Others · 3 buildings · 90 unitsRERA P52100054382

Akshar Altorios 2.o

Deedo IDDP-PUN-B445

Completion was pushed back 4 months, to Apr 2028; no MahaRERA orders on record.

Hadapsar, Pune 411028 · Property rates in Hadapsar · by Akshar Skywards Construction

DeliveryExtended 4 moPromised Dec 2027 · now due Apr 2028RegulatoryNo ordersNot in any MahaRERA list or order Deedo has readPrice₹8,850 /sq ft16% above Hadapsar · 175 registered sales

Buying a flat here?

See every deed registered on it.

Completion was pushed back 4 months, to Apr 2028

  • This projectRegistered 18 Jan 2024, completion promised 31 Dec 2027, revised to 30 Apr 2028.

No extension certificate on record.

1 registration · Source: MahaRERA registration and extension certificates

Latest registered deeds

Sales first, then rentals and mortgages matched to this project · the free view shows a price band

All 480 deeds →
Latest registered deeds in this project
MonthFlatKindAreaPriceRecord
Oct 2026Main building · 605Primary sale783 sq ftView Primary sale, Oct 2026
Jul 2026Main building · 802Primary sale771 sq ftView Primary sale, Jul 2026
Jul 2026Main building · 804Primary sale911 sq ftView Primary sale, Jul 2026
Jun 2026Main building · 505Primary sale783 sq ftView Primary sale, Jun 2026
Jun 2026Main building · 302Primary sale771 sq ftView Primary sale, Jun 2026
Apr 2026Main building · 801Primary sale771 sq ftView Primary sale, Apr 2026
Apr 2026Main building · 403Primary sale792 sq ftView Primary sale, Apr 2026
Apr 2026Main building · 1302Primary sale771 sq ftView Primary sale, Apr 2026
Mar 2026Main building · 1402Primary sale771 sq ftView Primary sale, Mar 2026
Mar 2026Main building · 303Primary sale785 sq ftView Primary sale, Mar 2026

3 buildings

Open a building to see every flat, floor by floor.

Floors and units from the registration certificate annexures and MahaRERA's project page.

Regulatory recordNone found

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

RERA registrationP52100054382
RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5210005438218 Jan 202431 Dec 202730 Apr 2028Akshar Skywards ConstructionProject page
Documents128

1 document held by Deedo, 127 filings listed on MahaRERA's project page

Registration certificate

Finance

  • PAN CardAkshar Skywards - Pan Card.pdf · uploaded 6 Nov 2023Source
  • Other – Financeilovepdf_merged (40).pdf · uploaded 14 Dec 2023Source

Legal

  • Declaration Form BFORM -B (Promoter)-rotated.pdf · uploaded 6 Nov 2023Source
  • Legal Title report20231218173111.pdf · uploaded 13 Dec 2023Source
  • Other – LegalSALE DEED KHEDEKAR FAMILY-rotated-part-1.pdf · uploaded 14 Dec 2023Source
  • Other – LegalSALE DEED KHEDEKAR FAMILY-rotated-part-2-compressed.pdf · uploaded 14 Dec 2023Source
  • Other – LegalFinal SALE DEED DEOKAR FAMILY-rotated_removed-1-55.pdf · uploaded 14 Dec 2023Source
Show all 128 documentsShow fewer documents

Legal

  • Other – LegalFinal SALE DEED DEOKAR FAMILY-rotated_removed-56-113-compressed.pdf · uploaded 14 Dec 2023Source
  • Other – LegalPARTNERSHIP DEED - AKSHAR SKYWARDS CONSTRUCTIONS.pdf · uploaded 11 Jan 2024Source

