Skip to content
Residential / Group Housing · 2 buildings · 181 unitsRERA P52100032695

Raahi Kasturi

Deedo IDDP-PUN-DGJ4

MahaRERA shows it completed; no MahaRERA orders on record; 38% of its units are booked.

Charholi, Pune 412105 · by Raahi Yashila

DeliveryCompletedCompletion / occupancy certificate on MahaRERARegulatoryNo ordersNot in any MahaRERA list or order Deedo has readSales38% booked68 of 181 units · as the promoter reported to MahaRERA

Buying a flat here?

See every deed registered on it.

MahaRERA shows it completed

  • This projectRegistered 24 Jan 2022, completion promised 30 Dec 2026.

1 extension certificate on record.

1 registration · Source: MahaRERA registration and extension certificates

Latest registered deeds

Sales first, then rentals and mortgages matched to this project · the free view shows a price band

No registered deeds matched to this project yet
Sales, resales, rentals and mortgages appear here once registered documents are matched to it by evidence.

2 buildings

Open a building to see every flat, floor by floor.

Floors and units from the registration certificate annexures and MahaRERA's project page.

Regulatory recordNone found

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

RERA registrationP52100032695
RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5210003269524 Jan 202230 Dec 202630 Dec 2026Raahi YashilaProject page
Documents352

2 documents held by Deedo, 350 filings listed on MahaRERA's project page

Extension certificate

Registration certificate

Finance

  • PAN CardPAN CARD ORGANIZATION-1_compressed.pdf · uploaded 13 Jan 2022Source

Legal

  • Legal Title reportsearch title report_compressed-1-7.pdf · uploaded 13 Jan 2022Source
  • Legal Title reportsearch title report_compressed-8-15.pdf · uploaded 13 Jan 2022Source
  • Legal Title reportFormat A_compressed (2).pdf · uploaded 13 Jan 2022Source
  • Declaration Form BForm B - Promoter.pdf · uploaded 13 Jan 2022Source
  • Declaration Form BLATEST NOTARY-FINAL.pdf · uploaded 30 Jun 2025Source
Show all 352 documentsShow fewer documents

