Amanora Gold
Deedo IDDP-PUN-QWGDMahaRERA shows it completed; no MahaRERA orders on record; 100% of its units are booked.
Hadapsar, Pune 411028 · Property rates in Hadapsar · by City Corporation Limited · 100% of its projects kept the RERA date
Buying a flat here?
See every deed registered on it.
MahaRERA shows it completed
- P52100017612Registered 29 Aug 2018, completion promised 30 Dec 2023.
- P52100017962Registered 1 Oct 2018, completion promised 30 May 2024.
No extension certificate on record.
2 registrations · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales, rentals and mortgages matched to this project · the free view shows a price band
- Title transfer · Oct 2026
- Rental · Oct 2026
- Family transfer · Oct 2026No amount
- Rental · Oct 2026
- Rental · Oct 2026
- Resale · Oct 2026
- Rental · Oct 2026
- Rental · Oct 2026
- Rental · Oct 2026
- Rental · Oct 2026
| Month | Flat | Kind | Area | Price | Record |
|---|---|---|---|---|---|
| Oct 2026 | Tower 42 | Title transfer | — | View Title transfer, Oct 2026 | |
| Oct 2026 | Tower 42 · 042-2602 | Rental | — | View Rental, Oct 2026 | |
| Oct 2026 | Tower 42 · 1511 | Family transfer | — | View Family transfer, Oct 2026 | |
| Oct 2026 | Tower 46 | Rental | — | View Rental, Oct 2026 | |
| Oct 2026 | Unit 1102 | Rental | — | View Rental, Oct 2026 | |
| Oct 2026 | Tower 46 | Resale | — | View Resale, Oct 2026 | |
| Oct 2026 | Tower 46 · 046-3302 | Rental | — | View Rental, Oct 2026 | |
| Oct 2026 | Unit 45 | Rental | — | View Rental, Oct 2026 | |
| Oct 2026 | Not on record | Rental | — | View Rental, Oct 2026 | |
| Oct 2026 | Tower 42 | Rental | — | View Rental, Oct 2026 |
14 buildings
Open a building to see every flat, floor by floor.
- Building (P52100017612)Size not on record98% booked
- Building (P52100017962)Size not on record55% booked
- FleorSize not on record100% booked
- Tower 4237 floors · 382 units100% booked
- Tower 4337 floors · 284 units100% booked
- Tower 4437 floors · 251 units100% booked
- Tower 4537 floors · 256 units100% booked
- Tower 4637 floors · 413 units100% booked
- TowersSize not on record100% booked
- Wing 42Size not on record
- Wing 43Size not on record
- Wing 44Size not on record
- Wing 45Size not on record
- Wing 46Size not on record
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrations2
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52100017612 | 29 Aug 2018 | 30 Dec 2023 | 30 Dec 2023 | City Corporation Limited | Project page |
| P52100017962 | 1 Oct 2018 | 30 May 2024 | 30 May 2024 | City Corporation Limited | Project page |
Documents173
4 documents held by Deedo, 169 filings listed on MahaRERA's project page
Registration certificate (2)
Finance
Show all 173 documentsShow fewer documents
Legal
- Legal Title reportP52100017612 · Title Certificate Sector R 29 Gold Towers 2.pdf · uploaded 23 Aug 2018Source
- Declaration Form BP52100017962 · Form B and BR Gold Towers 44 45 and 46 R29.pdf · uploaded 31 Aug 2018Source
- Legal Title reportP52100017962 · Title Certificate Sector R 29 Gold Towers .pdf · uploaded 5 Sep 2018Source
Migrated
- 1 PAN CardP52100017612 · Pan Card CCL.pdf · uploaded 23 Jul 2018Source
- 1 Details of encumbrancesP52100017612 · Encumbrance Certificate Gold Towers 42 and 43 R29.pdf · uploaded 31 Jul 2018Source
- 1 Declaration in FORM BP52100017612 · Form B and BR Gold Towers 42 and 43 R29.pdf · uploaded 31 Jul 2018Source
- 1 Copy of Layout Approval (in case of layout)P52100017612 · R29 Gold Towers Layout.pdf · uploaded 6 Aug 2018Source
- 1 Building Plan Approval (IOD)P52100017612 · R29 Gold Towers Layout.pdf · uploaded 6 Aug 2018Source
- 1 Commencement Certificates / NA Order for plotted developmentP52100017612 · Gold Towers R29 Commencement Certificate.pdf · uploaded 6 Aug 2018Source
- 1 Certificates of CA (Form 3)P52100017612 · Amanora Gold Towers 42 and 43 CA Certificate.pdf · uploaded 11 Aug 2018Source
