Akshar Altorios 2.o
Deedo IDDP-PUN-B445Completion was pushed back 4 months, to Apr 2028; no MahaRERA orders on record.
Hadapsar, Pune 411028 · Property rates in Hadapsar · by Akshar Skywards Construction
Buying a flat here?
See every deed registered on it.
Completion was pushed back 4 months, to Apr 2028
- This projectRegistered 18 Jan 2024, completion promised 31 Dec 2027, revised to 30 Apr 2028.
No extension certificate on record.
1 registration · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales first, then rentals and mortgages matched to this project · the free view shows a price band
- Primary sale · Oct 2026
- Primary sale · Jul 2026
- Primary sale · Jul 2026
- Primary sale · Jun 2026
- Primary sale · Jun 2026
- Primary sale · Apr 2026
- Primary sale · Apr 2026
- Primary sale · Apr 2026
- Primary sale · Mar 2026
- Primary sale · Mar 2026
| Month | Flat | Kind | Area | Price | Record |
|---|---|---|---|---|---|
| Oct 2026 | Main building · 605 | Primary sale | 783 sq ft | View Primary sale, Oct 2026 | |
| Jul 2026 | Main building · 802 | Primary sale | 771 sq ft | View Primary sale, Jul 2026 | |
| Jul 2026 | Main building · 804 | Primary sale | 911 sq ft | View Primary sale, Jul 2026 | |
| Jun 2026 | Main building · 505 | Primary sale | 783 sq ft | View Primary sale, Jun 2026 | |
| Jun 2026 | Main building · 302 | Primary sale | 771 sq ft | View Primary sale, Jun 2026 | |
| Apr 2026 | Main building · 801 | Primary sale | 771 sq ft | View Primary sale, Apr 2026 | |
| Apr 2026 | Main building · 403 | Primary sale | 792 sq ft | View Primary sale, Apr 2026 | |
| Apr 2026 | Main building · 1302 | Primary sale | 771 sq ft | View Primary sale, Apr 2026 | |
| Mar 2026 | Main building · 1402 | Primary sale | 771 sq ft | View Primary sale, Mar 2026 | |
| Mar 2026 | Main building · 303 | Primary sale | 785 sq ft | View Primary sale, Mar 2026 |
3 buildings
Open a building to see every flat, floor by floor.
- Main buildingSize not on record
- Wing D15 floors · 75 units48% booked
- Wing E9 floors · 15 units0% booked
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrationP52100054382
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52100054382 | 18 Jan 2024 | 31 Dec 2027 | 30 Apr 2028 | Akshar Skywards Construction | Project page |
Documents128
1 document held by Deedo, 127 filings listed on MahaRERA's project page
Finance
Legal
- Declaration Form BFORM -B (Promoter)-rotated.pdf · uploaded 6 Nov 2023Source
- Legal Title report20231218173111.pdf · uploaded 13 Dec 2023Source
- Other – LegalSALE DEED KHEDEKAR FAMILY-rotated-part-1.pdf · uploaded 14 Dec 2023Source
- Other – LegalSALE DEED KHEDEKAR FAMILY-rotated-part-2-compressed.pdf · uploaded 14 Dec 2023Source
- Other – LegalFinal SALE DEED DEOKAR FAMILY-rotated_removed-1-55.pdf · uploaded 14 Dec 2023Source
Show all 128 documentsShow fewer documents
Legal
Migrated
- 1 PAN CardAkshar Skywards - Pan Card.pdf · uploaded 6 Nov 2023Source
- 1 a Details of encumbrances concerned to Finance1 a Details of encumbrances concerned to Finance (15).pdf · uploaded 6 Nov 2023Source
- 2 a Details of encumbrances concerned to FinanceENCUMBRANCE LETTER Litigations- revised.pdf · uploaded 6 Nov 2023Source
- 1 b Details of encumbrances concerned to Legal1 a Details of encumbrances concerned to Finance (15).pdf · uploaded 6 Nov 2023Source
- 2 b Details of encumbrances concerned to LegalENCUMBRANCE LETTER Litigations- revised.pdf · uploaded 6 Nov 2023Source
- 1 Declaration in FORM BFORM -B (Promoter)-rotated.pdf · uploaded 6 Nov 2023Source
