Residential / Group Housing · 2 buildings · 225 unitsRERA P52100032079

Amanora Elevate Tower 47

Deedo IDDP-PUN-X6JH

MahaRERA shows it completed; no MahaRERA orders on record; 100% of its units are booked.

Hadapsar, Pune 411028 · Property rates in Hadapsar · by City Corporation Limited · 100% of its projects kept the RERA date

DeliveryCompletedCompletion / occupancy certificate on MahaRERARegulatoryNo ordersNot in any MahaRERA list or order Deedo has readSales100% booked225 of 225 units · as the promoter reported to MahaRERA

Buying a flat here?

See every deed registered on it.

MahaRERA shows it completed

  • This projectRegistered 3 Dec 2021, completion promised 31 Dec 2025.

No extension certificate on record.

1 registration · Source: MahaRERA registration and extension certificates

Latest registered deeds

Sales, rentals and mortgages matched to this project · the free view shows a price band

All 230 deeds →
Latest registered deeds in this project
MonthFlatKindAreaPriceRecord
Oct 2026Tower 47 · 2302Resale—View Resale, Oct 2026
Sep 2026Tower 47 · 2303Title transfer—View Title transfer, Sep 2026
Aug 2026Tower 47 · 47Rental—View Rental, Aug 2026
Aug 2026Tower 47 · 904Rental—View Rental, Aug 2026
Jul 2026Not on recordMortgage—View Mortgage, Jul 2026
Jul 2026Tower 47 · 2005Title transfer—View Title transfer, Jul 2026
Jul 2026Tower 47 · 2404Title transfer—View Title transfer, Jul 2026
Jul 2026Tower 47 · 1603Resale—View Resale, Jul 2026
Jul 2026Tower 47 · 2803Mortgage—View Mortgage, Jul 2026
Jul 2026Tower 47 · 302Title transfer—View Title transfer, Jul 2026

2 buildings

Open a building to see every flat, floor by floor.

Floors and units from the registration certificate annexures and MahaRERA's project page.

Regulatory recordNone found

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

RERA registrationP52100032079
RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P521000320793 Dec 202131 Dec 202531 Dec 2025City Corporation LimitedProject page
Documents100

1 document held by Deedo, 99 filings listed on MahaRERA's project page

Registration certificate

Finance

  • PAN CardPan Card CCL.pdf · uploaded 25 Oct 2021Source

Legal

  • Declaration Form BForm B and BR ELEVATE Towers.pdf · uploaded 28 Oct 2021Source
  • Legal Title reportLegal Title Report Amanora Elevate Tower 47.pdf · uploaded 10 Nov 2021Source
  • Declaration Form BForm B.pdf · uploaded 20 Nov 2021Source

Migrated

  • 1 PAN CardPan Card CCL.pdf · uploaded 25 Oct 2021Source
  • 1 Details of encumbrancesEncumbrance Certificate Elevate Towers R33.pdf · uploaded 28 Oct 2021Source
  • 1 Copy of Layout Approval (in case of layout)1 of 3 R33.pdf · uploaded 28 Oct 2021Source
Show all 100 documentsShow fewer documents

