Padmashree Phase - I
Deedo IDDP-PUN-GFWTCompletion was pushed back 4 months, to Apr 2028; no MahaRERA orders on record.
Katraj, Pune 411046 · Property rates in Katraj · by Nilesh Shashikant Ostwal
Buying a flat here?
See every deed registered on it.
Completion was pushed back 4 months, to Apr 2028
- This projectRegistered 30 Jan 2023, completion promised 31 Dec 2027, revised to 30 Apr 2028.
No extension certificate on record.
1 registration · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales first, then rentals and mortgages matched to this project · the free view shows a price band
- Primary sale · Sep 2026
- Primary sale · Jul 2026
- Primary sale · Nov 2025
- Primary sale · Sep 2025
- Primary sale · Jul 2025
- Primary sale · Jun 2025
- Primary sale · Jun 2025
- Primary sale · Jun 2025
- Primary sale · Apr 2025
- Primary sale · Apr 2025
| Month | Flat | Kind | Area | Price | Record |
|---|---|---|---|---|---|
| Sep 2026 | Padmashree Phase - I · 403 | Primary sale | 474 sq ft | View Primary sale, Sep 2026 | |
| Jul 2026 | Padmashree Phase - I · 306 | Primary sale | 695 sq ft | View Primary sale, Jul 2026 | |
| Nov 2025 | Padmashree Phase - I · 208 | Primary sale | 707 sq ft | View Primary sale, Nov 2025 | |
| Sep 2025 | Padmashree Phase - I · 205 | Primary sale | 707 sq ft | View Primary sale, Sep 2025 | |
| Jul 2025 | Padmashree Phase - I · 207 | Primary sale | 695 sq ft | View Primary sale, Jul 2025 | |
| Jun 2025 | Padmashree Phase - I · 608 | Primary sale | 707 sq ft | View Primary sale, Jun 2025 | |
| Jun 2025 | Padmashree Phase - I · 108 | Primary sale | 707 sq ft | View Primary sale, Jun 2025 | |
| Jun 2025 | Padmashree Phase - I · 308 | Primary sale | 707 sq ft | View Primary sale, Jun 2025 | |
| Apr 2025 | Padmashree Phase - I · 104 | Primary sale | 474 sq ft | View Primary sale, Apr 2025 | |
| Apr 2025 | Padmashree Phase - I · 404 | Primary sale | 474 sq ft | View Primary sale, Apr 2025 |
2 buildings
Open a building to see every flat, floor by floor.
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrationP52100049054
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52100049054 | 30 Jan 2023 | 31 Dec 2027 | 30 Apr 2028 | Nilesh Shashikant Ostwal | Project page |
Documents123
1 document held by Deedo, 122 filings listed on MahaRERA's project page
Finance
- PAN Card1 PAN Card.pdf · uploaded 21 Dec 2022Source
Legal
Migrated
- 1 PAN Card1 PAN Card.pdf · uploaded 21 Dec 2022Source
- 1 Copy of the legal title reportnilesh ostwal search report in rera format_20221203_0001.pdf · uploaded 21 Dec 2022Source
- 1 a Details of encumbrances concerned to FinanceEncumbrance -Legal -Padmashree.pdf · uploaded 21 Dec 2022Source
- 1 b Details of encumbrances concerned to LegalEncumbrance -Legal -Padmashree.pdf · uploaded 21 Dec 2022Source
Show all 123 documentsShow fewer documents
Migrated
- 1 Copy of Layout Approval (in case of layout)1 Copy of Layout Approval (in case of layout).pdf · uploaded 21 Dec 2022Source
- 1 Building Plan Approval / NA Order for plotted development1 Building Plan Approval _ NA Order for plotted development (1).pdf · uploaded 21 Dec 2022Source
- 1 Commencement Certificates / NA Order for plotted developmentComencement Certificate.pdf · uploaded 21 Dec 2022Source
- 1 Declaration about Commencement CertificateFormat -D -Padmashreee.pdf · uploaded 21 Dec 2022Source
- 1 Declaration in FORM B1 Declaration in FORM B Phase I.pdf · uploaded 21 Dec 2022Source
- 1 CERSAI detailsCERSAI_Search_Report_200255454633_For_Asset_Based_Search_21_12_2022_15_03_10_594.pdf · uploaded 21 Dec 2022Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFormat A-Padmashree.pdf · uploaded 21 Dec 2022Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)RERA GURUDATTA REALTORS SEP 2022.pdf · uploaded 7 Jan 2023Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Certificate 460.pdf · uploaded 7 Jan 2023Source
- 1 Disclosure of Interest in Other Real Estate OrganizationsAnnexure A -Padmashree.pdf · uploaded 7 Jan 2023Source
- 1 Proforma of Allotment letterFinal Al - Padmashree.pdf · uploaded 7 Jan 2023Source
- 1 Deviation Report with respect to Allotment letterDeviation Allotment -Padmashree.pdf · uploaded 7 Jan 2023Source