- 1 Copy of the legal title reportP52100017612 · Title Certificate Sector R 29 Gold Towers .pdf · uploaded 13 Aug 2018Source
- 1 Proforma of Allotment letterP52100017612 · Proforma of the allotment letter and agreement for lease Gold towers.pdf · uploaded 13 Aug 2018Source
- 2 Copy of the legal title reportP52100017612 · Title Certificate Sector R 29 Gold Towers 2.pdf · uploaded 23 Aug 2018Source
- 2 Certificates of CA (Form 3)P52100017612 · Amanora Gold Towers 42 and 43 CA Certificate 2.pdf · uploaded 23 Aug 2018Source
- 1 PAN CardP52100017962 · Pan Card CCL.pdf · uploaded 24 Aug 2018Source
- 1 Details of encumbrancesP52100017962 · Encumbrance Certificate Gold Towers 44 45 and 46 R29.pdf · uploaded 31 Aug 2018Source
- 1 Commencement Certificates / NA Order for plotted developmentP52100017962 · Gold Towers R29 Commencement Certificate.pdf · uploaded 31 Aug 2018Source
- 1 Declaration in FORM BP52100017962 · Form B and BR Gold Towers 44 45 and 46 R29.pdf · uploaded 31 Aug 2018Source
- 1 Copy of the legal title reportP52100017962 · Title Certificate Sector R 29 Gold Towers .pdf · uploaded 5 Sep 2018Source
- 1 Proforma of Allotment letterP52100017962 · Proforma of the allotment letter and agreement for lease Gold towers Phase-II.pdf · uploaded 7 Sep 2018Source
- 1 Copy of Layout Approval (in case of layout)P52100017962 · R29 Gold Towers Layout.pdf · uploaded 8 Sep 2018Source
- 1 Building Plan Approval (IOD)P52100017962 · R29 Gold Towers Layout.pdf · uploaded 8 Sep 2018Source
- 1 Certificates of CA (Form 3)P52100017962 · Amanora Gold Towers 44 45 and 46 CA Certificate.pdf · uploaded 8 Sep 2018Source
- 3 Certificates of CA (Form 3)P52100017612 · Amanora GOLD TOWERS CA Certificate 42 and 43 1.pdf · uploaded 20 Mar 2019Source
- 2 Certificates of CA (Form 3)P52100017962 · Amanora GOLD TOWERS CA Certificate 44 45 and 46 1.pdf · uploaded 20 Mar 2019Source
- 4 Certificates of CA (Form 3)P52100017612 · Amanora GOLD TOWERS CA Certificate 42 and 43 2.pdf · uploaded 23 Jul 2019Source
- 3 Certificates of CA (Form 3)P52100017962 · Amanora GOLD TOWERS CA Certificate 42 and 43 2.pdf · uploaded 23 Jul 2019Source
- 4 Certificates of CA (Form 3)P52100017962 · Amanora GOLD TOWERS CA Certificate 44 45 and 46 2.pdf · uploaded 23 Jul 2019Source
- 5 Certificates of CA (Form 3)P52100017962 · Amanora GOLD TOWERS CA Certificate 44 45 and 46 2.pdf · uploaded 24 Aug 2019Source
- 1 Annual Audit Report of Statutory CA (Form 5)P52100017612 · Amanora Gold Towers 42 43 Form 5.pdf · uploaded 30 Sep 2019Source
- 1 Annual Audit Report of Statutory CA (Form 5)P52100017962 · Amanora Gold Towers 44 45 46 Form 5.pdf · uploaded 30 Sep 2019Source
- 5 Certificates of CA (Form 3)P52100017612 · Form 3 Amanora Gold Towers 42 and 43 Phase 1 CA Certificate 03.pdf · uploaded 4 Oct 2019Source
- 6 Certificates of CA (Form 3)P52100017612 · Form 3 Amanora Gold Towers 42 and 43 Phase 1 CA Certificate 03.pdf · uploaded 4 Oct 2019Source
- 7 Certificates of CA (Form 3)P52100017612 · Form 3 Amanora Gold Towers 42 and 43 Phase 1 CA Certificate 03.pdf · uploaded 4 Oct 2019Source
- 6 Certificates of CA (Form 3)P52100017962 · Form 3 Amanora Gold Towers 44, 45 and 46 Phase 2 CA Certificate 03.pdf · uploaded 4 Oct 2019Source
- 7 Certificates of CA (Form 3)P52100017962 · Form 3- Amanora Gold Towers 44, 45 and 46 (Phase 2)-CA Certificate (4).pdf · uploaded 11 Dec 2019Source
- 8 Certificates of CA (Form 3)P52100017612 · Form 3 Amanora Gold Towers 42 and 43 Phase 1 CA Certificate 04.pdf · uploaded 24 Dec 2019Source
- 9 Certificates of CA (Form 3)P52100017612 · Form 3 Amanora Gold Towers 42 and 43 (Phase 1) CA Certificate (05).pdf · uploaded 13 Mar 2020Source
