It is due for completion in Jun 2027, with no extension on record; no MahaRERA orders on record; 83% of its units are booked.

Khadakale (Ct), Pune 410405 · by Gagan Lifespace

DeliveryDue Jun 2027No extension on recordRegulatoryNo ordersNot in any MahaRERA list or order Deedo has readSales83% booked389 of 469 units · as the promoter reported to MahaRERA

Buying a flat here?

See every deed registered on it.

It is due for completion in Jun 2027, with no extension on record

  • P52100002941Registered 4 Aug 2017, completion promised 30 Jun 2027.
  • P52100009642Registered 22 Aug 2017, completion promised 31 Mar 2018.

No extension certificate on record.

2 registrations · Source: MahaRERA registration and extension certificates

Latest registered deeds

Sales first, then rentals and mortgages matched to this project · the free view shows a price band

No registered deeds matched to this project yet
Sales, resales, rentals and mortgages appear here once registered documents are matched to it by evidence.

3 buildings

Open a building to see every flat, floor by floor.

Floors and units from the registration certificate annexures and MahaRERA's project page.

Regulatory recordNone found

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

RERA registrations2
RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P521000029414 Aug 201730 Jun 202730 Jun 2027Gagan LifespaceProject page
P5210000964222 Aug 201731 Mar 201831 Mar 2018Gagan LifespaceProject page
Documents123

2 documents held by Deedo, 121 filings listed on MahaRERA's project page

Registration certificate (2)

  • Registration certificateP52100009642 · 22 Aug 2017ViewSource
  • Registration certificateP52100002941 · 21 Aug 2026ViewSource

Finance

  • PAN CardP52100009642 · Gagan Lifespace PAN.pdf · uploaded 20 Jul 2017Source
  • PAN CardP52100002941 · Gagan Lifespace PAN.pdf · uploaded 27 Jul 2017Source

Legal

  • Legal Title reportP52100009642 · TITLE REPORT.pdf · uploaded 20 Jul 2017Source
  • Declaration Form BP52100009642 · Lifespace Face I Form B.pdf · uploaded 27 Jul 2017Source
  • Legal Title reportP52100002941 · TITLE REPORT.pdf · uploaded 27 Jul 2017Source
  • Declaration Form BP52100002941 · B- Form Phase II.pdf · uploaded 29 Jul 2017Source
Show all 123 documentsShow fewer documents

Legal

  • Declaration Form BP52100002941 · Form B Nulife Ph 2.pdf · uploaded 14 Aug 2023Source
  • Declaration Form BP52100002941 · Form B.pdf · uploaded 17 Feb 2025Source