Migrated

  • 1 PAN CardAkshar Skywards - Pan Card.pdf · uploaded 6 Nov 2023Source
  • 1 a Details of encumbrances concerned to Finance1 a Details of encumbrances concerned to Finance (15).pdf · uploaded 6 Nov 2023Source
  • 2 a Details of encumbrances concerned to FinanceENCUMBRANCE LETTER Litigations- revised.pdf · uploaded 6 Nov 2023Source
  • 1 b Details of encumbrances concerned to Legal1 a Details of encumbrances concerned to Finance (15).pdf · uploaded 6 Nov 2023Source
  • 2 b Details of encumbrances concerned to LegalENCUMBRANCE LETTER Litigations- revised.pdf · uploaded 6 Nov 2023Source
  • 1 Declaration in FORM BFORM -B (Promoter)-rotated.pdf · uploaded 6 Nov 2023Source
  • 1 CERSAI details1 CERSAI details (17).pdf · uploaded 6 Nov 2023Source
  • 1 Copy of the legal title report20231218173111.pdf · uploaded 13 Dec 2023Source
  • 1 Copy of Layout Approval (in case of layout)1 Copy of Layout Approval (in case of layout) (15).pdf · uploaded 13 Dec 2023Source
  • 1 Building Plan Approval / NA Order for plotted developmentscan 2031.pdf · uploaded 13 Dec 2023Source
  • 2 Building Plan Approval / NA Order for plotted developmentscan 2032.pdf · uploaded 13 Dec 2023Source
  • 3 Building Plan Approval / NA Order for plotted developmentscan 2033.pdf · uploaded 13 Dec 2023Source
  • 4 Building Plan Approval / NA Order for plotted developmentscan 2034.pdf · uploaded 13 Dec 2023Source
  • 5 Building Plan Approval / NA Order for plotted developmentscan 2035.pdf · uploaded 13 Dec 2023Source
  • 6 Building Plan Approval / NA Order for plotted developmentscan 2036.pdf · uploaded 13 Dec 2023Source
  • 1 Commencement Certificates / NA Order for plotted developmentCC.pdf · uploaded 13 Dec 2023Source
  • 1 Disclosure of Interest in Other Real Estate Organizationsilovepdf_merged (45).pdf · uploaded 13 Dec 2023Source
  • 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFORMAT A (2).pdf · uploaded 13 Dec 2023Source
  • 1 Other – LegalSALE DEED KHEDEKAR FAMILY-rotated-part-1.pdf · uploaded 14 Dec 2023Source
  • 2 Other – LegalSALE DEED KHEDEKAR FAMILY-rotated-part-2-compressed.pdf · uploaded 14 Dec 2023Source
  • 3 Other – LegalFinal SALE DEED DEOKAR FAMILY-rotated_removed-1-55.pdf · uploaded 14 Dec 2023Source
  • 4 Other – LegalFinal SALE DEED DEOKAR FAMILY-rotated_removed-56-113-compressed.pdf · uploaded 14 Dec 2023Source
  • 1 Other – Financeilovepdf_merged (40).pdf · uploaded 14 Dec 2023Source
  • 1 Other – Technicalilovepdf_merged (40).pdf · uploaded 14 Dec 2023Source
  • 2 Other – TechnicalCC Verification mail from Pune Municipal Corporation.pdf · uploaded 15 Dec 2023Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)form 1 - archtect certificate dated.pdf · uploaded 18 Dec 2023Source
  • 1 Proforma of Allotment letterAllotment Letter_Akshar Altorios 2_13122023.pdf · uploaded 18 Dec 2023Source
  • 1 Proforma of Agreement for saleAGREEMENT FOR SALE Akshar.pdf · uploaded 18 Dec 2023Source
  • 1 Deviation Report with respect to Allotment letterDeviation Report - Allotment Letter.pdf · uploaded 18 Dec 2023Source
  • 1 Deviation Report with respect to model copy of AgreementDeviation Report - Agreement for Sale_11zon.pdf · uploaded 18 Dec 2023Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Final Form 3 after Scrutiny- Akshar.pdf · uploaded 5 Jan 2024Source
  • 2 Commencement Certificates / NA Order for plotted developmentWhatsApp Image 2024-01-11 at 215035.pdf · uploaded 11 Jan 2024Source
  • 3 Commencement Certificates / NA Order for plotted development2 Commencement Certificates _ NA Order for plotted development (3).pdf · uploaded 11 Jan 2024Source
  • 1 Declaration about Commencement Certificateform d 11-Jan-2024 19-36-54(1).pdf · uploaded 11 Jan 2024Source
  • 5 Other – LegalPARTNERSHIP DEED - AKSHAR SKYWARDS CONSTRUCTIONS.pdf · uploaded 11 Jan 2024Source
  • 1 Disclosure of sold/ booked inventoryCircular 29.pdf · uploaded 15 Mar 2024Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)1 Architect’s Certificate of Percentage of Completion of Work (Form 1) (1).pdf · uploaded 20 Apr 2024Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Blank.pdf · uploaded 20 Apr 2024Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)1 CA Certificate.pdf · uploaded 20 Apr 2024Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Akshar Altorios as on 31st March 2024.pdf · uploaded 16 Jul 2024Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)2 Architect’s Certificate of Percentage of Completion of Work (Form 1) (2).pdf · uploaded 20 Jul 2024Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)2 Engineer’s Certificate on Cost Incurred on Project (Form 2) (1).pdf · uploaded 20 Jul 2024Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Akshar Altorios As on March 2024.pdf · uploaded 20 Jul 2024Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)qqqqqqqqq.pdf · uploaded 20 Jul 2024Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Akshar Altorios as on 30th June 2024.pdf · uploaded 5 Aug 2024Source
