Deedo IDDP-PUN-416WCompletion was pushed back 6 months to Dec 2024, and that date has passed too; no MahaRERA orders on record; 15% of its units are booked.
Ghorpadi, Pune 411001 · Property rates in Ghorpadi · by Abil Propcon Llp
Buying a flat here?
See every deed registered on it.
Completion was pushed back 6 months to Dec 2024, and that date has passed too
- This projectRegistered 25 Oct 2021, completion promised 30 Jun 2024, revised to 30 Dec 2024, and still not shown completed today.
1 extension certificate on record.
1 registration · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales first, then rentals and mortgages matched to this project · the free view shows a price band
2 buildings
Open a building to see every flat, floor by floor.
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrationP52100031530
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52100031530 | 25 Oct 2021 | 30 Jun 2024 | 30 Dec 2024 | Abil Propcon LLP | Project page |
Documents136
3 documents held by Deedo, 133 filings listed on MahaRERA's project page
Other
- OtherDate not statedView
Finance
Show all 136 documentsShow fewer documents
Legal
- Legal Title reportSupplementary Title_compressed.pdf · uploaded 18 Sep 2021Source
- Legal Title reportSecond Supplementary Title_compressed.pdf · uploaded 18 Sep 2021Source
- Declaration Form BDeclaration Form B.pdf · uploaded 18 Sep 2021Source
- Declaration Form BRERA - FORM B AFFIDAVIT.pdf · uploaded 1 Oct 2021Source
- Legal Title reportTitle Search.pdf · uploaded 12 Oct 2021Source
- Legal Title reportTitle Search Part 2.pdf · uploaded 12 Oct 2021Source
- Other – Legalabil boulevard.pdf · uploaded 17 Nov 2022Source
- Declaration Form BFORM B.pdf · uploaded 30 May 2024Source
- Other – LegalBoulevard Full OC 13032025.pdf · uploaded 17 Mar 2025Source
Migrated
- 1 PAN CardABIL Propcon LLP.pdf · uploaded 18 Sep 2021Source
- 2 PAN CardSEC PAN.pdf · uploaded 18 Sep 2021Source
- 3 PAN CardZSC PAN.pdf · uploaded 18 Sep 2021Source
- 1 Copy of the legal title reportTitle_2015_compressed-1-3.pdf · uploaded 18 Sep 2021Source
- 2 Copy of the legal title reportTitle_2015_compressed-4-6.pdf · uploaded 18 Sep 2021Source
- 3 Copy of the legal title reportSupplementary Title_compressed.pdf · uploaded 18 Sep 2021Source
- 4 Copy of the legal title reportSecond Supplementary Title_compressed.pdf · uploaded 18 Sep 2021Source
- 1 Copy of Layout Approval (in case of layout)Layout.pdf · uploaded 18 Sep 2021Source
- 1 Building Plan Approval / NA Order for plotted developmentLayout.pdf · uploaded 18 Sep 2021Source
- 1 Commencement Certificates / NA Order for plotted developmentCommencement Certificate 1048_2021_compressed.pdf · uploaded 18 Sep 2021Source
- 1 Declaration about Commencement CertificateDeclaration-Commencement Certificate.pdf · uploaded 18 Sep 2021Source
- 1 Declaration in FORM BDeclaration Form B.pdf · uploaded 18 Sep 2021Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1_compressed.pdf · uploaded 18 Sep 2021Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2_ Abil Boulevard_compressed.pdf · uploaded 18 Sep 2021Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)Form 2A_compressed.pdf · uploaded 18 Sep 2021Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3_compressed.pdf · uploaded 18 Sep 2021Source
- 1 Details of encumbrancesRERA - DETAILS OF ENCUMBRANCES.pdf · uploaded 1 Oct 2021Source
- 2 Declaration in FORM BRERA - FORM B AFFIDAVIT.pdf · uploaded 1 Oct 2021Source
- 5 Copy of the legal title reportTitle Search.pdf · uploaded 12 Oct 2021Source
- 6 Copy of the legal title reportTitle Search Part 2.pdf · uploaded 12 Oct 2021Source
- 2 Details of encumbrancesEncumbrances_Developer.pdf · uploaded 12 Oct 2021Source
- 2 Declaration about Commencement CertificateComencement Certificate_removed.pdf · uploaded 12 Oct 2021Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 and 3 clarification.pdf · uploaded 12 Oct 2021Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 2 and 3 clarification.pdf · uploaded 12 Oct 2021Source
- 1 Proforma of Allotment letterRERA Agreement- ABIL Boulevard.pdf · uploaded 12 Oct 2021Source
