Goodwill Breeza Phase 2
Deedo IDDP-PUN-HP6FMahaRERA shows it completed; no MahaRERA orders on record; 95% of its units are booked.
Dhanori, Pune 411015 · Property rates in Dhanori · by Choice Realtors
Buying a flat here?
See every deed registered on it.
MahaRERA shows it completed
- This projectRegistered 18 Mar 2020, completion promised 30 Dec 2024.
No extension certificate on record.
1 registration · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales first, then rentals and mortgages matched to this project · the free view shows a price band
| Month | Flat | Kind | Area | Price | Record |
|---|---|---|---|---|---|
| Jun 2025 | Wing H · 404 | Resale | 606 sq ft | View Resale, Jun 2025 | |
| Oct 2024 | F · 203 | Resale | 624 sq ft | View Resale, Oct 2024 | |
| Oct 2026 | D · 901 | Rental | — | View Rental, Oct 2026 | |
| Oct 2026 | Unit H-901 | Rental | — | View Rental, Oct 2026 | |
| Oct 2026 | D · 904 | Rental | — | View Rental, Oct 2026 | |
| Oct 2026 | Main building · 1101 | Mortgage | — | View Mortgage, Oct 2026 | |
| Sep 2026 | D · 302 | Rental | — | View Rental, Sep 2026 | |
| Sep 2026 | F · 801 | Rental | — | View Rental, Sep 2026 | |
| Sep 2026 | F · 101 | Rental | — | View Rental, Sep 2026 | |
| Sep 2026 | Unit 1101 | Rental | — | View Rental, Sep 2026 |
8 buildings
Open a building to see every flat, floor by floor.
- Building (P52100025114)Size not on record100% booked
- D16 floors · 52 units100% booked
- E16 floors · 56 units93% booked
- F16 floors · 56 units98% booked
- G16 floors · 56 units95% booked
- G WingSize not on record100% booked
- H16 floors · 54 units89% booked
- H WingSize not on record100% booked
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrationP52100025114
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52100025114 | 18 Mar 2020 | 30 Dec 2024 | 30 Dec 2024 | Choice Realtors | Project page |
Documents144
2 documents held by Deedo, 142 filings listed on MahaRERA's project page
Other
- OtherDate not statedView
Legal
Migrated
- 1 Copy of the legal title reportCR Search Title.pdf · uploaded 9 Mar 2020Source
- 1 Details of encumbrancesLetter of encumbarances ph2.pdf · uploaded 9 Mar 2020Source
- 1 Copy of Layout Approval (in case of layout)LAYOUT PLAN PH2.pdf · uploaded 9 Mar 2020Source
- 1 Building Plan Approval / NA Order for plotted development1-15.pdf · uploaded 9 Mar 2020Source
Show all 144 documentsShow fewer documents
Migrated
- 2 Building Plan Approval / NA Order for plotted development2-15.pdf · uploaded 9 Mar 2020Source
- 3 Building Plan Approval / NA Order for plotted development3-15.pdf · uploaded 9 Mar 2020Source
- 4 Building Plan Approval / NA Order for plotted development4-15.pdf · uploaded 9 Mar 2020Source
- 5 Building Plan Approval / NA Order for plotted development5-15.pdf · uploaded 9 Mar 2020Source
- 6 Building Plan Approval / NA Order for plotted development6-15.pdf · uploaded 9 Mar 2020Source
- 7 Building Plan Approval / NA Order for plotted development7-15.pdf · uploaded 9 Mar 2020Source
- 8 Building Plan Approval / NA Order for plotted development8-15.pdf · uploaded 9 Mar 2020Source
- 9 Building Plan Approval / NA Order for plotted development9-15.pdf · uploaded 9 Mar 2020Source
- 10 Building Plan Approval / NA Order for plotted development10-15.pdf · uploaded 9 Mar 2020Source
- 11 Building Plan Approval / NA Order for plotted development11-15.pdf · uploaded 9 Mar 2020Source
- 12 Building Plan Approval / NA Order for plotted development12-15.pdf · uploaded 9 Mar 2020Source
- 13 Building Plan Approval / NA Order for plotted development13-15.pdf · uploaded 9 Mar 2020Source
- 14 Building Plan Approval / NA Order for plotted development14-15.pdf · uploaded 9 Mar 2020Source
- 15 Building Plan Approval / NA Order for plotted development15-15.pdf · uploaded 9 Mar 2020Source
