Tanish Park
Deedo IDDP-PUN-2096Completion was pushed back 4 months, to Apr 2028; no MahaRERA orders on record; 44% of its units are booked.
Charoli, Pune 412105 · by Tanish Developers
Buying a flat here?
See every deed registered on it.
Completion was pushed back 4 months, to Apr 2028
- This projectRegistered 13 Sep 2021, completion promised 31 Dec 2027, revised to 30 Apr 2028.
No extension certificate on record.
1 registration · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales first, then rentals and mortgages matched to this project · the free view shows a price band
12 buildings
Open a building to see every flat, floor by floor.
- Tanish Park A14 floors · 166 units77% booked
- Tanish Park B14 floors · 166 units66% booked
- Tanish Park C14 floors · 166 units63% booked
- Tanish Park D14 floors · 166 units66% booked
- Tanish Park E14 floors · 166 units73% booked
- Tanish Park F14 floors · 166 units63% booked
- Tanish Park G14 floors · 166 units16% booked
- Tanish Park H14 floors · 166 units2% booked
- Tanish Park I14 floors · 166 units8% booked
- Tanish Park J16 floors · 148 units0% booked
- Wing K11 floor100% booked
- Wing K21 floor60% booked
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrationP52100030766
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P52100030766 | 13 Sep 2021 | 31 Dec 2027 | 30 Apr 2028 | Tanish Developers | Project page |
Documents140
1 document held by Deedo, 139 filings listed on MahaRERA's project page
Finance
Legal
- Declaration Form BForm B.pdf · uploaded 26 Aug 2021Source
- Legal Title reportilovepdf_merged_compressed-1-4.pdf · uploaded 27 Aug 2021Source
- Legal Title reportilovepdf_merged_compressed-5-8.pdf · uploaded 27 Aug 2021Source
- Legal Title reportilovepdf_merged_compressed-9-12.pdf · uploaded 27 Aug 2021Source
- Legal Title reportilovepdf_merged_compressed-13-17.pdf · uploaded 27 Aug 2021Source
Show all 140 documentsShow fewer documents
Legal
- Declaration Form BLegal Title.pdf · uploaded 15 Jun 2026Source
- Declaration Form BPARK FORM-B.pdf · uploaded 15 Jun 2026Source
- Declaration Form BSale Deed 1.pdf · uploaded 15 Jun 2026Source
- Declaration Form BSale Deed 2.pdf · uploaded 15 Jun 2026Source
- Declaration Form BSale Deed 3.pdf · uploaded 15 Jun 2026Source
- Declaration Form BSale Deed 4.pdf · uploaded 15 Jun 2026Source
- Declaration Form BPOA.pdf · uploaded 15 Jun 2026Source
- Declaration Form B712 Extract 1.pdf · uploaded 16 Jun 2026Source
- Declaration Form B712 Extract 2.pdf · uploaded 16 Jun 2026Source
- Declaration Form B712 Extract 3.pdf · uploaded 16 Jun 2026Source
- Declaration Form B712 Extract 4.pdf · uploaded 16 Jun 2026Source
Migrated
- 1 PAN CardFirm PAN.pdf · uploaded 26 Aug 2021Source
- 1 Details of encumbrancesENCUMBRANCES .pdf · uploaded 26 Aug 2021Source
- 1 Copy of Layout Approval (in case of layout)Layout Approval.pdf · uploaded 26 Aug 2021Source
- 1 Building Plan Approval / NA Order for plotted development1.pdf · uploaded 26 Aug 2021Source
- 2 Building Plan Approval / NA Order for plotted development2.pdf · uploaded 26 Aug 2021Source
- 1 Commencement Certificates / NA Order for plotted developmentCommencement final.pdf · uploaded 26 Aug 2021Source
- 1 Declaration about Commencement CertificateCircular 32.pdf · uploaded 26 Aug 2021Source
- 1 Declaration in FORM BForm B.pdf · uploaded 26 Aug 2021Source
