Deedo IDDP-PUN-1N6WCompletion was pushed back 4 months, to Aug 2028; no MahaRERA orders on record; 48% of its units are booked.
Ghorpadi, Pune 411001 · Property rates in Ghorpadi · by Lodha Developers Limited · 93% of its projects kept the RERA date
Buying a flat here?
See every deed registered on it.
Completion was pushed back 4 months, to Aug 2028
- This projectRegistered 19 May 2023, completion promised 30 Apr 2028, revised to 30 Aug 2028.
No extension certificate on record.
1 registration · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales first, then rentals and mortgages matched to this project · the free view shows a price band
The building
Open a building to see every flat, floor by floor.
- Residential Building on CTS 11/1/4/12,11/1/4/13,11/1/4/14, Plot B1, B230 floors · 27 units48% booked
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrationP52100050987
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52100050987 | 19 May 2023 | 30 Apr 2028 | 30 Aug 2028 | Lodha Developers Limited | Project page |
Documents148
1 document held by Deedo, 147 filings listed on MahaRERA's project page
Finance
- PAN CardMacrotech Developers Ltd PAN CARD.pdf · uploaded 29 Mar 2023Source
Legal
Migrated
- 1 PAN CardMacrotech Developers Ltd PAN CARD.pdf · uploaded 29 Mar 2023Source
- 1 Commencement Certificates / NA Order for plotted developmentCC.PDF · uploaded 29 Mar 2023Source
- 1 Disclosure of Interest in Other Real Estate OrganizationsAML.PDF · uploaded 29 Mar 2023Source
- 2 Disclosure of Interest in Other Real Estate OrganizationsRaunika.pdf · uploaded 29 Mar 2023Source
Show all 148 documentsShow fewer documents
Migrated
- 3 Disclosure of Interest in Other Real Estate OrganizationsRL.pdf · uploaded 29 Mar 2023Source
- 1 Proforma of Allotment letter1 Proforma of Allotment letter (24).pdf · uploaded 29 Mar 2023Source
- 1 Deviation Report with respect to Allotment letterAllotment Deviation.pdf · uploaded 29 Mar 2023Source
- 1 Copy of Layout Approval (in case of layout)layout bundgarden.pdf · uploaded 30 Mar 2023Source
- 1 Proforma of Agreement for saleNew AFS For Bund Garden.pdf · uploaded 3 Apr 2023Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameBank Declaration.pdf · uploaded 3 Apr 2023Source
- 1 a Details of encumbrances concerned to FinanceFinance Encumbrances New.pdf · uploaded 6 Apr 2023Source
- 2 a Details of encumbrances concerned to FinanceLegal Litigation New.pdf · uploaded 6 Apr 2023Source
- 1 b Details of encumbrances concerned to LegalFinance Encumbrances New.pdf · uploaded 6 Apr 2023Source
- 2 b Details of encumbrances concerned to LegalLegal Litigation New.pdf · uploaded 6 Apr 2023Source
- 1 CERSAI detailsCersai Declaration.pdf · uploaded 6 Apr 2023Source
- 1 Copy of the legal title reportNew Legal Title Report_Bund Garden, Pune_compressed.pdf · uploaded 11 Apr 2023Source
- 2 CERSAI detailsCERSAI.pdf · uploaded 11 Apr 2023Source
- 1 Declaration about Commencement CertificateCC Declaration.pdf · uploaded 14 Apr 2023Source
- 1 Declaration in FORM BMacrotech Form B.pdf · uploaded 14 Apr 2023Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3.pdf · uploaded 14 Apr 2023Source
- 1 Building Plan Approval / NA Order for plotted developmentGround Floor.pdf · uploaded 17 Apr 2023Source
- 2 Building Plan Approval / NA Order for plotted developmentFirst Floor.pdf · uploaded 17 Apr 2023Source
- 3 Building Plan Approval / NA Order for plotted developmentSeconf Floor.pdf · uploaded 17 Apr 2023Source
- 4 Building Plan Approval / NA Order for plotted development3,4,5 Floor.pdf · uploaded 17 Apr 2023Source
- 5 Building Plan Approval / NA Order for plotted development6,7 Floor.pdf · uploaded 17 Apr 2023Source
- 6 Building Plan Approval / NA Order for plotted developmentSection Plan.pdf · uploaded 17 Apr 2023Source