Migrated

  • 1 PAN CardPAN CARD ORGANIZATION-1_compressed.pdf · uploaded 13 Jan 2022Source
  • 1 Copy of the legal title reportsearch title report_compressed-1-7.pdf · uploaded 13 Jan 2022Source
  • 2 Copy of the legal title reportsearch title report_compressed-8-15.pdf · uploaded 13 Jan 2022Source
  • 3 Copy of the legal title reportFormat A_compressed (2).pdf · uploaded 13 Jan 2022Source
  • 1 Details of encumbrancesEncumbrance.pdf · uploaded 13 Jan 2022Source
  • 1 Copy of Layout Approval (in case of layout)layout.pdf · uploaded 13 Jan 2022Source
  • 2 Copy of Layout Approval (in case of layout)HPSC0445.pdf · uploaded 13 Jan 2022Source
  • 1 Building Plan Approval / NA Order for plotted developmentHPSC0446.pdf · uploaded 13 Jan 2022Source
  • 2 Building Plan Approval / NA Order for plotted developmentHPSC0447.pdf · uploaded 13 Jan 2022Source
  • 3 Building Plan Approval / NA Order for plotted developmentHPSC0448.pdf · uploaded 13 Jan 2022Source
  • 4 Building Plan Approval / NA Order for plotted developmentHPSC0449.pdf · uploaded 13 Jan 2022Source
  • 5 Building Plan Approval / NA Order for plotted developmentHPSC0450.pdf · uploaded 13 Jan 2022Source
  • 6 Building Plan Approval / NA Order for plotted developmentIOD-1.pdf · uploaded 13 Jan 2022Source
  • 1 Commencement Certificates / NA Order for plotted developmentcommi_compressed.pdf · uploaded 13 Jan 2022Source
  • 1 Declaration about Commencement CertificateFormat D (2).pdf · uploaded 13 Jan 2022Source
  • 1 Declaration in FORM BForm B - Promoter.pdf · uploaded 13 Jan 2022Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 13 Jan 2022Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 (2).pdf · uploaded 13 Jan 2022Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Form 2A.pdf · uploaded 13 Jan 2022Source
  • 1 CERSAI detailsCERSAI_Search_Report_200228029551_For_Asset_Based_Search_13_01_2022_15_58_40_647.pdf · uploaded 13 Jan 2022Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3_Raahi Yashila_11012021_compressed.pdf · uploaded 13 Jan 2022Source
  • 1 Proforma of Allotment letterAgreement to sale.pdf · uploaded 13 Jan 2022Source
  • 2 Proforma of Allotment letterALLOTMENT LETTER.pdf · uploaded 13 Jan 2022Source
  • 3 Proforma of Allotment letterRERA Draft - Final.pdf · uploaded 8 Mar 2022Source
  • 3 Copy of Layout Approval (in case of layout)HPSC1972_compressed.pdf · uploaded 21 Apr 2022Source
  • 7 Building Plan Approval / NA Order for plotted developmentHPSC1973_compressed.pdf · uploaded 21 Apr 2022Source
  • 8 Building Plan Approval / NA Order for plotted developmentHPSC1975_compressed.pdf · uploaded 21 Apr 2022Source
  • 9 Building Plan Approval / NA Order for plotted developmentHPSC1976_compressed.pdf · uploaded 21 Apr 2022Source
  • 10 Building Plan Approval / NA Order for plotted developmentHPSC1977_compressed.pdf · uploaded 21 Apr 2022Source
  • 11 Building Plan Approval / NA Order for plotted developmentHPSC1978_compressed.pdf · uploaded 21 Apr 2022Source
  • 2 Declaration about Commencement CertificateFormat D (3).pdf · uploaded 21 Apr 2022Source
  • 4 Proforma of Allotment letterRERA Draft - Final 111.pdf · uploaded 19 May 2022Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Raahi Kasturi .pdf · uploaded 17 Jan 2023Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Rera updated 13-01-23.pdf · uploaded 17 Jan 2023Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Raahi Kasturi .pdf · uploaded 17 Jan 2023Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Raahi Kasturi CA Certificate_compressed.pdf · uploaded 17 Jan 2023Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engg Cert.pdf · uploaded 6 Feb 2023Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA cert_compressed.pdf · uploaded 6 Feb 2023Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 7 Feb 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Form 5 21-22.pdf · uploaded 14 Feb 2023Source
  • 1 Disclosure of sold/ booked inventoryForm 3.pdf · uploaded 24 Feb 2023Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Adobe Scan 27 Mar 2023 (1).pdf · uploaded 27 Mar 2023Source
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)Rahi kasturi Engineer's certificate.pdf · uploaded 31 Mar 2023Source
  • 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)form 2.pdf · uploaded 4 May 2023Source
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)RAHHI KASTURI.pdf · uploaded 22 Jun 2023Source
  • 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)Rahi Kasturi f2.pdf · uploaded 22 Jun 2023Source
  • 2 Disclosure of sold/ booked inventorySold unsold june.pdf · uploaded 23 Jun 2023Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)ca certificate_compressed.pdf · uploaded 23 Jun 2023Source
  • 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)F1 SEP 23.pdf · uploaded 19 Aug 2023Source
  • 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)sep rahi kasturi 23.pdf · uploaded 4 Sep 2023Source
  • 3 Disclosure of sold/ booked inventorySold Unsold Cicular 29.pdf · uploaded 25 Sep 2023Source
  • 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)raahi kasturi_11zon.pdf · uploaded 25 Sep 2023Source
  • 2 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Form 5 FY 22-23.pdf · uploaded 30 Sep 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Form 5 FY 22-23.pdf · uploaded 30 Sep 2023Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form 2A (1).pdf · uploaded 26 Oct 2023Source