- 8 Certificates of CA (Form 3)P52100017962 · Form 3 Amanora Gold Towers 44, 45 and 46 (Phase 2)- CA Certificate (05).pdf · uploaded 13 Mar 2020Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100017612 · Form 1- Amanora Gold Towers 42 and 43 (Phase 1)- Architect Certificate (06).pdf · uploaded 18 Jun 2020Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100017612 · Form 2- Amanora Gold Towers 42 and 43 (Phase 1)- Engineer Certificate (6).pdf · uploaded 18 Jun 2020Source
- 10 Certificates of CA (Form 3)P52100017612 · Form 3 Amanora Gold Towers 42 and 43 Phase 1 CA Certificate 6.pdf · uploaded 18 Jun 2020Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100017962 · Form 1- Amanora Gold Towers 44, 45 and 46 (Phase 2)- Architect Certificate (06).pdf · uploaded 18 Jun 2020Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100017962 · Form 2- Amanora Gold Towers 44, 45 and 46 (Phase 2)- Engineer Certificate (6).pdf · uploaded 18 Jun 2020Source
- 9 Certificates of CA (Form 3)P52100017962 · Form 3 Amanora Gold Towers 44 45 and 46 Phase 2 CA Certificate 6.pdf · uploaded 18 Jun 2020Source
- 1 Details of Restarting of Construction work post lockdownP52100017612 · Amanora Gold Towers 42 and 43 Details of Restarting of Construction work post lockdown.pdf · uploaded 23 Jun 2020Source
- 1 Details of Restarting of Construction work post lockdownP52100017962 · Amanora Gold Towers 44 45 and 46 Details of Restarting of Construction work post lockdown.pdf · uploaded 23 Jun 2020Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100017612 · Form 1- Amanora Gold Towers 42 and 43 (Phase 1)- Architect Certificate (08).pdf · uploaded 19 Nov 2020Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100017612 · Form 2- Amanora Gold Towers 42 and 43 (Phase 1)- Engineer Certificate (8)_compressed.pdf · uploaded 19 Nov 2020Source
- 11 Certificates of CA (Form 3)P52100017612 · Form 3 - GOLD-I CA Certificate.pdf · uploaded 19 Nov 2020Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100017962 · Form 1- Amanora Gold Towers 44, 45 and 46 (Phase 2)- Architect Certificate (08).pdf · uploaded 19 Nov 2020Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100017962 · Form 2- Amanora Gold Towers 44, 45 and 46 (Phase 2)- Engineer Certificate (8).pdf · uploaded 19 Nov 2020Source
- 10 Certificates of CA (Form 3)P52100017962 · Form 3 - GOLD-II - CA Certificate.pdf · uploaded 19 Nov 2020Source
- 2 Annual Audit Report of Statutory CA (Form 5)P52100017612 · Form 5 Gold Phase 1.pdf · uploaded 21 Apr 2021Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)P52100017612 · Form 5 Gold Phase 1.pdf · uploaded 21 Apr 2021Source
- 2 Annual Audit Report of Statutory CA (Form 5)P52100017962 · Form 5 Gold Phase 2.pdf · uploaded 21 Apr 2021Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)P52100017962 · Form 5 Gold Phase 2.pdf · uploaded 21 Apr 2021Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100017612 · Form 1- Amanora Gold Towers 42 and 43 (Phase 1)- Architect Certificate (10).pdf · uploaded 18 Jun 2021Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100017962 · Form 1- Amanora Gold Towers 44, 45 and 46 (Phase 2)- Architect Certificate (10).pdf · uploaded 18 Jun 2021Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100017612 · Form 2- Amanora Gold Towers 42 and 43 (Phase 1)- Engineer Certificate R1 (10).pdf · uploaded 21 Jun 2021Source
- 12 Certificates of CA (Form 3)P52100017612 · Form 3 - Amanora Gold Towers 42 and 43 (Phase 1)- CA Certificate Dec.pdf · uploaded 21 Jun 2021Source
- 13 Certificates of CA (Form 3)P52100017612 · Form 3 - Amanora Gold Towers 42 and 43 (Phase 1)- CA Certificate.pdf · uploaded 21 Jun 2021Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100017962 · Form 2- Amanora Gold Towers 44, 45 and 46 (Phase 2)- Engineer Certificate (10).pdf · uploaded 21 Jun 2021Source
- 11 Certificates of CA (Form 3)P52100017962 · Form 3- Amanora Gold Towers 44, 45 and 46 (Phase 2)- CA Certificate Dec.pdf · uploaded 21 Jun 2021Source