Migrated

  • 1 PAN CardP52100009642 · Gagan Lifespace PAN.pdf · uploaded 20 Jul 2017Source
  • 1 Copy of the legal title reportP52100009642 · TITLE REPORT.pdf · uploaded 20 Jul 2017Source
  • 1 Details of encumbrancesP52100009642 · Mortgage Deed Index II.pdf · uploaded 20 Jul 2017Source
  • 1 Declaration in FORM BP52100009642 · Lifespace Face I Form B.pdf · uploaded 27 Jul 2017Source
  • 1 PAN CardP52100002941 · Gagan Lifespace PAN.pdf · uploaded 27 Jul 2017Source
  • 1 Copy of the legal title reportP52100002941 · TITLE REPORT.pdf · uploaded 27 Jul 2017Source
  • 1 Details of encumbrancesP52100002941 · Mortgage Deed Index II.pdf · uploaded 27 Jul 2017Source
  • 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)P52100009642 · ARCHITECT CERTIFICATE PH 1.pdf · uploaded 28 Jul 2017Source
  • 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)P52100002941 · ARCHITECT CERTIFICATE PH 2.pdf · uploaded 28 Jul 2017Source
  • 1 Copy of Layout Approval (in case of layout)P52100009642 · NuLife Phasing - FINAL.pdf · uploaded 29 Jul 2017Source
  • 1 Building Plan Approval (IOD)P52100009642 · D 1ST FLOOR.pdf · uploaded 29 Jul 2017Source
  • 2 Building Plan Approval (IOD)P52100009642 · D 2ND FLOOR.pdf · uploaded 29 Jul 2017Source
  • 3 Building Plan Approval (IOD)P52100009642 · D 3RD FLOOR.pdf · uploaded 29 Jul 2017Source
  • 4 Building Plan Approval (IOD)P52100009642 · D 8TH FLOOR.pdf · uploaded 29 Jul 2017Source
  • 5 Building Plan Approval (IOD)P52100009642 · E 1ST FLOOR.pdf · uploaded 29 Jul 2017Source
  • 6 Building Plan Approval (IOD)P52100009642 · E 2ND FLOOR.pdf · uploaded 29 Jul 2017Source
  • 7 Building Plan Approval (IOD)P52100009642 · E 3RD FLOOR.pdf · uploaded 29 Jul 2017Source
  • 8 Building Plan Approval (IOD)P52100009642 · E 8TH FLOOR.pdf · uploaded 29 Jul 2017Source
  • 1 Commencement Certificates / NA Order for plotted developmentP52100009642 · PMRD Letter 28-07-2017.pdf · uploaded 29 Jul 2017Source
  • 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)P52100009642 · engineer cert ph 1.pdf · uploaded 29 Jul 2017Source
  • 1 Certificates of CA (Form 3)P52100009642 · CA0001-2.pdf · uploaded 29 Jul 2017Source
  • 1 Proforma of Allotment letterP52100009642 · Final Rera_FP_for_Gagan_Nulife _1_.pdf · uploaded 29 Jul 2017Source
  • 1 Copy of Layout Approval (in case of layout)P52100002941 · NuLife Phasing - FINAL.pdf · uploaded 29 Jul 2017Source
  • 1 Building Plan Approval (IOD)P52100002941 · C 1ST FLOOR.pdf · uploaded 29 Jul 2017Source
  • 2 Building Plan Approval (IOD)P52100002941 · C 8TH FLOOR.pdf · uploaded 29 Jul 2017Source
  • 1 Commencement Certificates / NA Order for plotted developmentP52100002941 · PMRD Letter 28-07-2017.pdf · uploaded 29 Jul 2017Source
  • 1 Declaration in FORM BP52100002941 · B- Form Phase II.pdf · uploaded 29 Jul 2017Source
  • 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)P52100002941 · engineer cert ph 2.pdf · uploaded 29 Jul 2017Source
  • 1 Certificates of CA (Form 3)P52100002941 · CA CERTIFICATE PH 2.pdf · uploaded 29 Jul 2017Source
  • 1 Proforma of Allotment letterP52100002941 · Final Phase II Gagan Nulife Rera_FP.pdf · uploaded 29 Jul 2017Source
  • 1 Certificates of Architect (Form 4)P52100009642 · Form 4 nulife phase 1.pdf · uploaded 4 Oct 2017Source
  • 2 Certificates of Architect (Form 4)P52100009642 · Form 4 Nulife.pdf · uploaded 1 Dec 2017Source
  • 2 Details of encumbrancesP52100009642 · Encumbrance Nulife.pdf · uploaded 6 Dec 2017Source
  • 2 Details of encumbrancesP52100002941 · Encumbrance Nulife.pdf · uploaded 6 Dec 2017Source
  • 2 Certificates of Architect (Form 1)(Mandatory for only ongoing project)P52100009642 · Gagan Nulife Ph 1.pdf · uploaded 19 Feb 2018Source
  • 2 Certificates of Architect (Form 1)(Mandatory for only ongoing project)P52100002941 · Gagan Nulife Ph 2.pdf · uploaded 19 Feb 2018Source
  • 3 Certificates of Architect (Form 1)(Mandatory for only ongoing project)P52100009642 · ARCHITECT CERTIFICATE PH 1 09052018.pdf · uploaded 10 May 2018Source
  • 3 Certificates of Architect (Form 1)(Mandatory for only ongoing project)P52100002941 · ARCHITECT CERTIFICATE PH 2 09052018.pdf · uploaded 10 May 2018Source
  • 4 Certificates of Architect (Form 1)(Mandatory for only ongoing project)P52100009642 · ARCHITECT CERTIFICATE PH 1 03092018.pdf · uploaded 4 Sep 2018Source
  • 4 Certificates of Architect (Form 1)(Mandatory for only ongoing project)P52100002941 · ARCHITECT CERTIFICATE PH 2 03092018.pdf · uploaded 4 Sep 2018Source
  • 1 Certificates of CA (Form 5)P52100009642 · Gagan Nulife Phase 1 Form 5.pdf · uploaded 4 Dec 2018Source
  • 1 Certificates of CA (Form 5)P52100002941 · Gagan Nulife Phase 2 Form 5.pdf · uploaded 4 Dec 2018Source
  • 5 Certificates of Architect (Form 1)(Mandatory for only ongoing project)P52100009642 · Nulife Architect Certificate Phase 1 19122018.pdf · uploaded 20 Dec 2018Source
  • 1 Form 2AP52100009642 · Nulife Quality Assurance certificate Phase 1.pdf · uploaded 20 Dec 2018Source
  • 5 Certificates of Architect (Form 1)(Mandatory for only ongoing project)P52100002941 · Nulife Architect Certificate Phase 2 19122018.pdf · uploaded 20 Dec 2018Source
  • 1 Form 2AP52100002941 · Nulife Quality Assurance certificate Phase 2.PDF · uploaded 20 Dec 2018Source
  • 6 Certificates of Architect (Form 1)(Mandatory for only ongoing project)P52100002941 · ARCHITECT CERTIFICATE PH 2 04-05-2019.pdf · uploaded 9 May 2019Source