  • 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)form 1.pdf · uploaded 23 Dec 2023Source
  • 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)Raahi Kasturi Form 2.pdf · uploaded 23 Dec 2023Source
  • 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)form 3.pdf · uploaded 23 Dec 2023Source
  • 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3.pdf · uploaded 26 Dec 2023Source
  • 4 Disclosure of sold/ booked inventorySOLD UNSOLD CIRCULAR DEC 23.pdf · uploaded 8 Jan 2024Source
  • 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 (5).pdf · uploaded 10 Apr 2024Source
  • 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form2 (4).pdf · uploaded 10 Apr 2024Source
  • 5 Disclosure of sold/ booked inventoryrahi kasturi march b building sold unsold.pdf · uploaded 20 Apr 2024Source
  • 6 Disclosure of sold/ booked inventoryrahi kasturi sold unsold march 2024.pdf · uploaded 20 Apr 2024Source
  • 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)rahi kasturi f3 15 04 2024_11zon.pdf · uploaded 20 Apr 2024Source
  • 4 Copy of Layout Approval (in case of layout)Main Layout.pdf · uploaded 21 Jun 2024Source
  • 12 Building Plan Approval / NA Order for plotted developmentElevation (2).pdf · uploaded 21 Jun 2024Source
  • 13 Building Plan Approval / NA Order for plotted developmentelevation.pdf · uploaded 21 Jun 2024Source
  • 14 Building Plan Approval / NA Order for plotted developmentFloor Plane.pdf · uploaded 21 Jun 2024Source
  • 15 Building Plan Approval / NA Order for plotted developmentParking Plane 1.pdf · uploaded 21 Jun 2024Source
  • 16 Building Plan Approval / NA Order for plotted developmentParking Plane 2.pdf · uploaded 21 Jun 2024Source
  • 17 Building Plan Approval / NA Order for plotted developmentparking plane.pdf · uploaded 21 Jun 2024Source
  • 18 Building Plan Approval / NA Order for plotted developmentTarrece Plane.pdf · uploaded 21 Jun 2024Source
  • 2 Commencement Certificates / NA Order for plotted developmentRevised CC.pdf · uploaded 21 Jun 2024Source
  • 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 26 Jun 2024Source
  • 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)form 1.pdf · uploaded 26 Jun 2024Source
  • 11 Architect’s Certificate of Percentage of Completion of Work (Form 1)form 1.pdf · uploaded 26 Jun 2024Source
  • 12 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 26 Jun 2024Source
  • 11 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate - Form 2 (2) (1).pdf · uploaded 26 Jun 2024Source
  • 12 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate - Form 2 (3) (1) (1).pdf · uploaded 26 Jun 2024Source
  • 13 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate - Form 2 (4) (1) (1).pdf · uploaded 26 Jun 2024Source
  • 14 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 26 Jun 2024Source
  • 7 Disclosure of sold/ booked inventorysold unsold A building.pdf · uploaded 26 Jun 2024Source
  • 8 Disclosure of sold/ booked inventoryb building sold unsold.pdf · uploaded 26 Jun 2024Source
  • 9 Disclosure of sold/ booked inventoryNew Doc .pdf · uploaded 26 Jun 2024Source
  • 10 Disclosure of sold/ booked inventoryb building sold unsold.pdf · uploaded 26 Jun 2024Source
  • 11 Disclosure of sold/ booked inventoryNew Doc 04.pdf · uploaded 26 Jun 2024Source
  • 12 Disclosure of sold/ booked inventoryb building sold unsold.pdf · uploaded 26 Jun 2024Source
  • 13 Disclosure of sold/ booked inventorySOLD UNSOLD CIRCULAR DEC 23.pdf · uploaded 26 Jun 2024Source
  • 14 Disclosure of sold/ booked inventory01.pdf · uploaded 26 Jun 2024Source
  • 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)Adobe Scan 15 Sep 2023 (3) (1)_11zon.pdf · uploaded 26 Jun 2024Source
  • 10 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 2.pdf · uploaded 26 Jun 2024Source
  • 11 CA Certificate on Project Cost & Fund withdrawal (Form 3)IMG_0001_11zon.pdf · uploaded 26 Jun 2024Source
  • 12 CA Certificate on Project Cost & Fund withdrawal (Form 3)F3 (FY 2021-22-Q4)_11zon.pdf · uploaded 1 Jul 2024Source
  • 13 CA Certificate on Project Cost & Fund withdrawal (Form 3)F3 (FY 2022-23-Q1)_11zon.pdf · uploaded 1 Jul 2024Source
  • 14 CA Certificate on Project Cost & Fund withdrawal (Form 3)F3 (FY 2022-23-Q2)_11zon.pdf · uploaded 1 Jul 2024Source
  • 13 Architect’s Certificate of Percentage of Completion of Work (Form 1)1dec 2021.pdf · uploaded 5 Aug 2024Source
  • 14 Architect’s Certificate of Percentage of Completion of Work (Form 1)2 30_3_22.pdf · uploaded 5 Aug 2024Source
  • 15 Architect’s Certificate of Percentage of Completion of Work (Form 1)3 30_6_22.pdf · uploaded 5 Aug 2024Source
  • 16 Architect’s Certificate of Percentage of Completion of Work (Form 1)4 30_9_22 (2).pdf · uploaded 5 Aug 2024Source
  • 17 Architect’s Certificate of Percentage of Completion of Work (Form 1)5 dec 2022.pdf · uploaded 5 Aug 2024Source
  • 18 Architect’s Certificate of Percentage of Completion of Work (Form 1)6 march 2023 (1).pdf · uploaded 5 Aug 2024Source
  • 19 Architect’s Certificate of Percentage of Completion of Work (Form 1)7 june 2023.pdf · uploaded 5 Aug 2024Source
