One Aretha
Deedo IDDP-PUN-N4PKCompletion was pushed back 4 months, to Apr 2029; no MahaRERA orders on record; 34% of its units are booked.
Dhanori, Pune 411015 · Property rates in Dhanori · by Triaa Landmarks Llp
Buying a flat here?
See every deed registered on it.
Completion was pushed back 4 months, to Apr 2029
- P52100054352Registered 15 Jan 2024, completion promised 31 Dec 2028.
- PR1261012601285Registered 23 Jul 2026, completion promised 31 Dec 2028, revised to 30 Apr 2029.
No extension certificate on record.
2 registrations · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales, rentals and mortgages matched to this project · the free view shows a price band
- Primary sale · Sep 2026
- Primary sale · Sep 2026
- Primary sale · Sep 2026
- Primary sale · Sep 2026
- Primary sale · Sep 2026
- Primary sale · Sep 2026
- Primary sale · Sep 2026
- Primary sale · Aug 2026
- Primary sale · Aug 2026
- Primary sale · Aug 2026
| Month | Flat | Kind | Area | Price | Record |
|---|---|---|---|---|---|
| Sep 2026 | Wing B · 1103 | Primary sale | 1,003 sq ft | View Primary sale, Sep 2026 | |
| Sep 2026 | Wing B · 805 | Primary sale | 1,027 sq ft | View Primary sale, Sep 2026 | |
| Sep 2026 | Wing A · 506 | Primary sale | 1,006 sq ft | View Primary sale, Sep 2026 | |
| Sep 2026 | Wing B · 1604 | Primary sale | 1,003 sq ft | View Primary sale, Sep 2026 | |
| Sep 2026 | Wing B · 410 | Primary sale | 757 sq ft | View Primary sale, Sep 2026 | |
| Sep 2026 | Wing B · 507 | Primary sale | 757 sq ft | View Primary sale, Sep 2026 | |
| Sep 2026 | Wing B · 602 | Primary sale | 1,030 sq ft | View Primary sale, Sep 2026 | |
| Aug 2026 | Wing B · 201 | Primary sale | 968 sq ft | View Primary sale, Aug 2026 | |
| Aug 2026 | Wing B · 802 | Primary sale | 1,030 sq ft | View Primary sale, Aug 2026 | |
| Aug 2026 | Wing B · 1107 | Primary sale | 965 sq ft | View Primary sale, Aug 2026 |
5 buildings
Open a building to see every flat, floor by floor.
- Wing A17 floors · 158 units77% booked
- Wing B18 floors · 166 units7% booked
- Wing-D7 floors · 28 units0% booked
- Wing - D15 floors · 20 units0% booked
- Wing - D25 floors · 20 units0% booked
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrations2
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52100054352 | 15 Jan 2024 | 31 Dec 2028 | 31 Dec 2028 | Triaa Landmarks LLP | Project page |
| PR1261012601285 | 23 Jul 2026 | 31 Dec 2028 | 30 Apr 2029 | Triaa Landmarks LLP | Project page |
Documents126
2 documents held by Deedo, 124 filings listed on MahaRERA's project page
Registration certificate (2)
Finance
- PAN CardP52100054352 · PAN Card.pdf · uploaded 5 Nov 2023Source
- GSTIN DocumentPR1261012601285 · TRIAA LANDMARK GST CERT.pdf · uploaded 9 May 2026Source
- PAN CardPR1261012601285 · Landmarks llp PAN Card_unlocked.pdf · uploaded 9 May 2026Source
- OthersPR1261012601285 · Declaration regarding non-sharing of revenue with Landowners.pdf · uploaded 23 Jul 2026Source
Show all 126 documentsShow fewer documents
Legal
- OthersPR1261012601285 · Disclosure of Interest.pdf · uploaded 9 May 2026Source
- Declaration Form BPR1261012601285 · Form B.pdf · uploaded 11 May 2026Source