  • 7 Certificates of Architect (Form 1)(Mandatory for only ongoing project)P52100002941 · Gagan Nulife Phase 2 Arch Certificate 29062019.pdf · uploaded 4 Jul 2019Source
  • 8 Certificates of Architect (Form 1)(Mandatory for only ongoing project)P52100002941 · Gagan Nulife Ph 2 Arch Certificate 19122019.pdf · uploaded 25 Dec 2019Source
  • 9 Certificates of Architect (Form 1)(Mandatory for only ongoing project)P52100002941 · Gagan Nulife Ph 2 Arch certificate 29102020.pdf · uploaded 11 Nov 2020Source
  • 10 Certificates of Architect (Form 1)(Mandatory for only ongoing project)P52100002941 · Gagan Nulife Ph 2 Arch certificate 29012021.pdf · uploaded 8 Feb 2021Source
  • 11 Certificates of Architect (Form 1)(Mandatory for only ongoing project)P52100002941 · Gagan Nulife Ph 2 Arch certificate 06042021.pdf · uploaded 8 Apr 2021Source
  • 1 Declaration about Commencement CertificateP52100002941 · Declaration About CC Certificate.pdf · uploaded 29 Jul 2021Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)P52100002941 · Form 2A.pdf · uploaded 29 Jul 2021Source
  • 1 Disclosure of sold/ booked inventoryP52100002941 · Sold inventory.pdf · uploaded 29 Jul 2021Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)P52100002941 · Gagan Lifespace Annual Report 18-19.pdf · uploaded 30 Jul 2021Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)P52100002941 · Gagan Lifespace Annual Report_19-20.pdf · uploaded 30 Jul 2021Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)P52100002941 · Gagan Lifespace Annual Report 20-21.pdf · uploaded 30 Jul 2021Source
  • 12 Certificates of Architect (Form 1)(Mandatory for only ongoing project)P52100002941 · NULIFE RERA C WING.pdf · uploaded 9 Aug 2021Source
  • 1 Status of Formation of Legal Entity (Society/Co Op etc.)P52100009642 · letter for Formation of legal entity.pdf · uploaded 24 Aug 2021Source
  • 13 Certificates of Architect (Form 1)(Mandatory for only ongoing project)P52100002941 · Gagan Nulife Ph 2 Arch certificate 24122021.pdf · uploaded 4 Jan 2022Source
  • 14 Certificates of Architect (Form 1)(Mandatory for only ongoing project)P52100002941 · Phase 2 RERA LETTER.pdf · uploaded 30 Mar 2022Source
  • 15 Certificates of Architect (Form 1)(Mandatory for only ongoing project)P52100002941 · Nulife Ph 2 Arch certificate 16012023.pdf · uploaded 30 Jan 2023Source
  • 2 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)P52100002941 · Nulife Ph 2 Engg certificate 16012023.pdf · uploaded 30 Jan 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)P52100002941 · Lifespace Undertaking for Form 5.pdf · uploaded 29 Mar 2023Source
  • 2 Disclosure of sold/ booked inventoryP52100002941 · Nulife Sold Unsold Inventory.pdf · uploaded 2 Aug 2023Source
  • 2 Declaration in FORM BP52100002941 · Form B Nulife Ph 2.pdf · uploaded 14 Aug 2023Source
  • 1 Declaration in FORM BP52100002941 · Form B.pdf · uploaded 17 Feb 2025Source
  • 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)P52100002941 · Form 1.pdf · uploaded 17 Feb 2025Source
  • 1 Certificates of CA (Form 3)P52100002941 · Form 3 Nulife_compressed.pdf · uploaded 17 Feb 2025Source
  • 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)P52100002941 · Form 2.pdf · uploaded 17 Feb 2025Source
  • 2 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)P52100002941 · Form 3 Nulife_compressed.pdf · uploaded 17 Feb 2025Source
  • 3 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)P52100002941 · Form 2.pdf · uploaded 17 Feb 2025Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)P52100002941 · 2A Engineers Quality Assurance Certificate.pdf · uploaded 17 Feb 2025Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)P52100002941 · Form 5 Nulife.pdf · uploaded 17 Feb 2025Source
  • 1 Disclosure of sold/ booked inventoryP52100002941 · Gagan Nulife sold unsold data sheet.pdf · uploaded 11 Apr 2025Source
  • Form 5 (FY 2023-2024)P52100002941 · Form 5 23-24.pdf · uploaded 1 Aug 2026Source
  • Withdrawal Update Form 1P52100002941 · Form 1 Q1.pdf · uploaded 25 Aug 2026Source
  • Withdrawal Update Form 1P52100002941 · Form 1 Q2.pdf · uploaded 25 Aug 2026Source
  • Withdrawal Update Form 1P52100002941 · Form 1 Q3.pdf · uploaded 25 Aug 2026Source
  • Withdrawal Update Form 1P52100002941 · Form 1 Q4.pdf · uploaded 25 Aug 2026Source
  • Withdrawal Update Form 1P52100002941 · Form 1 2026-27 Q1.pdf · uploaded 25 Aug 2026Source
  • Withdrawal Update Form 2P52100002941 · Form 2 Q1.pdf · uploaded 25 Aug 2026Source
  • Withdrawal Update Form 2P52100002941 · Form 2 Q2.pdf · uploaded 25 Aug 2026Source
  • Withdrawal Update Form 2P52100002941 · Form 2 Q3.pdf · uploaded 25 Aug 2026Source
  • Withdrawal Update Form 2P52100002941 · Form 2 Q4.pdf · uploaded 25 Aug 2026Source
  • Withdrawal Update Form 2P52100002941 · Form 2 2026-27 Q1.pdf · uploaded 25 Aug 2026Source
  • Withdrawal Update Form 3P52100002941 · Form 3 F.pdf · uploaded 25 Aug 2026Source
  • Withdrawal Update Form 3P52100002941 · Form 3 F.pdf · uploaded 25 Aug 2026Source
  • Withdrawal Update Form 3P52100002941 · Form 3 F.pdf · uploaded 25 Aug 2026Source
  • Withdrawal Update Form 3P52100002941 · Form 3 F.pdf · uploaded 25 Aug 2026Source
  • Withdrawal Update Form 3P52100002941 · Form 3 Nulife Phase 2.pdf · uploaded 25 Aug 2026Source
  • Form 2A (FY 2025-2026)P52100002941 · Form 2A 31-03-26.pdf · uploaded 25 Aug 2026Source