- 2 a Details of encumbrances concerned to FinanceScan 21 Jan 2023_rotated_2-end.pdf · uploaded 23 Jan 2023Source
- 3 a Details of encumbrances concerned to FinanceScan 21 Jan 2023_rotated_1-1.pdf · uploaded 23 Jan 2023Source
- 2 b Details of encumbrances concerned to LegalScan 21 Jan 2023_rotated_2-end.pdf · uploaded 23 Jan 2023Source
- 3 b Details of encumbrances concerned to LegalScan 21 Jan 2023_rotated_1-1.pdf · uploaded 23 Jan 2023Source
- 1 Proforma of Agreement for saleFinal AFS Padmashree 230123.pdf · uploaded 23 Jan 2023Source
- 1 Deviation Report with respect to model copy of AgreementScan 16 Jan 2023 (1) (1)_11zon.pdf · uploaded 23 Jan 2023Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)GURUDATTA REALTORS RERA 1 FORM 31 MARCH 2023.pdf · uploaded 31 Oct 2023Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)GURUDATTA REALTORS RERA 1 FORM 30 JUNE 2023.pdf · uploaded 31 Oct 2023Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)GURUDATTA REALTORS RERA 1 FORM 30 SEPT 2023.pdf · uploaded 31 Oct 2023Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 - Padmashree Phase I as on March 2023.pdf · uploaded 7 Nov 2023Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 - Padmashree Phase I as on 30th June 2023.pdf · uploaded 7 Nov 2023Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 - Padmashree Phase I as on 30th Sept 2023.pdf · uploaded 7 Nov 2023Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Padmashree engg certificate March 2023.pdf · uploaded 9 Nov 2023Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)padmashree engineers certificate june 2023.pdf · uploaded 9 Nov 2023Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Padmashree Engineers certificate September 2023.pdf · uploaded 9 Nov 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)New Format Form 5.pdf · uploaded 24 Nov 2023Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - Padmashree Phase 1 as on March 2023.pdf · uploaded 11 Dec 2023Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - Padmashree Phase 1 as on June 2023.pdf · uploaded 11 Dec 2023Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - Padmashree Phase 1 as on Sep 2023.pdf · uploaded 11 Dec 2023Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 - Padmashree Phase 1 as on March 2023.pdf · uploaded 11 Dec 2023Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 - Padmashree Phase 1 as on June 2023.pdf · uploaded 11 Dec 2023Source
- 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 - Padmashree Phase 1 as on Sep 2023.pdf · uploaded 11 Dec 2023Source
- 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)5 (1).pdf · uploaded 5 Jan 2024Source
- 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - March 2023.pdf · uploaded 10 Jan 2024Source
- 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - June 2023.pdf · uploaded 10 Jan 2024Source
- 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - Sep 2023.pdf · uploaded 10 Jan 2024Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - March 2023.pdf · uploaded 10 Jan 2024Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - June 2023.pdf · uploaded 10 Jan 2024Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Sep 2023.pdf · uploaded 10 Jan 2024Source
- 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 - March 2023.pdf · uploaded 10 Jan 2024Source
- 10 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 - June 2023.pdf · uploaded 10 Jan 2024Source
- 11 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 - Sep 2023.pdf · uploaded 10 Jan 2024Source
- 2 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)(Form 5) (FY 2022-23).pdf · uploaded 10 Jan 2024Source
- 11 Architect’s Certificate of Percentage of Completion of Work (Form 1)Padmashree Phase I Dec 23 - Form1.pdf · uploaded 16 Jan 2024Source
- 12 Architect’s Certificate of Percentage of Completion of Work (Form 1)Padmashree Phase I Dec 23 - Form1.pdf · uploaded 16 Jan 2024Source
- 12 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 - Padmashree Phase I as on 31-12-2023.pdf · uploaded 16 Jan 2024Source
- 13 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 - March 2023.pdf · uploaded 16 Jan 2024Source
- 14 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 - June 2023.pdf · uploaded 16 Jan 2024Source