Migrated

  • 1 Building Plan Approval / NA Order for plotted development1 of 3 R33.pdf · uploaded 28 Oct 2021Source
  • 1 Commencement Certificates / NA Order for plotted developmentCommencement Certificate R33.pdf · uploaded 28 Oct 2021Source
  • 1 Declaration in FORM BForm B and BR ELEVATE Towers.pdf · uploaded 28 Oct 2021Source
  • 1 Declaration about Commencement CertificateFormat D DECLARATION ABOUT COMMENCEMNT CERTIFICATE R33 Elevate tower.pdf · uploaded 29 Oct 2021Source
  • 1 Proforma of Allotment letterProforma of the allotment letter and agreement Elevate tower.pdf · uploaded 9 Nov 2021Source
  • 1 Copy of the legal title reportLegal Title Report Amanora Elevate Tower 47.pdf · uploaded 10 Nov 2021Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Amanora Elevate Tower 47 CA certificate.pdf · uploaded 10 Nov 2021Source
  • 2 Building Plan Approval / NA Order for plotted development2 of 3.pdf · uploaded 20 Nov 2021Source
  • 2 Declaration in FORM BForm B.pdf · uploaded 20 Nov 2021Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1-Amanora Elevate Tower 47 2 31122021.pdf · uploaded 7 Jan 2022Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 - Elevate Tower.pdf · uploaded 7 Jan 2022Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Amanora Elevate Tower 47 2 31122021.pdf · uploaded 8 Jan 2022Source
  • 2 Declaration about Commencement CertificateFormat D DECLARATION ABOUT COMMENCEMNT CERTIFICATE R33 Elevate tower 1.pdf · uploaded 13 Jan 2022Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Elevate _March 22.pdf · uploaded 26 May 2022Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Amanora Elevate Tower 47 30062022.pdf · uploaded 7 Jul 2022Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Amanora Elevate Tower 30062022.pdf · uploaded 17 Aug 2022Source
  • 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Elevate Towers 30092022.pdf · uploaded 19 Nov 2022Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)2021-21-04 R33 Form 1 2022-12-31_compressed.pdf · uploaded 12 Jan 2023Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1- Amanora Elevate Tower 47 30092022.pdf · uploaded 18 Jan 2023Source
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1- Amanora Elevate Tower 47 31122022.pdf · uploaded 18 Jan 2023Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2- Amanora Elevate Tower 47 31122022.pdf · uploaded 18 Jan 2023Source
  • 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Elevate Tower 3112022.pdf · uploaded 23 Jan 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Form 5 Elevate Tower.pdf · uploaded 23 Jan 2023Source
  • 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1- Amanora Elevate Tower 47 (7).pdf · uploaded 24 Apr 2023Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2- Amanora Elevate Tower 47 (7).pdf · uploaded 24 Apr 2023Source
  • 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Elevate Tower as on 31-03-2023.pdf · uploaded 14 Jun 2023Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2- Amanora Elevate Tower 47 30062023.pdf · uploaded 20 Jul 2023Source
  • 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1- Amanora Elevate Tower 47 30062023.pdf · uploaded 26 Jul 2023Source
  • 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Elevate T47 30062023.pdf · uploaded 3 Aug 2023Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form 2A- Amanora Elevate Tower 47- 31032023.pdf · uploaded 4 Sep 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Form 5 Elevate Tower 31-03-2023.pdf · uploaded 13 Oct 2023Source
  • 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1- Amanora Elevate Tower 47 (9)- 30092023.pdf · uploaded 18 Oct 2023Source
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2- Amanora Elevate Tower 47 (9)- 30092023.pdf · uploaded 18 Oct 2023Source
  • 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Eevate Tower as on 30092023.pdf · uploaded 18 Oct 2023Source
  • 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2- Amanora Elevate Tower 47 - 31122023.pdf · uploaded 8 Jan 2024Source
  • 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1- Amanora Elevate Tower 47 3112023.pdf · uploaded 10 Jan 2024Source
  • 10 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Elevate_T47_31122023.pdf · uploaded 12 Jan 2024Source
