Skip to content
Residential / Group Housing · 7 buildings · 444 unitsRERA P52100050643 +1

The Rising

Deedo IDDP-PUN-VZ1R

Completion was pushed back 4 months, to Apr 2029; no MahaRERA orders on record; 60% of its units are booked.

Kiwale, Pune 412101 · Property rates in Kiwale · by Saniket Buildcon

DeliveryExtended 4 moPromised Dec 2028 · now due Apr 2029RegulatoryNo ordersNot in any MahaRERA list or order Deedo has readSales60% booked265 of 444 units · as the promoter reported to MahaRERA

Buying a flat here?

See every deed registered on it.

Completion was pushed back 4 months, to Apr 2029

  • P52100050643Registered 21 Apr 2023, completion promised 31 Jul 2027, revised to 30 Nov 2027.
  • P52100079133Registered 10 Feb 2025, completion promised 31 Dec 2028, revised to 30 Apr 2029.

No extension certificate on record.

2 registrations · Source: MahaRERA registration and extension certificates

Latest registered deeds

Sales first, then rentals and mortgages matched to this project · the free view shows a price band

No registered deeds matched to this project yet
Sales, resales, rentals and mortgages appear here once registered documents are matched to it by evidence.

7 buildings

Open a building to see every flat, floor by floor.

Floors and units from the registration certificate annexures and MahaRERA's project page.

Regulatory recordNone found

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

RERA registrations2
RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5210005064321 Apr 202331 Jul 202730 Nov 2027Saniket BuildconProject page
P5210007913310 Feb 202531 Dec 202830 Apr 2029Saniket BuildconProject page
Documents273

2 documents held by Deedo, 271 filings listed on MahaRERA's project page

Registration certificate (2)

  • Registration certificateP52100050643 · 12 Aug 2024ViewSource
  • Registration certificateP52100079133 · 21 Aug 2026ViewSource

Finance

  • PAN CardP52100050643 · 1 PAN Card.pdf · uploaded 18 Mar 2023Source
  • Other – FinanceP52100050643 · Rera Mhada letter-1-199_compressed.pdf · uploaded 13 Apr 2023Source
  • PAN CardP52100079133 · SANIKET BUILDCON - PAN.pdf · uploaded 16 Nov 2024Source
  • Other – FinanceP52100079133 · Latest Declaration - Landowner Bank Account.pdf · uploaded 28 Nov 2024Source
  • Other – FinanceP52100079133 · Latest Declaration of Land Value - Form 3.pdf · uploaded 4 Dec 2024Source
  • Other – FinanceP52100079133 · POA - Gaikwad.pdf · uploaded 23 Dec 2024Source
Show all 273 documentsShow fewer documents

Finance

  • Other – FinanceP52100079133 · POA - Sahasrabudhhe.pdf · uploaded 23 Dec 2024Source
  • Other – FinanceP52100079133 · POA_ Sakrikar.pdf · uploaded 23 Dec 2024Source

Legal

  • Legal Title reportP52100050643 · 1 Copy of the legal title report (5).pdf · uploaded 18 Mar 2023Source
  • Legal Title reportP52100050643 · Supplementory Title Report 2022_compressed.pdf · uploaded 18 Mar 2023Source
  • Declaration Form BP52100050643 · 1 Declaration in FORM B.pdf · uploaded 18 Mar 2023Source
  • Legal Title reportP52100079133 · Latest Title Report - 1st Part.pdf · uploaded 28 Nov 2024Source
  • Declaration Form BP52100079133 · Form B - Developer.pdf · uploaded 28 Nov 2024Source
  • Other – LegalP52100079133 · Deed of Disolution.pdf · uploaded 27 Jan 2025Source
  • Other – LegalP52100079133 · 7-12 Extract.pdf · uploaded 31 Jan 2025Source
  • Other – LegalP52100079133 · AFS_Saniket Buildcon_The Rising Phase 2_11122024.pdf · uploaded 31 Jan 2025Source
  • Other – LegalP52100079133 · Deviation Report - AFS - Revised payment terms_11zon.pdf · uploaded 31 Jan 2025Source
  • Legal Title reportP52100079133 · Latest Flow of the Title - 2nd part compr.pdf · uploaded 31 Jan 2025Source