- 1 Commencement Certificates / NA Order for plotted developmentnew cc 2928 choice realtors.pdf · uploaded 9 Mar 2020Source
- 1 Declaration in FORM BForm B Declaration.pdf · uploaded 9 Mar 2020Source
- 1 Proforma of Allotment letterAgreement draft and Allotment letter.pdf · uploaded 9 Mar 2020Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)RERA WORKING GOODWILL BREEZA.pdf · uploaded 14 Mar 2020Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)Engineers Certificate For Quality Assurance Goodwill Breeza Phase II.pdf · uploaded 19 Jul 2021Source
- 1 Declaration about Commencement CertificateGoodwill Breeza Phase 2 - Declaration About CC - 21072021.pdf · uploaded 21 Jul 2021Source
- 2 Declaration about Commencement CertificateGoodwill Breeza Declaration about CC 21072021.pdf · uploaded 21 Jul 2021Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Engineers Certificate For Quality Assurance Goodwill Breeza Phase II.pdf · uploaded 21 Jul 2021Source
- 2 Copy of Layout Approval (in case of layout)Breeza Layout Approval 29062021.pdf · uploaded 24 Jul 2021Source
- 16 Building Plan Approval / NA Order for plotted developmentBreeza SP 29062021 01.pdf · uploaded 24 Jul 2021Source
- 17 Building Plan Approval / NA Order for plotted developmentBreeza SP 29062021 02.pdf · uploaded 24 Jul 2021Source
- 18 Building Plan Approval / NA Order for plotted developmentBreeza SP 29062021 09D.pdf · uploaded 24 Jul 2021Source
- 19 Building Plan Approval / NA Order for plotted developmentBreeza SP 29062021 10D.pdf · uploaded 24 Jul 2021Source
- 20 Building Plan Approval / NA Order for plotted developmentBreeza SP 29062021 11E.pdf · uploaded 24 Jul 2021Source
- 21 Building Plan Approval / NA Order for plotted developmentBreeza SP 29062021 12EMHADA.pdf · uploaded 24 Jul 2021Source
- 22 Building Plan Approval / NA Order for plotted developmentBreeza SP 29062021 11E.pdf · uploaded 24 Jul 2021Source
- 23 Building Plan Approval / NA Order for plotted developmentBreeza SP 29062021 13E.pdf · uploaded 24 Jul 2021Source
- 24 Building Plan Approval / NA Order for plotted developmentBreeza SP 29062021 14F.pdf · uploaded 24 Jul 2021Source
- 25 Building Plan Approval / NA Order for plotted developmentBreeza SP 29062021 15F.pdf · uploaded 24 Jul 2021Source
- 26 Building Plan Approval / NA Order for plotted developmentBreeza SP 29062021 16G.pdf · uploaded 24 Jul 2021Source
- 27 Building Plan Approval / NA Order for plotted developmentBreeza SP 29062021 17G.pdf · uploaded 24 Jul 2021Source
- 2 Commencement Certificates / NA Order for plotted developmentBreeza CC 075021 29062021.pdf · uploaded 24 Jul 2021Source
- 3 Commencement Certificates / NA Order for plotted developmentBreeza CC 075021 29062021.pdf · uploaded 24 Jul 2021Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Choice Realtors (Phase 2).pdf · uploaded 15 Aug 2021Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Choice Realtors Phase FORM 3 PHASE 2.pdf · uploaded 15 Aug 2021Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)Signed F2A GBP2 2019to20 Q4 Compressed.pdf · uploaded 23 Aug 2021Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Signed F2A GBP2 2020to21 Q1 Compressed.pdf · uploaded 23 Aug 2021Source
- 3 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Signed F2A GBP2 2020to21 Q2 Compressed.pdf · uploaded 23 Aug 2021Source
- 4 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Signed F2A GBP2 2020to21 Q3 Compressed.pdf · uploaded 23 Aug 2021Source
- 5 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Signed F2A GBP2 2020to21 Q4 Compressed.pdf · uploaded 23 Aug 2021Source
- 1 Disclosure of sold/ booked inventorySigned DSU GBP2 2021to22 Q1 Compressed.pdf · uploaded 23 Aug 2021Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)F5 GBP2 2019to20_compressed.pdf · uploaded 25 Aug 2021Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)F5 GBP2 2020to21_compressed.pdf · uploaded 25 Aug 2021Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Signed F1 GBP2 2021to22 Q2.pdf · uploaded 9 Oct 2021Source
