Linea
Deedo IDDP-PUN-JZQWMahaRERA shows it completed; no MahaRERA orders on record; 86% of its units are booked.
Hadapsar, Pune 411028 · Property rates in Hadapsar · by Rajeev Shivnath Sonkar
Buying a flat here?
See every deed registered on it.
MahaRERA shows it completed
- This projectRegistered 4 Aug 2017, completion promised 30 Jun 2023.
No extension certificate on record.
1 registration · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales first, then rentals and mortgages matched to this project · the free view shows a price band
- Resale · Mar 2026
- Primary sale · Feb 2026
- Primary sale · Nov 2019
- Rental · Aug 2026
- Mortgage · Aug 2026No amount
- Rental · Jun 2026
- Mortgage · Mar 2026No amount
- Mortgage · Feb 2026No amount
- Rental · Jan 2026
- Rental · Aug 2025
| Month | Flat | Kind | Area | Price | Record |
|---|---|---|---|---|---|
| Mar 2026 | Main building · 504 | Resale | 462 sq ft | View Resale, Mar 2026 | |
| Feb 2026 | Main building · 504 | Primary sale | 462 sq ft | View Primary sale, Feb 2026 | |
| Nov 2019 | Wing A · 302 | Primary sale | 569 sq ft | View Primary sale, Nov 2019 | |
| Aug 2026 | Not on record | Rental | — | View Rental, Aug 2026 | |
| Aug 2026 | Not on record | Mortgage | — | View Mortgage, Aug 2026 | |
| Jun 2026 | Unit B-304 | Rental | — | View Rental, Jun 2026 | |
| Mar 2026 | Not on record | Mortgage | — | View Mortgage, Mar 2026 | |
| Feb 2026 | Unit 704 | Mortgage | — | View Mortgage, Feb 2026 | |
| Jan 2026 | Not on record | Rental | — | View Rental, Jan 2026 | |
| Aug 2025 | Not on record | Rental | — | View Rental, Aug 2025 |
4 buildings
Open a building to see every flat, floor by floor.
- A - Phase I13 floors · 58 units98% booked
- B - Phase I13 floors
- C - Phase II13 floors · 50 units58% booked
- D - Phase II14 floors · 48 units100% booked
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrationP52100002743
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52100002743 | 4 Aug 2017 | 30 Jun 2023 | 30 Jun 2023 | Rajeev Shivnath Sonkar | Project page |
Documents72
1 document held by Deedo, 71 filings listed on MahaRERA's project page
Finance
- PAN CardPAN card.pdf · uploaded 20 Jul 2017Source
Legal
- Legal Title reportSearch Report -1.pdf · uploaded 20 Jul 2017Source
- Legal Title reportSearch Report -2.pdf · uploaded 20 Jul 2017Source
- Legal Title reportSearch Report -3.pdf · uploaded 20 Jul 2017Source
- Declaration Form BFORM -B.pdf · uploaded 20 Jul 2017Source
- OtherOrder 505-2017.pdf · uploaded 31 Jan 2018Source
Migrated
- 1 PAN CardPAN card.pdf · uploaded 20 Jul 2017Source
Show all 72 documentsShow fewer documents
Migrated
- 1 Copy of the legal title reportSearch Report -1.pdf · uploaded 20 Jul 2017Source
- 2 Copy of the legal title reportSearch Report -2.pdf · uploaded 20 Jul 2017Source
- 3 Copy of the legal title reportSearch Report -3.pdf · uploaded 20 Jul 2017Source
- 1 Details of encumbrancesDetails of Encumbrances.pdf · uploaded 20 Jul 2017Source