Migrated

  • 1 PAN CardP52100050643 · 1 PAN Card.pdf · uploaded 18 Mar 2023Source
  • 1 Copy of the legal title reportP52100050643 · 1 Copy of the legal title report (5).pdf · uploaded 18 Mar 2023Source
  • 2 Copy of the legal title reportP52100050643 · Supplementory Title Report 2022_compressed.pdf · uploaded 18 Mar 2023Source
  • 1 a Details of encumbrances concerned to FinanceP52100050643 · 1 a Details of encumbrances concerned to Finance.pdf · uploaded 18 Mar 2023Source
  • 2 a Details of encumbrances concerned to FinanceP52100050643 · Legal Encumbrance Certificate (1).pdf · uploaded 18 Mar 2023Source
  • 1 b Details of encumbrances concerned to LegalP52100050643 · 1 a Details of encumbrances concerned to Finance.pdf · uploaded 18 Mar 2023Source
  • 2 b Details of encumbrances concerned to LegalP52100050643 · Legal Encumbrance Certificate (1).pdf · uploaded 18 Mar 2023Source
  • 1 Copy of Layout Approval (in case of layout)P52100050643 · 1 Copy of Layout Approval (in case of layout) (1).pdf · uploaded 18 Mar 2023Source
  • 1 Building Plan Approval / NA Order for plotted developmentP52100050643 · 1 Building Plan Approval _ NA Order for plotted development.pdf · uploaded 18 Mar 2023Source
  • 2 Building Plan Approval / NA Order for plotted developmentP52100050643 · 2 Building Plan Approval _ NA Order for plotted development.pdf · uploaded 18 Mar 2023Source
  • 3 Building Plan Approval / NA Order for plotted developmentP52100050643 · 3 Building Plan Approval _ NA Order for plotted development.pdf · uploaded 18 Mar 2023Source
  • 4 Building Plan Approval / NA Order for plotted developmentP52100050643 · 4 Building Plan Approval _ NA Order for plotted development.pdf · uploaded 18 Mar 2023Source
  • 5 Building Plan Approval / NA Order for plotted developmentP52100050643 · 5 Building Plan Approval _ NA Order for plotted development.pdf · uploaded 18 Mar 2023Source
  • 6 Building Plan Approval / NA Order for plotted developmentP52100050643 · 6 Building Plan Approval _ NA Order for plotted development.pdf · uploaded 18 Mar 2023Source
  • 7 Building Plan Approval / NA Order for plotted developmentP52100050643 · 7 Building Plan Approval _ NA Order for plotted development.pdf · uploaded 18 Mar 2023Source
  • 8 Building Plan Approval / NA Order for plotted developmentP52100050643 · 8 Building Plan Approval _ NA Order for plotted development.pdf · uploaded 18 Mar 2023Source
  • 9 Building Plan Approval / NA Order for plotted developmentP52100050643 · 9 Building Plan Approval _ NA Order for plotted development.pdf · uploaded 18 Mar 2023Source
  • 1 Commencement Certificates / NA Order for plotted developmentP52100050643 · 1 Commencement Certificates _ NA Order for plotted development (3).pdf · uploaded 18 Mar 2023Source
  • 1 Declaration about Commencement CertificateP52100050643 · 1 Declaration about Commencement Certificate.pdf · uploaded 18 Mar 2023Source
  • 1 Declaration in FORM BP52100050643 · 1 Declaration in FORM B.pdf · uploaded 18 Mar 2023Source
  • 1 CERSAI detailsP52100050643 · 1 CERSAI details.pdf · uploaded 18 Mar 2023Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100050643 · New Form-3 CA Certificate_compressed.pdf · uploaded 18 Mar 2023Source
  • 1 Disclosure of Interest in Other Real Estate OrganizationsP52100050643 · 1 Disclosure of Interest in Other Real Estate Organizations.pdf · uploaded 18 Mar 2023Source
  • 2 Disclosure of Interest in Other Real Estate OrganizationsP52100050643 · 2 Disclosure of Interest in Other Real Estate Organizations.pdf · uploaded 18 Mar 2023Source
  • 3 Disclosure of Interest in Other Real Estate OrganizationsP52100050643 · 3 Disclosure of Interest in Other Real Estate Organizations.pdf · uploaded 18 Mar 2023Source
  • 4 Disclosure of Interest in Other Real Estate OrganizationsP52100050643 · 4 Disclosure of Interest in Other Real Estate Organizations.pdf · uploaded 18 Mar 2023Source
  • 5 Disclosure of Interest in Other Real Estate OrganizationsP52100050643 · 5 Disclosure of Interest in Other Real Estate Organizations.pdf · uploaded 18 Mar 2023Source
  • 1 Proforma of Allotment letterP52100050643 · 1 Proforma of Allotment letter.pdf · uploaded 18 Mar 2023Source
  • 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameP52100050643 · 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the same.pdf · uploaded 18 Mar 2023Source
  • 1 Deviation Report with respect to Allotment letterP52100050643 · 1 Deviation Report with respect to Allotment letter.pdf · uploaded 18 Mar 2023Source