- 2 Proforma of Allotment letterDraft Allotment Letter.pdf · uploaded 18 Oct 2021Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)220113 RERA LETTER.pdf · uploaded 14 Jan 2022Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)From 2A Abil Boulevard 6-1-2021_compressed.pdf · uploaded 14 Jan 2022Source
- 1 Disclosure of sold/ booked inventoryDisclosure Letter.pdf · uploaded 31 Jan 2022View
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3_Boulevard_compressed.pdf · uploaded 31 Jan 2022Source
- 2 Disclosure of sold/ booked inventoryDisclouser Letter.pdf · uploaded 15 Apr 2022Source
- 2 Copy of Layout Approval (in case of layout)CC 4093_29032022.pdf · uploaded 19 Apr 2022Source
- 2 Building Plan Approval / NA Order for plotted developmentCC 4093_2021 dated 29032022.pdf · uploaded 19 Apr 2022Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 28 Jun 2022Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2_compressed (4).pdf · uploaded 28 Jun 2022Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)Abil propcon LLP Certificate of financial progress_compressed.pdf · uploaded 28 Jun 2022Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 221015 GHORPADI.pdf · uploaded 19 Oct 2022Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 APRIL.pdf · uploaded 19 Oct 2022Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 JULY.pdf · uploaded 19 Oct 2022Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Engineers Certificate ABIL Boulevard Sept 22.pdf · uploaded 19 Oct 2022Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 JULY.pdf · uploaded 19 Oct 2022Source
- 3 Disclosure of sold/ booked inventorySOLD INVENTORY JULY.pdf · uploaded 19 Oct 2022Source
- 4 Disclosure of sold/ booked inventorySOLD INVENTORY OCT.pdf · uploaded 19 Oct 2022Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 ABIL Propcon LLP Certificate Sept 22.pdf · uploaded 19 Oct 2022Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 JULY.pdf · uploaded 19 Oct 2022Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)FORM 5.pdf · uploaded 27 Oct 2022Source
- 1 Other – Legalabil boulevard.pdf · uploaded 17 Nov 2022Source
- 5 Disclosure of sold/ booked inventorysold inventory.pdf · uploaded 10 Jan 2023Source
- 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)form 3_compressed (3).pdf · uploaded 13 Jan 2023Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)form 1.pdf · uploaded 17 Jan 2023Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)form 2.pdf · uploaded 17 Jan 2023Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)form 1.pdf · uploaded 6 Apr 2023Source
- 6 Disclosure of sold/ booked inventorybooked inventory.pdf · uploaded 6 Apr 2023Source
- 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)form 2.pdf · uploaded 12 Apr 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)FORM 2A.pdf · uploaded 24 Apr 2023Source
- 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)form 3.pdf · uploaded 26 Apr 2023Source
- 3 Copy of Layout Approval (in case of layout)1942_compressed.pdf · uploaded 23 May 2023Source
- 4 Copy of Layout Approval (in case of layout)2624_compressed.pdf · uploaded 23 May 2023Source
- 2 Commencement Certificates / NA Order for plotted developmentC C 194222_compressed.pdf · uploaded 23 May 2023Source
- 3 Commencement Certificates / NA Order for plotted developmentC C 262422_compressed.pdf · uploaded 23 May 2023Source
- 4 Commencement Certificates / NA Order for plotted developmentCC 0222.pdf · uploaded 24 May 2023Source
- 5 Commencement Certificates / NA Order for plotted developmentcc 2375.pdf · uploaded 24 May 2023Source
- 6 Commencement Certificates / NA Order for plotted developmentcc 2711.pdf · uploaded 24 May 2023Source
- 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)form 1.pdf · uploaded 3 Jul 2023Source
- 7 Disclosure of sold/ booked inventorysold inventory.pdf · uploaded 3 Jul 2023Source
- 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)form 2.pdf · uploaded 21 Jul 2023Source
- 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3.pdf · uploaded 27 Jul 2023Source
- 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1.pdf · uploaded 17 Oct 2023Source
- 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)form 2 boulevard.pdf · uploaded 19 Oct 2023Source