Technical

  • DocumentP52100009642 · NuLife Phasing - FINAL.pdf · uploaded 29 Jul 2017Source
  • DocumentP52100009642 · D 1ST FLOOR.pdf · uploaded 29 Jul 2017Source
  • DocumentP52100009642 · D 2ND FLOOR.pdf · uploaded 29 Jul 2017Source
  • DocumentP52100009642 · D 3RD FLOOR.pdf · uploaded 29 Jul 2017Source
  • DocumentP52100009642 · D 8TH FLOOR.pdf · uploaded 29 Jul 2017Source
  • DocumentP52100009642 · E 1ST FLOOR.pdf · uploaded 29 Jul 2017Source
  • DocumentP52100009642 · E 2ND FLOOR.pdf · uploaded 29 Jul 2017Source
  • DocumentP52100009642 · E 3RD FLOOR.pdf · uploaded 29 Jul 2017Source
  • DocumentP52100009642 · E 8TH FLOOR.pdf · uploaded 29 Jul 2017Source
  • DocumentP52100002941 · C 8TH FLOOR.pdf · uploaded 29 Jul 2017Source
  • DocumentP52100002941 · NuLife Phasing - FINAL.pdf · uploaded 29 Jul 2017Source
  • DocumentP52100002941 · C 1ST FLOOR.pdf · uploaded 29 Jul 2017Source