- 1 Proforma of Allotment letter1.pdf · uploaded 26 Aug 2021Source
- 2 Proforma of Allotment letter2.pdf · uploaded 26 Aug 2021Source
- 3 Proforma of Allotment letterAllotment Letter PARK RERA.pdf · uploaded 26 Aug 2021Source
- 1 Copy of the legal title reportilovepdf_merged_compressed-1-4.pdf · uploaded 27 Aug 2021Source
- 2 Copy of the legal title reportilovepdf_merged_compressed-5-8.pdf · uploaded 27 Aug 2021Source
- 3 Copy of the legal title reportilovepdf_merged_compressed-9-12.pdf · uploaded 27 Aug 2021Source
- 4 Copy of the legal title reportilovepdf_merged_compressed-13-17.pdf · uploaded 27 Aug 2021Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 scanned_compressed-1-3.pdf · uploaded 3 Sep 2021Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 scanned_compressed-4-6.pdf · uploaded 3 Sep 2021Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 scanned_compressed-7-9.pdf · uploaded 3 Sep 2021Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 scanned_compressed-10-12.pdf · uploaded 3 Sep 2021Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 scanned_compressed-13-15.pdf · uploaded 3 Sep 2021Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 scanned_compressed-16-18.pdf · uploaded 3 Sep 2021Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARC 27-09-2021.pdf · uploaded 12 Jul 2023Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARC 28-03-2022.pdf · uploaded 12 Jul 2023Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARC 28-12-2021.pdf · uploaded 12 Jul 2023Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARC 30-06-2022.pdf · uploaded 12 Jul 2023Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARC 30-09-2022.pdf · uploaded 12 Jul 2023Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARC 31-12-2022.pdf · uploaded 12 Jul 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Form 5 Tanish Park 2021-22.pdf · uploaded 2 Aug 2023Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)SEP 21.pdf · uploaded 24 Aug 2023Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)DEC 21.pdf · uploaded 24 Aug 2023Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)MAR 22.pdf · uploaded 24 Aug 2023Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)JUN 22.pdf · uploaded 24 Aug 2023Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)SEP 22.pdf · uploaded 24 Aug 2023Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)DEC 22.pdf · uploaded 24 Aug 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)1.pdf · uploaded 24 Aug 2023Source
- 1 Copy of Layout Approval (in case of layout)PARK PLAN.pdf · uploaded 9 Oct 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)1 PARK ARCHITECT 30 03 23.pdf · uploaded 25 Oct 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)2 PARK ARCHITECT 30 06 23.pdf · uploaded 25 Oct 2024Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)3 PARK ARCHITECT 30 09 23.pdf · uploaded 25 Oct 2024Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)4 PARK ARCHITECT 30 12 23.pdf · uploaded 25 Oct 2024Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)5 PARK ARCHITECT 30 03 24.pdf · uploaded 25 Oct 2024Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)6 PARK ARCHITECT 30 06 24.pdf · uploaded 25 Oct 2024Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)7 ENGINEERS CERTIFICATE 29 03 2023.pdf · uploaded 25 Oct 