Nyati Elysia

Deedo IDDP-PUN-BCXJ

Its promised completion date, Sep 2023, has passed and MahaRERA does not show it completed; no MahaRERA orders on record.

Kharadi, Pune 411014 · Property rates in Kharadi · by Nitin Dwarkadas Nyati · 83% of its projects kept the RERA date

Delivery3 yrs 2 mo past duePromised Sep 2023 · no extension on record · not shown completedRegulatoryNo ordersNot in any MahaRERA list or order Deedo has read

Buying a flat here?

See every deed registered on it.

Its promised completion date, Sep 2023, has passed and MahaRERA does not show it completed

  • P52100021737Registered 22 Jul 2019, completion promised 30 Mar 2023, and still not shown completed today.
  • P52100021738Registered 22 Jul 2019, completion promised 30 Sep 2023.

No extension certificate on record.

2 registrations · Source: MahaRERA registration and extension certificates

Latest registered deeds

Sales first, then rentals and mortgages matched to this project · the free view shows a price band

All 511 deeds →
  • Rental · Nov 2026
  • Rental · Oct 2026
  • Rental · Oct 2026
  • Rental · Oct 2026
  • Rental · Oct 2026
  • Rental · Oct 2026
  • Rental · Oct 2026
  • Rental · Oct 2026
  • Rental · Oct 2026
  • Rental · Oct 2026
Latest registered deeds in this project
MonthFlatKindAreaPriceRecord
Nov 2026A1 · 2704Rental—View Rental, Nov 2026
Oct 2026B3 · 302Rental—View Rental, Oct 2026
Oct 2026B3 · 1402Rental—View Rental, Oct 2026
Oct 2026A1 · 2703Rental—View Rental, Oct 2026
Oct 2026E 1 · 1103Rental—View Rental, Oct 2026
Oct 2026Unit 1209Rental—View Rental, Oct 2026
Oct 2026Unit 512Rental—View Rental, Oct 2026
Oct 2026Unit 708Rental—View Rental, Oct 2026
Oct 2026Unit 1203Rental—View Rental, Oct 2026
Oct 2026Unit 501Rental—View Rental, Oct 2026

4 buildings

Open a building to see every flat, floor by floor.

Floors and units from the registration certificate annexures and MahaRERA's project page. Construction % is the average of the developer's own declared activity progress to MahaRERA, not an inspection.

Regulatory recordNone found

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

RERA registrations2
RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5210002173722 Jul 201930 Mar 202330 Mar 2023Nitin Dwarkadas NyatiProject page
P5210002173822 Jul 201930 Sep 202330 Sep 2023Nitin Dwarkadas NyatiProject page
Documents287

96 documents held by Deedo, 191 filings listed on MahaRERA's project page

Title report (2)

Form B (2)

Form 2 (9)

Show all 287 documentsShow fewer documents

Form 2 (9)

Commencement certificate (3)

  • Commencement certificateP52100021737 · 17 Jul 2019ViewSource
  • Commencement certificateP52100021738 · 17 Jul 2019ViewSource
  • Commencement certificateP52100021738 · 22 Dec 2020ViewSource

Allotment letter (7)

Form 2A (5)

Registration certificate (2)

  • Registration certificateP52100021737 · 8 Sep 2021ViewSource
  • Registration certificateP52100021738 · 8 Sep 2021ViewSource

Form 1 (11)

Form 5 (6)

Occupancy / completion certificate

  • Occupancy / completion certificateP52100021738 · 4 Apr 2023ViewSource

Other (37)

Building plan (11)

  • Building planP52100021737 · Date not statedViewSource
  • Building planP52100021737 · Date not statedViewSource
  • Building planP52100021738 · Date not statedViewSource
  • Building planP52100021737 · Date not statedViewSource
  • Building planP52100021738 · Date not statedViewSource
  • Building planP52100021738 · Date not statedViewSource
  • Building planP52100021738 · Date not statedViewSource
  • Building planP52100021738 · Date not statedViewSource
  • Building planP52100021738 · Date not statedViewSource
  • Building planP52100021738 · Date not statedViewSource
  • Building planP52100021738 · Date not statedViewSource