  • 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Akshar Altorios 30th June 2024.pdf · uploaded 5 Aug 2024Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Akshar Altorios 30th September 2024.pdf · uploaded 25 Oct 2024Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Akshar Altorios as on Sep 2024.pdf · uploaded 25 Nov 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form 5 Akshar Altorios 23-24.pdf · uploaded 25 Nov 2024Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - Akshar Altorios as on March 2024.pdf · uploaded 3 Dec 2024Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - Akshar Altorios as on June 2024.pdf · uploaded 3 Dec 2024Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - Akshar Altorios as on Sep 2024.pdf · uploaded 3 Dec 2024Source
  • 1 Disclosure of sold/ booked inventoryCircular 29 - Akshar Altorios 2-0 - 30-09-2024.pdf · uploaded 3 Dec 2024Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Akshar Altorios 31st December 2024.pdf · uploaded 20 Jan 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - Akshar Altorios 2,O as on December 2024.pdf · uploaded 10 Feb 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Akshar Altorios as on Dec 2024.pdf · uploaded 21 Mar 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Akshar Altorios 31st March 2025.pdf · uploaded 20 Apr 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Akshar Altorios as on March 2025.pdf · uploaded 20 Apr 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - Akshar Altorios as on March 2025.pdf · uploaded 2 May 2025Source
  • Form 1Form 1 - Akshar Altorios as on March 2025.pdf · uploaded 4 Jul 2025Source
  • Form 2Form 2 - Akshar Altorios as on March 2025.pdf · uploaded 4 Jul 2025Source
  • Form 3Form 3 Akshar Altorios 31st March 2025.pdf · uploaded 4 Jul 2025Source
  • Disclosure of Sold and Booked InventoryCircular 29 Altorios 2 Migration March 25.pdf · uploaded 4 Jul 2025Source
  • Withdrawal Update Form 1Form 1 - Akshar Altorios as on June 2025.pdf · uploaded 8 Sep 2025Source
  • Withdrawal Update Form 2Form 2 - Akshar Altorios as on June 2025.pdf · uploaded 8 Sep 2025Source
  • Withdrawal Update Form 3Form 3 - Akshar Altorios as on June 2025.pdf · uploaded 8 Sep 2025Source
  • Withdrawal Update Form 1Form 1 - Akshar Altorios as on Sep 2025.pdf · uploaded 21 Nov 2025Source
  • Withdrawal Update Form 2Form 2 - Akshar Altorios as on Sept 2025.pdf · uploaded 21 Nov 2025Source
  • Withdrawal Update Form 3Form 3 - Akshar Altorios as on Sept 2025.pdf · uploaded 21 Nov 2025Source
  • Withdrawal Update Form 1Form 1 - Akshar Altorios as on Dec 2025.pdf · uploaded 2 Feb 2026Source
  • Withdrawal Update Form 2Form 2 - Akshar Altorios as on Dec 2025.pdf · uploaded 2 Feb 2026Source
  • Withdrawal Update Form 3Form 3 - Akshar Altorios as on Dec 2025.pdf · uploaded 2 Feb 2026Source
  • Withdrawal Update Form 1Form 1 - signed Akshar Altorios.pdf · uploaded 16 Feb 2026Source
  • Withdrawal Update Form 2Form 2 - Signed Akshar Altorios.pdf · uploaded 16 Feb 2026Source
  • Withdrawal Update Form 3Form 3 - Signed Akshar Altorios.pdf · uploaded 16 Feb 2026Source
  • Withdrawal Update Form 1Form -1 Akshar Altorios As on Mar 2026.pdf · uploaded 15 May 2026Source
  • Withdrawal Update Form 2Form - 2 Akshar Altorios As on Mar 2026.pdf · uploaded 15 May 2026Source
  • Withdrawal Update Form 3Form -3 Akshar Altorios As on Mar 2026.pdf · uploaded 15 May 2026Source
  • Form 5 (FY 2024-2025)Form 5_Akshar Altorios_for FY 2024-25.pdf · uploaded 6 Jun 2026Source
  • Withdrawal Update Form 1Form 1 Akshar Altorios 2 O June 2026.pdf · uploaded 18 Jul 2026Source
  • Withdrawal Update Form 1Form 1 Akshar Altorios 2 O June 2026.pdf · uploaded 18 Jul 2026Source
  • Withdrawal Update Form 2Form 2 Akshar Altorios 2 O June 2026.pdf · uploaded 18 Jul 2026Source
  • Withdrawal Update Form 2Form 2 Akshar Altorios 2 O June 2026.pdf · uploaded 18 Jul 2026Source
  • Withdrawal Update Form 3Form 3 Akshar Altorios 2 O June 2026.pdf · uploaded 18 Jul 2026Source
  • Withdrawal Update Form 3Form 3 Akshar Altorios 2 O June 2026.pdf · uploaded 18 Jul 2026Source
  • Withdrawal Update Form 1Form 1 Akshar Altorios 2 O June 2026.pdf · uploaded 31 Aug 2026Source
  • Withdrawal Update Form 2Form 2 Akshar Altorios 2 O June 2026.pdf · uploaded 31 Aug 2026Source
  • Withdrawal Update Form 3Form 3 Akshar Altorios 2 O June 2026.pdf · uploaded 31 Aug 2026Source