  • 20 Architect’s Certificate of Percentage of Completion of Work (Form 1)8 sep 2023.pdf · uploaded 5 Aug 2024Source
  • 21 Architect’s Certificate of Percentage of Completion of Work (Form 1)9 dec 2023.pdf · uploaded 5 Aug 2024Source
  • 22 Architect’s Certificate of Percentage of Completion of Work (Form 1)10 march 2024.pdf · uploaded 5 Aug 2024Source
  • 23 Architect’s Certificate of Percentage of Completion of Work (Form 1)11 june 2024.pdf · uploaded 5 Aug 2024Source
  • 15 Engineer’s Certificate on Cost Incurred on Project (Form 2)1dec 2021 (1).pdf · uploaded 5 Aug 2024Source
  • 16 Engineer’s Certificate on Cost Incurred on Project (Form 2)2march 2022.pdf · uploaded 5 Aug 2024Source
  • 17 Engineer’s Certificate on Cost Incurred on Project (Form 2)3june 2022.pdf · uploaded 5 Aug 2024Source
  • 18 Engineer’s Certificate on Cost Incurred on Project (Form 2)4sep 2022.pdf · uploaded 5 Aug 2024Source
  • 19 Engineer’s Certificate on Cost Incurred on Project (Form 2)5dec 2022.pdf · uploaded 5 Aug 2024Source
  • 20 Engineer’s Certificate on Cost Incurred on Project (Form 2)6march 2023.pdf · uploaded 5 Aug 2024Source
  • 21 Engineer’s Certificate on Cost Incurred on Project (Form 2)7june 2023.pdf · uploaded 5 Aug 2024Source
  • 22 Engineer’s Certificate on Cost Incurred on Project (Form 2)8sep 2023.pdf · uploaded 5 Aug 2024Source
  • 23 Engineer’s Certificate on Cost Incurred on Project (Form 2)9dec 2023.pdf · uploaded 5 Aug 2024Source
  • 24 Engineer’s Certificate on Cost Incurred on Project (Form 2)10march 2024.pdf · uploaded 5 Aug 2024Source
  • 25 Engineer’s Certificate on Cost Incurred on Project (Form 2)11june 2024.pdf · uploaded 5 Aug 2024Source
  • 15 CA Certificate on Project Cost & Fund withdrawal (Form 3)1dec 2021.pdf · uploaded 6 Aug 2024Source
  • 16 CA Certificate on Project Cost & Fund withdrawal (Form 3)2march 2022.pdf · uploaded 6 Aug 2024Source
  • 17 CA Certificate on Project Cost & Fund withdrawal (Form 3)3june 2022.pdf · uploaded 6 Aug 2024Source
  • 18 CA Certificate on Project Cost & Fund withdrawal (Form 3)4sep 2022.pdf · uploaded 6 Aug 2024Source
  • 19 CA Certificate on Project Cost & Fund withdrawal (Form 3)5dec 2022.pdf · uploaded 6 Aug 2024Source
  • 20 CA Certificate on Project Cost & Fund withdrawal (Form 3)6march 2023_compressed.pdf · uploaded 6 Aug 2024Source
  • 21 CA Certificate on Project Cost & Fund withdrawal (Form 3)7june 2023.pdf · uploaded 6 Aug 2024Source
  • 22 CA Certificate on Project Cost & Fund withdrawal (Form 3)8sep 2023_compressed.pdf · uploaded 6 Aug 2024Source
  • 23 CA Certificate on Project Cost & Fund withdrawal (Form 3)9dec 2023.pdf · uploaded 6 Aug 2024Source
  • 24 CA Certificate on Project Cost & Fund withdrawal (Form 3)10march 2024_compressed.pdf · uploaded 6 Aug 2024Source
  • 25 CA Certificate on Project Cost & Fund withdrawal (Form 3)11june 2024_compressed.pdf · uploaded 6 Aug 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)fy 2021-22.pdf · uploaded 7 Aug 2024Source
  • 2 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)signed fy 2021-22.pdf · uploaded 7 Aug 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)fy 2023-24.pdf · uploaded 7 Aug 2024Source
  • 2 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)signed fy 2022-23.pdf · uploaded 7 Aug 2024Source
  • 3 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)signed 2021-22.pdf · uploaded 7 Aug 2024Source
  • 2 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)signed 2022-23.pdf · uploaded 7 Aug 2024Source
  • 15 Disclosure of sold/ booked inventory1march 2022.pdf · uploaded 9 Aug 2024Source
  • 16 Disclosure of sold/ booked inventory2june 2022.pdf · uploaded 9 Aug 2024Source
  • 17 Disclosure of sold/ booked inventory3sep 2022.pdf · uploaded 9 Aug 2024Source
  • 18 Disclosure of sold/ booked inventory4dec 2022.pdf · uploaded 9 Aug 2024Source
  • 19 Disclosure of sold/ booked inventory5march 2023 (2).pdf · uploaded 9 Aug 2024Source
  • 20 Disclosure of sold/ booked inventory6june 2023.pdf · uploaded 9 Aug 2024Source
  • 21 Disclosure of sold/ booked inventory7sep 2023.pdf · uploaded 9 Aug 2024Source
  • 22 Disclosure of sold/ booked inventory8dec 2023.pdf · uploaded 9 Aug 2024Source
  • 23 Disclosure of sold/ booked inventory9march 2024_compressed.pdf · uploaded 9 Aug 2024Source
  • 24 Disclosure of sold/ booked inventory10june 2024_compressed.pdf · uploaded 9 Aug 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1.pdf · uploaded 25 Jan 2025Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 25 Jan 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate - Form 2 (7).pdf · uploaded 25 Jan 2025Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate with sing stamp.pdf · uploaded 25 Jan 2025Source
  • 1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted development10.pdf · uploaded 25 Jan 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM-3_compressed (2).pdf · uploaded 5 Feb 2025Source
  • 1 Disclosure of sold/ booked inventorySold Unsold_compressed.pdf · uploaded 5 Feb 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Scan 01 Apr 25 10·28·53 (3).pdf · uploaded 15 Apr 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)form3 (17)_compressed.pdf · uploaded 15 Apr 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)form2.pdf · uploaded 15 Apr 2025Source