- 1 Copy of Layout Approval (in case of layout)Layout.PDF · uploaded 20 Jul 2017Source
- 1 Building Plan Approval (IOD)BUILDING PLAN APPROVAL1.PDF · uploaded 20 Jul 2017Source
- 2 Building Plan Approval (IOD)BUILDING PLAN APPROVAL2.PDF · uploaded 20 Jul 2017Source
- 3 Building Plan Approval (IOD)BUILDING PLAN APPROVAL3.PDF · uploaded 20 Jul 2017Source
- 4 Building Plan Approval (IOD)BUILDING PLAN APPROVAL4.pdf · uploaded 20 Jul 2017Source
- 5 Building Plan Approval (IOD)BUILDING PLAN APPROVAL 5.PDF · uploaded 20 Jul 2017Source
- 6 Building Plan Approval (IOD)BUILDING PLAN APPROVAL6.PDF · uploaded 20 Jul 2017Source
- 7 Building Plan Approval (IOD)BUILDING PLAN APPROVAL7.PDF · uploaded 20 Jul 2017Source
- 8 Building Plan Approval (IOD)BUILDING PLAN APPROVAL8.PDF · uploaded 20 Jul 2017Source
- 9 Building Plan Approval (IOD)BUILDING PLAN APPROVAL9.pdf · uploaded 20 Jul 2017Source
- 10 Building Plan Approval (IOD)BUILDING PLAN APPROVAL10.PDF · uploaded 20 Jul 2017Source
- 11 Building Plan Approval (IOD)BUILDING PLAN APPROVAL11.PDF · uploaded 20 Jul 2017Source
- 12 Building Plan Approval (IOD)BUILDING PLAN APPROVAL13.pdf · uploaded 20 Jul 2017Source
- 13 Building Plan Approval (IOD)BUILDING PLAN APPROVAL12.PDF · uploaded 20 Jul 2017Source
- 1 Commencement Certificates / NA Order for plotted developmentCommencement Certificate 1.pdf · uploaded 20 Jul 2017Source
- 1 Declaration in FORM BFORM -B.pdf · uploaded 20 Jul 2017Source
- 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect Certificate phase II.pdf · uploaded 20 Jul 2017Source
- 2 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect Certificate Phase I.pdf · uploaded 20 Jul 2017Source
- 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineer Certificate - Linea.pdf · uploaded 20 Jul 2017Source
- 1 Certificates of CA (Form 3)CA Certificate.PDF · uploaded 20 Jul 2017Source
- 1 Proforma of Allotment letterDraft Agreement.pdf · uploaded 20 Jul 2017Source
- 2 Proforma of Allotment letterALLOMENT LETTER.PDF · uploaded 20 Jul 2017Source
- 3 Proforma of Allotment letterBlank Flat Draft Linea as per RERA.pdf · uploaded 12 Oct 2017Source
- 1 OtherOrder 505-2017.pdf · uploaded 31 Jan 2018Source
- 1 Certificates of CA (Form 5)RERA CA CERTIFICATES-Linea.pdf · uploaded 29 Sep 2018Source
- 4 Proforma of Allotment letterBlank Draft of Linea.pdf · uploaded 18 Dec 2018Source
- 5 Proforma of Allotment letterMahad Agreeemnt (Mhada Draft.pdf · uploaded 7 Mar 2019Source
- 14 Building Plan Approval (IOD)Linea.pdf · uploaded 10 Apr 2019Source
- 15 Building Plan Approval (IOD)LINEA 1.pdf · uploaded 10 Apr 2019Source
- 16 Building Plan Approval (IOD)LINEA 2.pdf · uploaded 10 Apr 2019Source
- 17 Building Plan Approval (IOD)LINEA 1.pdf · uploaded 10 Apr 2019Source
- 1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentCompletion Certificate A and B Bldg.pdf · uploaded 23 Sep 2019Source