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)8 ENGINEERS CERTIFICATE 28 06 2023.pdf · uploaded 25 Oct 2024Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)9 ENGINEERS CERTIFICATE 29 09 2023.pdf · uploaded 25 Oct 2024Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)10 ENGINEERS CERTIFICATE 29 12 2023.pdf · uploaded 25 Oct 2024Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)11 ENGINEERS CERTIFICATE 29 03 2024.pdf · uploaded 25 Oct 2024Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)Tanish Park F3 Jun 2023_11zon.pdf · uploaded 17 Jan 2025Source
- 10 CA Certificate on Project Cost & Fund withdrawal (Form 3)Tanish Park F3 Sep 2024_11zon.pdf · uploaded 17 Jan 2025Source
- 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)Tanish Park F3 Jun 2024_11zon.pdf · uploaded 17 Jan 2025Source
- 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)Tanish Park F3 Mar 2024_11zon.pdf · uploaded 17 Jan 2025Source
- 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)Tanish Park F3 Dec 2023_11zon.pdf · uploaded 17 Jan 2025Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)Tanish Park F3 Sep 2023_11zon.pdf · uploaded 17 Jan 2025Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)Tanish Park F3 Mar 2023_11zon.pdf · uploaded 17 Jan 2025Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Tanish Park F3 Jun 2022_11zon.pdf · uploaded 17 Jan 2025Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Tanish Park F3 Dec 2021_11zon.pdf · uploaded 17 Jan 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Tanish Park F3 Sep 2021_11zon.pdf · uploaded 17 Jan 2025Source
- Form 2A (FY 2022-2023)Form 2A Final 2023.pdf · uploaded 8 May 2026Source
- Form 2A (FY 2023-2024)Form 2A Final 2024.pdf · uploaded 8 May 2026Source
- Form 2A (FY 2024-2025)Form 2A Final 2025.pdf · uploaded 8 May 2026Source
- Form 2A (FY 2025-2026)Form 2A Final 2026.pdf · uploaded 8 May 2026Source
- Form 1FORM 1.pdf · uploaded 25 May 2026Source
- Form 1FORM 1.pdf · uploaded 25 May 2026Source
- Form 2FORM 2.pdf · uploaded 25 May 2026Source
- Form 2FORM 2.pdf · uploaded 25 May 2026Source
- Form 3FORM 3.pdf · uploaded 25 May 2026Source
- Form 3FORM 3.pdf · uploaded 25 May 2026Source
- Disclosure of Sold and Booked InventorySOLD CIRCULAR.pdf · uploaded 25 May 2026Source
- Disclosure of Sold and Booked InventorySOLD CIRCULAR.pdf · uploaded 25 May 2026Source
- Withdrawal Update Form 1FORM 1 FINAL.pdf · uploaded 26 May 2026Source
- Withdrawal Update Form 1FORM 1.pdf · uploaded 26 May 2026Source
- Withdrawal Update Form 1FORM 1.pdf · uploaded 26 May 2026Source
- Withdrawal Update Form 1FORM 1.pdf · uploaded 26 May 2026Source
- Withdrawal Update Form 2FORM 2 FINAL.pdf · uploaded 26 May 2026Source
- Withdrawal Update Form 2FORM 2.pdf · uploaded 26 May 2026Source
- Withdrawal Update Form 2FORM 2.pdf · uploaded 26 May 2026Source
- Withdrawal Update Form 2FORM 2.pdf · uploaded 26 May 2026Source
- Withdrawal Update Form 3FORM 3 FINAL.pdf · uploaded 26 May 2026Source
- Withdrawal Update Form 3FORM 3.pdf · uploaded 26 May 2026Source
- Withdrawal Update Form 3FORM 3 FINAL.pdf · uploaded 26 May 2026Source
- Withdrawal Update Form 3FORM 3.pdf · uploaded 26 May 2026Source
- Form 5 (FY 2022-2023)Form-5 Signed.pdf · uploaded 16 Jun 2026Source
- Form 5 (FY 2023-2024)Form 5 Final.pdf · uploaded 17 Jun 2026Source
- Form 5 (FY 2024-2025)Form 5 Final.pdf · uploaded 17 Jun 2026Source