- 12 Certificates of CA (Form 3)P52100017962 · Form 3- Amanora Gold Towers 44, 45 and 46 (Phase 2)- CA Certificate Mar 21.pdf · uploaded 21 Jun 2021Source
- 1 Disclosure of sold/ booked inventoryP52100017612 · Gold Towers 042.pdf · uploaded 24 Jul 2021Source
- 2 Disclosure of sold/ booked inventoryP52100017612 · Gold Towers 043.pdf · uploaded 24 Jul 2021View
- 1 Disclosure of sold/ booked inventoryP52100017962 · Gold Towers 044-045.pdf · uploaded 24 Jul 2021Source
- 2 Disclosure of sold/ booked inventoryP52100017962 · Gold Towers 046.pdf · uploaded 24 Jul 2021View
- 1 Status of Formation of Legal Entity (Society/Co Op etc.)P52100017612 · Status of Formation of Legal Entity.pdf · uploaded 26 Jul 2021Source
- 1 Status of Formation of Legal Entity (Society/Co Op etc.)P52100017962 · Status of Formation of Legal Entity.pdf · uploaded 26 Jul 2021Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100017612 · Form 1- Amanora Gold Towers 42 and 43 (Phase 1)- Architect Certificate (11)_compressed.pdf · uploaded 5 Aug 2021Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100017962 · Form 1- Amanora Gold Towers 44, 45 and 46 (Phase 2)- Architect Certificate (11)_compressed.pdf · uploaded 5 Aug 2021Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100017612 · Form 1- Amanora Gold Towers 42 and 43 (Phase 1)- Architect Certificate (11).pdf · uploaded 14 Aug 2021Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100017612 · Form 2- Amanora Gold Towers 42 and 43 (Phase 1)- Engineer Certificate (11).pdf · uploaded 14 Aug 2021Source
- 14 Certificates of CA (Form 3)P52100017612 · Form 3 Certificate Gold Phase1.pdf · uploaded 14 Aug 2021Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100017962 · Form 1- Amanora Gold Towers 44, 45 and 46 (Phase 2)- Architect Certificate (11).pdf · uploaded 14 Aug 2021Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100017962 · Form 2- Amanora Gold Towers 44, 45 and 46 (Phase 2)- Engineer Certificate (11).pdf · uploaded 14 Aug 2021Source
- 13 Certificates of CA (Form 3)P52100017962 · Form 3 Certificate Gold Phase 2.pdf · uploaded 14 Aug 2021Source
- 3 Annual Audit Report of Statutory CA (Form 5)P52100017612 · Amanora Gold Towers 42 43 Form 5 2.pdf · uploaded 6 Oct 2021Source
- 3 Annual Audit Report of Statutory CA (Form 5)P52100017962 · Amanora Gold Towers 44 45 46 Form 5 2.pdf · uploaded 6 Oct 2021Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100017612 · Form 1 Amanora Gold Towers 42 and 43 Phase 1 Architect Certificate 12.pdf · uploaded 7 Oct 2021Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100017612 · Form 2 Amanora Gold Towers 42 and 43 Phase 1 Engineer Certificate 12.pdf · uploaded 7 Oct 2021Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100017962 · Form 1 Amanora Gold Towers 44, 45 and 46 Phase 2 Architect Certificate 12.pdf · uploaded 7 Oct 2021Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100017962 · Form 2 Amanora Gold Towers 44, 45 and 46 Phase 2 Engineer Certificate 12.pdf · uploaded 7 Oct 2021Source
- 14 Certificates of CA (Form 3)P52100017962 · Form 3 Amanora Gold Towers 44, 45 and 46 Phase 2 CA Certificate 12.pdf · uploaded 7 Oct 2021Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100017612 · Form 1 Amanora Gold Tower 42 and 43 13 31122021.pdf · uploaded 7 Jan 2022Source
- 15 Certificates of CA (Form 3)P52100017612 · Form 3 - Gold Tower Phase 1.pdf · uploaded 7 Jan 2022Source
- 2 Status of Formation of Legal Entity (Society/Co Op etc.)P52100017612 · 02 Formation of society Amanora letter to RERA 06012022.pdf · uploaded 7 Jan 2022Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100017962 · Form 1 Amanora Gold Tower 44 45 and 46 13 31122021.pdf · uploaded 7 Jan 2022Source
- 15 Certificates of CA (Form 3)P52100017962 · Form 3 Gold Tower Phase 2.pdf · uploaded 7 Jan 2022Source