Technical (Architect)

  • DocumentP52100009642 · Nulife Architect Certificate Phase 1 19122018.pdf · uploaded 20 Dec 2018Source
  • DocumentP52100002941 · Form 1.pdf · uploaded 17 Feb 2025Source
  • DocumentP52100002941 · Form 1 2026-27 Q1.pdf · uploaded 25 Aug 2026Source

Technical (Engineer)

  • DocumentP52100009642 · engineer cert ph 1.pdf · uploaded 29 Jul 2017Source
  • DocumentP52100002941 · Form 2.pdf · uploaded 17 Feb 2025Source
  • DocumentP52100002941 · Form 3 Nulife_compressed.pdf · uploaded 17 Feb 2025Source
  • DocumentP52100002941 · Form 2.pdf · uploaded 17 Feb 2025Source
  • DocumentP52100002941 · Form 2 2026-27 Q1.pdf · uploaded 25 Aug 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Land & approvalsLand parcel GAT NO 106/1 106/2 161/1/3, SR NO 106/1 106/2 161/1/3

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Certificate Signed
Phases
2
Unit types
1 BHK, 1BHK, 2 BHK, 2BHK469 units in all
Address
SR NO 106/1 106/2 161/1/3, Pune Mumbai old highway, KamshetPIN 410405
Village
Kusgaon Kh., Mawal taluka
Land area for this project
2,999 sq m (32,281 sq ft)
Permissible built-up area
6,697 sq m (72,085 sq ft)
Sanctioned built-up area
6,697 sq m (72,085 sq ft)
Recreational open space
300 sq m (3,228 sq ft)
Designated bank account
109
Developed in phases
No
Also registered as
Gagan Nulife Phase 1, Gagan Nulife Phase 2

Survey, CTS, gat or plot numbers

GAT NO 106/1 106/2 161/1/3SR NO 106/1 106/2 161/1/3

Land as published on MahaRERA's project page

SR NO 106/1 106/2 161/1/3

Boundaries

North
Sr No 105
South
Kusgaon Village Boundary
East
Openspace
West
Building

Source: registration certificates and MahaRERA's project page, as stated there.