Document library

  • Declaration in FORM BP52100021737 · Form B - Elysia III - Housing.pdf · uploaded 19 Mar 2019View
  • Copy of the legal title reportP52100021737 · Title Certificate.pdf · uploaded 19 Mar 2019View
  • Details of encumbrancesP52100021737 · Mortgage Deed 13857-2018.pdf · uploaded 19 Mar 2019View
  • Copy of the legal title reportP52100021737 · Addendum To title Certificate.pdf · uploaded 19 Mar 2019View
  • Declaration in FORM BP52100021738 · Form B - NH Elysia IV.pdf · uploaded 7 Jun 2019View
  • Details of encumbrancesP52100021738 · Mortgage Deed 13857-2018.pdf · uploaded 7 Jun 2019View
  • Copy of the legal title reportP52100021738 · Title Certificate.pdf · uploaded 10 Jun 2019View
  • Copy of the legal title reportP52100021738 · Addendum To title Certificate.pdf · uploaded 10 Jun 2019View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)P52100021737 · ARCHITECT CERTIFICATE.pdf · uploaded 28 Jun 2019View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)P52100021737 · Engineer certificate.pdf · uploaded 28 Jun 2019View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)P52100021738 · Engineer Certificate.pdf · uploaded 16 Jul 2019View
  • Copy of Layout Approval (in case of layout)P52100021737 · Sanction Layout.pdf · uploaded 17 Jul 2019View
  • Building Plan Approval (IOD)P52100021737 · E1 Odd Floor Plan.pdf · uploaded 17 Jul 2019View
  • Building Plan Approval (IOD)P52100021737 · E1 8th 13rd 14th Floor Plan.pdf · uploaded 17 Jul 2019View
  • Building Plan Approval (IOD)P52100021737 · E1 Ele Section.pdf · uploaded 17 Jul 2019View
  • Commencement Certificates / NA Order for plotted developmentP52100021737 · Commencment Certificate.pdf · uploaded 17 Jul 2019View
  • Commencement Certificates / NA Order for plotted developmentP52100021738 · Commencment Certificate.pdf · uploaded 17 Jul 2019View
  • Copy of Layout Approval (in case of layout)P52100021738 · Sanction Layout.pdf · uploaded 17 Jul 2019View
  • Building Plan Approval (IOD)P52100021738 · A1 Odd Floor.pdf · uploaded 17 Jul 2019View
  • Building Plan Approval (IOD)P52100021738 · A1 Even Floor.pdf · uploaded 17 Jul 2019View
  • Building Plan Approval (IOD)P52100021738 · A1 Elevation.pdf · uploaded 17 Jul 2019View
  • Building Plan Approval (IOD)P52100021738 · A1 Section AA.pdf · uploaded 17 Jul 2019View
  • Building Plan Approval (IOD)P52100021738 · A1 Section BB.pdf · uploaded 17 Jul 2019View
  • Building Plan Approval (IOD)P52100021738 · B3 Odd Even Floor.pdf · uploaded 17 Jul 2019View
  • Building Plan Approval (IOD)P52100021738 · B3 Elevation.pdf · uploaded 17 Jul 2019View
  • Building Plan Approval (IOD)P52100021738 · B3 Section AA.pdf · uploaded 17 Jul 2019View
  • Building Plan Approval (IOD)P52100021738 · B3 Section BB.pdf · uploaded 17 Jul 2019View
  • Building Plan Approval (IOD)P52100021738 · B3 5th 10th 15th Floor.pdf · uploaded 17 Jul 2019View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)P52100021738 · ARCHITECT CERTIFICATE.pdf · uploaded 18 Jul 2019View
  • Proforma of Allotment letterP52100021737 · UNIT AGREEMENT Elysia III.pdf · uploaded 19 Jul 2019View
  • Proforma of Allotment letterP52100021738 · ELYSIA IV UNIT AGREEMENT.pdf · uploaded 19 Jul 2019View
  • Proforma of Allotment letterP52100021737 · UNIT AGREEMENT Elysia III E1 Bldg REVISED.pdf · uploaded 31 Jul 2019View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)P52100021737 · Form 2A Elysia III.pdf · uploaded 20 Nov 2019View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)P52100021738 · Form 2A Elysia IV.pdf · uploaded 20 Nov 2019View
  • Proforma of Allotment letterP52100021738 · ELYSIA II REVISED UNIT AGREEMENT 241219.pdf · uploaded 26 Dec 2019View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)P52100021737 · Form 2A.pdf · uploaded 24 Feb 2020View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)P52100021738 · Form 2A.pdf · uploaded 24 Feb 2020View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)P52100021737 · Form 2A III.pdf · uploaded 10 Jul 2020View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)P52100021738 · Form 2A IV.pdf · uploaded 10 Jul 2020View