- 2 Certificates of CA (Form 5)Form 5 Linea.pdf · uploaded 30 Sep 2019Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)Rera Form 5 DRV Linea_compressed.pdf · uploaded 31 Mar 2021Source
- 2 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentLinea C and D_compressed.pdf · uploaded 27 Jul 2021Source
- 1 Status of Formation of Legal Entity (Society/Co Op etc.)LINEA A and B WING SOCIETY Registration Certificate.pdf · uploaded 27 Jul 2021Source
- 2 Architect’s Certificate on Completion of Project (Form 4)Form 4_Linea C, D.pdf · uploaded 21 Sep 2023Source
- 3 Architect’s Certificate on Completion of Project (Form 4)Form 4_Linea A, B.pdf · uploaded 21 Sep 2023Source
- 4 Architect’s Certificate on Completion of Project (Form 4)Form 4 Linea A,B.pdf · uploaded 26 Sep 2023Source
- 5 Architect’s Certificate on Completion of Project (Form 4)Form 4 Linea C,D.pdf · uploaded 26 Sep 2023Source
Technical
- DocumentLayout.PDF · uploaded 20 Jul 2017Source
- DocumentBUILDING PLAN APPROVAL1.PDF · uploaded 20 Jul 2017Source
- DocumentBUILDING PLAN APPROVAL2.PDF · uploaded 20 Jul 2017Source
- DocumentBUILDING PLAN APPROVAL3.PDF · uploaded 20 Jul 2017Source
- DocumentBUILDING PLAN APPROVAL4.pdf · uploaded 20 Jul 2017Source
- DocumentBUILDING PLAN APPROVAL 5.PDF · uploaded 20 Jul 2017Source
- DocumentBUILDING PLAN APPROVAL6.PDF · uploaded 20 Jul 2017Source
- DocumentBUILDING PLAN APPROVAL7.PDF · uploaded 20 Jul 2017Source
- DocumentBUILDING PLAN APPROVAL8.PDF · uploaded 20 Jul 2017Source
- DocumentBUILDING PLAN APPROVAL9.pdf · uploaded 20 Jul 2017Source
- DocumentBUILDING PLAN APPROVAL10.PDF · uploaded 20 Jul 2017Source
- DocumentBUILDING PLAN APPROVAL11.PDF · uploaded 20 Jul 2017Source
- DocumentBUILDING PLAN APPROVAL13.pdf · uploaded 20 Jul 2017Source
- DocumentBUILDING PLAN APPROVAL12.PDF · uploaded 20 Jul 2017Source
- DocumentLinea.pdf · uploaded 10 Apr 2019Source
- DocumentLINEA 1.pdf · uploaded 10 Apr 2019Source
- DocumentLINEA 2.pdf · uploaded 10 Apr 2019Source
- DocumentLINEA 1.pdf · uploaded 10 Apr 2019Source
Technical (Architect)
- DocumentArchitect Certificate Phase I.pdf · uploaded 20 Jul 2017Source
Technical (Engineer)
- DocumentEngineer Certificate - Linea.pdf · uploaded 20 Jul 2017Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvalsLand parcel 65
As registered with MahaRERA and published on its project page
- Project type
- Others
- Status on MahaRERA
- Certificate Signed
- Unit types
- 2BHK, Shop, 1BHK, MHADA 1BHK156 units in all
- Address
- 65PIN 411028
- Village
- Hadapsar, Haveli taluka
- Location
- 18.47167, 73.93242
- Land area for this project
- 6,715 sq m (72,280 sq ft)
- Permissible built-up area
- 7,908 sq m (85,120 sq ft)
- Sanctioned built-up area
- 7,908 sq m (85,120 sq ft)
- Recreational open space
- 499 sq m (5,374 sq ft)
- Designated bank account
- 51
- Developed in phases
- Yes
Survey, CTS, gat or plot numbers
Land as published on MahaRERA's project page
65
Boundaries
- North
- Road goes towards JSPM College
- South
- Property belong to Dreams Group
- East