- Declaration Form BPR1261012601285 · Search and Title Report.pdf · uploaded 12 May 2026Source
- OthersPR1261012601285 · Satbara 1-1.pdf · uploaded 26 Jun 2026Source
- OthersPR1261012601285 · Satbara 1-2.pdf · uploaded 26 Jun 2026Source
- OthersPR1261012601285 · Satbara 1-3.pdf · uploaded 26 Jun 2026Source
- OthersPR1261012601285 · Satbara 1-4.pdf · uploaded 26 Jun 2026Source
- OthersPR1261012601285 · Satbara 1-5.pdf · uploaded 26 Jun 2026Source
- OthersPR1261012601285 · Satbara 1-6.pdf · uploaded 26 Jun 2026Source
- OthersPR1261012601285 · Satbara 1-7.pdf · uploaded 26 Jun 2026Source
- OthersPR1261012601285 · Satbara 1-8.pdf · uploaded 26 Jun 2026Source
- OthersPR1261012601285 · Satbara 1-9.pdf · uploaded 26 Jun 2026Source
- OthersPR1261012601285 · Satbara 1-10.pdf · uploaded 26 Jun 2026Source
- OthersPR1261012601285 · Satbara 1-11.pdf · uploaded 26 Jun 2026Source
- OthersPR1261012601285 · Satbara 1-12.pdf · uploaded 26 Jun 2026Source
- OthersPR1261012601285 · Satbara 1-13.pdf · uploaded 26 Jun 2026Source
- OthersPR1261012601285 · Satbara 1-14.pdf · uploaded 26 Jun 2026Source
Migrated
- 1 Declaration in FORM BP52100054352 · Form B.pdf · uploaded 24 Oct 2023Source
- 1 Deviation Report with respect to Allotment letterP52100054352 · Deviation Report - Allotment Letter.pdf · uploaded 24 Oct 2023Source
- 1 Deviation Report with respect to model copy of AgreementP52100054352 · Deviation Report - Agreement.pdf · uploaded 24 Oct 2023Source
- 1 PAN CardP52100054352 · PAN Card.pdf · uploaded 5 Nov 2023Source
- 1 Copy of the legal title reportP52100054352 · Title Search Report Annexure.pdf · uploaded 5 Nov 2023Source
- 1 a Details of encumbrances concerned to FinanceP52100054352 · Encumbrance Certificate.pdf · uploaded 5 Nov 2023Source
- 1 b Details of encumbrances concerned to LegalP52100054352 · Encumbrance Certificate.pdf · uploaded 5 Nov 2023Source
- 1 Building Plan Approval / NA Order for plotted developmentP52100054352 · Plan 1.pdf · uploaded 5 Nov 2023Source
- 2 Building Plan Approval / NA Order for plotted developmentP52100054352 · Plan 2.pdf · uploaded 5 Nov 2023Source
- 3 Building Plan Approval / NA Order for plotted developmentP52100054352 · Plan 3.pdf · uploaded 5 Nov 2023Source
- 4 Building Plan Approval / NA Order for plotted developmentP52100054352 · Plan 4.pdf · uploaded 5 Nov 2023Source
- 5 Building Plan Approval / NA Order for plotted developmentP52100054352 · Plan 5.pdf · uploaded 5 Nov 2023Source
- 6 Building Plan Approval / NA Order for plotted developmentP52100054352 · Plan 6.pdf · uploaded 5 Nov 2023Source
- 7 Building Plan Approval / NA Order for plotted developmentP52100054352 · Plan 7.pdf · uploaded 5 Nov 2023Source
- 8 Building Plan Approval / NA Order for plotted developmentP52100054352 · Plan 8.pdf · uploaded 5 Nov 2023Source
- 1 Commencement Certificates / NA Order for plotted developmentP52100054352 · Commencement Certificate.pdf · uploaded 5 Nov 2023Source
- 1 Declaration about Commencement CertificateP52100054352 · Format D.pdf · uploaded 5 Nov 2023Source
- 1 CERSAI detailsP52100054352 · CERSAI Declaration.pdf · uploaded 5 Nov 2023Source