  • Proforma of Allotment letterP52100021738 · ELYSIA IV REVISED UNIT AGREEMENT 08062020.pdf · uploaded 21 Aug 2020View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)P52100021737 · Nyati Elysia III.pdf · uploaded 30 Sep 2020View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)P52100021738 · Nyati Elysia IV.pdf · uploaded 30 Sep 2020View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)P52100021737 · Form 2A III.pdf · uploaded 5 Oct 2020View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)P52100021738 · Form 2A IV.pdf · uploaded 5 Oct 2020View
  • Proforma of Allotment letterP52100021738 · ELYSIA IV UNIT AGREEMENT 08062020 REVISED CLEAN 30102020.pdf · uploaded 30 Oct 2020View
  • Commencement Certificates / NA Order for plotted developmentP52100021738 · Commencement Certificate.pdf · uploaded 22 Dec 2020View
  • Copy of Layout Approval (in case of layout)P52100021738 · Layout.pdf · uploaded 22 Dec 2020View
  • Building Plan Approval (IOD)P52100021738 · A1 Odd Floor.pdf · uploaded 22 Dec 2020View
  • Building Plan Approval (IOD)P52100021738 · A1 Even and Rufuge Floor.pdf · uploaded 22 Dec 2020View
  • Building Plan Approval (IOD)P52100021738 · A1 Elevation.pdf · uploaded 22 Dec 2020View
  • Building Plan Approval (IOD)P52100021738 · A1 Section AA.pdf · uploaded 22 Dec 2020View
  • Building Plan Approval (IOD)P52100021738 · A1 Section BB.pdf · uploaded 22 Dec 2020View
  • Building Plan Approval (IOD)P52100021738 · B3 Odd and Even Floors.pdf · uploaded 22 Dec 2020View
  • Building Plan Approval (IOD)P52100021738 · B3 Refuge Floors.pdf · uploaded 22 Dec 2020View
  • Building Plan Approval (IOD)P52100021738 · B3 Elevation.pdf · uploaded 22 Dec 2020View
  • Building Plan Approval (IOD)P52100021738 · B3 Section AA.pdf · uploaded 22 Dec 2020View
  • Building Plan Approval (IOD)P52100021738 · B3 Section BB.pdf · uploaded 22 Dec 2020View
  • Copy of Layout Approval (in case of layout)P52100021737 · Layout.pdf · uploaded 22 Dec 2020View
  • Commencement Certificates / NA Order for plotted developmentP52100021737 · Commencement Certificate.pdf · uploaded 22 Dec 2020View
  • Building Plan Approval (IOD)P52100021737 · E1 Typical Floor.pdf · uploaded 22 Dec 2020View
  • Building Plan Approval (IOD)P52100021737 · E1 8th 13rd and 14th Floor.pdf · uploaded 22 Dec 2020View
  • Building Plan Approval (IOD)P52100021737 · E1 Elevation and Sections.pdf · uploaded 22 Dec 2020View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)P52100021737 · Form 2A.pdf · uploaded 16 Jan 2021View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)P52100021738 · Form 2A.pdf · uploaded 16 Jan 2021View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)P52100021737 · Form 2A.pdf · uploaded 7 Jun 2021View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)P52100021738 · Form 2A.pdf · uploaded 7 Jun 2021View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)P52100021737 · Form 2A.pdf · uploaded 7 Jul 2021View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)P52100021738 · Form 2A.pdf · uploaded 7 Jul 2021View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)P52100021737 · Form 2A.pdf · uploaded 11 Oct 2021View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)P52100021738 · Form 2A.pdf · uploaded 11 Oct 2021View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)P52100021737 · Nyati Elysia III.pdf · uploaded 18 Nov 2021View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)P52100021738 · Nyati Elysia IV.pdf · uploaded 18 Nov 2021View
  • Proforma of Allotment letterP52100021738 · ELYSIA IV UNIT AGREEON 22 FLOOR SANCT B3 BLDG (REVISED 29112021) CLEAN emailed.pdf · uploaded 29 Nov 2021View
  • Copy of Layout Approval (in case of layout)P52100021737 · Layout (1).pdf · uploaded 4 Jan 2022View
  • Commencement Certificates / NA Order for plotted developmentP52100021737 · CC.pdf · uploaded 4 Jan 2022View
  • Building Plan Approval (IOD)P52100021737 · Upper Parking.pdf · uploaded 4 Jan 2022View
  • Building Plan Approval (IOD)P52100021737 · Typical Floor.pdf · uploaded 4 Jan 2022View