- Withdrawal Update Form 1Form1 Final.pdf · uploaded 19 Jul 2026Source
- Withdrawal Update Form 2Form2 Final.pdf · uploaded 19 Jul 2026Source
- Withdrawal Update Form 3Form3 Final.pdf · uploaded 19 Jul 2026Source
Technical
- DocumentLayout Approval.pdf · uploaded 26 Aug 2021Source
- Document1.pdf · uploaded 26 Aug 2021Source
- Document2.pdf · uploaded 26 Aug 2021Source
- DocumentPARK PLAN.pdf · uploaded 9 Oct 2024Source
- DocumentLayout Upload.pdf · uploaded 12 Sep 2025Source
- DocumentSanction Plan 1.pdf · uploaded 12 Sep 2025Source
- DocumentSanction Plan 2.pdf · uploaded 12 Sep 2025Source
- DocumentSanction Plan 3.pdf · uploaded 12 Sep 2025Source
- DocumentSanction Plan 4.pdf · uploaded 12 Sep 2025Source
- DocumentSanction Plan 5.pdf · uploaded 12 Sep 2025Source
- DocumentSanction Plan 6.pdf · uploaded 12 Sep 2025Source
- DocumentLayout Approval.pdf · uploaded 28 May 2026Source
- DocumentSanction Plan 1.pdf · uploaded 28 May 2026Source
- DocumentSanction Plan 2.pdf · uploaded 28 May 2026Source
- DocumentSanction Plan 3.pdf · uploaded 28 May 2026Source
- DocumentSanction Plan 4.pdf · uploaded 28 May 2026Source
- DocumentSanction Plan 5.pdf · uploaded 28 May 2026Source
- DocumentSanction Plan 6.pdf · uploaded 28 May 2026Source
- DocumentSanction Plan 7.pdf · uploaded 28 May 2026Source
- OthersDeclaration Letter - Arch.pdf · uploaded 4 Jun 2026Source
- OthersDeclaration letter - Promoter.pdf · uploaded 4 Jun 2026Source
Technical (Architect)
- Document1 PARK ARCHITECT 30 03 23.pdf · uploaded 25 Oct 2024Source
- Document2 PARK ARCHITECT 30 06 23.pdf · uploaded 25 Oct 2024Source
- Document3 PARK ARCHITECT 30 09 23.pdf · uploaded 25 Oct 2024Source
- Document4 PARK ARCHITECT 30 12 23.pdf · uploaded 25 Oct 2024Source
- Document5 PARK ARCHITECT 30 03 24.pdf · uploaded 25 Oct 2024Source
- Document6 PARK ARCHITECT 30 06 24.pdf · uploaded 25 Oct 2024Source
- DocumentForm1 Final.pdf · uploaded 19 Jul 2026Source
Technical (Engineer)
- Document7 ENGINEERS CERTIFICATE 29 03 2023.pdf · uploaded 25 Oct 2024Source
- Document8 ENGINEERS CERTIFICATE 28 06 2023.pdf · uploaded 25 Oct 2024Source
- Document9 ENGINEERS CERTIFICATE 29 09 2023.pdf · uploaded 25 Oct 2024Source
- Document10 ENGINEERS CERTIFICATE 29 12 2023.pdf · uploaded 25 Oct 2024Source
- Document11 ENGINEERS CERTIFICATE 29 03 2024.pdf · uploaded 25 Oct 2024Source
- DocumentForm2 Final.pdf · uploaded 19 Jul 2026Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvalsLand parcel 228 P, 229/1/1
As registered with MahaRERA and published on its project page
- Project type
- Others
- Status on MahaRERA
- Certificate Signed
- Unit types
- Row house, 1BHK, 2BHK, Office space, Shop1,642 units in all
- Address
- 228 P, 229/1/1, 229/2, 229/1/2, Charholi, CharholiPIN 412105
- Village
- Charoli, Haveli taluka
- Location
- 18.65372, 73.90775
- Land area for this project
- 30,904 sq m (3,32,652 sq ft)
- Permissible built-up area
- 1,11,734 sq m (12,02,689 sq ft)
- Sanctioned built-up area
- 1,11,734 sq m (12,02,689 sq ft)
- Recreational open space
- 3,216 sq m (34,614 sq ft)
- Designated bank account
- 196
- Developed in phases
- Yes
Survey, CTS, gat or plot numbers
Land as published on MahaRERA's project page
228 P, 229/1/2, 229/1/1, 229/2
Boundaries
- North
- Adj S No 228 P
- South
- Adj S No 232 230 225
- East
- 9 m wide Road
- West