- 2 Status of Formation of Legal Entity (Society/Co Op etc.)P52100017962 · 02 Formation of society Amanora letter to RERA 06012022.pdf · uploaded 7 Jan 2022Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100017612 · Form 2 Amanora Gold Tower 42 and 43 Phase 1 31122021.pdf · uploaded 8 Jan 2022Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100017962 · Form 2 Amanora Gold Tower 44 45 and 46 Phase 2 13 31122021.pdf · uploaded 8 Jan 2022Source
- 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100017612 · Form 1- Amanora Gold Tower 42 and 43 14.pdf · uploaded 13 Jun 2022Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100017612 · Form 2 Amanora Gold Tower 42 and 43 Phase 1 14.pdf · uploaded 13 Jun 2022Source
- 16 Certificates of CA (Form 3)P52100017612 · Form 3 Phase 1 Gold towers 42 and 43.pdf · uploaded 13 Jun 2022Source
- 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100017962 · Form 1 Amanora Gold Tower 44, 45 and 46 14.pdf · uploaded 13 Jun 2022Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100017962 · Form 2 Amanora Gold Tower 44 45 and 46 Phase 2 14.pdf · uploaded 13 Jun 2022Source
- 16 Certificates of CA (Form 3)P52100017962 · Form 3 Amanora Gold Towers 44 45 and 46.pdf · uploaded 13 Jun 2022Source
- 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100017612 · Form 1 Amanora Gold 42 43.pdf · uploaded 14 Jul 2022Source
- 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100017962 · Form 1 Amanora Gold 44 45 46.pdf · uploaded 21 Jul 2022Source
- 17 Certificates of CA (Form 3)P52100017612 · Form 3 Gold Ph_1 Towers 30062022.pdf · uploaded 14 Nov 2022Source
- 17 Certificates of CA (Form 3)P52100017962 · Form 3 Gold Ph_2 Towers 30062022.pdf · uploaded 14 Nov 2022Source
- 4 Annual Audit Report of Statutory CA (Form 5)P52100017962 · Form 3 Gold Ph_2 Towers 30062022.pdf · uploaded 14 Nov 2022Source
- 18 Certificates of CA (Form 3)P52100017612 · Form 3 Gold Ph-I 30-09-2022.pdf · uploaded 25 Nov 2022Source
- 18 Certificates of CA (Form 3)P52100017962 · Form 3 Gold Ph-II 30-09-2022.pdf · uploaded 25 Nov 2022Source
- 1 Declaration about Commencement CertificateP52100017962 · Declaration about commencement Gold 44,45,46.pdf · uploaded 26 Nov 2022Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)P52100017962 · Form 2 A Gold Towers 45 45 46 30092022.pdf · uploaded 26 Nov 2022Source
- 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100017612 · Form 1- Amanora Gold Tower 42 and 43 30092022.pdf · uploaded 18 Jan 2023Source
- 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100017612 · Form 2- Amanora Gold Tower 42 and 43 Phase 1 31122022.pdf · uploaded 18 Jan 2023Source
- 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100017962 · Form 1- Amanora Gold Tower 44, 45 and 46 30092022.pdf · uploaded 18 Jan 2023Source
- 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100017962 · Form 2- Amanora Gold Tower 44, 45 and 46 Phase 2 31122022.pdf · uploaded 18 Jan 2023Source
- 11 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100017612 · Form 1- Amanora Gold Tower 42 and 43 31120200.pdf · uploaded 19 Jan 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)P52100017612 · Amanora Gold Towers 42 43 Form 5 1819.pdf · uploaded 19 Jan 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)P52100017612 · Amanora Gold Towers 42 43 Form 5 2.pdf · uploaded 19 Jan 2023Source
- 11 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100017962 · Form 1- Amanora Gold Tower 44, 45 and 46 31122022.pdf · uploaded 19 Jan 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)P52100017962 · Amanora Gold Towers 44 45 46 Form 1819.pdf · uploaded 19 Jan 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)P52100017962 · Amanora Gold Towers 44 45 46 Form 5 2.pdf · uploaded 19 Jan 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)P52100017612 · Form 5 Gold Ph-I.pdf · uploaded 23 Jan 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)P52100017962 · Form 5 Gold Ph-II.pdf · uploaded 23 Jan 2023Source