- Remaining area of sr no 65
- West
- 24 meter D P Road
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking156 units
134 of 156 units booked (86%), as the promoter reported to MahaRERA
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| A - Phase I | 2BHK | 47.58 sq m · 512 sq ft | 1 | 1 |
| A - Phase I | 2BHK | 47.69 sq m · 513 sq ft | 1 | 1 |
| A - Phase I | 2BHK | 47.72 sq m · 514 sq ft | 1 | 1 |
| A - Phase I | 2BHK | 47.77 sq m · 514 sq ft | 8 | 8 |
| A - Phase I | 2BHK | 50.64 sq m · 545 sq ft | 4 | 4 |
| A - Phase I | 2BHK | 50.68 sq m · 546 sq ft | 5 | 5 |
| A - Phase I | 2BHK | 52.04 sq m · 560 sq ft | 4 | 4 |
| A - Phase I | 2BHK | 52.25 sq m · 562 sq ft | 5 | 5 |
Show all 68 unit rowsShow fewer unit rows
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| A - Phase I | 2BHK | 52.87 sq m · 569 sq ft | 4 | 4 |
| A - Phase I | 2BHK | 53.01 sq m · 571 sq ft | 5 | 5 |
| A - Phase I | 2BHK | 55.22 sq m · 594 sq ft | 1 | 1 |
| A - Phase I | 2BHK | 69.28 sq m · 746 sq ft | 1 | 0 |
| A - Phase I | Shop | 12.11 sq m · 130 sq ft | 2 | 2 |
| A - Phase I | Shop | 12.2 sq m · 131 sq ft | 1 | 1 |
| A - Phase I | Shop | 13.36 sq m · 144 sq ft | 1 | 1 |
| A - Phase I | Shop | 13.37 sq m · 144 sq ft | 1 | 1 |
| A - Phase I | Shop | 14.35 sq m · 154 sq ft | 1 | 1 |
| A - Phase I | Shop | 14.48 sq m · 156 sq ft | 1 | 1 |
| A - Phase I | Shop | 14.65 sq m · 158 sq ft | 2 | 2 |
| A - Phase I | Shop | 14.69 sq m · 158 sq ft | 1 | 1 |
| A - Phase I | Shop | 14.79 sq m · 159 sq ft | 1 | 1 |
| A - Phase I | Shop | 14.84 sq m · 160 sq ft | 1 | 1 |
| A - Phase I | Shop | 20.67 sq m · 222 sq ft | 1 | 1 |
| A - Phase I | Shop | 21.07 sq m · 227 sq ft | 1 | 1 |
| A - Phase I | Shop | 21.43 sq m · 231 sq ft | 1 | 1 |
| A - Phase I | Shop | 29.44 sq m · 317 sq ft | 1 | 1 |
| A - Phase I | Shop | 30.1 sq m · 324 sq ft | 1 | 1 |
| A - Phase I | Shop | 31 sq m · 334 sq ft | 1 | 1 |
| C - Phase II | 2BHK | 42.72 sq m · 460 sq ft | 9 | 2 |
| C - Phase II | 2BHK | 42.76 sq m · 460 sq ft | 5 | 3 |
| C - Phase II | 2BHK | 42.85 sq m · 461 sq ft | 1 | 0 |
| C - Phase II | 2BHK | 42.88 sq m · 462 sq ft | 1 | 1 |
| C - Phase II | 2BHK | 42.96 sq m · 462 sq ft | 4 | 0 |
| C - Phase II | 2BHK | 44.91 sq m · 483 sq ft | 9 | 9 |
| C - Phase II | 2BHK | 45.03 sq m · 485 sq ft | 1 | 0 |
| C - Phase II | 2BHK | 47.92 sq m · 516 sq ft | 4 | 3 |
| C - Phase II | 2BHK | 48.05 sq m · 517 sq ft | 1 | 1 |
| C - Phase II | 2BHK | 48.07 sq m · 517 sq ft | 5 | 3 |
| C - Phase II | Shop | 16.44 sq m · 177 sq ft | 1 | 1 |
| C - Phase II | Shop | 16.45 sq m · 177 sq ft | 1 | 1 |
| C - Phase II | Shop | 17.64 sq m · 190 sq ft | 1 | 1 |
| C - Phase II | Shop | 24.59 sq m · 265 sq ft | 1 | 0 |
| C - Phase II | Shop | 25.12 sq m · 270 sq ft | 1 | 0 |
| C - Phase II | Shop | 25.28 sq m · 272 sq ft | 1 | 1 |
| C - Phase II | Shop | 25.57 sq m · 275 sq ft | 1 | 0 |
| C - Phase II | Shop | 27.05 sq m · 291 sq ft | 1 | 1 |
| C - Phase II | Shop | 27.36 sq m · 295 sq ft | 1 | 1 |