- 1 CERSAI details1 CERSAI details (17).pdf · uploaded 6 Nov 2023Source
- 1 Copy of the legal title report20231218173111.pdf · uploaded 13 Dec 2023Source
- 1 Copy of Layout Approval (in case of layout)1 Copy of Layout Approval (in case of layout) (15).pdf · uploaded 13 Dec 2023Source
- 1 Building Plan Approval / NA Order for plotted developmentscan 2031.pdf · uploaded 13 Dec 2023Source
- 2 Building Plan Approval / NA Order for plotted developmentscan 2032.pdf · uploaded 13 Dec 2023Source
- 3 Building Plan Approval / NA Order for plotted developmentscan 2033.pdf · uploaded 13 Dec 2023Source
- 4 Building Plan Approval / NA Order for plotted developmentscan 2034.pdf · uploaded 13 Dec 2023Source
- 5 Building Plan Approval / NA Order for plotted developmentscan 2035.pdf · uploaded 13 Dec 2023Source
- 6 Building Plan Approval / NA Order for plotted developmentscan 2036.pdf · uploaded 13 Dec 2023Source
- 1 Commencement Certificates / NA Order for plotted developmentCC.pdf · uploaded 13 Dec 2023Source
- 1 Disclosure of Interest in Other Real Estate Organizationsilovepdf_merged (45).pdf · uploaded 13 Dec 2023Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFORMAT A (2).pdf · uploaded 13 Dec 2023Source
- 1 Other – LegalSALE DEED KHEDEKAR FAMILY-rotated-part-1.pdf · uploaded 14 Dec 2023Source
- 2 Other – LegalSALE DEED KHEDEKAR FAMILY-rotated-part-2-compressed.pdf · uploaded 14 Dec 2023Source
- 3 Other – LegalFinal SALE DEED DEOKAR FAMILY-rotated_removed-1-55.pdf · uploaded 14 Dec 2023Source
- 4 Other – LegalFinal SALE DEED DEOKAR FAMILY-rotated_removed-56-113-compressed.pdf · uploaded 14 Dec 2023Source
- 1 Other – Financeilovepdf_merged (40).pdf · uploaded 14 Dec 2023Source
- 1 Other – Technicalilovepdf_merged (40).pdf · uploaded 14 Dec 2023Source
- 2 Other – TechnicalCC Verification mail from Pune Municipal Corporation.pdf · uploaded 15 Dec 2023Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)form 1 - archtect certificate dated.pdf · uploaded 18 Dec 2023Source
- 1 Proforma of Allotment letterAllotment Letter_Akshar Altorios 2_13122023.pdf · uploaded 18 Dec 2023Source
- 1 Proforma of Agreement for saleAGREEMENT FOR SALE Akshar.pdf · uploaded 18 Dec 2023Source
- 1 Deviation Report with respect to Allotment letterDeviation Report - Allotment Letter.pdf · uploaded 18 Dec 2023Source
- 1 Deviation Report with respect to model copy of AgreementDeviation Report - Agreement for Sale_11zon.pdf · uploaded 18 Dec 2023Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Final Form 3 after Scrutiny- Akshar.pdf · uploaded 5 Jan 2024Source
- 2 Commencement Certificates / NA Order for plotted developmentWhatsApp Image 2024-01-11 at 215035.pdf · uploaded 11 Jan 2024Source
- 3 Commencement Certificates / NA Order for plotted development2 Commencement Certificates _ NA Order for plotted development (3).pdf · uploaded 11 Jan 2024Source
- 1 Declaration about Commencement Certificateform d 11-Jan-2024 19-36-54(1).pdf · uploaded 11 Jan 2024Source
- 5 Other – LegalPARTNERSHIP DEED - AKSHAR SKYWARDS CONSTRUCTIONS.pdf · uploaded 11 Jan 2024Source