  • Building Plan Approval (IOD)P52100021737 · Elevation Section.pdf · uploaded 4 Jan 2022View
  • Copy of Layout Approval (in case of layout)P52100021738 · Layout.pdf · uploaded 4 Jan 2022View
  • Commencement Certificates / NA Order for plotted developmentP52100021738 · CC.pdf · uploaded 4 Jan 2022View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)P52100021737 · Elysia III Form 2A.pdf · uploaded 7 Jan 2022View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)P52100021738 · Elysia IV Form 2A.pdf · uploaded 7 Jan 2022View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)P52100021737 · Form 2A.pdf · uploaded 25 Apr 2022View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)P52100021738 · Form 2A.pdf · uploaded 25 Apr 2022View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)P52100021737 · Form 2A.pdf · uploaded 25 Jul 2022View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)P52100021738 · Form 2A.pdf · uploaded 25 Jul 2022View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)P52100021737 · Nyati Elysia III.pdf · uploaded 17 Sep 2022View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)P52100021738 · Nyati Elysia IV.pdf · uploaded 17 Sep 2022View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)P52100021737 · Form 2A.pdf · uploaded 20 Oct 2022View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)P52100021738 · Form 2A.pdf · uploaded 20 Oct 2022View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)P52100021737 · Nyati Elysia III.pdf · uploaded 19 Jan 2023View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)P52100021738 · Nyati Elysia IV.pdf · uploaded 19 Jan 2023View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)P52100021737 · Nyati Elysia III.pdf · uploaded 20 Jan 2023View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)P52100021738 · Nyati Elysia IV.pdf · uploaded 20 Jan 2023View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)P52100021737 · Form 2A.pdf · uploaded 25 Jan 2023View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)P52100021738 · Form 2A.pdf · uploaded 25 Jan 2023View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)P52100021738 · FORM 1 ARCHITECT CERTIFICATE ELYSIA IV Dec 2022.pdf · uploaded 30 Jan 2023View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)P52100021738 · FORM 2A Engineer Certificate Dec 2022.pdf · uploaded 30 Jan 2023View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)P52100021738 · 1 Form 1.pdf · uploaded 16 Feb 2023View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)P52100021738 · 2 Form 1.pdf · uploaded 16 Feb 2023View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)P52100021738 · 3 Form 1.pdf · uploaded 16 Feb 2023View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)P52100021738 · 4 Form 1.pdf · uploaded 16 Feb 2023View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)P52100021738 · 5 Form 1.pdf · uploaded 16 Feb 2023View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)P52100021738 · 6 Form 1.pdf · uploaded 16 Feb 2023View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)P52100021738 · 7 Form 1.pdf · uploaded 16 Feb 2023View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)P52100021738 · 8 Form 1.pdf · uploaded 16 Feb 2023View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)P52100021738 · 9 Form 1.pdf · uploaded 16 Feb 2023View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)P52100021738 · 10 Form 1.pdf · uploaded 16 Feb 2023View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)P52100021738 · 11 Form 1.pdf · uploaded 16 Feb 2023View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)P52100021738 · 12 Form 1.pdf · uploaded 16 Feb 2023View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)P52100021738 · 13 Form 1.pdf · uploaded 16 Feb 2023View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)P52100021738 · 14 Form 1.pdf · uploaded 16 Feb 2023View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)P52100021738 · 16 Form 1.pdf · uploaded 16 Feb 2023View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)P52100021738 · 17 Form 1.pdf · uploaded 16 Feb 