  • 2 Copy of Layout Approval (in case of layout)P52100050643 · 1 OF 13 (1)_compressed.pdf · uploaded 20 Mar 2023Source
  • 1 Proforma of Agreement for saleP52100050643 · AFS Revised Draft 29-03-2023.pdf · uploaded 29 Mar 2023Source
  • 1 Deviation Report with respect to model copy of AgreementP52100050643 · AFS-Revised Deviation Report.pdf · uploaded 29 Mar 2023Source
  • 1 Other – FinanceP52100050643 · Rera Mhada letter-1-199_compressed.pdf · uploaded 13 Apr 2023Source
  • 1 Other – TechnicalP52100050643 · Rera Mhada letter-1-199_compressed.pdf · uploaded 13 Apr 2023Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100050643 · FORM 1- Sept 2023.pdf · uploaded 21 Dec 2023Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100050643 · Form 1 - July 2023.pdf · uploaded 21 Dec 2023Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100050643 · FORM 2 - SEPT 23.pdf · uploaded 21 Dec 2023Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100050643 · FORM 2 - JULY 2023.pdf · uploaded 21 Dec 2023Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100050643 · FORM 3 - SEPT 23.pdf · uploaded 21 Dec 2023Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100050643 · Form 3 - July 23.pdf · uploaded 21 Dec 2023Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100050643 · Form 1 - The Rising as on Dec 2023.pdf · uploaded 12 Jan 2024Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100050643 · Form 1 - The Rising as on Dec 2023.pdf · uploaded 18 Jan 2024Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100050643 · FORM 2 - The Rising as on DEC 2023.pdf · uploaded 18 Jan 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)P52100050643 · FORM 2A - The Rising as on FY 2022-23.pdf · uploaded 18 Jan 2024Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100050643 · FORM 3 - The Rising as on DEC 2023.pdf · uploaded 18 Jan 2024Source
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100050643 · FORM 1 - The Rising as on March 2024.pdf · uploaded 15 Apr 2024Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100050643 · FORM 2 - The Rising as on March 2024.pdf · uploaded 15 Apr 2024Source
  • 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100050643 · FORM 3 - The Rising as on March 2024.pdf · uploaded 15 Apr 2024Source
  • 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100050643 · 5 Architect’s Certificate of Percentage of Completion of Work (Form 1) (2).pdf · uploaded 20 Apr 2024Source
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100050643 · 4 Engineer’s Certificate on Cost Incurred on Project (Form 2) (4).pdf · uploaded 20 Apr 2024Source
  • 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100050643 · R.pdf · uploaded 20 Apr 2024Source
  • 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100050643 · Form 1 - July 2024.pdf · uploaded 27 Jul 2024Source
  • 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100050643 · Form 2 - July 2024.pdf · uploaded 27 Jul 2024Source
  • 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100050643 · Form 3- July 2024_11zon (1).pdf · uploaded 27 Jul 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)P52100050643 · Quality Certificate - FY 2023-24.pdf · uploaded 29 Jul 2024Source
  • 2 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)P52100050643 · Form 2A- July 2024.pdf · uploaded 30 Jul 2024Source
  • 1 Disclosure of sold/ booked inventoryP52100050643 · Circular 29 - Saniket Buildcon_11zon.pdf · uploaded 7 Aug 2024Source
  • 1 Copy of Layout Approval (in case of layout)P52100050643 · 1 OF 17 _12_11zon_rotated.pdf · uploaded 17 Oct 2024Source
  • 1 Commencement Certificates / NA Order for plotted developmentP52100050643 · CC-99-2024 Dated 7-10-2024.pdf · uploaded 17 Oct 2024Source
  • 2 Commencement Certificates / NA Order for plotted developmentP52100050643 · CC-99-2024 Dated 7-10-2024.pdf · uploaded 17 Oct 2024Source
  • 10 Building Plan Approval / NA Order for plotted developmentP52100050643 · 11 OF 17 _3_11zon_rotated.pdf · uploaded 17 Oct 2024Source
  • 6 Building Plan Approval / NA Order for plotted developmentP52100050643 · 7 of 17 _rotated.pdf · uploaded 17 Oct 2024Source
  • 11 Building Plan Approval / NA Order for plotted developmentP52100050643 · 12 of 17 _2_11zon_rotated.pdf · uploaded 17 Oct 2024Source
  • 12 Building Plan Approval / NA Order for plotted developmentP52100050643 · 13 of 17 _1_11zon_rotated.pdf · uploaded 17 Oct 2024Source