- 1 Disclosure of sold/ booked inventoryCircular 29.pdf · uploaded 15 Mar 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)1 Architect’s Certificate of Percentage of Completion of Work (Form 1) (1).pdf · uploaded 20 Apr 2024Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Blank.pdf · uploaded 20 Apr 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)1 CA Certificate.pdf · uploaded 20 Apr 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Akshar Altorios as on 31st March 2024.pdf · uploaded 16 Jul 2024Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)2 Architect’s Certificate of Percentage of Completion of Work (Form 1) (2).pdf · uploaded 20 Jul 2024Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)2 Engineer’s Certificate on Cost Incurred on Project (Form 2) (1).pdf · uploaded 20 Jul 2024Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Akshar Altorios As on March 2024.pdf · uploaded 20 Jul 2024Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)qqqqqqqqq.pdf · uploaded 20 Jul 2024Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Akshar Altorios as on 30th June 2024.pdf · uploaded 5 Aug 2024Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Akshar Altorios 30th June 2024.pdf · uploaded 5 Aug 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Akshar Altorios 30th September 2024.pdf · uploaded 25 Oct 2024Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Akshar Altorios as on Sep 2024.pdf · uploaded 25 Nov 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form 5 Akshar Altorios 23-24.pdf · uploaded 25 Nov 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - Akshar Altorios as on March 2024.pdf · uploaded 3 Dec 2024Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - Akshar Altorios as on June 2024.pdf · uploaded 3 Dec 2024Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - Akshar Altorios as on Sep 2024.pdf · uploaded 3 Dec 2024Source
- 1 Disclosure of sold/ booked inventoryCircular 29 - Akshar Altorios 2-0 - 30-09-2024.pdf · uploaded 3 Dec 2024Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Akshar Altorios 31st December 2024.pdf · uploaded 20 Jan 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - Akshar Altorios 2,O as on December 2024.pdf · uploaded 10 Feb 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Akshar Altorios as on Dec 2024.pdf · uploaded 21 Mar 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Akshar Altorios 31st March 2025.pdf · uploaded 20 Apr 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Akshar Altorios as on March 2025.pdf · uploaded 20 Apr 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - Akshar Altorios as on March 2025.pdf · uploaded 2 May 2025Source
- Form 1Form 1 - Akshar Altorios as on March 2025.pdf · uploaded 4 Jul 2025Source
- Form 2Form 2 - Akshar Altorios as on March 2025.pdf · uploaded 4 Jul 2025Source
- Form 3Form 3 Akshar Altorios 31st March 2025.pdf · uploaded 4 Jul 2025Source
- Disclosure of Sold and Booked InventoryCircular 29 Altorios 2 Migration March 25.pdf · uploaded 4 Jul 2025Source
- Withdrawal Update Form 1Form 1 - Akshar Altorios as on June 2025.pdf · uploaded 8 Sep 2025Source
- Withdrawal Update Form 2Form 2 - Akshar Altorios as on June 2025.pdf · uploaded 8 Sep 2025Source
- Withdrawal Update Form 3Form 3 - Akshar Altorios as on June 2025.pdf · uploaded 8 Sep 2025Source
- Withdrawal Update Form 1Form 1 - Akshar Altorios as on Sep 2025.pdf · uploaded 21 Nov 2025Source
- Withdrawal Update Form 2Form 2 - Akshar Altorios as on Sept 2025.pdf · uploaded 21 Nov 2025Source
- Withdrawal Update Form 3Form 3 - Akshar Altorios as on Sept 2025.pdf · uploaded 21 Nov 2025Source
- Withdrawal Update Form 1Form 1 - Akshar Altorios as on Dec 2025.pdf · uploaded 2 Feb 2026Source
- Withdrawal Update Form 2Form 2 - Akshar Altorios as on Dec 2025.pdf · uploaded 2 Feb 2026Source
- Withdrawal Update Form 3Form 3 - Akshar Altorios as on Dec 2025.pdf · uploaded 2 Feb 2026Source
- Withdrawal Update Form 1Form 1 - signed Akshar Altorios.pdf · uploaded 16 Feb 2026Source