- 15 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 - Sep 2023.pdf · uploaded 16 Jan 2024Source
- 16 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 - Dec 2023.pdf · uploaded 16 Jan 2024Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Padmashree Phase 1 as on Dec 2023 (SIGNED).pdf · uploaded 18 Jan 2024Source
- 17 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 - Padmashree Phase 1 as on March 2023 (Signed).pdf · uploaded 25 Jan 2024Source
- 18 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 - June 2023.pdf · uploaded 25 Jan 2024Source
- 19 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 - Sep 2023.pdf · uploaded 25 Jan 2024Source
- 20 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 - Dec 2023.pdf · uploaded 25 Jan 2024Source
- 13 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - Padmashree Phase 1 as on March 2024.pdf · uploaded 10 Apr 2024Source
- 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Padmashree Phase 1 as on March 2024.pdf · uploaded 10 Apr 2024Source
- 14 Architect’s Certificate of Percentage of Completion of Work (Form 1)13 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf · uploaded 20 Apr 2024Source
- 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)8 Engineer’s Certificate on Cost Incurred on Project (Form 2) (3).pdf · uploaded 20 Apr 2024Source
- 21 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 - Padmashree Phase I as on 31-03-2024 Final.pdf · uploaded 20 Apr 2024Source
- 22 CA Certificate on Project Cost & Fund withdrawal (Form 3)w.pdf · uploaded 20 Apr 2024Source
- 2 Copy of Layout Approval (in case of layout)Plans 1 of 5_compressed.pdf · uploaded 9 Jul 2024Source
- 2 Building Plan Approval / NA Order for plotted developmentPlans 2 3 4.pdf · uploaded 9 Jul 2024Source
- 3 Building Plan Approval / NA Order for plotted developmentPlans 5 of 5_compressed.pdf · uploaded 9 Jul 2024Source
- 2 Commencement Certificates / NA Order for plotted developmentRevised CC.pdf · uploaded 9 Jul 2024Source
- 2 Declaration about Commencement CertificateFormat D.pdf · uploaded 9 Jul 2024Source
- 15 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Mar 2024_11zon.pdf · uploaded 9 Jul 2024Source
- 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 March 2024_11zon.pdf · uploaded 9 Jul 2024Source
- 1 Disclosure of sold/ booked inventoryFinal Circular 29.pdf · uploaded 9 Jul 2024Source
- 23 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 March 2024_11zon (1).pdf · uploaded 9 Jul 2024Source
- 24 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 - Padmashree Phase I as on 30-06-2024.pdf · uploaded 19 Jul 2024Source
- 16 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - Padmashree Phase I as on 30-06-2024.pdf · uploaded 20 Jul 2024Source
- 11 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Padmashree Phase I as on 30-06-2024.pdf · uploaded 20 Jul 2024Source
- 17 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Mar 2024_11zon.pdf · uploaded 26 Jul 2024Source
- 12 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 March 2024_11zon.pdf · uploaded 26 Jul 2024Source
- 25 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 March 2024_11zon (1).pdf · uploaded 26 Jul 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - Padmashree Phase I as on Sep 2024.pdf · uploaded 4 Nov 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form 5-Padmashree Phase 1 FY 2023-24.pdf · uploaded 11 Nov 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 - Padmashree Phase I as on Sep 2024.pdf · uploaded 22 Nov 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Padmashree engg certificates sep 2024.pdf · uploaded 4 Dec 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)18 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf · uploaded 19 Feb 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)26 CA Certificate on Project Cost Fund withdrawal (Form 3).pdf · uploaded 19 Feb 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)13 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf · uploaded 19 Feb 2025Source
- Form 1Form 1 Mar25.pdf · uploaded 10 Jun 2026Source
- Form 2Form 2 Mar25.pdf · uploaded 10 Jun 2026Source
- Form 3Form 3 Mar25.pdf · uploaded 10 Jun 2026Source
- Disclosure of Sold and Booked InventoryDisclosure of Inventory.pdf · uploaded 10 Jun 2026Source