- 8 Disclosure of sold/ booked inventorysold inventory.pdf · uploaded 19 Oct 2023Source
- 10 CA Certificate on Project Cost & Fund withdrawal (Form 3)form 3 boulevard.pdf · uploaded 20 Oct 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)FORM 5 Boulevard.pdf · uploaded 26 Oct 2023Source
- 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)form 1.pdf · uploaded 12 Jan 2024Source
- 11 Engineer’s Certificate on Cost Incurred on Project (Form 2)form 2.pdf · uploaded 16 Jan 2024Source
- 9 Disclosure of sold/ booked inventorysold inventory.pdf · uploaded 24 Jan 2024Source
- 11 CA Certificate on Project Cost & Fund withdrawal (Form 3)form 3.pdf · uploaded 24 Jan 2024Source
- 11 Architect’s Certificate of Percentage of Completion of Work (Form 1)form 1.pdf · uploaded 23 Apr 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)form 2a.pdf · uploaded 23 Apr 2024Source
- 12 Engineer’s Certificate on Cost Incurred on Project (Form 2)form 2.pdf · uploaded 20 May 2024Source
- 10 Disclosure of sold/ booked inventorydiclosure of sold inventory.pdf · uploaded 20 May 2024Source
- 12 CA Certificate on Project Cost & Fund withdrawal (Form 3)form 3.pdf · uploaded 20 May 2024Source
- 1 CERSAI detailscersai.pdf · uploaded 29 May 2024Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameseparate bank acc details.pdf · uploaded 29 May 2024Source
- 3 Declaration in FORM BFORM B.pdf · uploaded 30 May 2024Source
- 1 Disclosure of Interest in Other Real Estate Organizationsdisclosure of interest in other organisation.pdf · uploaded 17 Jun 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)form 2a letter head.pdf · uploaded 21 Jun 2024Source
- 12 Architect’s Certificate of Percentage of Completion of Work (Form 1)form 1.pdf · uploaded 15 Jul 2024Source
- 13 Engineer’s Certificate on Cost Incurred on Project (Form 2)form 2.pdf · uploaded 15 Jul 2024Source
- 11 Disclosure of sold/ booked inventorysold inventory.pdf · uploaded 15 Jul 2024Source
- 13 CA Certificate on Project Cost & Fund withdrawal (Form 3)form 3.pdf · uploaded 15 Jul 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)form 1.pdf · uploaded 23 Oct 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)form 3.pdf · uploaded 23 Oct 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)form 2.pdf · uploaded 23 Oct 2024Source
- 2 Disclosure of sold/ booked inventorysold unsold abil boulevard.pdf · uploaded 23 Oct 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)FORM 5 2023-2024 Boulevard.pdf · uploaded 2 Jan 2025Source
- 1 Disclosure of sold/ booked inventoryABC sold-unsold.pdf · uploaded 6 Jan 2025View
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 ABIL PROPCON LLP.pdf · uploaded 10 Jan 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 ABIL BOULEVARD_organized.pdf · uploaded 13 Jan 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 ABIL BOULEVARD.pdf · uploaded 22 Jan 2025Source
- 1 Other – LegalBoulevard Full OC 13032025.pdf · uploaded 17 Mar 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 ABIL Boulevard.pdf · uploaded 9 Apr 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)FORM 2A ABIL.pdf · uploaded 23 Apr 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 ABIL PROPCON.pdf · uploaded 8 May 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 ABIL PROPCON.pdf · uploaded 8 May 2025Source
- 1 Disclosure of sold/ booked inventorySOLD UNSOLD ABIL Boulevard.pdf · uploaded 8 May 2025View
Technical
- DocumentLayout.pdf · uploaded 18 Sep 2021Source
- DocumentLayout.pdf · uploaded 18 Sep 2021Source
- DocumentCC 4093_29032022.pdf · uploaded 19 Apr 2022Source
- DocumentCC 4093_2021 dated 29032022.pdf · uploaded 19 Apr 2022Source
- Document1942_compressed.pdf · uploaded 23 May 2023Source
- Document2624_compressed.pdf · uploaded 23 May 2023Source
Technical (Architect)
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvalsLand parcel 279
As registered with MahaRERA and published on its project page
- Project type
- Commercial
- Status on MahaRERA
- Certificate Signed
- Unit types
- Office space, Retail26 units in all
- Address
- 279, Land bearing.NO. 35A/2, 35A/3, 36/1, 36/2, and corresponding CTS NO.279, admeasuring 8, 746.60 Sq. Mtrs, Village- Ghorpadi, Taluka- Pune city, District-Pune, GHORPADIPIN 411001