- 1 Proforma of Allotment letterP52100054352 · Allotment Letter.pdf · uploaded 5 Nov 2023Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameP52100054352 · Bank Account Details.pdf · uploaded 5 Nov 2023Source
- 1 Copy of Layout Approval (in case of layout)P52100054352 · Layout (1).pdf · uploaded 21 Nov 2023Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100054352 · CA Certificate.pdf · uploaded 24 Nov 2023Source
- 1 Disclosure of Interest in Other Real Estate OrganizationsP52100054352 · Disclosure of Interest.pdf · uploaded 25 Dec 2023Source
- 1 Proforma of Agreement for saleP52100054352 · Sample Agreement.pdf · uploaded 26 Dec 2023Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100054352 · Form 1_Architect Certificate - 31-03-2024.pdf · uploaded 20 Apr 2024Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100054352 · Annexure - B - form -2 - 31-03-2024.pdf · uploaded 20 Apr 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100054352 · Form 3 - CA Certificate - 31-03-2024 V1.pdf · uploaded 20 Apr 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100054352 · Scanned Form 1_Triaa Landmarks LLP.pdf · uploaded 20 Jul 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100054352 · Scanned Form 2_Triaa Landmarks LLP.pdf · uploaded 20 Jul 2024Source
- 1 Disclosure of sold/ booked inventoryP52100054352 · Scanned Sold Booked Data_Triaa Landmarks LLP.pdf · uploaded 20 Jul 2024Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100054352 · Scanned Form 3_Triaa Landmarks LLP_compressed.pdf · uploaded 20 Jul 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100054352 · Form 1.pdf · uploaded 20 Oct 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100054352 · Form 3.pdf · uploaded 20 Oct 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100054352 · Form 2.pdf · uploaded 20 Oct 2024Source
- 1 Disclosure of sold/ booked inventoryP52100054352 · Disclosure of Inventory.pdf · uploaded 20 Oct 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)P52100054352 · Form 5 (2023-24).pdf · uploaded 20 Oct 2024Source
- 1 a Details of encumbrances concerned to FinanceP52100054352 · Scanned Encumbrance certificate.pdf · uploaded 8 Nov 2024Source
- 1 b Details of encumbrances concerned to LegalP52100054352 · Scanned Encumbrance certificate.pdf · uploaded 8 Nov 2024Source
- 2 a Details of encumbrances concerned to FinanceP52100054352 · RERA Encumbrance letter_Co borrower.pdf · uploaded 2 Dec 2024Source
- 2 b Details of encumbrances concerned to LegalP52100054352 · RERA Encumbrance letter_Co borrower.pdf · uploaded 2 Dec 2024Source
- 1 Commencement Certificates / NA Order for plotted developmentP52100054352 · Commencement Certificates _ NA Order for plotted development.pdf · uploaded 1 Feb 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100054352 · Form 1.pdf · uploaded 11 Feb 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100054352 · Form 3.pdf · uploaded 11 Feb 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100054352 · Form 2.pdf · uploaded 11 Feb 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P52100054352 · Form 1.pdf · uploaded 20 Apr 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P52100054352 · Form 3.pdf · uploaded 20 Apr 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P52100054352 · Form 2.pdf · uploaded 20 Apr 2025Source