- 1 Deviation Report with respect to model copy of Agreement5 (7).pdf · uploaded 17 Apr 2023Source
- 2 Copy of Layout Approval (in case of layout)layout approval_compressed.pdf · uploaded 28 Sep 2023Source
- 7 Building Plan Approval / NA Order for plotted development2nd podium Terrece floor plan.pdf · uploaded 28 Sep 2023Source
- 8 Building Plan Approval / NA Order for plotted development3 To 18 plan.pdf · uploaded 28 Sep 2023Source
- 9 Building Plan Approval / NA Order for plotted development19 to 25 Plan.pdf · uploaded 28 Sep 2023Source
- 10 Building Plan Approval / NA Order for plotted development26 to 27 Plan.pdf · uploaded 28 Sep 2023Source
- 11 Building Plan Approval / NA Order for plotted development28 to 29 Plan.pdf · uploaded 28 Sep 2023Source
- 12 Building Plan Approval / NA Order for plotted development30 plus Terrace Floor Plan.pdf · uploaded 28 Sep 2023Source
- 13 Building Plan Approval / NA Order for plotted developmentParking 1st Floor.pdf · uploaded 28 Sep 2023Source
- 14 Building Plan Approval / NA Order for plotted developmentParking 2nd floor plan.pdf · uploaded 28 Sep 2023Source
- 15 Building Plan Approval / NA Order for plotted developmentParking 3 - Service floor.pdf · uploaded 28 Sep 2023Source
- 16 Building Plan Approval / NA Order for plotted developmentParking 4 - 1st floor plan.pdf · uploaded 28 Sep 2023Source
- 17 Building Plan Approval / NA Order for plotted developmentGround Floor Parking.pdf · uploaded 28 Sep 2023Source
- 2 Commencement Certificates / NA Order for plotted developmentCC.pdf · uploaded 28 Sep 2023Source
- 2 Declaration about Commencement CertificateBund Garden Pune - CC Declaration - Revised - 25 9 2023.pdf · uploaded 28 Sep 2023Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Bund Garden Project - Form1 - Sep23.pdf · uploaded 21 Nov 2023Source
- 1 Disclosure of sold/ booked inventoryBund Garden Project - P52100050987 - Sep23.pdf · uploaded 27 Dec 2023Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form1 - Bund Garden Project - P52100050987 - Dec23.pdf · uploaded 26 Feb 2024Source
- 2 Disclosure of sold/ booked inventorySold Unsold - Bund Garden Project - P52100050987 - Dec23.pdf · uploaded 26 Feb 2024Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form2 - Bund Garden Project - P52100050987 - April23.pdf · uploaded 8 Apr 2024Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - Bund Garden Project - P52100050987 - March 24.pdf · uploaded 7 May 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form3 - Bund Garden - April23.pdf · uploaded 15 May 2024Source
- 3 Disclosure of sold/ booked inventorySold Unsold - Bund Garden Project - P52100050987 - March 24.pdf · uploaded 28 May 2024Source
- 4 Disclosure of sold/ booked inventoryBund Garden Project - P52100050987 - June24.pdf · uploaded 7 Aug 2024Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Bund Garden Project - P52100050987 - June24.pdf · uploaded 10 Aug 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 2A - Bund Garden Project - P52100050987.pdf · uploaded 17 Oct 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)P52100050987 - Bund Garden Project.pdf · uploaded 19 Oct 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Bund Garden Project.pdf · uploaded 5 Nov 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Bund Garden Sep-24.pdf · uploaded 16 Dec 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 - Pune Bund Garden - Sep 24.pdf · uploaded 17 Dec 2024Source
- 2 Disclosure of sold/ booked inventoryBund Garden.pdf · uploaded 20 Dec 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Bund Garden Project.pdf · uploaded 24 Jan 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 - Bund Garden - Dec 24_compressed.pdf · uploaded 7 Feb 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Bund Garden - Dec 24_compressed.pdf · uploaded 19 Feb 2025Source