  • 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1- Amanora Elevate Tower 47 31032024.pdf · uploaded 15 Apr 2024Source
  • 2 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form 2A- Amanora Elevate Tower 47- 31032024.pdf · uploaded 26 Apr 2024Source
  • 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2- Amanora Elevate Tower 47 31032024.pdf · uploaded 4 May 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 2A- Amanora Elevate Tower 47- 31032024.pdf · uploaded 4 May 2024Source
  • 11 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3- Amanora Elevate Tower 47 - 31032024.pdf · uploaded 6 May 2024Source
  • 11 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1- Amanora Elevate Tower 47 30062024.pdf · uploaded 8 Jul 2024Source
  • 12 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3- Amanora Elevate Tower 47 - 30062024.pdf · uploaded 11 Jul 2024Source
  • 1 Disclosure of sold/ booked inventoryElevate Tower 47 Inventory Disclosure 30062024.pdf · uploaded 10 Aug 2024Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1- Amanora Elevate Tower 47 30092024.pdf · uploaded 9 Oct 2024Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3- Amanora Elevate Tower 47 - 30092024.pdf · uploaded 17 Oct 2024Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2- Amanora Elevate Tower 47 30062024.pdf · uploaded 24 Oct 2024Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 3- Amanora Elevate Tower 47 - 30092024.pdf · uploaded 24 Oct 2024Source
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2- Amanora Elevate Tower 47 30092024.pdf · uploaded 24 Oct 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Elevate Towers Form-5.pdf · uploaded 24 Oct 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1- Amanora Elevate Tower 47- 31122024.pdf · uploaded 9 Jan 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 1- Amanora Elevate Tower 47- 31122024.pdf · uploaded 9 Jan 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3- Amanora Elevate Tower 47 - 31122024.pdf · uploaded 13 Jan 2025Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2- Amanora Elevate Tower 47- 3112024.pdf · uploaded 13 Jan 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1- Amanora Elevate Tower 47- 31032025.pdf · uploaded 9 Apr 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3- Amanora Elevate Tower 47 - 31032025.pdf · uploaded 14 Apr 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2- Amanora Elevate Tower 47 31032025.pdf · uploaded 14 Apr 2025Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 2A- Amanora Elevate Tower.pdf · uploaded 3 May 2025Source
  • Form 1Form 1- Amanora Elevate Tower 47- 31032025.pdf · uploaded 18 Jul 2025Source
  • Form 2Form 2- Amanora Elevate Tower 47 31032025.pdf · uploaded 18 Jul 2025Source
  • Form 3Form 3- Amanora Elevate Tower 47 - 31032025.pdf · uploaded 18 Jul 2025Source
  • Disclosure of Sold and Booked InventoryELEVATE TOWER -Inventory Status 30032025.pdf · uploaded 18 Jul 2025Source
  • Form 5 (FY 2024-2025)Form 5 Elevate Tower 31-03-2025.pdf · uploaded 19 Sep 2025Source
  • Withdrawal Update Form 1Form1 - Amanora Elevate Tower.pdf · uploaded 18 Oct 2025Source
  • Withdrawal Update Form 1Form 3 - Amanora Elevate Tower 47.pdf · uploaded 18 Oct 2025Source
  • Withdrawal Update Form 1Form1 - Amanora Elevate Tower 47.pdf · uploaded 18 Oct 2025Source
  • Withdrawal Update Form 2Form2 - Elevate Tower.pdf · uploaded 18 Oct 2025Source
  • Withdrawal Update Form 2Form2 - Elevate Tower.pdf · uploaded 18 Oct 2025Source
  • Withdrawal Update Form 2Form2 - Elevate Tower.pdf · uploaded 18 Oct 2025Source
  • Withdrawal Update Form 3Form 3 - Amanora Elevate Tower 47.pdf · uploaded 18 Oct 2025Source
  • Withdrawal Update Form 3Form 3 - Amanora Elevate Tower 47.pdf · uploaded 18 Oct 2025Source
  • Withdrawal Update Form 3Form 3 - Amanora Elevate Tower 47.pdf · uploaded 18 Oct 2025Source
  • Occupational CertificateAmanora R-33 - Elevate Tower 47- Final OC.pdf · uploaded 30 Dec 2025Source
  • Occupational CertificateForm 4 -R33-Amanora Elevate Tower 47.pdf · uploaded 30 Dec 2025Source
  • Withdrawal Update Form 1Elevate Tower 47- Form 1- 02012026.pdf · uploaded 20 Jan 2026Source
  • Withdrawal Update Form 2Elevate Tower 47- Form 2- 06012026.pdf · uploaded 20 Jan 2026Source
  • Withdrawal Update Form 3Form 3 Amanora Elevate Tower 20012026.pdf · uploaded 20 Jan 2026Source