- 1 Disclosure of sold/ booked inventoryP52100054352 · Disclosure of Sold Inventory.pdf · uploaded 20 Apr 2025Source
- Withdrawal Update Form 1P52100054352 · Form -1-Artitech certificate -30-6-2025 -Triaa Landmarks LLP.pdf · uploaded 23 Dec 2025Source
- Withdrawal Update Form 2P52100054352 · Form 2 - Engineers Certificate 30-06-2025.pdf · uploaded 23 Dec 2025Source
- Withdrawal Update Form 3P52100054352 · Form 3.pdf · uploaded 23 Dec 2025Source
- Withdrawal Update Form 1P52100054352 · Form -1 - Architect Certificate -30-09-2025.pdf · uploaded 24 Dec 2025Source
- Withdrawal Update Form 2P52100054352 · Form -2 - Engineers Certificate -30-09-2025.pdf · uploaded 24 Dec 2025Source
- Withdrawal Update Form 3P52100054352 · Form -3 CA Certificate- 30-09-2025.pdf · uploaded 24 Dec 2025Source
- Withdrawal Update Form 1P52100054352 · Form -1-Artitech certificate -31-12-2025 -Triaa Landmarks LLP.pdf · uploaded 29 Apr 2026Source
- Withdrawal Update Form 1P52100054352 · Scanned Form 1_Triaa Landmarks LLP_Mar 26.pdf · uploaded 29 Apr 2026Source
- Withdrawal Update Form 2P52100054352 · Form 2.pdf · uploaded 29 Apr 2026Source
- Withdrawal Update Form 2P52100054352 · Scanned Form 2_Triaa Landmarks LLP_Mar 26.pdf · uploaded 29 Apr 2026Source
- Withdrawal Update Form 3P52100054352 · Form -3-CA certificate -31-12-2025 -Triaa Landmarks LLP.pdf · uploaded 29 Apr 2026Source
- Withdrawal Update Form 3P52100054352 · Scanned Form 3_Triaa Landmarks LLP_Mar 26.pdf · uploaded 29 Apr 2026Source
- Withdrawal Update Form 1P52100054352 · Form -1-Artitech certificate -16-07-2026 -Triaa Landmarks LLP.pdf · uploaded 27 Jul 2026Source
- Withdrawal Update Form 2P52100054352 · Form 2.pdf · uploaded 27 Jul 2026Source
- Withdrawal Update Form 3P52100054352 · Form 3.pdf · uploaded 27 Jul 2026Source
Technical
- DocumentP52100054352 · Plan 1.pdf · uploaded 5 Nov 2023Source
- DocumentP52100054352 · Plan 2.pdf · uploaded 5 Nov 2023Source
- DocumentP52100054352 · Plan 3.pdf · uploaded 5 Nov 2023Source
- DocumentP52100054352 · Plan 4.pdf · uploaded 5 Nov 2023Source
- DocumentP52100054352 · Plan 5.pdf · uploaded 5 Nov 2023Source
- DocumentP52100054352 · Plan 6.pdf · uploaded 5 Nov 2023Source
- DocumentP52100054352 · Plan 7.pdf · uploaded 5 Nov 2023Source
- DocumentP52100054352 · Plan 8.pdf · uploaded 5 Nov 2023Source
- DocumentP52100054352 · Layout (1).pdf · uploaded 21 Nov 2023Source
- DocumentP52100054352 · Layout.pdf · uploaded 16 Dec 2025Source
- DocumentP52100054352 · Plan 1.pdf · uploaded 16 Dec 2025Source
- DocumentP52100054352 · Plan 2.pdf · uploaded 16 Dec 2025Source
- DocumentP52100054352 · Plan 3.pdf · uploaded 16 Dec 2025Source
- DocumentP52100054352 · Plan 4.pdf · uploaded 16 Dec 2025Source
- DocumentP52100054352 · Plan 5.pdf · uploaded 16 Dec 2025Source
- DocumentP52100054352 · Plan 6.pdf · uploaded 16 Dec 2025Source
- DocumentP52100054352 · Plan 7.pdf · uploaded 16 Dec 2025Source
- DocumentP52100054352 · Plan 8.pdf · uploaded 16 Dec 2025Source
- DocumentP52100054352 · Plan 9.pdf · uploaded 16 Dec 2025Source