- 19 Certificates of CA (Form 3)P52100017612 · Form 3 Gold Ph I 31122022.pdf · uploaded 16 Mar 2023Source
- 19 Certificates of CA (Form 3)P52100017962 · Form 3 Amanora Gold Tower 44 45 and 46.pdf · uploaded 20 Mar 2023Source
- 20 Certificates of CA (Form 3)P52100017612 · Form 3 Gold Tower T042 TO 043 310323.pdf · uploaded 9 Jun 2023Source
- 12 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100017612 · Form 1- Amanora Gold Tower 42 and 43 31032023.pdf · uploaded 17 Jun 2023Source
- 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100017612 · Form 2- Amanora Gold Tower 42 and 43 Phase 1 - 31032023.pdf · uploaded 17 Jun 2023Source
- 12 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100017962 · Form 1- Amanora Gold Tower 44, 45 and 46 31032023.pdf · uploaded 17 Jun 2023Source
- 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100017962 · Form 2- Amanora Gold Tower 44, 45 and 46 Phase 2 - 31032023.pdf · uploaded 17 Jun 2023Source
- 20 Certificates of CA (Form 3)P52100017962 · Form 3 Gold Ph_II as on 31-03-2023.pdf · uploaded 17 Jun 2023Source
- 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100017962 · Form 2- Amanora Gold Tower 44, 45 and 46 Phase 2 30062023.pdf · uploaded 20 Jul 2023Source
- 13 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100017612 · Form 1- Amanora Gold Tower 42 and 43 30062023.pdf · uploaded 27 Jul 2023Source
- 13 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100017962 · Form 1- Amanora Gold Tower 44 45 and 46 30062023.pdf · uploaded 27 Jul 2023Source
- 21 Certificates of CA (Form 3)P52100017962 · Form 3 Gold Ph-II T044 TO 046 30062023.pdf · uploaded 3 Aug 2023Source
- 21 Certificates of CA (Form 3)P52100017612 · Form 3 Gold Ph-I_ T042 TO 043 30062023.pdf · uploaded 5 Aug 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)P52100017612 · Form 2A- Amanora Gold Tower 42 and 43 Phase 1- 31032023.pdf · uploaded 2 Sep 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)P52100017962 · Form 2A- Amanora Gold Tower 44, 45 and 46 Phase 2- 31032023.pdf · uploaded 2 Sep 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)P52100017612 · Form 5 Gold Ph_I 31-03-2023.pdf · uploaded 13 Oct 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)P52100017962 · Form 5 Gold Ph_II 31-03-2023.pdf · uploaded 13 Oct 2023Source
- 11 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100017962 · Form 2- Amanora Gold Tower 44, 45 and 46 Phase 2 (20)- 30092023.pdf · uploaded 18 Oct 2023Source
- 14 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100017962 · Form 1- Amanora Gold Tower 44, 45 and 46 (20)- 30092023.pdf · uploaded 21 Oct 2023Source
- 22 Certificates of CA (Form 3)P52100017962 · Gold Tower PH_2 Form 3 as on 30092023.pdf · uploaded 26 Oct 2023Source
- 1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentP52100017612 · Amanora Gold OC T42 43 07062023.pdf · uploaded 22 Dec 2023Source
- 2 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentP52100017612 · Format-FORM 4 - Amanora Gold Towers 42 - 43.pdf · uploaded 22 Dec 2023Source
- 1 Architect’s Certificate on Completion of Project (Form 4)P52100017612 · Format-FORM 4 - Amanora Gold Towers 42 - 43.pdf · uploaded 22 Dec 2023Source
- 15 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100017962 · Form 1- Amanora Gold Tower 44, 45 and 46 3112023.pdf · uploaded 6 Mar 2024Source
- 12 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100017962 · Form 2- Amanora Gold Tower 44, 45 and 46 Phase 2 31122023.pdf · uploaded 6 Mar 2024Source
- 23 Certificates of CA (Form 3)P52100017962 · Form 3 Gold Ph-II_ T044 TO 046 31122023.pdf · uploaded 1 Apr 2024Source