- Village
- Ghorpadi, Haveli taluka
- Location
- 18.53377, 73.91508
- Land area for this project
- 8,747 sq m (94,148 sq ft)
- Permissible built-up area
- 44,272 sq m (4,76,538 sq ft)
- Sanctioned built-up area
- 44,272 sq m (4,76,538 sq ft)
- Recreational open space
- 875 sq m (9,416 sq ft)
- Designated bank account
- 28
- Developed in phases
- No
Survey, CTS, gat or plot numbers
Land as published on MahaRERA's project page
279
Boundaries
- North
- 30 Mtrs Wide Road
- South
- 30 Mtrs Wide Road
- East
- Adjacent Cts No 280
- West
- Adjacent Cts No 277
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking26 units
4 of 26 units booked (15%), as the promoter reported to MahaRERA
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| Office space | 1,407.99 sq m · 15,155 sq ft | 1 | 0 |
| Office space | 1,569.64 sq m · 16,895 sq ft | 2 | 0 |
| Office space | 1,569.65 sq m · 16,896 sq ft | 1 | 1 |
| Office space | 1,575.05 sq m · 16,954 sq ft | 1 | 1 |
| Office space | 1,601.94 sq m · 17,243 sq ft | 1 | 0 |
| Office space | 1,796.09 sq m · 19,333 sq ft | 1 | 0 |
| Office space | 1,803.24 sq m · 19,410 sq ft | 1 | 0 |
| Office space | 1,806.09 sq m · 19,441 sq ft | 11 | 0 |
Show all 14 unit rowsShow fewer unit rows
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| Office space | 1,849.81 sq m · 19,911 sq ft | 2 | 2 |
| Retail | 94.82 sq m · 1,021 sq ft | 1 | 0 |
| Retail | 162.8 sq m · 1,752 sq ft | 1 | 0 |
| Retail | 193.37 sq m · 2,081 sq ft | 1 | 0 |
| Retail | 198.38 sq m · 2,135 sq ft | 1 | 0 |
| Retail | 682.56 sq m · 7,347 sq ft | 1 | 0 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Professionals31
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Ssa Architects | — |
| Chartered accountant | Supriya Abhijeet Mundada | — |
| Engineer | Jw Consultants LLP | — |
| Other | J W Consultants | — |
| Other | Lighting Vision India | — |
| Other | S N Joshi Private Limited | — |
| Other | Vertex Enviro Consultancy Private Limited | — |
| Registered real estate agent | Abhijit Sahebrao Sabbarwar | — |
Show all 31 professionalsShow fewer professionals
| Role | Name | Registration no. |
|---|---|---|
| Registered real estate agent | A K Properties | — |
| Registered real estate agent | ANAROCK Property Consultants Pvt. Ltd. | — |
| Registered real estate agent | Bhavin Pranlal Pujara | — |
| Registered real estate agent | CBRE South Asia Private Limited | — |
| Registered real estate agent | Colliers International India Property Services Pvt Ltd | — |
| Registered real estate agent | Global Realtors | — |
| Registered real estate agent | Jones Lang Lasalle Property Consultants (India) Private Limited | — |
| Registered real estate agent | K G Ramesh Kumar Nair | — |
| Registered real estate agent | Knight Frank (India) Private Limited | — |
| Registered real estate agent | Mahesh Nanikram Lalchandani | — |
| Registered real estate agent | Mumbai Property Exchange Pvt Ltd | — |
| Registered real estate agent | Pearlquest Associates Pvt Ltd | — |
| Registered real estate agent | Pearl Realtors | — |
| Registered real estate agent | Prerana Ventures LLP | — |
| Registered real estate agent | Propbuying Realtors Pvt Ltd | — |
| Registered real estate agent | Property Chef Consulting Services | — |
| Registered real estate agent | Propozone Technologies Private Limited | — |
| Registered real estate agent | Quikr Realty Limited | — |
| Registered real estate agent | Rockholdings Realty LLP | — |
| Registered real estate agent | Smc Real Estate Advisors Private Limited | — |
| Registered real estate agent | Suggested Property Private Limited | — |
| Registered real estate agent | Terraa Propex Private Limited | — |
| Registered real estate agent | Umang Jitender Soni | — |
Source: MahaRERA project page. Contact details are not shown.
Other projects in Ghorpadi
- F5 SkyraRERA PR1260002601909
- Geet GovindRERA PR1260002601209
- LuxoraRERA PR1260002601074
- One Place-Bund Garden RoadRERA PM1260002600754
- Magnar OneRERA PC1260002600695
- 9 Tara CrestRERA PR1260002502197
- Clover AmanoRERA P52100081031
- K P OneRERA PC1260002501289
All 57 projects in Ghorpadi · Compare Abil Boulevard with another project