- 18 m wide Road
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking1,642 units
722 of 1,642 units booked (44%), as the promoter reported to MahaRERA
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| Proposed Row Houses | Row house | — | 0 | 0 |
| Tanish Park A | 1BHK | 40.5 sq m · 436 sq ft | 13 | 11 |
| Tanish Park A | 1BHK | 44.5 sq m · 479 sq ft | 1 | 1 |
| Tanish Park A | 1BHK | 44.58 sq m · 480 sq ft | 12 | 11 |
| Tanish Park A | 1BHK | 46.08 sq m · 496 sq ft | 11 | 10 |
| Tanish Park A | 2BHK | 58.74 sq m · 632 sq ft | 13 | 8 |
| Tanish Park A | 2BHK | 61.21 sq m · 659 sq ft | 10 | 10 |
| Tanish Park A | 2BHK | 61.6 sq m · 663 sq ft | 14 | 12 |
Show all 93 unit rowsShow fewer unit rows
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| Tanish Park A | Office space | 40.5 sq m · 436 sq ft | 7 | 4 |
| Tanish Park A | Office space | 44.58 sq m · 480 sq ft | 7 | 4 |
| Tanish Park A | Office space | 46.08 sq m · 496 sq ft | 7 | 5 |
| Tanish Park A | Office space | 58.74 sq m · 632 sq ft | 7 | 4 |
| Tanish Park A | Office space | 61.21 sq m · 659 sq ft | 9 | 5 |
| Tanish Park A | Office space | 61.6 sq m · 663 sq ft | 6 | 4 |
| Tanish Park A | Shop | 40.5 sq m · 436 sq ft | 8 | 5 |
| Tanish Park A | Shop | 41.52 sq m · 447 sq ft | 2 | 1 |
| Tanish Park A | Shop | 43.02 sq m · 463 sq ft | 2 | 1 |
| Tanish Park A | Shop | 44.58 sq m · 480 sq ft | 6 | 5 |
| Tanish Park A | Shop | 46.08 sq m · 496 sq ft | 8 | 8 |
| Tanish Park A | Shop | 58.74 sq m · 632 sq ft | 8 | 4 |
| Tanish Park A | Shop | 61.21 sq m · 659 sq ft | 8 | 8 |
| Tanish Park A | Shop | 61.6 sq m · 663 sq ft | 7 | 7 |
| Tanish Park B | 1BHK | 40.5 sq m · 436 sq ft | 28 | 8 |
| Tanish Park B | 1BHK | 41.52 sq m · 447 sq ft | 2 | 2 |
| Tanish Park B | 1BHK | 43.02 sq m · 463 sq ft | 2 | 2 |
| Tanish Park B | 1BHK | 44.58 sq m · 480 sq ft | 26 | 19 |
| Tanish Park B | 1BHK | 46.08 sq m · 496 sq ft | 26 | 22 |
| Tanish Park B | 2BHK | 58.74 sq m · 632 sq ft | 28 | 8 |
| Tanish Park B | 2BHK | 61.21 sq m · 659 sq ft | 27 | 23 |
| Tanish Park B | 2BHK | 61.6 sq m · 663 sq ft | 27 | 25 |
| Tanish Park C | 1BHK | 40.5 sq m · 436 sq ft | 28 | 10 |
| Tanish Park C | 1BHK | 41.52 sq m · 447 sq ft | 2 | 1 |
| Tanish Park C | 1BHK | 43.02 sq m · 463 sq ft | 2 | 2 |
| Tanish Park C | 1BHK | 44.58 sq m · 480 sq ft | 26 | 20 |
| Tanish Park C | 1BHK | 46.08 sq m · 496 sq ft | 26 | 22 |
| Tanish Park C | 2BHK | 58.74 sq m · 632 sq ft | 28 | 3 |
| Tanish Park C | 2BHK | 61.21 sq m · 659 sq ft | 27 | 23 |
| Tanish Park C | 2BHK | 61.6 sq m · 663 sq ft | 27 | 23 |
| Tanish Park D | 1BHK | 40.5 sq m · 436 sq ft | 28 | 8 |
| Tanish Park D | 1BHK | 41.52 sq m · 447 sq ft | 2 | 1 |
| Tanish Park D | 1BHK | 43.02 sq m · 463 sq ft | 2 | 1 |
| Tanish Park D | 1BHK | 44.58 sq m · 480 sq ft | 26 | 21 |
| Tanish Park D | 1BHK | 46.08 sq m · 496 sq ft | 26 | 23 |
| Tanish Park D | 2BHK | 58.74 sq m · 632 sq ft | 28 | 9 |
| Tanish Park D | 2BHK | 61.21 sq m · 659 sq ft | 27 | 24 |
| Tanish Park D | 2BHK | 61.6 sq m · 663 sq ft | 27 | 23 |
| Tanish Park E | 1BHK | 40.5 sq m · 436 sq ft | 28 | 9 |
| Tanish Park E | 1BHK | 41.52 sq m · 447 sq ft | 2 | 1 |
| Tanish Park E | 1BHK | 43.02 sq m · 463 sq ft | 2 | 1 |
| Tanish Park E | 1BHK | 44.58 sq m · 480 sq ft | 26 | 22 |
| Tanish Park E | 1BHK | 46.08 sq m · 496 sq ft | 26 | 24 |