| C - Phase II | Shop | 27.93 sq m · 301 sq ft | 1 | 1 |
| D - Phase II | 1BHK | 33.12 sq m · 357 sq ft | 1 | 1 |
| D - Phase II | 1BHK | 33.13 sq m · 357 sq ft | 2 | 2 |
| D - Phase II | 1BHK | 33.33 sq m · 359 sq ft | 2 | 2 |
| D - Phase II | 1BHK | 33.34 sq m · 359 sq ft | 2 | 2 |
| D - Phase II | 1BHK | 35.07 sq m · 377 sq ft | 3 | 3 |
| D - Phase II | 1BHK | 35.09 sq m · 378 sq ft | 1 | 1 |
| D - Phase II | 1BHK | 35.37 sq m · 381 sq ft | 1 | 1 |
| D - Phase II | 1BHK | 35.39 sq m · 381 sq ft | 3 | 3 |
| D - Phase II | 2BHK | 55.02 sq m · 592 sq ft | 1 | 1 |
| D - Phase II | MHADA 1BHK | 33.02 sq m · 355 sq ft | 12 | 12 |
| D - Phase II | MHADA 1BHK | 34.83 sq m · 375 sq ft | 6 | 6 |
| D - Phase II | MHADA 1BHK | 35.15 sq m · 378 sq ft | 6 | 6 |
| D - Phase II | Shop | 16.2 sq m · 174 sq ft | 1 | 1 |
| D - Phase II | Shop | 19.19 sq m · 207 sq ft | 1 | 1 |
| D - Phase II | Shop | 20.18 sq m · 217 sq ft | 1 | 1 |
| D - Phase II | Shop | 25.15 sq m · 271 sq ft | 1 | 1 |
| D - Phase II | Shop | 25.8 sq m · 278 sq ft | 1 | 1 |
| D - Phase II | Shop | 26.91 sq m · 290 sq ft | 1 | 1 |
| D - Phase II | Shop | 26.97 sq m · 290 sq ft | 1 | 1 |
| D - Phase II | Shop | 27.54 sq m · 296 sq ft | 1 | 1 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Professionals3
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Vilas Suresh Tarwadi | — |
| Engineer | Parag Prakash Chopada | — |
| Other | Chander Laxman Rathod | — |
Source: MahaRERA project page. Contact details are not shown.
Other projects in Hadapsar
- Palladio Presidential Towers Phase 1RERA PM1260002602526
- Dosti Greenscapes - Phase 5₹11,500 a sq ft
- Oxy BelamarRERA PM1260002601661
- Aastha HousingRERA PR1262022601204
- Gandharv Leela₹9,710 a sq ft
- Park Imperial Tower ARERA PR1261012600792
- Gandharv Gokulam₹11,900 a sq ft
- Euphoric BlossomRERA PR1260002600219
All 4,589 projects in Hadapsar · Compare Linea with another project
Linea in numbers
Registered deals, summarised
Deedo has 94 registered documents at Linea, from May 2016 to Aug 2026: 3 sales, 45 leave and licence agreements, 43 mortgages. The median registered sale since May 2016 works out to about ₹9,200 per sq ft, at a median of ₹43 L a deal; 33% of sales were resales.
- What is the price per sq ft at Linea?
- The median registered sale since May 2016 works out to about ₹9,200 per sq ft, at a median of ₹43 L a deal; 33% of sales were resales.
- How many properties have been sold at Linea?
- 3 sales are registered at Linea, 1 of them a resale.
- Are properties at Linea rented out?
- Yes: 45 leave and licence agreements are registered at Linea, at a median rent since May 2016 of about ₹11,000 a month with a deposit of about ₹28,000.
- Where does this data come from?
- The figures come from registered documents (Index II) at the Maharashtra sub-registrar offices, matched at Linea by Deedo, last updated with deals registered in Aug 2026.
Latest deal · Resale · Mar 2026
₹25–50 L