- Withdrawal Update Form 2Form 2 - Signed Akshar Altorios.pdf · uploaded 16 Feb 2026Source
- Withdrawal Update Form 3Form 3 - Signed Akshar Altorios.pdf · uploaded 16 Feb 2026Source
- Withdrawal Update Form 1Form -1 Akshar Altorios As on Mar 2026.pdf · uploaded 15 May 2026Source
- Withdrawal Update Form 2Form - 2 Akshar Altorios As on Mar 2026.pdf · uploaded 15 May 2026Source
- Withdrawal Update Form 3Form -3 Akshar Altorios As on Mar 2026.pdf · uploaded 15 May 2026Source
- Form 5 (FY 2024-2025)Form 5_Akshar Altorios_for FY 2024-25.pdf · uploaded 6 Jun 2026Source
- Withdrawal Update Form 1Form 1 Akshar Altorios 2 O June 2026.pdf · uploaded 18 Jul 2026Source
- Withdrawal Update Form 1Form 1 Akshar Altorios 2 O June 2026.pdf · uploaded 18 Jul 2026Source
- Withdrawal Update Form 2Form 2 Akshar Altorios 2 O June 2026.pdf · uploaded 18 Jul 2026Source
- Withdrawal Update Form 2Form 2 Akshar Altorios 2 O June 2026.pdf · uploaded 18 Jul 2026Source
- Withdrawal Update Form 3Form 3 Akshar Altorios 2 O June 2026.pdf · uploaded 18 Jul 2026Source
- Withdrawal Update Form 3Form 3 Akshar Altorios 2 O June 2026.pdf · uploaded 18 Jul 2026Source
- Withdrawal Update Form 1Form 1 Akshar Altorios 2 O June 2026.pdf · uploaded 31 Aug 2026Source
- Withdrawal Update Form 2Form 2 Akshar Altorios 2 O June 2026.pdf · uploaded 31 Aug 2026Source
- Withdrawal Update Form 3Form 3 Akshar Altorios 2 O June 2026.pdf · uploaded 31 Aug 2026Source
Technical
- Document1 Copy of Layout Approval (in case of layout) (15).pdf · uploaded 13 Dec 2023Source
- Documentscan 2031.pdf · uploaded 13 Dec 2023Source
- Documentscan 2032.pdf · uploaded 13 Dec 2023Source
- Documentscan 2033.pdf · uploaded 13 Dec 2023Source
- Documentscan 2034.pdf · uploaded 13 Dec 2023Source
- Documentscan 2035.pdf · uploaded 13 Dec 2023Source
- Documentscan 2036.pdf · uploaded 13 Dec 2023Source
- Other – Technicalilovepdf_merged (40).pdf · uploaded 14 Dec 2023Source
- Other – TechnicalCC Verification mail from Pune Municipal Corporation.pdf · uploaded 15 Dec 2023Source
- DocumentLayout.pdf · uploaded 9 Jan 2026Source
- DocumentLayout.pdf · uploaded 9 Jan 2026Source
- Document2.pdf · uploaded 9 Jan 2026Source
- Document3.pdf · uploaded 9 Jan 2026Source
- Document4.pdf · uploaded 9 Jan 2026Source
- Document5 - 6.pdf · uploaded 9 Jan 2026Source
- DocumentLayout (10-11-2025).pdf · uploaded 16 Feb 2026Source
- Document3 (10-11-2025).pdf · uploaded 16 Feb 2026Source
- Document2 (10-11-2025).pdf · uploaded 16 Feb 2026Source
- Document4 (10-11-2025).pdf · uploaded 16 Feb 2026Source
- Document5 - 6 (10-11-2025).pdf · uploaded 16 Feb 2026Source
Technical (Architect)
- DocumentForm 1 - Akshar Altorios as on March 2024.pdf · uploaded 3 Dec 2024Source
- DocumentForm 1 - Akshar Altorios as on June 2024.pdf · uploaded 3 Dec 2024Source
- DocumentForm 1 - Akshar Altorios as on Sep 2024.pdf · uploaded 3 Dec 2024Source
- DocumentForm 1 - Akshar Altorios 2,O as on December 2024.pdf · uploaded 10 Feb 2025Source
- DocumentForm 1 - Akshar Altorios as on March 2025.pdf · uploaded 2 May 2025Source
- DocumentForm 1 Akshar Altorios 2 O June 2026.pdf · uploaded 18 Jul 2026Source
Technical (Engineer)
- DocumentForm 2 - Akshar Altorios as on Sep 2024.pdf · uploaded 25 Nov 2024Source
- DocumentForm 2 - Akshar Altorios as on Dec 2024.pdf · uploaded 21 Mar 2025Source
- DocumentForm 2 - Akshar Altorios as on March 2025.pdf · uploaded 20 Apr 2025Source
- DocumentForm 2 Akshar Altorios 2 O June 2026.pdf · uploaded 18 Jul 2026Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvalsLand parcel 172/6+7+8/2, 174/5