- 1 Disclosure of sold/ booked inventorySold Unsold - Bund Garden - Dec 24_compressed.pdf · uploaded 25 Feb 2025Source
- 1 Copy of Layout Approval (in case of layout)1-15.pdf · uploaded 4 Apr 2025Source
- 1 Commencement Certificates / NA Order for plotted development00_CC_4493-24_28032025_compressed.pdf · uploaded 4 Apr 2025Source
- 1 Building Plan Approval / NA Order for plotted development2-15.pdf · uploaded 4 Apr 2025Source
- 2 Building Plan Approval / NA Order for plotted development3-15.pdf · uploaded 4 Apr 2025Source
- 3 Building Plan Approval / NA Order for plotted development4-15.pdf · uploaded 4 Apr 2025Source
- 4 Building Plan Approval / NA Order for plotted development5-15.pdf · uploaded 4 Apr 2025Source
- 5 Building Plan Approval / NA Order for plotted development6-15.pdf · uploaded 4 Apr 2025Source
- 6 Building Plan Approval / NA Order for plotted development7-15.pdf · uploaded 4 Apr 2025Source
- 7 Building Plan Approval / NA Order for plotted development8-15.pdf · uploaded 4 Apr 2025Source
- 8 Building Plan Approval / NA Order for plotted development9-15.pdf · uploaded 4 Apr 2025Source
- 9 Building Plan Approval / NA Order for plotted development10-15.pdf · uploaded 4 Apr 2025Source
- 10 Building Plan Approval / NA Order for plotted development11-15.pdf · uploaded 4 Apr 2025Source
- 11 Building Plan Approval / NA Order for plotted development12-15.pdf · uploaded 4 Apr 2025Source
- 12 Building Plan Approval / NA Order for plotted development13-15.pdf · uploaded 4 Apr 2025Source
- 13 Building Plan Approval / NA Order for plotted development14-15.pdf · uploaded 4 Apr 2025Source
- 14 Building Plan Approval / NA Order for plotted development15-15.pdf · uploaded 4 Apr 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Bund Garden Project.pdf · uploaded 2 May 2025Source
- Form 1Bund Garden Project - Form1 - June-25 - P52100050987-ok.pdf · uploaded 18 Jul 2025Source
- Form 1Form-1 Bund Garden Project- Mar-25.pdf · uploaded 18 Jul 2025Source
- Form 2Form 2 - Bund Garden - Jun 25.pdf · uploaded 18 Jul 2025Source
- Form 2Form 2 - Bund Garden - Mar 25.pdf · uploaded 18 Jul 2025Source
- Form 3Form 3 - Bund Garden - Jun 25.pdf · uploaded 18 Jul 2025Source
- Form 3Form 3 - Bund Garden - Mar 25.pdf · uploaded 18 Jul 2025Source
- Disclosure of Sold and Booked InventorySold Unsold - Bund Garden - Jun 25.pdf · uploaded 18 Jul 2025Source
- Disclosure of Sold and Booked InventorySold Unsold - Bund Garden - Mar 25.pdf · uploaded 18 Jul 2025Source
- Form 2A (FY 2024-2025)Bund Garden Project - P52100050987 - Form 2A.pdf · uploaded 25 Aug 2025Source
- Form 5 (FY 2024-2025)Bund Garden Project - 50987.pdf · uploaded 22 Oct 2025Source
- Withdrawal Update Form 1Bund Garden Project-scan.pdf · uploaded 27 Oct 2025Source
- Withdrawal Update Form 2Form 2 - Bund Garden - Sep 25.pdf · uploaded 27 Oct 2025Source
- Withdrawal Update Form 3Form 3 - Bund Garden.pdf · uploaded 27 Oct 2025Source
- Withdrawal Update Form 1From 1 Bund Garden Dec-25.pdf · uploaded 27 Jan 2026Source
- Withdrawal Update Form 2Form 2 - Bund Garden - Dec 25.pdf · uploaded 27 Jan 2026Source
- Withdrawal Update Form 3Form 3 Bund Garden.pdf · uploaded 27 Jan 2026Source
- Withdrawal Update Form 1Form-1 Bund Garden- Mar-26.pdf · uploaded 20 Apr 2026Source
- Withdrawal Update Form 2Form 2.pdf · uploaded 20 Apr 2026Source
- Withdrawal Update Form 3Form 3.pdf · uploaded 20 Apr 2026Source
- Form 2A (FY 2025-2026)FORM 2A - Bund Garden Project - P52100050987.pdf · uploaded 23 Jun 2026Source
- Withdrawal Update Form 1Form 1 - Bund Garden Project - P52100050987.pdf · uploaded 19 Jul 2026Source
- Withdrawal Update Form 2Form 2 Bund Garden Project.pdf · uploaded 19 Jul 2026Source
- Withdrawal Update Form 3Form 3 - Bund Garden - June 26.pdf · uploaded 19 Jul 2026Source