2023View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)P52100021738 · 001 Engineer Certificate.pdf · uploaded 16 Feb 2023View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)P52100021738 · 01 Engineer Certificate.pdf · uploaded 16 Feb 2023View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)P52100021738 · 02 Engineer Certificate.pdf · uploaded 16 Feb 2023View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)P52100021738 · 03 Engineer Certificate.pdf · uploaded 16 Feb 2023View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)P52100021738 · 04 Engineer Certificate.pdf · uploaded 16 Feb 2023View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)P52100021738 · 05 Engineer Certificate.pdf · uploaded 16 Feb 2023View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)P52100021738 · 06 Engineer Certificate.pdf · uploaded 16 Feb 2023View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)P52100021738 · 07 Engineer Certificate.pdf · uploaded 16 Feb 2023View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)P52100021738 · 08 Engineer Certificate.pdf · uploaded 16 Feb 2023View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)P52100021738 · 09 Engineer Certificate.pdf · uploaded 16 Feb 2023View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)P52100021738 · 10 Engineer Certificate.pdf · uploaded 16 Feb 2023View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)P52100021738 · 11 Engineer Certificate.pdf · uploaded 16 Feb 2023View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)P52100021738 · 12 Engineer Certificate.pdf · uploaded 16 Feb 2023View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)P52100021738 · 13 Engineer Certificate.pdf · uploaded 16 Feb 2023View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)P52100021738 · 14 Engineer Certificate.pdf · uploaded 16 Feb 2023View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)P52100021738 · 16 Engineer Certificate.pdf · uploaded 16 Feb 2023View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)P52100021738 · 17 Engineer Certificate.pdf · uploaded 16 Feb 2023View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)P52100021738 · 001 Form 1.pdf · uploaded 16 Feb 2023View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)P52100021737 · elysia III.pdf · uploaded 17 Feb 2023View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)P52100021738 · Elysia IV.pdf · uploaded 17 Feb 2023View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)P52100021737 · Nyati Elysia III Form 5.pdf · uploaded 20 Feb 2023View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)P52100021738 · Nyati Elysia IV Form 5.pdf · uploaded 20 Feb 2023View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)P52100021737 · FORM 2A.pdf · uploaded 4 Apr 2023View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentP52100021738 · Completion Certificate.pdf · uploaded 4 Apr 2023View
  • Architect’s Certificate on Completion of Project (Form 4)P52100021738 · Form 4 Architect Certificate.pdf · uploaded 4 Apr 2023View
  • Proforma of Agreement for saleP52100021738 · Elysia IV Revised Unit Agreement 17042023.pdf · uploaded 17 Apr 2023View
  • Proforma of Allotment letterP52100021738 · ELYSIA IV Allotment Letter 17042023.pdf · uploaded 17 Apr 2023View
  • Proforma of Agreement for saleP52100021737 · Elysia III E1 HDH Bldg Unit Agr 19072023.pdf · uploaded 20 Jul 2023View
  • Proforma of Allotment letterP52100021737 · Elysia III E1 HDH Bldg Allotment Letter.pdf · uploaded 20 Jul 2023View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)P52100021737 · Nyati Elysia III.pdf · uploaded 30 Sep 2023View
  • Status of Formation of Legal Entity (Society/Co Op etc.)P52100021738 · Nyati Elysia IV.pdf · uploaded 20 Oct 2023View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)P52100021738 · Form 5.pdf · uploaded 19 Mar 2024View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)P52100021738 · Nyati Elysia IV - Form 5.pdf · uploaded 7 Oct 2024View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)P52100021738 · Nyati Elysia IV - Form 5.pdf · uploaded 7 Oct 2024View