Technical

  • Document1 of 3 R33.pdf · uploaded 28 Oct 2021Source
  • Document1 of 3 R33.pdf · uploaded 28 Oct 2021Source
  • Document2 of 3.pdf · uploaded 20 Nov 2021Source

Technical (Architect)

  • DocumentForm 1- Amanora Elevate Tower 47 30092024.pdf · uploaded 9 Oct 2024Source
  • DocumentForm 1- Amanora Elevate Tower 47- 31122024.pdf · uploaded 9 Jan 2025Source
  • DocumentForm 1- Amanora Elevate Tower 47- 31032025.pdf · uploaded 9 Apr 2025Source
  • DocumentElevate Tower 47- Form 1- 02012026.pdf · uploaded 20 Jan 2026Source

Technical (Engineer)

  • DocumentForm 2- Amanora Elevate Tower 47 30062024.pdf · uploaded 24 Oct 2024Source
  • DocumentForm 3- Amanora Elevate Tower 47 - 30092024.pdf · uploaded 24 Oct 2024Source
  • DocumentForm 2- Amanora Elevate Tower 47 30092024.pdf · uploaded 24 Oct 2024Source
  • DocumentForm 1- Amanora Elevate Tower 47- 31122024.pdf · uploaded 9 Jan 2025Source
  • DocumentForm 2- Amanora Elevate Tower 47- 3112024.pdf · uploaded 13 Jan 2025Source
  • DocumentForm 2- Amanora Elevate Tower 47 31032025.pdf · uploaded 14 Apr 2025Source
  • DocumentElevate Tower 47- Form 2- 06012026.pdf · uploaded 20 Jan 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Land & approvalsLand parcel Sector R33

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Certificate Signed
Unit types
2 BHK 1 A, 2 BHK 2A, 2 BHK 3A, 2 BHK 4, 4 BHK, Studio 1B, Studio 2B, Studio 3B225 units in all
Address
Sector R-33, Amanora Park Town, Hadapsar-Kharadi Bypass, Amanora Park TownPIN 411028
Village
Hadapsar, Haveli taluka
Land area for this project
6,006 sq m (64,648 sq ft)
Permissible built-up area
18,986 sq m (2,04,368 sq ft)
Sanctioned built-up area
18,986 sq m (2,04,368 sq ft)
Recreational open space
601 sq m (6,465 sq ft)
Designated bank account
85
Developed in phases
No
Also registered as
Amanora Elivhet, अमनोरा एलिव्हेट

Survey, CTS, gat or plot numbers

Sector R33

Land as published on MahaRERA's project page

Sector R-33, Amanora Park Town

Boundaries

North
15 meter wide road
South
Sector G 8 by 2
East
Survey no 191 part
West
Sector SP 1 by 2

Source: registration certificates and MahaRERA's project page, as stated there.

Units & parking225 units

225 of 225 units booked (100%), as the promoter reported to MahaRERA

2 BHK 1 A · 29 units2 BHK 2A · 29 units2 BHK 3A · 28 units2 BHK 4 · 29 units4 BHK · 29 unitsStudio 1B · 24 unitsStudio 2B · 29 unitsStudio 3B · 28 units
TypeCarpet areaUnitsBooked
2 BHK 1 A66.63 sq m · 717 sq ft2929
2 BHK 2A66.86 sq m · 720 sq ft2929
2 BHK 3A80.18 sq m · 863 sq ft2828
2 BHK 471.55 sq m · 770 sq ft2929
4 BHK139.87 sq m · 1,506 sq ft2929
Studio 1B22.1 sq m · 238 sq ft2424
Studio 2B22.39 sq m · 241 sq ft2929
Studio 3B18.94 sq m · 204 sq ft2828

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Professionals5

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectGNA Architects—
Chartered accountantSPCM & Associates—
EngineerMandar Kulkarni—
OtherJ+W Consultants LLP—
OtherMEP System Solutions Pvt. Ltd—

Source: MahaRERA project page. Contact details are not shown.

Amanora Elevate Tower 47 in numbers

Registered deals, summarised

Deedo has 230 registered documents at Amanora Elevate Tower 47, from Feb 2022 to Oct 2026: 163 sales, 14 leave and licence agreements, 51 mortgages.

How many properties have been sold at Amanora Elevate Tower 47?
163 sales are registered at Amanora Elevate Tower 47, 15 of them resales.
Are properties at Amanora Elevate Tower 47 rented out?
Yes: 14 leave and licence agreements are registered at Amanora Elevate Tower 47, at a median rent since Feb 2022 of about ₹47,000 a month with a deposit of about ₹1,00,000.
Where does this data come from?
The figures come from registered documents (Index II) at the Maharashtra sub-registrar offices, matched at Amanora Elevate Tower 47 by Deedo, last updated with deals registered in Oct 2026.

Latest deal · Resale · Oct 2026

₹1.5–2 Cr

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project page · registered documents (Index II)Data through is when MahaRERA's project page was last read.Report a problemMethodology