- 16 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100017962 · Form 1- Amanora Gold Tower 44, 45 and 46 31032024.pdf · uploaded 15 Apr 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)P52100017962 · Form 2A- Amanora Gold Tower 44 45 and 46- 31032024.pdf · uploaded 21 May 2024Source
- 13 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100017962 · Form 2- Amanora Gold Tower 44, 45 and 46 Phase 2 31032024.pdf · uploaded 24 May 2024Source
- 24 Certificates of CA (Form 3)P52100017962 · Form 3 Gold Ph-II_ T044 TO 046 31032024.pdf · uploaded 24 May 2024Source
- 1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentP52100017962 · OC T44-45-46 Combined Highlighted.pdf · uploaded 13 Jun 2024Source
- 1 Architect’s Certificate on Completion of Project (Form 4)P52100017962 · Form F Amanora Gold Towers 44 45 46.pdf · uploaded 13 Jun 2024Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100017962 · Form 2- Amanora Gold Tower 44, 45 and 46 Phase 2 30062024.pdf · uploaded 24 Oct 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)P52100017612 · Form 5 Gold Ph_I 31-03-2024.pdf · uploaded 15 Jan 2025Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)P52100017962 · Form 5 Gold Ph_II 31-03-2024.pdf · uploaded 15 Jan 2025Source
Technical
- DocumentP52100017612 · R29 Gold Towers Layout.pdf · uploaded 6 Aug 2018Source
- DocumentP52100017612 · R29 Gold Towers Layout.pdf · uploaded 6 Aug 2018Source
- DocumentP52100017962 · R29 Gold Towers Layout.pdf · uploaded 8 Sep 2018Source
- DocumentP52100017962 · R29 Gold Towers Layout.pdf · uploaded 8 Sep 2018Source
Technical (Architect)
Technical (Engineer)
- DocumentP52100017612 · Form 2- Amanora Gold Tower 42 and 43 Phase 1 - 31032023.pdf · uploaded 17 Jun 2023Source
- DocumentP52100017962 · Form 2- Amanora Gold Tower 44, 45 and 46 Phase 2 31032024.pdf · uploaded 24 May 2024Source
- DocumentP52100017962 · Form 2- Amanora Gold Tower 44, 45 and 46 Phase 2 30062024.pdf · uploaded 24 Oct 2024Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvalsLand parcel Sector R29
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Certificate Signed
- Phases
- 2
- Unit types
- 1.5 BHK, 1 BHK, 1 BHK CORNR STUDIO A, 2 BHK, 2 BHK A, 2 BHK A E DECK, 2 BHK E DECK, 2 BHK F, 2 BHK F E DECK, 1.5 BHK E DECK, 1 BHK Corner Studio, 1 BHK 1, 1 BHK CORNER STUDIO, 2 BHK A 1, Studio, 1 BHK E DECK, 2 BHK B, 2 BHK B E DECK1,586 units in all
- Address
- Sector R29, Hadapsar-Kharadi bypass, Amanora Park TownPIN 411028
- Village
- Hadapsar, Haveli taluka
- Location
- 18.52381, 73.93945
- Land area for this project
- 30,254 sq m (3,25,651 sq ft)
- Permissible built-up area
- 49,961 sq m (5,37,776 sq ft)
- Sanctioned built-up area
- 49,961 sq m (5,37,776 sq ft)
- Recreational open space
- 3,070 sq m (33,047 sq ft)
- Designated bank account
- 85
- Developed in phases
- Yes
- Also registered as
- Amanora Gold Towers 42 and 43, Amanora Gold Towers 44, 45 and 46, Amanora Gold Tower 042, Amanora Gold Tower 043, Amanora Gold Tower 044, Amanora Gold Tower 045, Amanora Gold Tower 046, अमनोरा गोल्ड
Survey, CTS, gat or plot numbers
Land as published on MahaRERA's project page
Sector R29
Boundaries
- North
- Survey no 43 by 1 by 1 and Survey no 43 by 1 by 2
- South
- Survey no 184
- East
- Regional Plan Road
- West
- Magarpatta Sub Station
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking1,586 units
1,586 of 1,586 units booked (100%), as the promoter reported to MahaRERA
| RERA | Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|---|
| P52100017612 | Tower 42 | 1.5 BHK | 47.42 sq m · 510 sq ft | 61 | 61 |
| P52100017612 | Tower 42 | 1 BHK | 37.29 sq m · 401 sq ft | 66 | 66 |
| P52100017612 | Tower 42 | 1 BHK CORNR STUDIO A | 34.65 sq m · 373 sq ft | 1 | 1 |
| P52100017612 | Tower 42 | 2 BHK | 55 sq m · 592 sq ft | 97 | 97 |
| P52100017612 | Tower 42 | 2 BHK A | 53.79 sq m · 579 sq ft | 27 | 27 |
| P52100017612 | Tower 42 | 2 BHK A E DECK | 57.07 sq m · 614 sq ft | 1 | 1 |