  • 13 Building Plan Approval / NA Order for plotted developmentP52100050643 · 14 of 17 _15_11zon_rotated.pdf · uploaded 17 Oct 2024Source
  • 14 Building Plan Approval / NA Order for plotted developmentP52100050643 · 15 of 17 _14_11zon_rotated.pdf · uploaded 17 Oct 2024Source
  • 15 Building Plan Approval / NA Order for plotted developmentP52100050643 · 16 of 17 _13_11zon_rotated.pdf · uploaded 17 Oct 2024Source
  • 16 Building Plan Approval / NA Order for plotted developmentP52100050643 · 16 of 17 _13_11zon_rotated_rotated.pdf · uploaded 17 Oct 2024Source
  • 17 Building Plan Approval / NA Order for plotted developmentP52100050643 · 17 of 17 (1)_rotated.pdf · uploaded 17 Oct 2024Source
  • 9 Building Plan Approval / NA Order for plotted developmentP52100050643 · 10 OF 17 _4_11zon_rotated.pdf · uploaded 17 Oct 2024Source
  • 8 Building Plan Approval / NA Order for plotted developmentP52100050643 · 9 of 17 _5_11zon_rotated.pdf · uploaded 17 Oct 2024Source
  • 7 Building Plan Approval / NA Order for plotted developmentP52100050643 · 8 OF 17_6_11zon_rotated.pdf · uploaded 17 Oct 2024Source
  • 5 Building Plan Approval / NA Order for plotted developmentP52100050643 · 6 OF 17 _7_11zon_rotated.pdf · uploaded 17 Oct 2024Source
  • 4 Building Plan Approval / NA Order for plotted developmentP52100050643 · 5 OF 17 _8_11zon_rotated.pdf · uploaded 17 Oct 2024Source
  • 3 Building Plan Approval / NA Order for plotted developmentP52100050643 · 4 OF 17 _9_11zon_rotated.pdf · uploaded 17 Oct 2024Source
  • 2 Building Plan Approval / NA Order for plotted developmentP52100050643 · 3 OF 17_10_11zon_rotated.pdf · uploaded 17 Oct 2024Source
  • 1 Building Plan Approval / NA Order for plotted developmentP52100050643 · 2 OF 17_11_11zon_rotated.pdf · uploaded 17 Oct 2024Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100050643 · Form 1 - Sept 24.pdf · uploaded 7 Nov 2024Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100050643 · Form 3 - Sept 24.pdf · uploaded 7 Nov 2024Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100050643 · Form 2 - Sept 24.pdf · uploaded 7 Nov 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)P52100050643 · Form 2A- Sept 24.pdf · uploaded 7 Nov 2024Source
  • 1 PAN CardP52100079133 · SANIKET BUILDCON - PAN.pdf · uploaded 16 Nov 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)P52100050643 · Form 5 - THE RISING for FY 2023-24.pdf · uploaded 26 Nov 2024Source
  • 2 Copy of the legal title reportP52100079133 · Latest Title Report - 1st Part.pdf · uploaded 28 Nov 2024Source
  • 1 a Details of encumbrances concerned to FinanceP52100079133 · Encrumbance Letter- Finance.pdf · uploaded 28 Nov 2024Source
  • 2 a Details of encumbrances concerned to FinanceP52100079133 · Encrumbance Letter - Legal.pdf · uploaded 28 Nov 2024Source
  • 1 Copy of Layout Approval (in case of layout)P52100079133 · Layout pg 1.pdf · uploaded 28 Nov 2024Source
  • 1 Proforma of Allotment letterP52100079133 · Allotment letter_Saniket Buildcon_The Rising Phase 2_03122024.pdf · uploaded 28 Nov 2024Source
  • 1 Declaration in FORM BP52100079133 · Form B - Developer.pdf · uploaded 28 Nov 2024Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100079133 · Form 3 - The Rising Phase-2_11zon.pdf · uploaded 28 Nov 2024Source
  • 1 Commencement Certificates / NA Order for plotted developmentP52100079133 · CC-99-2024 Dated 7-10-2024.pdf · uploaded 28 Nov 2024Source
  • 1 Building Plan Approval / NA Order for plotted developmentP52100079133 · Layout pg 1.pdf · uploaded 28 Nov 2024Source
  • 8 Building Plan Approval / NA Order for plotted developmentP52100079133 · Layout pg 8.pdf · uploaded 28 Nov 2024Source
  • 7 Building Plan Approval / NA Order for plotted developmentP52100079133 · Layout pg 7.pdf · uploaded 28 Nov 2024Source
  • 6 Building Plan Approval / NA Order for plotted developmentP52100079133 · Layout pg 6.pdf · uploaded 28 Nov 2024Source
  • 5 Building Plan Approval / NA Order for plotted developmentP52100079133 · Layout pg 5.pdf · uploaded 28 Nov 2024Source
  • 4 Building Plan Approval / NA Order for plotted developmentP52100079133 · Layout pg 4.pdf · uploaded 28 Nov 2024Source
  • 3 Building Plan Approval / NA Order for plotted developmentP52100079133 · Layout pg 3.pdf · uploaded 28 Nov 2024Source
  • 2 Building Plan Approval / NA Order for plotted developmentP52100079133 · Layout pg 2.pdf · uploaded 28 Nov 2024Source