- DocumentP52100054352 · Plan 10.pdf · uploaded 16 Dec 2025Source
- DocumentP52100054352 · Plan 11.pdf · uploaded 16 Dec 2025Source
- DocumentP52100054352 · Plan 12.pdf · uploaded 16 Dec 2025Source
- DocumentP52100054352 · Plan 13.pdf · uploaded 16 Dec 2025Source
- DocumentP52100054352 · Plan 14.pdf · uploaded 16 Dec 2025Source
- DocumentP52100054352 · Plan 15.pdf · uploaded 16 Dec 2025Source
- DocumentP52100054352 · Plan 16.pdf · uploaded 16 Dec 2025Source
- DocumentPR1261012601285 · Annexure A.pdf · uploaded 9 May 2026Source
- DocumentPR1261012601285 · Marked Layout.pdf · uploaded 9 May 2026Source
- DocumentPR1261012601285 · Plan.pdf · uploaded 9 May 2026Source
- OthersPR1261012601285 · Declaration regarding plot area.pdf · uploaded 9 May 2026Source
Technical (Architect)
- DocumentP52100054352 · Form 1.pdf · uploaded 20 Oct 2024Source
- DocumentP52100054352 · Form 1.pdf · uploaded 11 Feb 2025Source
- DocumentP52100054352 · Form 1.pdf · uploaded 20 Apr 2025Source
- DocumentP52100054352 · Form -1-Artitech certificate -16-07-2026 -Triaa Landmarks LLP.pdf · uploaded 27 Jul 2026Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvalsLand parcel S. No. 1/1 to 1/14
As registered with MahaRERA and published on its project page
- Project type
- Others
- Status on MahaRERA
- Certificate Signed
- Phases
- 2
- Unit types
- 2BHK, 3BHK, 4BHK, Shop, —, 1BHK392 units in all
- Address
- S. No. 1/1(P), 1/2, 1/3, 1/4, 1/5, 1/6, 1/7, 1/8, 1/9, 1/10, 1/11, 1/12, 1/13, 1/14(P), Dhanori, DhanoriPIN 411015
- Village
- Dhanori
- Location
- 18.59682, 73.89794
- Land area for this project
- 11,250 sq m (1,21,094 sq ft)
- Permissible built-up area
- 1,17,566 sq m (12,65,464 sq ft)
- Sanctioned built-up area
- 17,566 sq m (1,89,074 sq ft)
- Recreational open space
- 1,112 sq m (11,966 sq ft)
- Designated bank account
- 109
- Developed in phases
- Yes
- Also registered as
- One Aretha Phase 1, One Aretha - D
Survey, CTS, gat or plot numbers
Land as published on MahaRERA's project page
S. No. 1/1(P), 1/2, 1/3, 1/4, 1/5, 1/6, 1/7, 1/8, 1/9, 1/10, 1/11, 1/12, 1/13, 1/14(P)
Boundaries
- North
- By Part of S No 2
- South
- By 24 Mtrs DP Road
- East
- By S No 16
- West
- By Dhanori Gaothan
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking392 units
134 of 392 units booked (34%), as the promoter reported to MahaRERA
| RERA | Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|---|
| P52100054352 | Wing A | 2BHK | 61.43 sq m · 661 sq ft | 17 | 17 |
| P52100054352 | Wing A | 2BHK | 63.47 sq m · 683 sq ft | 17 | 17 |
| P52100054352 | Wing A | 2BHK | 63.5 sq m · 684 sq ft | 12 | 12 |
| P52100054352 | Wing A | 2BHK | 64.14 sq m · 690 sq ft | 17 | 17 |
| P52100054352 | Wing A | 2BHK | 76.23 sq m · 821 sq ft | 11 | 11 |
| P52100054352 | Wing A | 2BHK | 76.96 sq m · 828 sq ft | 1 | 1 |
| P52100054352 | Wing A | 3BHK | 90.75 sq m · 977 sq ft | 28 | 28 |
| P52100054352 | Wing A | 3BHK | 95.97 sq m · 1,033 sq ft | 2 | 2 |
Show all 37 unit rowsShow fewer unit rows
| RERA | Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|---|
| P52100054352 | Wing A | 4BHK | 103.64 sq m · 1,116 sq ft | 14 | 14 |
| P52100054352 | Wing A | 4BHK | 104.44 sq m · 1,124 sq ft | 3 | 3 |