Technical

  • Document1 Copy of Layout Approval (in case of layout) (15).pdf · uploaded 13 Dec 2023Source
  • Documentscan 2031.pdf · uploaded 13 Dec 2023Source
  • Documentscan 2032.pdf · uploaded 13 Dec 2023Source
  • Documentscan 2033.pdf · uploaded 13 Dec 2023Source
  • Documentscan 2034.pdf · uploaded 13 Dec 2023Source
  • Documentscan 2035.pdf · uploaded 13 Dec 2023Source
  • Documentscan 2036.pdf · uploaded 13 Dec 2023Source
  • Other – Technicalilovepdf_merged (40).pdf · uploaded 14 Dec 2023Source
  • Other – TechnicalCC Verification mail from Pune Municipal Corporation.pdf · uploaded 15 Dec 2023Source
  • DocumentLayout.pdf · uploaded 9 Jan 2026Source
  • DocumentLayout.pdf · uploaded 9 Jan 2026Source
  • Document2.pdf · uploaded 9 Jan 2026Source
  • Document3.pdf · uploaded 9 Jan 2026Source
  • Document4.pdf · uploaded 9 Jan 2026Source
  • Document5 - 6.pdf · uploaded 9 Jan 2026Source
  • DocumentLayout (10-11-2025).pdf · uploaded 16 Feb 2026Source
  • Document3 (10-11-2025).pdf · uploaded 16 Feb 2026Source
  • Document2 (10-11-2025).pdf · uploaded 16 Feb 2026Source
  • Document4 (10-11-2025).pdf · uploaded 16 Feb 2026Source
  • Document5 - 6 (10-11-2025).pdf · uploaded 16 Feb 2026Source

Technical (Architect)

  • DocumentForm 1 - Akshar Altorios as on March 2024.pdf · uploaded 3 Dec 2024Source
  • DocumentForm 1 - Akshar Altorios as on June 2024.pdf · uploaded 3 Dec 2024Source
  • DocumentForm 1 - Akshar Altorios as on Sep 2024.pdf · uploaded 3 Dec 2024Source
  • DocumentForm 1 - Akshar Altorios 2,O as on December 2024.pdf · uploaded 10 Feb 2025Source
  • DocumentForm 1 - Akshar Altorios as on March 2025.pdf · uploaded 2 May 2025Source
  • DocumentForm 1 Akshar Altorios 2 O June 2026.pdf · uploaded 18 Jul 2026Source

Technical (Engineer)