  • 1 Declaration about Commencement CertificateP52100079133 · Format-D - Declaration of CC.pdf · uploaded 28 Nov 2024Source
  • 1 CERSAI detailsP52100079133 · Cersai Declaration.pdf · uploaded 28 Nov 2024Source
  • 1 Declaration about all RERA Designated Bank Accounts (Format A)P52100079133 · Format A- All RERA Designated bank accounts.pdf · uploaded 28 Nov 2024Source
  • 1 Deviation Report with respect to Allotment letterP52100079133 · Deviation Report - AL.pdf · uploaded 28 Nov 2024Source
  • 1 b Details of encumbrances concerned to LegalP52100079133 · Encrumbance Letter- Finance.pdf · uploaded 28 Nov 2024Source
  • 2 b Details of encumbrances concerned to LegalP52100079133 · Encrumbance Letter - Legal.pdf · uploaded 28 Nov 2024Source
  • 1 Other – FinanceP52100079133 · Latest Declaration - Landowner Bank Account.pdf · uploaded 28 Nov 2024Source
  • 1 Other – TechnicalP52100079133 · Annexure A - Order No 50.pdf · uploaded 28 Nov 2024Source
  • 1 Deviation Report with respect to model copy of AgreementP52100079133 · Deviation Report - AFS.pdf · uploaded 28 Nov 2024Source
  • 1 Proforma of Agreement for saleP52100079133 · AFS_Saniket Buildcon_The Rising Phase 2_03122024.pdf · uploaded 28 Nov 2024Source
  • 1 Disclosure of Interest in Other Real Estate OrganizationsP52100079133 · Annexure-A - Saniket Buildcon_11zon.pdf · uploaded 28 Nov 2024Source
  • 1 Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)P52100079133 · Format B - Declaration from the bank.pdf · uploaded 28 Nov 2024Source
  • 1 Disclosure for secured/unsecured finance availed for the projectP52100079133 · Disclosure of Secured and Unsecured loan.pdf · uploaded 28 Nov 2024Source
  • 2 Commencement Certificates / NA Order for plotted developmentP52100079133 · CC Verification Mail - The Rising Phase - 2.pdf · uploaded 4 Dec 2024Source
  • 2 Other – FinanceP52100079133 · Latest Declaration of Land Value - Form 3.pdf · uploaded 4 Dec 2024Source
  • 2 Other – TechnicalP52100079133 · Plot Area Confirmation.pdf · uploaded 4 Dec 2024Source
  • 3 Other – TechnicalP52100079133 · CC Verification Mail - The Rising Phase - 2.pdf · uploaded 4 Dec 2024Source
  • 3 Other – FinanceP52100079133 · POA - Gaikwad.pdf · uploaded 23 Dec 2024Source
  • 5 Other – FinanceP52100079133 · POA_ Sakrikar.pdf · uploaded 23 Dec 2024Source
  • 4 Other – FinanceP52100079133 · POA - Sahasrabudhhe.pdf · uploaded 23 Dec 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100050643 · Form 1 - Jan-25.pdf · uploaded 20 Jan 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100050643 · Form 3 - Jan 25_11zon.pdf · uploaded 20 Jan 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100050643 · Form 2 - Jan-25.pdf · uploaded 20 Jan 2025Source
  • 1 Other – LegalP52100079133 · Deed of Disolution.pdf · uploaded 27 Jan 2025Source
  • 1 Copy of the legal title reportP52100079133 · Latest Flow of the Title - 2nd part compr.pdf · uploaded 31 Jan 2025Source
  • 4 Other – LegalP52100079133 · Deviation Report - AFS - Revised payment terms_11zon.pdf · uploaded 31 Jan 2025Source
  • 3 Other – LegalP52100079133 · AFS_Saniket Buildcon_The Rising Phase 2_11122024.pdf · uploaded 31 Jan 2025Source
  • 2 Other – LegalP52100079133 · 7-12 Extract.pdf · uploaded 31 Jan 2025Source
  • 1 Commencement Certificates / NA Order for plotted developmentP52100079133 · CC.pdf · uploaded 11 Apr 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100050643 · Form 1 - PHASE 1.pdf · uploaded 16 Apr 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100050643 · Form 3 - PHASE 1.pdf · uploaded 16 Apr 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100050643 · Form 2 - PHASE 1.pdf · uploaded 16 Apr 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100079133 · Form 1 - Phase 2.pdf · uploaded 16 Apr 2025Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100079133 · Form 1 - Phase 2.pdf · uploaded 16 Apr 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100079133 · Form 3 - Phase 2.pdf · uploaded 16 Apr 2025Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100079133 · Form 3 - Phase 2.pdf · uploaded 16 Apr 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100079133 · Form 2 - Phase 2.pdf · uploaded 16 Apr 2025Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100079133 · Form 2 - Phase 2.pdf · uploaded 16 Apr 2025Source
  • Form 1P52100079133 · Form 1 - Phase 2.pdf · uploaded 20 Jul 2025Source
  • Form 2P52100079133 · Form 2 - Phase 2.pdf · uploaded 20 Jul 2025Source