Promoter documents

  • Declaration Form BP52100021737 · Form B - Elysia III - Housing.pdf · uploaded 19 Mar 2019View
  • Legal Title reportP52100021737 · Title Certificate.pdf · uploaded 19 Mar 2019View
  • Legal Title reportP52100021737 · Addendum To title Certificate.pdf · uploaded 19 Mar 2019View
  • Declaration Form BP52100021738 · Form B - NH Elysia IV.pdf · uploaded 7 Jun 2019View
  • Legal Title reportP52100021738 · Title Certificate.pdf · uploaded 10 Jun 2019View
  • Legal Title reportP52100021738 · Addendum To title Certificate.pdf · uploaded 10 Jun 2019View

Technical documents

  • Layout ApprovalP52100021737 · Sanction Layout.pdfView
  • Building Plan ApprovalP52100021737 · E1 Odd Floor Plan.pdfView
  • Building Plan ApprovalP52100021737 · E1 8th 13rd 14th Floor Plan.pdfView
  • Building Plan ApprovalP52100021737 · E1 Ele Section.pdfView
  • Layout ApprovalP52100021737 · Layout.pdfView
  • Building Plan ApprovalP52100021737 · E1 Typical Floor.pdfView
  • Building Plan ApprovalP52100021737 · E1 8th 13rd and 14th Floor.pdfView
  • Building Plan ApprovalP52100021737 · E1 Elevation and Sections.pdfView
  • Layout ApprovalP52100021737 · Layout (1).pdfView
  • Building Plan ApprovalP52100021737 · Upper Parking.pdfView
  • Building Plan ApprovalP52100021737 · Typical Floor.pdfView
  • Building Plan ApprovalP52100021737 · Elevation Section.pdfView
  • Layout ApprovalP52100021738 · Layout.pdfView
  • Building Plan ApprovalP52100021738 · A1 Odd Floor.pdfView
  • Building Plan ApprovalP52100021738 · A1 Even and Rufuge Floor.pdfView
  • Building Plan ApprovalP52100021738 · A1 Elevation.pdfView
  • Building Plan ApprovalP52100021738 · A1 Section AA.pdfView
  • Building Plan ApprovalP52100021738 · A1 Section BB.pdfView
  • Building Plan ApprovalP52100021738 · B3 Odd and Even Floors.pdfView
  • Building Plan ApprovalP52100021738 · B3 Refuge Floors.pdfView
  • Building Plan ApprovalP52100021738 · B3 Elevation.pdfView
  • Building Plan ApprovalP52100021738 · B3 Section AA.pdfView
  • Building Plan ApprovalP52100021738 · B3 Section BB.pdfView
  • Layout ApprovalP52100021738 · Sanction Layout.pdfView
  • Building Plan ApprovalP52100021738 · A1 Odd Floor.pdfView
  • Building Plan ApprovalP52100021738 · A1 Even Floor.pdfView
  • Building Plan ApprovalP52100021738 · A1 Elevation.pdfView
  • Building Plan ApprovalP52100021738 · A1 Section AA.pdfView
  • Building Plan ApprovalP52100021738 · A1 Section BB.pdfView
  • Building Plan ApprovalP52100021738 · B3 Odd Even Floor.pdfView
  • Building Plan ApprovalP52100021738 · B3 Elevation.pdfView
  • Building Plan ApprovalP52100021738 · B3 Section AA.pdfView
  • Building Plan ApprovalP52100021738 · B3 Section BB.pdfView
  • Building Plan ApprovalP52100021738 · B3 5th 10th 15th Floor.pdfView
  • Layout ApprovalP52100021738 · Layout.pdfView

Proforma allotment letter

  • Proforma allotment letterP52100021737 · UNIT AGREEMENT Elysia III.pdfView
  • Proforma allotment letterP52100021738 · ELYSIA IV Allotment Letter 17042023.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Land & approvalsLand parcel 17/6/1/1, 17/6/1/1

As registered with MahaRERA and published on its project page

Project type
Others
Status on MahaRERA
Lapsed
Phases
2
Unit types
3rhk, 2rhk, 1RK 1T365 units in all
Address
Part Of Plot A Out Of Sanctioned Layout Of S No 22/2a, 17/6/1/1, 17/6/1/2, 17/6/1/3, 17/6/2 And 17/7, Kharadi, KharadiPIN 411014
Village
Kharadi
Land area for this project
1,598 sq m (17,198 sq ft)
Permissible built-up area
4,866 sq m (52,373 sq ft)
Sanctioned built-up area
4,866 sq m (52,373 sq ft)
Designated bank account
Icici Bank Limited
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared
Also registered as
Nyati Elysia III, Nyati Elysia IV, Niyati elsiya-Building Hera