  • 1 Disclosure of sold/ booked inventorysold unsold march 2025.pdf · uploaded 19 Apr 2025Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)F1-22-23-Q1.pdf · uploaded 27 Jun 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)F1-21-22-Q4.pdf · uploaded 27 Jun 2025Source
  • 13 Architect’s Certificate of Percentage of Completion of Work (Form 1)F1-24-25-Q4.pdf · uploaded 27 Jun 2025Source
  • 12 Architect’s Certificate of Percentage of Completion of Work (Form 1)F1-24-25-Q3.pdf · uploaded 27 Jun 2025Source
  • 11 Architect’s Certificate of Percentage of Completion of Work (Form 1)F1-24-25-Q2.pdf · uploaded 27 Jun 2025Source
  • 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)F1-24-25-Q1.pdf · uploaded 27 Jun 2025Source
  • 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)F1-23-24-Q4-1-3.pdf · uploaded 27 Jun 2025Source
  • 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)F1-23-24-Q3.pdf · uploaded 27 Jun 2025Source
  • 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)F1-23-24-Q2.pdf · uploaded 27 Jun 2025Source
  • 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)F1-23-24-Q1.pdf · uploaded 27 Jun 2025Source
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)F1-22-23-Q4.pdf · uploaded 27 Jun 2025Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)F1-22-23-Q3.pdf · uploaded 27 Jun 2025Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)F1-22-23-Q2.pdf · uploaded 27 Jun 2025Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)F3-DEC-22.pdf · uploaded 27 Jun 2025Source
  • 13 CA Certificate on Project Cost & Fund withdrawal (Form 3)F3-MARCH-25.pdf · uploaded 27 Jun 2025Source
  • 12 CA Certificate on Project Cost & Fund withdrawal (Form 3)F3-DEC-24.pdf · uploaded 27 Jun 2025Source
  • 11 CA Certificate on Project Cost & Fund withdrawal (Form 3)F3-SEPT-24_compressed.pdf · uploaded 27 Jun 2025Source
  • 10 CA Certificate on Project Cost & Fund withdrawal (Form 3)F3-JUNE-24.pdf · uploaded 27 Jun 2025Source
  • 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)F3-MARCH-24.pdf · uploaded 27 Jun 2025Source
  • 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)F3-DEC-23.pdf · uploaded 27 Jun 2025Source
  • 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)F3-SEPT-23.pdf · uploaded 27 Jun 2025Source
  • 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)F3-JUNE-23.pdf · uploaded 27 Jun 2025Source
  • 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)F3-MARCH-23.pdf · uploaded 27 Jun 2025Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)F3-SEPT-22.pdf · uploaded 27 Jun 2025Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)F3-JUNE-22.pdf · uploaded 27 Jun 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)F3-MARCH-22.pdf · uploaded 27 Jun 2025Source
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)F2-MARCH-23.pdf · uploaded 27 Jun 2025Source
  • 13 Engineer’s Certificate on Cost Incurred on Project (Form 2)F2-MARCH-25.pdf · uploaded 27 Jun 2025Source
  • 12 Engineer’s Certificate on Cost Incurred on Project (Form 2)F2-DEC-24.pdf · uploaded 27 Jun 2025Source
  • 11 Engineer’s Certificate on Cost Incurred on Project (Form 2)F2-SEPT-24.pdf · uploaded 27 Jun 2025Source
  • 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)F2-JUNE-24.pdf · uploaded 27 Jun 2025Source
  • 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)F2-MARCH-24.pdf · uploaded 27 Jun 2025Source
  • 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)F2-DEC-23.pdf · uploaded 27 Jun 2025Source
  • 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)F2-JUNE-23.pdf · uploaded 27 Jun 2025Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)F2-DEC-22.pdf · uploaded 27 Jun 2025Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)F2-SEPT-22.pdf · uploaded 27 Jun 2025Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)F2-JUNE-22.pdf · uploaded 27 Jun 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)F2-MARCH-22.pdf · uploaded 27 Jun 2025Source
  • 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)F2-SEPT-23.pdf · uploaded 27 Jun 2025Source
  • 8 Disclosure of sold/ booked inventorySU-DEC-23.pdf · uploaded 27 Jun 2025Source
  • 14 Disclosure of sold/ booked inventorySU-MARCH-25.pdf · uploaded 27 Jun 2025Source
  • 13 Disclosure of sold/ booked inventorySU-MARCH-25.pdf · uploaded 27 Jun 2025Source
  • 12 Disclosure of sold/ booked inventorySU-DEC-24.pdf · uploaded 27 Jun 2025Source
  • 11 Disclosure of sold/ booked inventorySU-SEPT-24.pdf · uploaded 27 Jun 2025Source
  • 10 Disclosure of sold/ booked inventorySU-JUNE-24.pdf · uploaded 27 Jun 2025Source
  • 9 Disclosure of sold/ booked inventorySU-MARCH-24.pdf · uploaded 27 Jun 2025Source
  • 7 Disclosure of sold/ booked inventorySU-SEPT-23.pdf · uploaded 27 Jun 2025Source
  • 6 Disclosure of sold/ booked inventorySU-JUNE-23.pdf · uploaded 27 Jun 2025Source
  • 5 Disclosure of sold/ booked inventorySU-MARCH-23.pdf · uploaded 27 Jun 2025Source
  • 4 Disclosure of sold/ booked inventorySU-DEC-22.pdf · uploaded 27 Jun 2025Source
  • 3 Disclosure of sold/ booked inventorySU-SEPT-22.pdf · uploaded 27 Jun 2025Source
  • 2 Disclosure of sold/ booked inventorySU-JUNE-22.pdf · uploaded 27 Jun 2025Source
  • 1 Disclosure of sold/ booked inventorySU-MARCH-22.pdf · uploaded 27 Jun 2025Source