  • Form 3P52100079133 · Form 3 - Phase 2.pdf · uploaded 20 Jul 2025Source
  • Disclosure of Sold and Booked InventoryP52100079133 · Circular 29 - Phase 2.pdf · uploaded 20 Jul 2025Source
  • Withdrawal Update Form 1P52100079133 · Form 1 - The Rising Phase - 2 as on Sept 2025.pdf · uploaded 15 Dec 2025Source
  • Withdrawal Update Form 2P52100079133 · Form 2 - The Rising Phase - 2 as on Sept 2025.pdf · uploaded 15 Dec 2025Source
  • Withdrawal Update Form 3P52100079133 · Form 3 - The Rising Phase - 2 as on Sept 2025.pdf · uploaded 15 Dec 2025Source
  • Withdrawal Update Form 1P52100050643 · Form 1 - The Rising as on June 2025.pdf · uploaded 19 Dec 2025Source
  • Withdrawal Update Form 1P52100050643 · Form 1 - The Rising as on June 2025.pdf · uploaded 19 Dec 2025Source
  • Withdrawal Update Form 1P52100050643 · Form 1 - The Rising as on Sept 2025.pdf · uploaded 19 Dec 2025Source
  • Withdrawal Update Form 2P52100050643 · Form 2 - The Rising as on June 2025.pdf · uploaded 19 Dec 2025Source
  • Withdrawal Update Form 2P52100050643 · Form 2 - The Rising as on June 2025.pdf · uploaded 19 Dec 2025Source
  • Withdrawal Update Form 2P52100050643 · Form 2 - The Rising as on Sept 2025.pdf · uploaded 19 Dec 2025Source
  • Withdrawal Update Form 3P52100050643 · Form 1 - The Rising as on June 2025.pdf · uploaded 19 Dec 2025Source
  • Withdrawal Update Form 3P52100050643 · Form 3 - The Rising as on June 2025.pdf · uploaded 19 Dec 2025Source
  • Withdrawal Update Form 3P52100050643 · Form 3 - The Rising as on Sept 2025.pdf · uploaded 19 Dec 2025Source
  • Form 2A (FY 2024-2025)P52100079133 · Form 2A- Phase2 (2024-25).pdf · uploaded 13 Jan 2026Source
  • Form 5 (FY 2024-2025)P52100079133 · Form 5 - Phase-2 Sept-25.pdf · uploaded 14 Jan 2026Source
  • Withdrawal Update Form 1P52100050643 · Form 1- The Rising Phase 1 as on Dec 2025.pdf · uploaded 4 Feb 2026Source
  • Withdrawal Update Form 1P52100050643 · Form 1- The Rising Phase 1 as on Dec 2025.pdf · uploaded 4 Feb 2026Source
  • Withdrawal Update Form 2P52100050643 · Form 2- The Rising Phase 1 as on Dec 2025.pdf · uploaded 4 Feb 2026Source
  • Withdrawal Update Form 2P52100050643 · Form 2- The Rising Phase 1 as on Dec 2025.pdf · uploaded 4 Feb 2026Source
  • Withdrawal Update Form 3P52100050643 · Form 3- The Rising Phase 1 as on Dec 2025.pdf · uploaded 4 Feb 2026Source
  • Withdrawal Update Form 3P52100050643 · Form 3- The Rising Phase 1 as on Dec 2025.pdf · uploaded 4 Feb 2026Source
  • Withdrawal Update Form 1P52100079133 · Form 1 - The Rising Phase 2 as on Dec 2025.pdf · uploaded 4 Feb 2026Source
  • Withdrawal Update Form 2P52100079133 · Form 2 - The Rising Phase 2 as on Dec 2025.pdf · uploaded 4 Feb 2026Source
  • Withdrawal Update Form 3P52100079133 · Form 3 - The Rising Phase 2 as on Dec 2025_compressed.pdf · uploaded 4 Feb 2026Source
  • Withdrawal Update Form 1P52100050643 · Form 1 - The Rising as on March 2026.pdf · uploaded 27 Apr 2026Source
  • Withdrawal Update Form 2P52100050643 · Form 2 - The Rising as on March 2026.pdf · uploaded 27 Apr 2026Source
  • Withdrawal Update Form 3P52100050643 · Form 3 - The Rising as on March 2026.pdf · uploaded 27 Apr 2026Source
  • Withdrawal Update Form 1P52100079133 · Form 1 - The Rising Phase 2 as on March 2026.pdf · uploaded 27 Apr 2026Source
  • Withdrawal Update Form 2P52100079133 · Form 2 - The Rising Phase 2 as on March 2026.pdf · uploaded 27 Apr 2026Source
  • Withdrawal Update Form 3P52100079133 · Form 3 - The Rising Phase 2 as on March 2026.pdf · uploaded 27 Apr 2026Source
  • Withdrawal Update Form 1P52100050643 · Form 1 -The Rising As on June 2026.pdf · uploaded 17 Jul 2026Source
  • Withdrawal Update Form 2P52100050643 · Form 2 -The Rising As on June 2026.pdf · uploaded 17 Jul 2026Source
  • Withdrawal Update Form 3P52100050643 · Form 3 -The Rising As on June 2026_compressed.pdf · uploaded 17 Jul 2026Source
  • Withdrawal Update Form 1P52100079133 · Form 1 - The Rising Phase 2.pdf · uploaded 18 Jul 2026Source
  • Withdrawal Update Form 2P52100079133 · Form 2 - Phase 2 (2).pdf · uploaded 18 Jul 2026Source
  • Withdrawal Update Form 3P52100079133 · Form 3 - the Rising Phase 2 (1)_compressed (1).pdf · uploaded 18 Jul 2026Source
  • Form 5 (FY 2025-2026)P52100050643 · Form 5 - The Rising Fy 25-26.pdf · uploaded 6 Oct 2026Source
  • Form 5 (FY 2025-2026)P52100079133 · The_Rising_Phase_-_2_Form5_2025-26_06-10-2026_15-45.pdf · uploaded 6 Oct 2026Source