  • DocumentForm 2 - Akshar Altorios as on Sep 2024.pdf · uploaded 25 Nov 2024Source
  • DocumentForm 2 - Akshar Altorios as on Dec 2024.pdf · uploaded 21 Mar 2025Source
  • DocumentForm 2 - Akshar Altorios as on March 2025.pdf · uploaded 20 Apr 2025Source
  • DocumentForm 2 Akshar Altorios 2 O June 2026.pdf · uploaded 18 Jul 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Land & approvalsLand parcel 172/6+7+8/2, 174/5

As registered with MahaRERA and published on its project page

Project type
Others
Status on MahaRERA
Certificate Signed
Unit types
1BHK, 2BHK, 3BHK, 4BHK90 units in all
Address
Survey No-172/1+2+3+4+5/3, 172/6+7+8/2, 174/5, 174/6, Sadesatara Nali, HadapsarPIN 411028
Village
Hadapsar, Haveli taluka
Land area for this project
13,550 sq m (1,45,851 sq ft)
Permissible built-up area
13,844 sq m (1,49,012 sq ft)
Sanctioned built-up area
13,844 sq m (1,49,012 sq ft)
Recreational open space
1,317 sq m (14,179 sq ft)
Designated bank account
76
Developed in phases
Yes
Also registered as
Akshar Altoriyas 2.0, अक्षर अल्टोरियस 2.0

Survey, CTS, gat or plot numbers

172/6+7+8/2174/5174/6Survey No-172/1+2+3+4+5/3

Land as published on MahaRERA's project page

Survey No-172/1+2+3+4+5/3, 172/6+7+8/2,174/5, 174/6

Boundaries

North
Property of Ranjana Tupe and Sakore
South
Property of Vasant Baburao Tupe and others
East
Property of Sakore and Shewale
West
Property of Vitthal Shivaji Tupe

Source: registration certificates and MahaRERA's project page, as stated there.

Units & parking90 units

36 of 90 units booked (40%), as the promoter reported to MahaRERA

1BHK · 15 units2BHK · 54 units3BHK · 18 units4BHK · 3 units
BuildingTypeCarpet areaUnitsBooked
Wing D1BHK46.21 sq m · 497 sq ft1513
Wing D2BHK73.81 sq m · 794 sq ft156
Wing D2BHK73.86 sq m · 795 sq ft152
Wing D2BHK74.08 sq m · 797 sq ft157
Wing D3BHK85.49 sq m · 920 sq ft158
Wing E2BHK69.25 sq m · 745 sq ft30
Wing E2BHK69.47 sq m · 748 sq ft30
Wing E2BHK72.24 sq m · 778 sq ft30
Wing E3BHK83.04 sq m · 894 sq ft30
Wing E4BHK206.81 sq m · 2,226 sq ft30

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Professionals1

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectAtit Atit Admulwar—

Source: MahaRERA project page. Contact details are not shown.

Other projects in Hadapsar

All 4,589 projects in Hadapsar · Compare Akshar Altorios 2.o with another project

Akshar Altorios 2.o in numbers

Registered deals, summarised

Deedo has 480 registered documents at Akshar Altorios 2.o, from Jan 2016 to Oct 2026: 175 sales, 197 leave and licence agreements, 92 mortgages. The median registered sale since Jan 2016 works out to about ₹8,800 per sq ft, at a median of ₹65 L a deal; 7% of sales were resales.

What is the price per sq ft at Akshar Altorios 2.o?
The median registered sale since Jan 2016 works out to about ₹8,800 per sq ft, at a median of ₹65 L a deal; 7% of sales were resales.
How many properties have been sold at Akshar Altorios 2.o?
175 sales are registered at Akshar Altorios 2.o, 13 of them resales.
Are properties at Akshar Altorios 2.o rented out?
Yes: 197 leave and licence agreements are registered at Akshar Altorios 2.o, at a median rent since Jan 2016 of about ₹23,000 a month with a deposit of about ₹50,000.
Where does this data come from?
The figures come from registered documents (Index II) at the Maharashtra sub-registrar offices, matched at Akshar Altorios 2.o by Deedo, last updated with deals registered in Oct 2026.

Latest deal · Primary sale · Oct 2026

₹1–1.5 Cr

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project page · registered documents (Index II)Data through is when MahaRERA's project page was last read.Report a problemMethodology