Units & parking469 units

389 of 469 units booked (83%), as the promoter reported to MahaRERA

1 BHK · 194 units1BHK · 60 units2 BHK · 175 units2BHK · 40 units
RERABuildingTypeCarpet areaUnitsBooked
P52100009642Building D1 D2 D31 BHK32.06 sq m · 345 sq ft11
P52100009642Building D1 D2 D31 BHK36.59 sq m · 394 sq ft55
P52100009642Building D1 D2 D31 BHK36.67 sq m · 395 sq ft55
P52100009642Building D1 D2 D31 BHK44.1 sq m · 475 sq ft1010
P52100009642Building D1 D2 D31 BHK52.29 sq m · 563 sq ft1010
P52100009642Building D1 D2 D31 BHK52.54 sq m · 566 sq ft99
P52100009642Building D1 D2 D31 BHK52.61 sq m · 566 sq ft55
P52100009642Building D1 D2 D31 BHK52.62 sq m · 566 sq ft55
Show all 102 unit rowsShow fewer unit rows
RERABuildingTypeCarpet areaUnitsBooked
P52100009642Building D1 D2 D31 BHK56.71 sq m · 610 sq ft10
P52100009642Building D1 D2 D31 BHK56.77 sq m · 611 sq ft11
P52100009642Building D1 D2 D31 BHK56.86 sq m · 612 sq ft10
P52100009642Building D1 D2 D31 BHK113.63 sq m · 1,223 sq ft11
P52100009642Building D1 D2 D31BHK38.15 sq m · 411 sq ft99
P52100009642Building D1 D2 D31BHK78.14 sq m · 841 sq ft11
P52100009642Building D1 D2 D32 BHK38.15 sq m · 411 sq ft11
P52100009642Building D1 D2 D32 BHK40.98 sq m · 441 sq ft11
P52100009642Building D1 D2 D32 BHK61.16 sq m · 658 sq ft55
P52100009642Building D1 D2 D32 BHK61.24 sq m · 659 sq ft42
P52100009642Building D1 D2 D32 BHK61.28 sq m · 660 sq ft43
P52100009642Building D1 D2 D32 BHK62.22 sq m · 670 sq ft51
P52100009642Building D1 D2 D32 BHK63.52 sq m · 684 sq ft53
P52100009642Building D1 D2 D32 BHK63.59 sq m · 684 sq ft53
P52100009642Building D1 D2 D32 BHK63.65 sq m · 685 sq ft53
P52100009642Building D1 D2 D32 BHK63.71 sq m · 686 sq ft55
P52100009642Building D1 D2 D32 BHK69.12 sq m · 744 sq ft11
P52100009642Building D1 D2 D32 BHK69.17 sq m · 745 sq ft53
P52100009642Building D1 D2 D32 BHK69.18 sq m · 745 sq ft65
P52100009642Building D1 D2 D32 BHK69.2 sq m · 745 sq ft53
P52100009642Building D1 D2 D32 BHK69.28 sq m · 746 sq ft53
P52100009642Building D1 D2 D32 BHK78.19 sq m · 842 sq ft11
P52100009642Building D1 D2 D32 BHK78.21 sq m · 842 sq ft11
P52100009642Building D1 D2 D32 BHK78.22 sq m · 842 sq ft11
P52100009642Building D1 D2 D32 BHK123.16 sq m · 1,326 sq ft11
P52100009642Building D1 D2 D32 BHK138.86 sq m · 1,495 sq ft11
P52100009642Building D1 D2 D32BHK61.12 sq m · 658 sq ft53
P52100009642Building D1 D2 D32BHK62.13 sq m · 669 sq ft52
P52100009642Building D1 D2 D32BHK69.11 sq m · 744 sq ft55
P52100009642Building D1 D2 D32BHK69.15 sq m · 744 sq ft51
P52100009642Building D1 D2 D32BHK69.22 sq m · 745 sq ft55
P52100009642Building D1 D2 D32BHK69.27 sq m · 746 sq ft53
P52100009642Building D1 D2 D32BHK69.29 sq m · 746 sq ft53
P52100009642Building D1 D2 D32BHK69.33 sq m · 746 sq ft54
P52100009642Building E1 E2 E31 BHK36.59 sq m · 394 sq ft55
P52100009642Building E1 E2 E31 BHK36.67 sq m · 395 sq ft55
P52100009642Building E1 E2 E31 BHK38.15 sq m · 411 sq ft88
P52100009642Building E1 E2 E31 BHK44.1 sq m · 475 sq ft1010
P52100009642Building E1 E2 E31 BHK52.29 sq m · 563 sq ft1010
P52100009642Building E1 E2 E31 BHK52.54 sq m · 566 sq ft109
P52100009642Building E1 E2 E31 BHK52.61 sq m · 566 sq ft55
P52100009642Building E1 E2 E31 BHK52.62 sq m · 566 sq ft55
P52100009642Building E1 E2 E31 BHK56.71 sq m · 610 sq ft11
P52100009642Building E1 E2 E31 BHK56.77 sq m · 611 sq ft11
P52100009642Building E1 E2 E31 BHK56.86 sq m · 612 sq ft11
P52100009642Building E1 E2 E31 BHK61.28 sq m · 660 sq ft11
P52100009642Building E1 E2 E32 BHK38.15 sq m · 411 sq ft11
P52100009642Building E1 E2 E32 BHK40.98 sq m · 441 sq ft10