Technical

  • DocumentP52100050643 · 1 Copy of Layout Approval (in case of layout) (1).pdf · uploaded 18 Mar 2023Source
  • DocumentP52100050643 · 1 Building Plan Approval _ NA Order for plotted development.pdf · uploaded 18 Mar 2023Source
  • DocumentP52100050643 · 2 Building Plan Approval _ NA Order for plotted development.pdf · uploaded 18 Mar 2023Source
  • DocumentP52100050643 · 3 Building Plan Approval _ NA Order for plotted development.pdf · uploaded 18 Mar 2023Source
  • DocumentP52100050643 · 4 Building Plan Approval _ NA Order for plotted development.pdf · uploaded 18 Mar 2023Source
  • DocumentP52100050643 · 5 Building Plan Approval _ NA Order for plotted development.pdf · uploaded 18 Mar 2023Source
  • DocumentP52100050643 · 6 Building Plan Approval _ NA Order for plotted development.pdf · uploaded 18 Mar 2023Source
  • DocumentP52100050643 · 7 Building Plan Approval _ NA Order for plotted development.pdf · uploaded 18 Mar 2023Source
  • DocumentP52100050643 · 8 Building Plan Approval _ NA Order for plotted development.pdf · uploaded 18 Mar 2023Source
  • DocumentP52100050643 · 9 Building Plan Approval _ NA Order for plotted development.pdf · uploaded 18 Mar 2023Source
  • DocumentP52100050643 · 1 OF 13 (1)_compressed.pdf · uploaded 20 Mar 2023Source
  • Other – TechnicalP52100050643 · Rera Mhada letter-1-199_compressed.pdf · uploaded 13 Apr 2023Source
  • DocumentP52100050643 · 1 OF 17 _12_11zon_rotated.pdf · uploaded 17 Oct 2024Source
  • DocumentP52100050643 · 2 OF 17_11_11zon_rotated.pdf · uploaded 17 Oct 2024Source
  • DocumentP52100050643 · 3 OF 17_10_11zon_rotated.pdf · uploaded 17 Oct 2024Source
  • DocumentP52100050643 · 4 OF 17 _9_11zon_rotated.pdf · uploaded 17 Oct 2024Source
  • DocumentP52100050643 · 5 OF 17 _8_11zon_rotated.pdf · uploaded 17 Oct 2024Source
  • DocumentP52100050643 · 6 OF 17 _7_11zon_rotated.pdf · uploaded 17 Oct 2024Source
  • DocumentP52100050643 · 7 of 17 _rotated.pdf · uploaded 17 Oct 2024Source
  • DocumentP52100050643 · 8 OF 17_6_11zon_rotated.pdf · uploaded 17 Oct 2024Source
  • DocumentP52100050643 · 9 of 17 _5_11zon_rotated.pdf · uploaded 17 Oct 2024Source
  • DocumentP52100050643 · 10 OF 17 _4_11zon_rotated.pdf · uploaded 17 Oct 2024Source
  • DocumentP52100050643 · 11 OF 17 _3_11zon_rotated.pdf · uploaded 17 Oct 2024Source
  • DocumentP52100050643 · 12 of 17 _2_11zon_rotated.pdf · uploaded 17 Oct 2024Source
  • DocumentP52100050643 · 13 of 17 _1_11zon_rotated.pdf · uploaded 17 Oct 2024Source
  • DocumentP52100050643 · 14 of 17 _15_11zon_rotated.pdf · uploaded 17 Oct 2024Source
  • DocumentP52100050643 · 15 of 17 _14_11zon_rotated.pdf · uploaded 17 Oct 2024Source
  • DocumentP52100050643 · 16 of 17 _13_11zon_rotated.pdf · uploaded 17 Oct 2024Source
  • DocumentP52100050643 · 16 of 17 _13_11zon_rotated_rotated.pdf · uploaded 17 Oct 2024Source
  • DocumentP52100050643 · 17 of 17 (1)_rotated.pdf · uploaded 17 Oct 2024Source
  • DocumentP52100079133 · Layout pg 1.pdf · uploaded 28 Nov 2024Source
  • DocumentP52100079133 · Layout pg 1.pdf · uploaded 28 Nov 2024Source
  • DocumentP52100079133 · Layout pg 2.pdf · uploaded 28 Nov 2024Source
  • DocumentP52100079133 · Layout pg 3.pdf · uploaded 28 Nov 2024Source
  • DocumentP52100079133 · Layout pg 4.pdf · uploaded 28 Nov 2024Source
  • DocumentP52100079133 · Layout pg 5.pdf · uploaded 28 Nov 2024Source
  • DocumentP52100079133 · Layout pg 6.pdf · uploaded 28 Nov 2024Source
  • DocumentP52100079133 · Layout pg 7.pdf · uploaded 28 Nov 2024Source
  • DocumentP52100079133 · Layout pg 8.pdf · uploaded 28 Nov 2024Source
  • Other – TechnicalP52100079133 · Annexure A - Order No 50.pdf · uploaded 28 Nov 2024Source
  • Other – TechnicalP52100079133 · Plot Area Confirmation.pdf · uploaded 4 Dec 2024Source
  • Other – TechnicalP52100079133 · CC Verification Mail - The Rising Phase - 2.pdf · uploaded 4 Dec 2024Source
  • DocumentP52100079133 · 1 OF 20_highlighted__.pdf · uploaded 29 May 2026Source
  • DocumentP52100079133 · 2 OF 20_.pdf · uploaded 29 May 2026Source
  • DocumentP52100079133 · 3 OF 20_.pdf · uploaded 29 May 2026Source
  • DocumentP52100079133 · 4 OF 20_.pdf · uploaded 29 May 2026Source
  • DocumentP52100079133 · 5 OF 20_.pdf · uploaded 29 May 2026Source
  • DocumentP52100079133 · 6 OF 20_.pdf · uploaded 29 May 2026Source
  • DocumentP52100079133 · 7 OF 20_.pdf · uploaded 29 May 2026Source
  • DocumentP52100079133 · 8 OF 20_.pdf · uploaded 29 May 2026Source
  • DocumentP52100079133 · 9 OF 20_.pdf · uploaded 29 May 2026Source
  • DocumentP52100079133 · 10 OF 20_.pdf · uploaded 29 May 2026Source
  • DocumentP52100079133 · 11 OF 20_.pdf · uploaded 29 May 2026Source
  • DocumentP52100079133 · 12 OF 20_.pdf · uploaded 29 May 2026Source
  • DocumentP52100079133 · 13 OF 20_.pdf · uploaded 29 May 2026Source
  • DocumentP52100079133 · 14 OF 20_.pdf · uploaded 29 May 2026Source
  • DocumentP52100079133 · 15 OF 20_.pdf · uploaded 29 May 2026Source
  • DocumentP52100079133 · 16 OF 20_.pdf · uploaded 29 May 2026Source
  • DocumentP52100079133 · 17 OF 20_.pdf · uploaded 29 May 2026Source
  • DocumentP52100079133 · 18 OF 20_.pdf · uploaded 29 May 2026Source
  • DocumentP52100079133 · 19 OF 20_.pdf · uploaded 29 May 2026Source
  • DocumentP52100079133 · 20 OF 20_.pdf · uploaded 29 May 2026Source

Technical (Architect)

  • DocumentP52100050643 · Form 1 - Sept 24.pdf · uploaded 7 Nov 2024Source
  • DocumentP52100050643 · Form 1 - Jan-25.pdf · uploaded 20 Jan 2025Source
  • DocumentP52100050643 · Form 1 - PHASE 1.pdf · uploaded 16 Apr 2025Source
  • DocumentP52100079133 · Form 1 - Phase 2.pdf · uploaded 16 Apr 2025Source
  • DocumentP52100050643 · Form 1 -The Rising As on June 2026.pdf · uploaded 17 Jul 2026Source
  • DocumentP52100079133 · Form 1 - The Rising Phase 2.pdf · uploaded 18 Jul 2026Source

Technical (Engineer)