  • 1 Declaration about all RERA Designated Bank Accounts (Format A)FORMAT-A-FINAL.pdf · uploaded 27 Jun 2025Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Form 2A-21-22.pdf · uploaded 27 Jun 2025Source
  • 1 Disclosure of Interest in Other Real Estate Organizations1.pdf · uploaded 27 Jun 2025Source
  • 2 Disclosure of Interest in Other Real Estate Organizations2.pdf · uploaded 27 Jun 2025Source
  • 3 Disclosure of Interest in Other Real Estate Organizations3.pdf · uploaded 27 Jun 2025Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form 2A-22-23.pdf · uploaded 27 Jun 2025Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 2A-23-24.pdf · uploaded 27 Jun 2025Source
  • Form 1F1-21-22-Q4.pdf · uploaded 27 Jun 2025Source
  • Form 1F1-22-23-Q1.pdf · uploaded 27 Jun 2025Source
  • Form 1F1-22-23-Q2.pdf · uploaded 27 Jun 2025Source
  • Form 1F1-22-23-Q3.pdf · uploaded 27 Jun 2025Source
  • Form 1F1-22-23-Q4.pdf · uploaded 27 Jun 2025Source
  • Form 1F1-23-24-Q1.pdf · uploaded 27 Jun 2025Source
  • Form 1F1-23-24-Q2.pdf · uploaded 27 Jun 2025Source
  • Form 1F1-23-24-Q3.pdf · uploaded 27 Jun 2025Source
  • Form 1F1-23-24-Q4-1-3.pdf · uploaded 27 Jun 2025Source
  • Form 1F1-24-25-Q1.pdf · uploaded 27 Jun 2025Source
  • Form 1F1-24-25-Q2.pdf · uploaded 27 Jun 2025Source
  • Form 1F1-24-25-Q3.pdf · uploaded 27 Jun 2025Source
  • Form 1F1-24-25-Q4.pdf · uploaded 27 Jun 2025Source
  • Form 2F2-MARCH-22.pdf · uploaded 27 Jun 2025Source
  • Form 2F2-JUNE-22.pdf · uploaded 27 Jun 2025Source
  • Form 2F2-SEPT-22.pdf · uploaded 27 Jun 2025Source
  • Form 2F2-DEC-22.pdf · uploaded 27 Jun 2025Source
  • Form 2F2-MARCH-23.pdf · uploaded 27 Jun 2025Source
  • Form 2F2-JUNE-23.pdf · uploaded 27 Jun 2025Source
  • Form 2F2-SEPT-23.pdf · uploaded 27 Jun 2025Source
  • Form 2F2-DEC-23.pdf · uploaded 27 Jun 2025Source
  • Form 2F2-MARCH-24.pdf · uploaded 27 Jun 2025Source
  • Form 2F2-JUNE-24.pdf · uploaded 27 Jun 2025Source
  • Form 2F2-SEPT-24.pdf · uploaded 27 Jun 2025Source
  • Form 2F2-DEC-24.pdf · uploaded 27 Jun 2025Source
  • Form 2F2-MARCH-25.pdf · uploaded 27 Jun 2025Source
  • Form 3F3-MARCH-22.pdf · uploaded 27 Jun 2025Source
  • Form 3F3-JUNE-22.pdf · uploaded 27 Jun 2025Source
  • Form 3F3-SEPT-22.pdf · uploaded 27 Jun 2025Source
  • Form 3F3-DEC-22.pdf · uploaded 27 Jun 2025Source
  • Form 3F3-MARCH-23.pdf · uploaded 27 Jun 2025Source
  • Form 3F3-JUNE-23.pdf · uploaded 27 Jun 2025Source
  • Form 3F3-SEPT-23.pdf · uploaded 27 Jun 2025Source
  • Form 3F3-DEC-23.pdf · uploaded 27 Jun 2025Source
  • Form 3F3-MARCH-24.pdf · uploaded 27 Jun 2025Source
  • Form 3F3-JUNE-24.pdf · uploaded 27 Jun 2025Source
  • Form 3F3-SEPT-24_compressed.pdf · uploaded 27 Jun 2025Source
  • Form 3F3-DEC-24.pdf · uploaded 27 Jun 2025Source
  • Form 3F3-MARCH-25.pdf · uploaded 27 Jun 2025Source
  • Disclosure of Sold and Booked InventorySU-MARCH-22.pdf · uploaded 27 Jun 2025Source
  • Disclosure of Sold and Booked InventorySU-JUNE-22.pdf · uploaded 27 Jun 2025Source
  • Disclosure of Sold and Booked InventorySU-SEPT-22.pdf · uploaded 27 Jun 2025Source
  • Disclosure of Sold and Booked InventorySU-DEC-22.pdf · uploaded 27 Jun 2025Source
  • Disclosure of Sold and Booked InventorySU-MARCH-23.pdf · uploaded 27 Jun 2025Source
  • Disclosure of Sold and Booked InventorySU-JUNE-23.pdf · uploaded 27 Jun 2025Source
  • Disclosure of Sold and Booked InventorySU-SEPT-23.pdf · uploaded 27 Jun 2025Source
  • Disclosure of Sold and Booked InventorySU-DEC-23.pdf · uploaded 27 Jun 2025Source
  • Disclosure of Sold and Booked InventorySU-MARCH-24.pdf · uploaded 27 Jun 2025Source
  • Disclosure of Sold and Booked InventorySU-JUNE-24.pdf · uploaded 27 Jun 2025Source
  • Disclosure of Sold and Booked InventorySU-SEPT-24.pdf · uploaded 27 Jun 2025Source
  • Disclosure of Sold and Booked InventorySU-DEC-24.pdf · uploaded 27 Jun 2025Source
  • Disclosure of Sold and Booked InventorySU-MARCH-25.pdf · uploaded 27 Jun 2025Source
  • Form 2A (FY 2021-2022)Form 2A-21-22.pdf · uploaded 27 Jun 2025Source
  • Form 2A (FY 2022-2023)Form 2A-22-23.pdf · uploaded 27 Jun 2025Source
  • Form 2A (FY 2023-2024)Form 2A-23-24.pdf · uploaded 27 Jun 2025Source
  • Form 2A (FY 2024-2025)Form 2A-24-25.pdf · uploaded 27 Jun 2025Source
  • 1 Declaration in FORM BLATEST NOTARY-FINAL.pdf · uploaded 30 Jun 2025Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form 5 FY 23-24.pdf · uploaded 30 Jun 2025Source
  • Form 1F1-FINAL.pdf · uploaded 19 Jul 2025Source
  • Form 2F2-FINAL.pdf · uploaded 19 Jul 2025Source
  • Form 3F3-FINAL.pdf · uploaded 19 Jul 2025Source
  • Disclosure of Sold and Booked InventorySU-FINAL.pdf · uploaded 19 Jul 2025Source
  • Form 5 (FY 2024-2025)F5-RAAHI YASHILA (1).pdf · uploaded 29 Sep 2025Source
  • Withdrawal Update Form 1F1.pdf · uploaded 12 Nov 2025Source
  • Withdrawal Update Form 2FORM-2.pdf · uploaded 12 Nov 2025Source
  • Withdrawal Update Form 3FORM-3 (RAAHI YASHILA)_compressed.pdf · uploaded 12 Nov 2025Source
  • Withdrawal Update Form 1F1-Q4.pdf · uploaded 23 Apr 2026Source
  • Withdrawal Update Form 1F1-Q3.pdf · uploaded 23 Apr 2026Source
  • Withdrawal Update Form 2F2-Q4.pdf · uploaded 23 Apr 2026Source
  • Withdrawal Update Form 2F2-Q3.pdf · uploaded 23 Apr 2026Source
  • Withdrawal Update Form 3F3-Q4_compressed.pdf · uploaded 23 Apr 2026Source
  • Withdrawal Update Form 3F3-Q3.pdf · uploaded 23 Apr 2026Source

