Promised date passed16 floorsRERA P52100032483

A3, Unique Youtopia Phase I

Deedo IDDP-PUN-YE1D-A3

MahaRERA has not published a flat-by-flat record for this tower, and no registered deed names it yet.

Median saleNot on recordneeds 3 or more sales
Completion31 Dec 2025as registered
Units & parking in A3
TypeCarpet areaUnitsBooked
1BHK50.3 m² (542 sq.ft)2Not on record
2BHK66.5 m² (716 sq.ft)28Not on record
2BHK66.8 m² (719 sq.ft)26Not on record
3BHK79.5 m² (855 sq.ft)28Not on record
3BHK88.3 m² (950 sq.ft)28Not on record

Parking: Closed/Covered 112 · Open Space 0 (as declared to MahaRERA)

Construction progress (declared)

Work completed, as the promoter reported it to MahaRERA (Form 1). Not verified on site.

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%
As registered with MahaRERA
RERA registration
P52100032483 · registered 10 Jan 2022
Promised completion
31 Dec 2025
Revised completion
31 Dec 2025
Sanctioned habitable floors
16
Sanctioned floors (incl. basement, stilt, podium)
16
Units declared
0
Homes
0
Shops and offices
0
MahaRERA status
Certificate Signed
Deedo ID
DP-PUN-YE1D-A3
Questions about A3

When is A3 due for completion?

The MahaRERA registration promises 31 Dec 2025.

How many floors does A3 have?

16 sanctioned habitable floors, as registered with MahaRERA.

Data through1 Nov 2026SourcesMahaRERA registration and project page · IGR Maharashtra Index IIFloors and units are as registered; a promoter can revise them in later filings. Party names appear only inside an unlocked Index II.Report a problemMethodology