- Withdrawal Update Form 1Form 1 Jun25.pdf · uploaded 10 Jun 2026Source
- Withdrawal Update Form 1Form 1 Sep25.pdf · uploaded 10 Jun 2026Source
- Withdrawal Update Form 1Form 1 Dec25.pdf · uploaded 10 Jun 2026Source
- Withdrawal Update Form 1Form 1 Mar26.pdf · uploaded 10 Jun 2026Source
- Withdrawal Update Form 1Form 1 Mar26.pdf · uploaded 10 Jun 2026Source
- Withdrawal Update Form 2Form 2 Jun25.pdf · uploaded 10 Jun 2026Source
- Withdrawal Update Form 2Form 2 Sep25.pdf · uploaded 10 Jun 2026Source
- Withdrawal Update Form 2Form 2 Dec25.pdf · uploaded 10 Jun 2026Source
- Withdrawal Update Form 2Form 2 Mar26.pdf · uploaded 10 Jun 2026Source
- Withdrawal Update Form 2Form 2 Mar26.pdf · uploaded 10 Jun 2026Source
- Withdrawal Update Form 3Form 3 Jun25.pdf · uploaded 10 Jun 2026Source
- Withdrawal Update Form 3Form 3 Sep25.pdf · uploaded 10 Jun 2026Source
- Withdrawal Update Form 3Form 3 Dec25.pdf · uploaded 10 Jun 2026Source
- Withdrawal Update Form 3Form 3 Dec25.pdf · uploaded 10 Jun 2026Source
- Withdrawal Update Form 3Form 3 Mar26.pdf · uploaded 10 Jun 2026Source
Technical
- Document1 Copy of Layout Approval (in case of layout).pdf · uploaded 21 Dec 2022Source
- Document1 Building Plan Approval _ NA Order for plotted development (1).pdf · uploaded 21 Dec 2022Source
- DocumentPlans 1 of 5_compressed.pdf · uploaded 9 Jul 2024Source
- DocumentPlans 2 3 4.pdf · uploaded 9 Jul 2024Source
- DocumentPlans 5 of 5_compressed.pdf · uploaded 9 Jul 2024Source
Technical (Architect)
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvalsLand parcel S.No. 21/1/2/2
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Certificate Signed
- Unit types
- 1BHK, 2BHK44 units in all
- Address
- S.No. 21/1/2/2, Sukhsagar Nagar, Katraj, PunePIN 411046
- Village
- Katraj, Haveli taluka
- Location
- 18.45651, 73.87011
- Land area for this project
- 387 sq m (4,161 sq ft)
- Permissible built-up area
- 3,324 sq m (35,780 sq ft)
- Sanctioned built-up area
- 3,324 sq m (35,780 sq ft)
- Designated bank account
- 119
- Developed in phases
- No
- Also registered as
- Padmashri, पद्मश्री
Survey, CTS, gat or plot numbers
Land as published on MahaRERA's project page
S.No. 21/1/2/2
Boundaries
- North
- Remaining portion of said land
- South
- Anand Nagar Chawl
- East
- Devi Udyog Factory
- West
- Raviraj Terrace Building
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking44 units
10 of 44 units booked (23%), as the promoter reported to MahaRERA
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| 1BHK | 38.08 sq m · 410 sq ft | 12 | 4 |
| 2BHK | 57.81 sq m · 622 sq ft | 12 | 3 |
| 2BHK | 58.97 sq m · 635 sq ft | 6 | 2 |
| 2BHK | 59.21 sq m · 637 sq ft | 6 | 1 |
| 2BHK | 61.87 sq m · 666 sq ft | 8 | 0 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Professionals2
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Viinod Khanzode | — |
| Engineer | Shailesh Vimalkumar Oswal | — |
Source: MahaRERA project page. Contact details are not shown.
Other projects in Katraj
- PrernaRERA PM1260002602596
- Shivam Residency₹5,960 a sq ft
- Yashraj SanskrutiRERA PM1260002602407
- The VantageRERA PC1260002502684
- Infinity StudioRERA PM1260002501807
- Habitat Spring₹6,570 a sq ft
- Krishna Residency₹4,270 a sq ft
- Vrindavan₹5,350 a sq ft
All 2,149 projects in Katraj · Compare Padmashree Phase - I with another project
Padmashree Phase - I in numbers
Registered deals, summarised
Deedo has 32 registered documents at Padmashree Phase - I, from Mar 2024 to Sep 2026: 20 sales, 12 mortgages. The median registered sale since Mar 2024 works out to about ₹6,400 per sq ft, at a median of ₹45 L a deal; 0% of sales were resales.
- What is the price per sq ft at Padmashree Phase - I?
- The median registered sale since Mar 2024 works out to about ₹6,400 per sq ft, at a median of ₹45 L a deal; 0% of sales were resales.
- How many properties have been sold at Padmashree Phase - I?
- 20 sales are registered at Padmashree Phase - I.
- Where does this data come from?
- The figures come from registered documents (Index II) at the Maharashtra sub-registrar offices, matched at Padmashree Phase - I by Deedo, last updated with deals registered in Sep 2026.
Latest deal · Primary sale · Sep 2026
₹25–50 L