| P52100017612 | Tower 42 | 2 BHK E DECK | 58.49 sq m · 630 sq ft | 1 | 1 |
| P52100017612 | Tower 42 | 2 BHK F | 56.96 sq m · 613 sq ft | 126 | 126 |
Show all 37 unit rowsShow fewer unit rows
| RERA | Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|---|
| P52100017612 | Tower 42 | 2 BHK F E DECK | 59.98 sq m · 646 sq ft | 2 | 2 |
| P52100017612 | Tower 43 | 1.5 BHK | 47.42 sq m · 510 sq ft | 128 | 128 |
| P52100017612 | Tower 43 | 1.5 BHK E DECK | 50.71 sq m · 546 sq ft | 1 | 1 |
| P52100017612 | Tower 43 | 1 BHK | 37.29 sq m · 401 sq ft | 28 | 28 |
| P52100017612 | Tower 43 | 1 BHK Corner Studio | 33.72 sq m · 363 sq ft | 1 | 1 |
| P52100017612 | Tower 43 | 2 BHK | 55 sq m · 592 sq ft | 124 | 124 |
| P52100017612 | Tower 43 | 2 BHK E DECK | 58.49 sq m · 630 sq ft | 2 | 2 |
| P52100017962 | Tower 44 | 1.5 BHK | 47.42 sq m · 510 sq ft | 92 | 92 |
| P52100017962 | Tower 44 | 1.5 BHK E DECK | 50.71 sq m · 546 sq ft | 1 | 1 |
| P52100017962 | Tower 44 | 1 BHK 1 | 37.56 sq m · 404 sq ft | 31 | 31 |
| P52100017962 | Tower 44 | 1 BHK CORNER STUDIO | 33.72 sq m · 363 sq ft | 1 | 1 |
| P52100017962 | Tower 44 | 2 BHK | 55 sq m · 592 sq ft | 93 | 93 |
| P52100017962 | Tower 44 | 2 BHK A 1 | 54.29 sq m · 584 sq ft | 32 | 32 |
| P52100017962 | Tower 44 | 2 BHK E DECK | 58.49 sq m · 630 sq ft | 1 | 1 |
| P52100017962 | Tower 45 | 1 BHK CORNER STUDIO | 33.72 sq m · 363 sq ft | 1 | 1 |
| P52100017962 | Tower 45 | 2 BHK | 55 sq m · 592 sq ft | 124 | 124 |
| P52100017962 | Tower 45 | 2 BHK E DECK | 58.49 sq m · 630 sq ft | 2 | 2 |
| P52100017962 | Tower 45 | 2 BHK F | 56.96 sq m · 613 sq ft | 123 | 123 |
| P52100017962 | Tower 45 | 2 BHK F E DECK | 59.98 sq m · 646 sq ft | 1 | 1 |
| P52100017962 | Tower 45 | Studio | 25.6 sq m · 276 sq ft | 5 | 5 |
| P52100017962 | Tower 46 | 1.5 BHK | 47.42 sq m · 510 sq ft | 123 | 123 |
| P52100017962 | Tower 46 | 1.5 BHK E DECK | 50.71 sq m · 546 sq ft | 1 | 1 |
| P52100017962 | Tower 46 | 1 BHK | 37.29 sq m · 401 sq ft | 161 | 161 |
| P52100017962 | Tower 46 | 1 BHK CORNER STUDIO | 33.72 sq m · 363 sq ft | 1 | 1 |
| P52100017962 | Tower 46 | 1 BHK E DECK | 37.45 sq m · 403 sq ft | 2 | 2 |
| P52100017962 | Tower 46 | 2 BHK | 55 sq m · 592 sq ft | 60 | 60 |
| P52100017962 | Tower 46 | 2 BHK B | 53.74 sq m · 578 sq ft | 62 | 62 |
| P52100017962 | Tower 46 | 2 BHK B E DECK | 57.17 sq m · 615 sq ft | 2 | 2 |
| P52100017962 | Tower 46 | 2 BHK E DECK | 58.49 sq m · 630 sq ft | 1 | 1 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Professionals6
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. | RERA |
|---|---|---|---|
| Architect | Integrid Design Consultants Pvt. Ltd. | — | P52100017962 |
| Architect | Integrid Design Consultants Pvt. Ltd. | — | P52100017612 |
| Engineer | J+W Consultants LLP | — | P52100017612 |
| Engineer | J+W Consultants LLP | — | P52100017962 |
| Other | MEP System Solutions Pvt. Ltd. | — | P52100017612 |
| Other | MEP System Solutions Pvt. Ltd. | — | P52100017962 |
Source: MahaRERA project page. Contact details are not shown.
Amanora Gold in numbers
Registered deals, summarised
Deedo has 3,156 registered documents at Amanora Gold, from Dec 2018 to Oct 2026: 1,224 sales, 1,325 leave and licence agreements, 578 mortgages.
- How many properties have been sold at Amanora Gold?
- 1,224 sales are registered at Amanora Gold, 187 of them resales.
- Are properties at Amanora Gold rented out?
- Yes: 1,325 leave and licence agreements are registered at Amanora Gold, at a median rent since Dec 2018 of about ₹30,000 a month with a deposit of about ₹60,000.
- Where does this data come from?
- The figures come from registered documents (Index II) at the Maharashtra sub-registrar offices, matched at Amanora Gold by Deedo, last updated with deals registered in Oct 2026.
Latest deal · Title transfer · Oct 2026
₹25–50 L