| Tanish Park E | 2BHK | 58.74 sq m · 632 sq ft | 28 | 13 |
| Tanish Park E | 2BHK | 61.21 sq m · 659 sq ft | 25 | 25 |
| Tanish Park E | 2BHK | 61.6 sq m · 663 sq ft | 27 | 25 |
| Tanish Park E | 2BHK | 66.08 sq m · 711 sq ft | 2 | 2 |
| Tanish Park F | 1BHK | 40.5 sq m · 436 sq ft | 28 | 8 |
| Tanish Park F | 1BHK | 41.52 sq m · 447 sq ft | 2 | 0 |
| Tanish Park F | 1BHK | 43.02 sq m · 463 sq ft | 2 | 0 |
| Tanish Park F | 1BHK | 44.58 sq m · 480 sq ft | 26 | 22 |
| Tanish Park F | 1BHK | 46.08 sq m · 496 sq ft | 26 | 17 |
| Tanish Park F | 2BHK | 58.74 sq m · 632 sq ft | 28 | 12 |
| Tanish Park F | 2BHK | 61.21 sq m · 659 sq ft | 27 | 23 |
| Tanish Park F | 2BHK | 61.6 sq m · 663 sq ft | 27 | 23 |
| Tanish Park G | 1BHK | 40.5 sq m · 436 sq ft | 28 | 0 |
| Tanish Park G | 1BHK | 41.52 sq m · 447 sq ft | 2 | 0 |
| Tanish Park G | 1BHK | 43.02 sq m · 463 sq ft | 2 | 0 |
| Tanish Park G | 1BHK | 44.58 sq m · 480 sq ft | 26 | 2 |
| Tanish Park G | 1BHK | 46.08 sq m · 496 sq ft | 26 | 0 |
| Tanish Park G | 2BHK | 58.74 sq m · 632 sq ft | 28 | 0 |
| Tanish Park G | 2BHK | 61.21 sq m · 659 sq ft | 27 | 13 |
| Tanish Park G | 2BHK | 61.6 sq m · 663 sq ft | 27 | 12 |
| Tanish Park H | 1BHK | 40.5 sq m · 436 sq ft | 28 | 0 |
| Tanish Park H | 1BHK | 41.52 sq m · 447 sq ft | 2 | 0 |
| Tanish Park H | 1BHK | 43.02 sq m · 463 sq ft | 2 | 0 |
| Tanish Park H | 1BHK | 44.58 sq m · 480 sq ft | 26 | 0 |
| Tanish Park H | 1BHK | 46.08 sq m · 496 sq ft | 26 | 0 |
| Tanish Park H | 2BHK | 58.74 sq m · 632 sq ft | 28 | 0 |
| Tanish Park H | 2BHK | 61.21 sq m · 659 sq ft | 27 | 2 |
| Tanish Park H | 2BHK | 61.6 sq m · 663 sq ft | 27 | 2 |
| Tanish Park I | 1BHK | 40.5 sq m · 436 sq ft | 28 | 1 |
| Tanish Park I | 1BHK | 41.52 sq m · 447 sq ft | 2 | 0 |
| Tanish Park I | 1BHK | 43.02 sq m · 463 sq ft | 2 | 0 |
| Tanish Park I | 1BHK | 44.58 sq m · 480 sq ft | 26 | 0 |
| Tanish Park I | 1BHK | 46.08 sq m · 496 sq ft | 26 | 1 |
| Tanish Park I | 2BHK | 58.74 sq m · 632 sq ft | 28 | 1 |
| Tanish Park I | 2BHK | 61.21 sq m · 659 sq ft | 27 | 2 |
| Tanish Park I | 2BHK | 61.6 sq m · 663 sq ft | 27 | 8 |
| Tanish Park J | 2BHK | 60.11 sq m · 647 sq ft | 58 | 0 |
| Tanish Park J | 2BHK | 62.06 sq m · 668 sq ft | 15 | 0 |
| Tanish Park J | 2BHK | 63.27 sq m · 681 sq ft | 30 | 0 |
| Tanish Park J | 2BHK | 63.73 sq m · 686 sq ft | 15 | 0 |
| Tanish Park J | 2BHK | 64.57 sq m · 695 sq ft | 15 | 0 |
| Tanish Park J | 2BHK | 66.5 sq m · 716 sq ft | 15 | 0 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Professionals7
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Dream Space Architects | — |
| Architect | Mahendra Thakur | — |
| Chartered accountant | PGMJ and ASSOCIATES | — |
| Engineer | Ravindra Disale | — |
| Engineer | Rk Randhave | — |
| Engineer | Satish Deshpande | — |
| Registered real estate agent | Rolmer Enterprises Private Limited | — |
Source: MahaRERA project page. Contact details are not shown.
Other projects in Charoli
- Shriram NyraRERA PR1261012601931
- Aarika Towers A And B BuildingsRERA PR1261012601522
- Montreal F-GRERA PR1260002601380
- Amrutyog ResidencyRERA PR1260002601337
- Miami-A1-A2-A3-B2RERA PR1260002600188
- Paramount EnclaveRERA PR1260002600020
- Shubhshree ResidencyRERA PR1260002502627
- Miami A4-A5RERA PR1260002502081
All 29 projects in Charoli · Compare Tanish Park with another project