Technical

  • Documentlayout.pdf · uploaded 13 Jan 2022Source
  • DocumentHPSC0445.pdf · uploaded 13 Jan 2022Source
  • DocumentIOD-1.pdf · uploaded 13 Jan 2022Source
  • DocumentHPSC0446.pdf · uploaded 13 Jan 2022Source
  • DocumentHPSC0447.pdf · uploaded 13 Jan 2022Source
  • DocumentHPSC0448.pdf · uploaded 13 Jan 2022Source
  • DocumentHPSC0449.pdf · uploaded 13 Jan 2022Source
  • DocumentHPSC0450.pdf · uploaded 13 Jan 2022Source
  • DocumentHPSC1972_compressed.pdf · uploaded 21 Apr 2022Source
  • DocumentHPSC1973_compressed.pdf · uploaded 21 Apr 2022Source
  • DocumentHPSC1975_compressed.pdf · uploaded 21 Apr 2022Source
  • DocumentHPSC1976_compressed.pdf · uploaded 21 Apr 2022Source
  • DocumentHPSC1977_compressed.pdf · uploaded 21 Apr 2022Source
  • DocumentHPSC1978_compressed.pdf · uploaded 21 Apr 2022Source
  • DocumentMain Layout.pdf · uploaded 21 Jun 2024Source
  • DocumentElevation (2).pdf · uploaded 21 Jun 2024Source
  • Documentelevation.pdf · uploaded 21 Jun 2024Source
  • DocumentFloor Plane.pdf · uploaded 21 Jun 2024Source
  • DocumentParking Plane 1.pdf · uploaded 21 Jun 2024Source
  • DocumentParking Plane 2.pdf · uploaded 21 Jun 2024Source
  • Documentparking plane.pdf · uploaded 21 Jun 2024Source
  • DocumentTarrece Plane.pdf · uploaded 21 Jun 2024Source

Technical (Architect)

