · 1,869 sq ft | 1 | 0 |
| Imperial Plaza B Phase 1 | Office space | 180.62 sq m · 1,944 sq ft | 1 | 0 |
| Imperial Plaza B Phase 1 | Office space | 240.64 sq m · 2,590 sq ft | 3 | 0 |
| Imperial Plaza B Phase 1 | Office space | 240.64 sq m · 2,590 sq ft | 1 | 0 |
| Imperial Plaza B Phase 1 | Office space | 240.64 sq m · 2,590 sq ft | 1 | 0 |
| Imperial Plaza B Phase 1 | Office space | 253.63 sq m · 2,730 sq ft | 1 | 0 |
| Imperial Plaza B Phase 1 | Shop | 20.91 sq m · 225 sq ft | 4 | 0 |
| Imperial Plaza B Phase 1 | Showroom | 106.13 sq m · 1,142 sq ft | 1 | 0 |
| Imperial Plaza B Phase 1 | Showroom | 106.13 sq m · 1,142 sq ft | 1 | 0 |
| Imperial Plaza B Phase 1 | Showroom | 128.94 sq m · 1,388 sq ft | 1 | 0 |
| Imperial Plaza B Phase 1 | Showroom | 139.69 sq m · 1,504 sq ft | 1 | 0 |
| Imperial Plaza B Phase 1 | Showroom | 155.76 sq m · 1,677 sq ft | 1 | 0 |
| Imperial Plaza B Phase 1 | Showroom | 159.78 sq m · 1,720 sq ft | 1 | 0 |
| Imperial Plaza B Phase 1 | Showroom | 196.44 sq m · 2,114 sq ft | 1 | 0 |
| Imperial Plaza B Phase 1 | Showroom | 203.41 sq m · 2,189 sq ft | 1 | 0 |
| Imperial Plaza B Phase 1 | Showroom | 300.09 sq m · 3,230 sq ft | 1 | 0 |
| Imperial Plaza B Phase 1 | store | 29.68 sq m · 319 sq ft | 1 | 0 |
| Imperial Plaza B Phase 1 | store | 96.6 sq m · 1,040 sq ft | 1 | 0 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Professionals7
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Ajit Thakur Associates | — |
| Chartered accountant | B P Oswal and Co | — |
| Chartered accountant | Savin Yeola and Associates | — |
| Engineer | Ishan Sherekar | — |
| Engineer | Mansing Narsingrao more | — |
| Engineer | Somnath Balu Rode | — |
| Engineer | yash praful malamkar | — |
Source: MahaRERA project page. Contact details are not shown.
Other projects in Kothrud
- SuramyaRERA PR1260002602717
- 1st Avenue - VinaykunjRERA PR1261012602185
- Yash Aura₹8,350 a sq ft
- Aqura IndraprasthaRERA PM1260002601531
- GurusevaRERA PR1260002601254
- Shree Ganesh Park Chsl₹12,610 a sq ft
- Shri Dattakrupa₹13,760 a sq ft
- Lotus SevaRERA PM1260002600759
All 4,695 projects in Kothrud · Compare Imperial Plaza with another project
Imperial Plaza in numbers
Registered deals, summarised
Deedo has 99 registered documents at Imperial Plaza, from Aug 2021 to Nov 2026: 64 sales, 23 leave and licence agreements, 3 mortgages. The median registered sale since Aug 2021 works out to about ₹11,800 per sq ft, at a median of ₹97 L a deal; 0% of sales were resales.
- What is the price per sq ft at Imperial Plaza?
- The median registered sale since Aug 2021 works out to about ₹11,800 per sq ft, at a median of ₹97 L a deal; 0% of sales were resales.
- How many properties have been sold at Imperial Plaza?
- 64 sales are registered at Imperial Plaza.
- Are properties at Imperial Plaza rented out?
- Yes: 23 leave and licence agreements are registered at Imperial Plaza, at a median rent since Aug 2021 of about ₹45,000 a month with a deposit of about ₹1,60,000.
- Where does this data come from?
- The figures come from registered documents (Index II) at the Maharashtra sub-registrar offices, matched at Imperial Plaza by Deedo, last updated with deals registered in Nov 2026.
Latest deal · Primary sale · Nov 2026
₹1–1.5 Cr