- 6 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Signed - F2A GBP2 2021to22 Q2.pdf · uploaded 9 Oct 2021Source
- 28 Building Plan Approval / NA Order for plotted developmentGB CC_2722_21 dt 16122021 SP 01.pdf · uploaded 27 Dec 2021Source
- 29 Building Plan Approval / NA Order for plotted developmentGB CC_2722_21 dt 16122021 SP 02.pdf · uploaded 27 Dec 2021Source
- 30 Building Plan Approval / NA Order for plotted developmentGB CC_2722_21 dt 16122021 SP 09.pdf · uploaded 27 Dec 2021Source
- 31 Building Plan Approval / NA Order for plotted developmentGB CC_2722_21 dt 16122021 SP 10.pdf · uploaded 27 Dec 2021Source
- 32 Building Plan Approval / NA Order for plotted developmentGB CC_2722_21 dt 16122021 SP 11.pdf · uploaded 27 Dec 2021Source
- 33 Building Plan Approval / NA Order for plotted developmentGB CC_2722_21 dt 16122021 SP 12.pdf · uploaded 27 Dec 2021Source
- 34 Building Plan Approval / NA Order for plotted developmentGB CC_2722_21 dt 16122021 SP 13.pdf · uploaded 27 Dec 2021Source
- 35 Building Plan Approval / NA Order for plotted developmentGB CC_2722_21 dt 16122021 SP 14.pdf · uploaded 27 Dec 2021Source
- 36 Building Plan Approval / NA Order for plotted developmentGB CC_2722_21 dt 16122021 SP 15.pdf · uploaded 27 Dec 2021Source
- 37 Building Plan Approval / NA Order for plotted developmentGB CC_2722_21 dt 16122021 SP 16.pdf · uploaded 27 Dec 2021Source
- 38 Building Plan Approval / NA Order for plotted developmentGB CC_2722_21 dt 16122021 SP 17.pdf · uploaded 27 Dec 2021Source
- 39 Building Plan Approval / NA Order for plotted developmentGB CC_2722_21 dt 16122021 SP 18.pdf · uploaded 27 Dec 2021Source
- 40 Building Plan Approval / NA Order for plotted developmentGB CC_2722_21 dt 16122021 SP 19.pdf · uploaded 27 Dec 2021Source
- 4 Commencement Certificates / NA Order for plotted developmentCC-2722-21_16122021_compressed.pdf · uploaded 27 Dec 2021Source
- 3 Declaration about Commencement CertificateGB Declaration about CC 27-12-2021.pdf · uploaded 27 Dec 2021Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Signed F1 GBP2 2021to22 Q4.pdf · uploaded 9 Apr 2022Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Signed F2 GBP2 2021to22 Q4.pdf · uploaded 9 Apr 2022Source
- 7 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Signed F2A GBP2 2021to22 Q4.pdf · uploaded 9 Apr 2022Source
- 2 Disclosure of sold/ booked inventoryDSI GBP2 14Mar2022 Signed.pdf · uploaded 9 Apr 2022Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Signed F3 GBP2 2021to22 Q4.pdf · uploaded 9 Apr 2022Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Signed F1 GBP2 2022to23 Q1_compressed.pdf · uploaded 5 Aug 2022Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Signed F1 GBP2 2022to23 Q3.pdf · uploaded 10 Feb 2023Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Signed F2 GBP2 2022to23 Q3.pdf · uploaded 10 Feb 2023Source
- 3 Disclosure of sold/ booked inventoryDSI GBP2 2022to23 Q3_Signed.pdf · uploaded 10 Feb 2023Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)Signed F3 GBP2 2022to23 Q3_compressed.pdf · uploaded 10 Feb 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)F5 GBP2 01Feb2023.pdf · uploaded 6 Mar 2023Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)Signed F1 GBP2 2022to23 Q4.pdf · uploaded 20 Apr 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Signed F2A GBP2 2022to23 Q4.pdf · uploaded 20 Apr 2023Source
- 4 Disclosure of sold/ booked inventoryDSU GBP2 2022to23 Q4_Signed.pdf · uploaded 20 Apr 2023Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)Signed F3 GBP2 2022to23 Q4_compressed.pdf · uploaded 20 Apr 2023Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Signed F2 GBP2 2022to23 Q4.pdf · uploaded 5 May 2023Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)Signed F1 GBP2 2023to24 Q1.pdf · uploaded 18 Jul 2023Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Signed F2 GBP2 2023to24 Q1.pdf · uploaded 18 Jul 2023Source