Survey, CTS, gat or plot numbers

17/6/1/117/6/1/117/6/1/217/6/1/217/6/1/317/6/1/317/6/217/6/217/717/7222A 17611 17612 17613 177 176222-2A 17-6-1-1 17-6-1-2 17-6-1-3 17-7 17-6-2PART OF PLOT A OUT OF SANCTIONED LAYOUT OF S NO 22/2APART OF PLOT A OUT OF SANCTIONED LAYOUT OF S NO 22/2A

Land as published on MahaRERA's project page

PART OF PLOT A OUT OF SANCTIONED LAYOUT OF S NO 22/2A, 17/6/1/1, 17/6/1/2, 17/6/1/3, 17/6/2 AND 17/7

Boundaries

North
30m Wide Dp Road
South
Amenity 2 And Amenity Of Hdh Of The Layout
East
By The Land Bearing Adjacent S No 17-5
West
Plot B Of The Said Sanctioned Layout

Source: registration certificates and MahaRERA's project page, as stated there.

Units & parking365 units · 28 parking spaces

365 units registered

3rhk · 112 units2rhk · 88 units1RK 1T · 165 units
RERABuildingTypeCarpet areaUnits
P52100021738A13rhk85.41 sq m · 919 sq ft1
P52100021738A13rhk85.59 sq m · 921 sq ft13
P52100021738A13rhk85.77 sq m · 923 sq ft1
P52100021738A13rhk85.95 sq m · 925 sq ft13
P52100021738A13rhk85.96 sq m · 925 sq ft14
P52100021738A13rhk86.32 sq m · 929 sq ft14
P52100021738A13rhk86.39 sq m · 930 sq ft14
P52100021738A13rhk86.5 sq m · 931 sq ft14
Show all 27 unit rowsShow fewer unit rows
RERABuildingTypeCarpet areaUnits
P52100021738A13rhk86.75 sq m · 934 sq ft14
P52100021738A13rhk86.87 sq m · 935 sq ft14
P52100021738B32rhk58.67 sq m · 632 sq ft2
P52100021738B32rhk58.74 sq m · 632 sq ft2
P52100021738B32rhk58.85 sq m · 633 sq ft9
P52100021738B32rhk58.92 sq m · 634 sq ft9
P52100021738B32rhk58.96 sq m · 635 sq ft11
P52100021738B32rhk59 sq m · 635 sq ft11
P52100021738B32rhk59.04 sq m · 636 sq ft11
P52100021738B32rhk59.07 sq m · 636 sq ft11
P52100021738B32rhk59.11 sq m · 636 sq ft11
P52100021738B32rhk59.18 sq m · 637 sq ft11
P52100021737E 11RK 1T25.14 sq m · 271 sq ft28
P52100021737E 11RK 1T25.36 sq m · 273 sq ft12
P52100021737E 11RK 1T25.43 sq m · 274 sq ft27
P52100021737E 11RK 1T25.54 sq m · 275 sq ft42
P52100021737E 11RK 1T25.66 sq m · 276 sq ft14
P52100021737E 11RK 1T25.67 sq m · 276 sq ft14
P52100021737E 11RK 1T25.93 sq m · 279 sq ft28

Parking

BuildingTypeTwo-wheelerFour-wheelerBusVisitorTotal
A1Closed/Covered000016
A1Open Space00000
B3Closed/Covered000012
B3Open Space00000
E 1Closed/Covered00000
E 1Open Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress4 buildings and areas

Work completed, as the promoter reported it to MahaRERA (Form 1)

A1

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)100%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

B3

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)100%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

E 1

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)98%
  • Plinth100%
  • Stilt Floor98%
  • Slabs of Super Structure98%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises98%
  • Sanitary Fittings within the flats / premises90%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks98%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.75%