As registered with MahaRERA and published on its project page
- Project type
- Others
- Status on MahaRERA
- Certificate Signed
- Unit types
- 1BHK, 2BHK, 3BHK, 4BHK90 units in all
- Address
- Survey No-172/1+2+3+4+5/3, 172/6+7+8/2, 174/5, 174/6, Sadesatara Nali, HadapsarPIN 411028
- Village
- Hadapsar, Haveli taluka
- Location
- 18.51466, 73.93698
- Land area for this project
- 13,550 sq m (1,45,851 sq ft)
- Permissible built-up area
- 13,844 sq m (1,49,012 sq ft)
- Sanctioned built-up area
- 13,844 sq m (1,49,012 sq ft)
- Recreational open space
- 1,317 sq m (14,179 sq ft)
- Designated bank account
- 76
- Developed in phases
- Yes
- Also registered as
- Akshar Altoriyas 2.0, अक्षर अल्टोरियस 2.0
Survey, CTS, gat or plot numbers
Land as published on MahaRERA's project page
Survey No-172/1+2+3+4+5/3, 172/6+7+8/2,174/5, 174/6
Boundaries
- North
- Property of Ranjana Tupe and Sakore
- South
- Property of Vasant Baburao Tupe and others
- East
- Property of Sakore and Shewale
- West
- Property of Vitthal Shivaji Tupe
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking90 units
36 of 90 units booked (40%), as the promoter reported to MahaRERA
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| Wing D | 1BHK | 46.21 sq m · 497 sq ft | 15 | 13 |
| Wing D | 2BHK | 73.81 sq m · 794 sq ft | 15 | 6 |
| Wing D | 2BHK | 73.86 sq m · 795 sq ft | 15 | 2 |
| Wing D | 2BHK | 74.08 sq m · 797 sq ft | 15 | 7 |
| Wing D | 3BHK | 85.49 sq m · 920 sq ft | 15 | 8 |
| Wing E | 2BHK | 69.25 sq m · 745 sq ft | 3 | 0 |
| Wing E | 2BHK | 69.47 sq m · 748 sq ft | 3 | 0 |
| Wing E | 2BHK | 72.24 sq m · 778 sq ft | 3 | 0 |
| Wing E | 3BHK | 83.04 sq m · 894 sq ft | 3 | 0 |
| Wing E | 4BHK | 206.81 sq m · 2,226 sq ft | 3 | 0 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Professionals1
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Atit Atit Admulwar | — |
Source: MahaRERA project page. Contact details are not shown.
Other projects in Hadapsar
- Palladio Presidential Towers Phase 1RERA PM1260002602526
- Dosti Greenscapes - Phase 5₹11,500 a sq ft
- Oxy BelamarRERA PM1260002601661
- Aastha HousingRERA PR1262022601204
- Gandharv Leela₹9,710 a sq ft
- Park Imperial Tower ARERA PR1261012600792
- Gandharv Gokulam₹11,900 a sq ft
- Euphoric BlossomRERA PR1260002600219
All 4,589 projects in Hadapsar · Compare Akshar Altorios 2.o with another project
Akshar Altorios 2.o in numbers
Registered deals, summarised
Deedo has 480 registered documents at Akshar Altorios 2.o, from Jan 2016 to Oct 2026: 175 sales, 197 leave and licence agreements, 92 mortgages. The median registered sale since Jan 2016 works out to about ₹8,800 per sq ft, at a median of ₹65 L a deal; 7% of sales were resales.
- What is the price per sq ft at Akshar Altorios 2.o?
- The median registered sale since Jan 2016 works out to about ₹8,800 per sq ft, at a median of ₹65 L a deal; 7% of sales were resales.
- How many properties have been sold at Akshar Altorios 2.o?
- 175 sales are registered at Akshar Altorios 2.o, 13 of them resales.
- Are properties at Akshar Altorios 2.o rented out?
- Yes: 197 leave and licence agreements are registered at Akshar Altorios 2.o, at a median rent since Jan 2016 of about ₹23,000 a month with a deposit of about ₹50,000.
- Where does this data come from?
- The figures come from registered documents (Index II) at the Maharashtra sub-registrar offices, matched at Akshar Altorios 2.o by Deedo, last updated with deals registered in Oct 2026.
Latest deal · Primary sale · Oct 2026
₹1–1.5 Cr