- 5 Disclosure of sold/ booked inventorySigned DSI GBP2 2023to24 Q1_compressed.pdf · uploaded 18 Jul 2023Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)Signed F3 GBP2 2023to24 Q1_compressed.pdf · uploaded 18 Jul 2023Source
- 6 Disclosure of sold/ booked inventoryGoodwill Breeza Phase 2.pdf · uploaded 5 Oct 2023View
- 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Architect's Certificate On 30-09-2023.pdf · uploaded 6 Oct 2023Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Engineer's Certificate On 30-09-2023.pdf · uploaded 6 Oct 2023Source
- 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Chartered Accountant's Certificate On 30-09-2023.pdf · uploaded 6 Oct 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)breeza phase 2.pdf · uploaded 7 Oct 2023Source
- 1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentGBP1 OC_compressed.pdf · uploaded 8 Nov 2023Source
- 2 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentGoodwill Breeza P2 OC.pdf · uploaded 8 Nov 2023Source
- 1 Architect’s Certificate on Completion of Project (Form 4)CR Form 4 Architect's Certificate.pdf · uploaded 21 Nov 2023Source
Technical
- DocumentLAYOUT PLAN PH2.pdf · uploaded 9 Mar 2020Source
- Document1-15.pdf · uploaded 9 Mar 2020Source
- Document2-15.pdf · uploaded 9 Mar 2020Source
- Document3-15.pdf · uploaded 9 Mar 2020Source
- Document4-15.pdf · uploaded 9 Mar 2020Source
- Document5-15.pdf · uploaded 9 Mar 2020Source
- Document6-15.pdf · uploaded 9 Mar 2020Source
- Document7-15.pdf · uploaded 9 Mar 2020Source
- Document8-15.pdf · uploaded 9 Mar 2020Source
- Document9-15.pdf · uploaded 9 Mar 2020Source
- Document10-15.pdf · uploaded 9 Mar 2020Source
- Document11-15.pdf · uploaded 9 Mar 2020Source
- Document12-15.pdf · uploaded 9 Mar 2020Source
- Document13-15.pdf · uploaded 9 Mar 2020Source
- Document14-15.pdf · uploaded 9 Mar 2020Source
- Document15-15.pdf · uploaded 9 Mar 2020Source
- DocumentBreeza SP 29062021 09D.pdf · uploaded 24 Jul 2021Source
- DocumentBreeza SP 29062021 10D.pdf · uploaded 24 Jul 2021Source
- DocumentBreeza SP 29062021 11E.pdf · uploaded 24 Jul 2021Source
- DocumentBreeza SP 29062021 12EMHADA.pdf · uploaded 24 Jul 2021Source
- DocumentBreeza SP 29062021 11E.pdf · uploaded 24 Jul 2021Source
- DocumentBreeza SP 29062021 13E.pdf · uploaded 24 Jul 2021Source
- DocumentBreeza SP 29062021 14F.pdf · uploaded 24 Jul 2021Source
- DocumentBreeza SP 29062021 15F.pdf · uploaded 24 Jul 2021Source
- DocumentBreeza SP 29062021 16G.pdf · uploaded 24 Jul 2021Source
- DocumentBreeza SP 29062021 17G.pdf · uploaded 24 Jul 2021Source
- DocumentBreeza Layout Approval 29062021.pdf · uploaded 24 Jul 2021Source
- DocumentBreeza SP 29062021 01.pdf · uploaded 24 Jul 2021Source
- DocumentBreeza SP 29062021 02.pdf · uploaded 24 Jul 2021Source
- DocumentGB CC_2722_21 dt 16122021 SP 01.pdf · uploaded 27 Dec 2021Source
- DocumentGB CC_2722_21 dt 16122021 SP 02.pdf · uploaded 27 Dec 2021Source
- DocumentGB CC_2722_21 dt 16122021 SP 09.pdf · uploaded 27 Dec 2021Source
- DocumentGB CC_2722_21 dt 16122021 SP 10.pdf · uploaded 27 Dec 2021Source
- DocumentGB CC_2722_21 dt 16122021 SP 11.pdf · uploaded 27 Dec 2021Source
- DocumentGB CC_2722_21 dt 16122021 SP 12.pdf · uploaded 27 Dec 2021Source
- DocumentGB CC_2722_21 dt 16122021 SP 13.pdf · uploaded 27 Dec 2021Source
- DocumentGB CC_2722_21 dt 16122021 SP 14.pdf · uploaded 27 Dec 2021Source
- DocumentGB CC_2722_21 dt 16122021 SP 15.pdf · uploaded 27 Dec 2021Source
- DocumentGB CC_2722_21 dt 16122021 SP 16.pdf · uploaded 27 Dec 2021Source
- DocumentGB CC_2722_21 dt 16122021 SP 17.pdf · uploaded 27 Dec 2021Source
- DocumentGB CC_2722_21 dt 16122021 SP 18.pdf · uploaded 27 Dec 2021Source