  • DocumentP52100050643 · Form 2 - Sept 24.pdf · uploaded 7 Nov 2024Source
  • DocumentP52100050643 · Form 2 - Jan-25.pdf · uploaded 20 Jan 2025Source
  • DocumentP52100050643 · Form 2 - PHASE 1.pdf · uploaded 16 Apr 2025Source
  • DocumentP52100079133 · Form 2 - Phase 2.pdf · uploaded 16 Apr 2025Source
  • DocumentP52100050643 · Form 2 -The Rising As on June 2026.pdf · uploaded 17 Jul 2026Source
  • DocumentP52100079133 · Form 2 - Phase 2 (2).pdf · uploaded 18 Jul 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Land & approvalsLand parcel 67/2B/1, 67/2B/1/1(P) Mouje - Kiwale

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Certificate Signed
Phases
2
Unit types
2BHK, 3BHK, 2BHK (MHADA), MHADA 2 BHK, Sale 2 BHK, Sale 3 BHK444 units in all
Address
Gat No. 67/2a/1 To 67/2a/5, 67/2b/1 And 67/2b/1/1 Kiwale, Adarsh Nagar, KiwalePIN 412101
Village
Kiwale, Haveli taluka
Land area for this project
8,943 sq m (96,262 sq ft)
Permissible built-up area
40,934 sq m (4,40,608 sq ft)
Sanctioned built-up area
34,934 sq m (3,76,025 sq ft)
Recreational open space
1,880 sq m (20,235 sq ft)
Designated bank account
171
Developed in phases
Yes
Also registered as
The Rising Phase - 2

Survey, CTS, gat or plot numbers

67/2B/167/2B/1/1(P) Mouje - KiwaleS. No. 67/2A/1 to 67/2A/5

Land as published on MahaRERA's project page

GAT NO. 67/2A/1 TO 67/2A/5, 67/2B/1 AND 67/2B/1/1 KIWALE

Boundaries

North
By Survey No 67 P
South
By Survey No 67 P And Road
East
By Survey No 67 P
West
By Survey No 67 P

Source: registration certificates and MahaRERA's project page, as stated there.

Units & parking444 units

265 of 444 units booked (60%), as the promoter reported to MahaRERA

2BHK · 217 units3BHK · 109 units2BHK (MHADA) · 22 unitsMHADA 2 BHK · 24 unitsSale 2 BHK · 65 unitsSale 3 BHK · 7 units
RERABuildingTypeCarpet areaUnitsBooked
P52100050643B1 Wing2BHK65.22 sq m · 702 sq ft4231
P52100050643B1 Wing2BHK68.44 sq m · 737 sq ft32
P52100050643B1 Wing2BHK71.9 sq m · 774 sq ft11
P52100050643B1 Wing3BHK89.16 sq m · 960 sq ft3825
P52100050643B2 Wing2BHK61.81 sq m · 665 sq ft2116
P52100050643B2 Wing2BHK62.42 sq m · 672 sq ft32
P52100050643B2 Wing2BHK64.77 sq m · 697 sq ft11
P52100050643B2 Wing2BHK65.22 sq m · 702 sq ft4434
Show all 32 unit rowsShow fewer unit rows
RERABuildingTypeCarpet areaUnitsBooked
P52100050643B2 Wing2BHK68.44 sq m · 737 sq ft11
P52100050643B2 Wing3BHK79.84 sq m · 859 sq ft1814
P52100050643B3 Wing2BHK61.81 sq m · 665 sq ft1715
P52100050643B3 Wing2BHK62.42 sq m · 672 sq ft33
P52100050643B3 Wing2BHK65.22 sq m · 702 sq ft3228
P52100050643B3 Wing2BHK (MHADA)50 sq m · 538 sq ft220
P52100050643B3 Wing3BHK79.84 sq m · 859 sq ft1412
P52100050643B4 Wing2BHK65.22 sq m · 702 sq ft4541
P52100050643B4 Wing2BHK68.44 sq m · 737 sq ft33
P52100050643B4 Wing2BHK71.9 sq m · 774 sq ft11
P52100050643B4 Wing3BHK89.16 sq m · 960 sq ft3935
P52100079133Building - A Wing - A3MHADA 2 BHK48.18 sq m · 519 sq ft60
P52100079133Building - A Wing - A3MHADA 2 BHK50 sq m · 538 sq ft180
P52100079133Building - A Wing - A4Sale 2 BHK59.84 sq m · 644 sq ft10
P52100079133Building - A Wing - A4Sale 2 BHK62.95 sq m · 678 sq ft90
P52100079133Building - A Wing - A4Sale 2 BHK66.18 sq m · 712 sq ft10
P52100079133Building - A Wing - A4Sale 2 BHK66.5 sq m · 716 sq ft180
P52100079133Building - A Wing - A4Sale 3 BHK81.17 sq m · 874 sq ft70
P52100079133Building - A Wing - A5Sale 2 BHK65.22 sq m · 702 sq ft20
P52100079133Building - A Wing - A5Sale 2 BHK66.5 sq m · 716 sq ft160
P52100079133Building - A Wing - A5Sale 2 BHK68.44 sq m · 737 sq ft10
P52100079133Building - A Wing - A5Sale 2 BHK72.66 sq m · 782 sq ft10
P52100079133Building - A Wing - A5Sale 2 BHK89.16 sq m · 960 sq ft10
P52100079133Building - A Wing - A5Sale 2 BHK90.26 sq m · 972 sq ft150

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Professionals1

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.RERA
EngineerSunil Rakhunde—P52100079133

Source: MahaRERA project page. Contact details are not shown.

Other projects in Kiwale

All 123 projects in Kiwale · Compare The Rising with another project

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Report a problemMethodology