| P52100054352 | Wing A | Shop | 27.38 sq m · 295 sq ft | 3 | 0 |
| P52100054352 | Wing A | Shop | 27.73 sq m · 298 sq ft | 3 | 0 |
| P52100054352 | Wing A | Shop | 28.18 sq m · 303 sq ft | 3 | 0 |
| P52100054352 | Wing A | Shop | 32.97 sq m · 355 sq ft | 3 | 0 |
| P52100054352 | Wing A | Shop | 33.49 sq m · 360 sq ft | 3 | 0 |
| P52100054352 | Wing A | Shop | 33.95 sq m · 365 sq ft | 3 | 0 |
| P52100054352 | Wing A | Shop | 35.96 sq m · 387 sq ft | 3 | 0 |
| P52100054352 | Wing A | Shop | 41.34 sq m · 445 sq ft | 3 | 0 |
| P52100054352 | Wing A | Shop | 46.33 sq m · 499 sq ft | 3 | 0 |
| P52100054352 | Wing A | Shop | 46.98 sq m · 506 sq ft | 3 | 0 |
| P52100054352 | Wing A | Shop | 59.16 sq m · 637 sq ft | 3 | 0 |
| P52100054352 | Wing A | Shop | 88.7 sq m · 955 sq ft | 3 | 0 |
| P52100054352 | Wing B | 3BHK | 89.53 sq m · 964 sq ft | 17 | 3 |
| P52100054352 | Wing B | 3BHK | 89.65 sq m · 965 sq ft | 32 | 0 |
| P52100054352 | Wing B | 3BHK | 89.94 sq m · 968 sq ft | 17 | 3 |
| P52100054352 | Wing B | 3BHK | 93.21 sq m · 1,003 sq ft | 32 | 0 |
| P52100054352 | Wing B | 3BHK | 94.37 sq m · 1,016 sq ft | 32 | 3 |
| P52100054352 | Wing B | 3BHK | 95.44 sq m · 1,027 sq ft | 15 | 0 |
| P52100054352 | Wing B | 3BHK | 95.7 sq m · 1,030 sq ft | 17 | 1 |
| P52100054352 | Wing B | 3BHK | 95.88 sq m · 1,032 sq ft | 2 | 0 |
| P52100054352 | Wing B | 3BHK | 98.86 sq m · 1,064 sq ft | 1 | 1 |
| P52100054352 | Wing B | 3BHK | 99.27 sq m · 1,069 sq ft | 1 | 1 |
| PR1261012601285 | Wing-D | — | — | 28 | — |
| P52100054352 | Wing - D1 | 2BHK | 49.14 sq m · 529 sq ft | 10 | 0 |
| P52100054352 | Wing - D1 | 2BHK | 49.66 sq m · 535 sq ft | 10 | 0 |
| P52100054352 | Wing - D2 | 1BHK | 36.63 sq m · 394 sq ft | 10 | 0 |
| P52100054352 | Wing - D2 | 2BHK | 49.14 sq m · 529 sq ft | 10 | 0 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Professionals3
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. | RERA |
|---|---|---|---|
| Architect | Cubix Architects Associates | — | P52100054352 |
| Chartered accountant | D J S & Associates | — | P52100054352 |
| Engineer | Ajay Bhilare and Associates | — | P52100054352 |
Source: MahaRERA project page. Contact details are not shown.
One Aretha in numbers
Registered deals, summarised
Deedo has 232 registered documents at One Aretha, from Mar 2024 to Sep 2026: 227 sales, 2 leave and licence agreements, 1 mortgage. The median registered sale since Mar 2024 works out to about ₹10,000 per sq ft, at a median of ₹96 L a deal; 0% of sales were resales.
- What is the price per sq ft at One Aretha?
- The median registered sale since Mar 2024 works out to about ₹10,000 per sq ft, at a median of ₹96 L a deal; 0% of sales were resales.
- How many properties have been sold at One Aretha?
- 227 sales are registered at One Aretha.
- Are properties at One Aretha rented out?
- Yes: 2 leave and licence agreements are registered at One Aretha.
- Where does this data come from?
- The figures come from registered documents (Index II) at the Maharashtra sub-registrar offices, matched at One Aretha by Deedo, last updated with deals registered in Sep 2026.
Latest deal · Primary sale · Sep 2026
₹1–1.5 Cr