- DocumentGB CC_2722_21 dt 16122021 SP 19.pdf · uploaded 27 Dec 2021Source
Technical (Architect)
- DocumentForm 1 Architect's Certificate On 30-09-2023.pdf · uploaded 6 Oct 2023Source
Technical (Engineer)
- DocumentForm 2 Engineer's Certificate On 30-09-2023.pdf · uploaded 6 Oct 2023Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvalsLand parcel 14 P
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Certificate Signed
- Unit types
- 1BHK, 2BHK274 units in all
- Address
- 14 P, Off Porwal Road, Madhav NagarPIN 411015
- Village
- Dhanori
- Location
- 19.38750, 75.16320
- Land area for this project
- 11,880 sq m (1,27,871 sq ft)
- Permissible built-up area
- 20,052 sq m (2,15,838 sq ft)
- Sanctioned built-up area
- 13,624 sq m (1,46,647 sq ft)
- Recreational open space
- 1,135 sq m (12,222 sq ft)
- Designated bank account
- 109
- Developed in phases
- Yes
Survey, CTS, gat or plot numbers
Land as published on MahaRERA's project page
14 P
Boundaries
- North
- By Sno 12
- South
- By 6 mtr internal road
- East
- owned by Bramhagreen coop hsg soc and Mr Khurana
- West
- Remaining part of Sno 14
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking274 units
260 of 274 units booked (95%), as the promoter reported to MahaRERA
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| D | 1BHK | 46.86 sq m · 504 sq ft | 2 | 2 |
| D | 2BHK | 53.45 sq m · 575 sq ft | 11 | 11 |
| D | 2BHK | 53.49 sq m · 576 sq ft | 13 | 13 |
| D | 2BHK | 57.59 sq m · 620 sq ft | 26 | 26 |
| E | 1BHK | 43.71 sq m · 470 sq ft | 2 | 2 |
| E | 2BHK | 49.7 sq m · 535 sq ft | 4 | 4 |
| E | 2BHK | 49.74 sq m · 535 sq ft | 46 | 46 |
| E | 2BHK | 49.76 sq m · 536 sq ft | 1 | 0 |
Show all 19 unit rowsShow fewer unit rows
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| E | 2BHK | 49.8 sq m · 536 sq ft | 3 | 0 |
| F | 1BHK | 54 sq m · 581 sq ft | 2 | 1 |
| F | 2BHK | 57.95 sq m · 624 sq ft | 50 | 50 |
| F | 2BHK | 58.59 sq m · 631 sq ft | 4 | 4 |
| G | 1BHK | 54 sq m · 581 sq ft | 2 | 0 |
| G | 2BHK | 57.95 sq m · 624 sq ft | 50 | 49 |
| G | 2BHK | 58.59 sq m · 631 sq ft | 4 | 4 |
| H | 1BHK | 51.95 sq m · 559 sq ft | 2 | 0 |
| H | 2BHK | 56.32 sq m · 606 sq ft | 24 | 22 |
| H | 2BHK | 56.95 sq m · 613 sq ft | 2 | 2 |
| H | 2BHK | 57.59 sq m · 620 sq ft | 26 | 24 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Professionals3
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Ar Imran Shaikh Of Cubix Architects Associates | — |
| Chartered accountant | Bansal Garg And Associates | — |
| Engineer | Kedar Mashalkar | — |
Source: MahaRERA project page. Contact details are not shown.
Other projects in Dhanori
- Namo CasaRERA PR1260002602720
- United AthilaRERA PM1260002602534
- Que 101 Phase IRERA PM1261012602127
- VedantaRERA PM1260002602044
- ArcVistaRERA PC1261012601504
- Aurapolis₹7,170 a sq ft
- Shreeyash AnurajRERA PR1260002600198
- Tirupati Sai Samruddhii₹9,230 a sq ft
All 2,604 projects in Dhanori · Compare Goodwill Breeza Phase 2 with another project
Goodwill Breeza Phase 2 in numbers
Registered deals, summarised
Deedo has 186 registered documents at Goodwill Breeza Phase 2, from Jan 2021 to Oct 2026: 2 sales, 176 leave and licence agreements, 6 mortgages.
- How many properties have been sold at Goodwill Breeza Phase 2?
- 2 sales are registered at Goodwill Breeza Phase 2, 2 of them resales.
- Are properties at Goodwill Breeza Phase 2 rented out?
- Yes: 176 leave and licence agreements are registered at Goodwill Breeza Phase 2, at a median rent since Jan 2021 of about ₹24,000 a month with a deposit of about ₹50,000.
- Where does this data come from?
- The figures come from registered documents (Index II) at the Maharashtra sub-registrar offices, matched at Goodwill Breeza Phase 2 by Deedo, last updated with deals registered in Oct 2026.
Latest deal · Resale · Jun 2025
₹50–75 L