Common areas and amenities

  • Internal Roads & FootpathsTremix road No Footpath95%
  • Water SupplyInfra ie UGWT OHWT and Networking98%
  • Sewerage (Chamber, Lines, Septic Tank , STP)Chambers networking and STP99%
  • Storm Water DrainsConnected to Rain Water Harvesting Pits99%
  • Landscaping & Tree PlantingAs per Statutory requirements99%
  • Street LightingAs per Plan99%
Show all 30 activitiesShow fewer activities
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterTreated in STP Recycled for Flushing and Gardening98%
  • Solid Waste Management And DisposalWet waste treated in OWC Dry waste to Authz vendor98%
  • Water conservation /Rain water harvestingRain Water Harvesting Pits98%
  • Energy managemcntCFL & LED in Common areas98%
  • Fire protection and fire safety requirementsAs per Statutory requirements97%
  • Electrical meter room, sub-station, receiving stationAs per Statutory requirements98%
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNot applicable
  • Internal Roads & FootpathsTremix roads No Footpaths100%
  • Water SupplyInfra ie UGWT OHWT and Networking100%
  • Sewerage (Chamber, Lines, Septic Tank , STP)Chambers networking and STP100%
  • Storm Water DrainsConnected to Rain Water Harvesting Pits100%
  • Landscaping & Tree PlantingAs per Statutory requirements100%
  • Street LightingAs per Plan100%
  • Community BuildingsClub House to be shared with entire Elysia project100%
  • Treatment And Disposal Of Sewage And Sullage WaterTreated in STP Recycled for Flushing and Gardening100%
  • Solid Waste Management And DisposalWet waste treated in OWC Dry waste to Authz vendor100%
  • Water conservation /Rain water harvestingRain Water Harvesting Pits100%
  • Energy managemcntCFL & LED in Common areas100%
  • Fire protection and fire safety requirementsAs per Statutory requirements100%
  • Electrical meter room, sub-station, receiving stationAs per Statutory requirements100%
  • Aggregate area of recreational Open SpaceOpen Space to be shared with entire Elysia project100%
  • Open ParkingAs per Sanction100%

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Professionals19

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.RERA
ArchitectSanjeev Mukund Mehta—P52100021738
ArchitectSanjeev Mukund Mehta—P52100021737
ArchitectShirish Dasnurkar and Associates—P52100021738
ArchitectShirish Dasnurkar and Associates—P52100021737
Chartered accountantChirag P. Shah & Co—P52100021738
Chartered accountantChirag P. Shah & Co—P52100021737
Chartered accountantVipin Gujarathi & Associates—P52100021737
Chartered accountantVipin Gujarathi & Associates—P52100021738
Show all 19 professionalsShow fewer professionals
RoleNameRegistration no.RERA
EngineerJW Consultant LLP—P52100021738
EngineerJW Consultant LLP—P52100021737
OtherGopi Sharma—P52100021737
OtherGopi Sharma—P52100021738
OtherPhoenix Construction—P52100021738
OtherSaddam Mofid Sharma—P52100021737
OtherSaddam Mofid Sharma—P52100021738
OtherS N Joshi Consultants Pv t Ltd—P52100021738
OtherS N Joshi Consultants Pv t Ltd—P52100021737
OtherZopate Electrical Consultant—P52100021737
OtherZopate Electrical Consultant—P52100021738

Source: MahaRERA project page. Contact details are not shown.

Other projects in Kharadi

All 3,136 projects in Kharadi · Compare Nyati Elysia with another project

Nyati Elysia in numbers

Registered deals, summarised

Deedo has 511 registered documents at Nyati Elysia, from May 2017 to Nov 2026: 442 leave and licence agreements, 68 mortgages.

Are properties at Nyati Elysia rented out?
Yes: 442 leave and licence agreements are registered at Nyati Elysia, at a median rent since May 2017 of about ₹22,000 a month with a deposit of about ₹50,000.
Where does this data come from?
The figures come from registered documents (Index II) at the Maharashtra sub-registrar offices, matched at Nyati Elysia by Deedo, last updated with deals registered in Nov 2026.

Latest deal · Rental · Nov 2026

₹50k–1 L / month

Data through1 Nov 2026SourcesMahaRERA project search · registration certificates · MahaRERA project page · registered documents (Index II)Data through is when MahaRERA's project page was last read.Report a problemMethodology