- Form 5 (FY 2025-2026)Bund Garden Project.pdf · uploaded 29 Sep 2026Source
Technical
- Documentlayout bundgarden.pdf · uploaded 30 Mar 2023Source
- DocumentGround Floor.pdf · uploaded 17 Apr 2023Source
- DocumentFirst Floor.pdf · uploaded 17 Apr 2023Source
- DocumentSeconf Floor.pdf · uploaded 17 Apr 2023Source
- Document3,4,5 Floor.pdf · uploaded 17 Apr 2023Source
- Document6,7 Floor.pdf · uploaded 17 Apr 2023Source
- DocumentSection Plan.pdf · uploaded 17 Apr 2023Source
- Document30 plus Terrace Floor Plan.pdf · uploaded 28 Sep 2023Source
- DocumentParking 1st Floor.pdf · uploaded 28 Sep 2023Source
- DocumentParking 2nd floor plan.pdf · uploaded 28 Sep 2023Source
- DocumentParking 3 - Service floor.pdf · uploaded 28 Sep 2023Source
- DocumentParking 4 - 1st floor plan.pdf · uploaded 28 Sep 2023Source
- DocumentGround Floor Parking.pdf · uploaded 28 Sep 2023Source
- Document26 to 27 Plan.pdf · uploaded 28 Sep 2023Source
- Document28 to 29 Plan.pdf · uploaded 28 Sep 2023Source
- Documentlayout approval_compressed.pdf · uploaded 28 Sep 2023Source
- Document2nd podium Terrece floor plan.pdf · uploaded 28 Sep 2023Source
- Document3 To 18 plan.pdf · uploaded 28 Sep 2023Source
- Document19 to 25 Plan.pdf · uploaded 28 Sep 2023Source
- Document1-15.pdf · uploaded 4 Apr 2025Source
- Document2-15.pdf · uploaded 4 Apr 2025Source
- Document3-15.pdf · uploaded 4 Apr 2025Source
- Document4-15.pdf · uploaded 4 Apr 2025Source
- Document5-15.pdf · uploaded 4 Apr 2025Source
- Document6-15.pdf · uploaded 4 Apr 2025Source
- Document7-15.pdf · uploaded 4 Apr 2025Source
- Document8-15.pdf · uploaded 4 Apr 2025Source
- Document9-15.pdf · uploaded 4 Apr 2025Source
- Document10-15.pdf · uploaded 4 Apr 2025Source
- Document11-15.pdf · uploaded 4 Apr 2025Source
- Document12-15.pdf · uploaded 4 Apr 2025Source
- Document13-15.pdf · uploaded 4 Apr 2025Source
- Document14-15.pdf · uploaded 4 Apr 2025Source
- Document15-15.pdf · uploaded 4 Apr 2025Source
- DocumentLayout - 1-15.pdf · uploaded 19 May 2026Source
Technical (Architect)
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvalsLand parcel 11/1/4/12, 11/1/4/13
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Certificate Signed
- Unit types
- —27 units in all
- Address
- 11/1/4/12, 11/1/4/13, 11/1/4/14, Bund Garden Road, Bund GardenPIN 411001
- Village
- Ghorpadi, Haveli taluka
- Land area for this project
- 4,458 sq m (47,985 sq ft)
- Permissible built-up area
- 18,953 sq m (2,04,007 sq ft)
- Sanctioned built-up area
- 18,953 sq m (2,04,007 sq ft)
- Recreational open space
- 446 sq m (4,799 sq ft)
- Designated bank account
- 159
- Developed in phases
- No
Survey, CTS, gat or plot numbers
Land as published on MahaRERA's project page
11/1/4/12,11/1/4/13,11/1/4/14
Boundaries
- North
- Exiting 12M W road
- South
- Existing 7 Point 5 M W Road
- East
- 24 Mts Existing Road
- West
- A D J Cts 11
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking27 units
27 units registered
| Type | Carpet area | Units |
|---|---|---|
| — | — | 27 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Professionals6
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Vilas Desai & Associate | — |
| Chartered accountant | Chirag Sarvaiya & Co | — |
| Engineer | K C Shah Consultants | — |
| Engineer | Saket Deodhar | — |
| Engineer | Siddharthsingh Pardeshi | — |
| Registered real estate agent | Deep Realtors | — |
Source: MahaRERA project page. Contact details are not shown.
Other projects in Ghorpadi
- F5 SkyraRERA PR1260002601909
- Geet GovindRERA PR1260002601209
- LuxoraRERA PR1260002601074
- One Place-Bund Garden RoadRERA PM1260002600754
- Magnar OneRERA PC1260002600695
- 9 Tara CrestRERA PR1260002502197
- Clover AmanoRERA P52100081031
- K P OneRERA PC1260002501289
All 57 projects in Ghorpadi · Compare Bund Garden Project with another project