P52100009642Building E1 E2 E32 BHK61.12 sq m · 658 sq ft55
P52100009642Building E1 E2 E32 BHK61.16 sq m · 658 sq ft55
P52100009642Building E1 E2 E32 BHK61.24 sq m · 659 sq ft54
P52100009642Building E1 E2 E32 BHK61.28 sq m · 660 sq ft44
P52100009642Building E1 E2 E32 BHK62.13 sq m · 669 sq ft53
P52100009642Building E1 E2 E32 BHK62.22 sq m · 670 sq ft54
P52100009642Building E1 E2 E32 BHK63.52 sq m · 684 sq ft55
P52100009642Building E1 E2 E32 BHK63.59 sq m · 684 sq ft55
P52100009642Building E1 E2 E32 BHK63.65 sq m · 685 sq ft54
P52100009642Building E1 E2 E32 BHK63.71 sq m · 686 sq ft54
P52100009642Building E1 E2 E32 BHK69.11 sq m · 744 sq ft42
P52100009642Building E1 E2 E32 BHK69.12 sq m · 744 sq ft11
P52100009642Building E1 E2 E32 BHK69.13 sq m · 744 sq ft22
P52100009642Building E1 E2 E32 BHK69.15 sq m · 744 sq ft55
P52100009642Building E1 E2 E32 BHK69.17 sq m · 745 sq ft54
P52100009642Building E1 E2 E32 BHK69.18 sq m · 745 sq ft54
P52100009642Building E1 E2 E32 BHK69.2 sq m · 745 sq ft53
P52100009642Building E1 E2 E32 BHK69.22 sq m · 745 sq ft55
P52100009642Building E1 E2 E32 BHK69.27 sq m · 746 sq ft55
P52100009642Building E1 E2 E32 BHK69.28 sq m · 746 sq ft55
P52100009642Building E1 E2 E32 BHK69.29 sq m · 746 sq ft54
P52100009642Building E1 E2 E32 BHK69.33 sq m · 746 sq ft54
P52100009642Building E1 E2 E32 BHK78.14 sq m · 841 sq ft10
P52100009642Building E1 E2 E32 BHK78.19 sq m · 842 sq ft11
P52100009642Building E1 E2 E32 BHK78.21 sq m · 842 sq ft11
P52100009642Building E1 E2 E32 BHK78.22 sq m · 842 sq ft10
P52100009642Building E1 E2 E32 BHK138.81 sq m · 1,494 sq ft11
P52100002941C Building1 BHK35.28 sq m · 380 sq ft54
P52100002941C Building1 BHK35.36 sq m · 381 sq ft108
P52100002941C Building1 BHK35.41 sq m · 381 sq ft55
P52100002941C Building1 BHK35.45 sq m · 382 sq ft55
P52100002941C Building1 BHK35.49 sq m · 382 sq ft96
P52100002941C Building1 BHK35.72 sq m · 384 sq ft54
P52100002941C Building1 BHK35.76 sq m · 385 sq ft55
P52100002941C Building1 BHK36.14 sq m · 389 sq ft109
P52100002941C Building1 BHK36.6 sq m · 394 sq ft53
P52100002941C Building1 BHK36.63 sq m · 394 sq ft51
P52100002941C Building1 BHK36.64 sq m · 394 sq ft40
P52100002941C Building1 BHK36.76 sq m · 396 sq ft54
P52100002941C Building1 BHK36.79 sq m · 396 sq ft54
P52100002941C Building1BHK35.24 sq m · 379 sq ft54
P52100002941C Building1BHK35.29 sq m · 380 sq ft108
P52100002941C Building1BHK35.32 sq m · 380 sq ft108
P52100002941C Building1BHK35.51 sq m · 382 sq ft109
P52100002941C Building1BHK36.56 sq m · 394 sq ft55
P52100002941C Building1BHK36.82 sq m · 396 sq ft1010

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Professionals12

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.RERA
ArchitectVilas Tarwadi—P52100009642
ArchitectVilas Tarwadi—P52100002941
EngineerAjit Gijare—P52100009642
EngineerG A Bhilare Consultants Pvt Ltd—P52100002941
OtherGovind Parasram—P52100009642
OtherKalyan Singh Shekahawat—P52100009642
OtherMaheshwar Meghanath Das—P52100009642
OtherMohammad Rafique Mulla—P52100009642
Show all 12 professionalsShow fewer professionals
RoleNameRegistration no.RERA
OtherMukesh Sapariya—P52100009642
OtherPraful Virchand Mavani—P52100009642
Registered real estate agentPankaj Kumar Chaurasia—P52100009642
Registered real estate agentPankaj Kumar Chaurasia—P52100002941

Source: MahaRERA project page. Contact details are not shown.

Other projects in Khadakale (Ct)

All 3 projects in Khadakale (Ct) · Compare Gagan Nulife with another project

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Report a problemMethodology