  • DocumentFORM 1.pdf · uploaded 25 Jan 2025Source
  • DocumentForm 1.pdf · uploaded 25 Jan 2025Source
  • DocumentScan 01 Apr 25 10·28·53 (3).pdf · uploaded 15 Apr 2025Source
  • DocumentF1-21-22-Q4.pdf · uploaded 27 Jun 2025Source
  • DocumentF1-22-23-Q1.pdf · uploaded 27 Jun 2025Source
  • DocumentF1-22-23-Q2.pdf · uploaded 27 Jun 2025Source
  • DocumentF1-22-23-Q3.pdf · uploaded 27 Jun 2025Source
  • DocumentF1-22-23-Q4.pdf · uploaded 27 Jun 2025Source
  • DocumentF1-23-24-Q1.pdf · uploaded 27 Jun 2025Source
  • DocumentF1-23-24-Q2.pdf · uploaded 27 Jun 2025Source
  • DocumentF1-23-24-Q3.pdf · uploaded 27 Jun 2025Source
  • DocumentF1-23-24-Q4-1-3.pdf · uploaded 27 Jun 2025Source
  • DocumentF1-24-25-Q1.pdf · uploaded 27 Jun 2025Source
  • DocumentF1-24-25-Q2.pdf · uploaded 27 Jun 2025Source
  • DocumentF1-24-25-Q3.pdf · uploaded 27 Jun 2025Source
  • DocumentF1-24-25-Q4.pdf · uploaded 27 Jun 2025Source
  • DocumentF1-Q3.pdf · uploaded 23 Apr 2026Source

Technical (Engineer)

  • DocumentEngineer Certificate - Form 2 (7).pdf · uploaded 25 Jan 2025Source
  • DocumentEngineer Certificate with sing stamp.pdf · uploaded 25 Jan 2025Source
  • Documentform2.pdf · uploaded 15 Apr 2025Source
  • DocumentF2-MARCH-22.pdf · uploaded 27 Jun 2025Source
  • DocumentF2-JUNE-22.pdf · uploaded 27 Jun 2025Source
  • DocumentF2-SEPT-22.pdf · uploaded 27 Jun 2025Source
  • DocumentF2-DEC-22.pdf · uploaded 27 Jun 2025Source
  • DocumentF2-MARCH-23.pdf · uploaded 27 Jun 2025Source
  • DocumentF2-JUNE-23.pdf · uploaded 27 Jun 2025Source
  • DocumentF2-SEPT-23.pdf · uploaded 27 Jun 2025Source
  • DocumentF2-DEC-23.pdf · uploaded 27 Jun 2025Source
  • DocumentF2-MARCH-24.pdf · uploaded 27 Jun 2025Source
  • DocumentF2-JUNE-24.pdf · uploaded 27 Jun 2025Source
  • DocumentF2-SEPT-24.pdf · uploaded 27 Jun 2025Source
  • DocumentF2-DEC-24.pdf · uploaded 27 Jun 2025Source
  • DocumentF2-MARCH-25.pdf · uploaded 27 Jun 2025Source
  • DocumentF2-Q3.pdf · uploaded 23 Apr 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Land & approvalsLand parcel SURVEY NO 495/2 496/4

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Certificate Signed
Unit types
1BHK, 2BHK181 units in all
Address
Survey No 495/2 496/4, Charholi, CharholiPIN 412105
Village
Charholi, Haveli taluka
Land area for this project
3,562 sq m (38,336 sq ft)
Permissible built-up area
14,246 sq m (1,53,344 sq ft)
Sanctioned built-up area
11,159 sq m (1,20,111 sq ft)
Recreational open space
254 sq m (2,737 sq ft)
Designated bank account
85
Developed in phases
Yes

Survey, CTS, gat or plot numbers

SURVEY NO 495/2 496/4

Land as published on MahaRERA's project page

SURVEY NO 495/2 496/4

Boundaries

North
Survey No 496 P
South
By 18 M Wide Road
East
Survey No 496 P
West
Survey No 495 P

Source: registration certificates and MahaRERA's project page, as stated there.

Units & parking181 units

68 of 181 units booked (38%), as the promoter reported to MahaRERA

1BHK · 90 units2BHK · 91 units
BuildingTypeCarpet areaUnitsBooked
A Building1BHK34.27 sq m · 369 sq ft130
A Building1BHK35.31 sq m · 380 sq ft130
A Building1BHK46.02 sq m · 495 sq ft130
A Building2BHK50.17 sq m · 540 sq ft130
A Building2BHK51.29 sq m · 552 sq ft133
A Building2BHK58.29 sq m · 627 sq ft131
A Building2BHK60.09 sq m · 647 sq ft130
B Building1BHK36.57 sq m · 394 sq ft130
Show all 16 unit rowsShow fewer unit rows
BuildingTypeCarpet areaUnitsBooked
B Building1BHK40.37 sq m · 435 sq ft1312
B Building1BHK41.1 sq m · 442 sq ft44
B Building1BHK47.1 sq m · 507 sq ft99
B Building1BHK48.82 sq m · 525 sq ft129
B Building2BHK40.28 sq m · 434 sq ft135
B Building2BHK49.07 sq m · 528 sq ft1313
B Building2BHK60.1 sq m · 647 sq ft22
B Building2BHK63.11 sq m · 679 sq ft1110

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Professionals4

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectShree Spaces—
Chartered accountantPgmj And Associates—
EngineerMr Abhijit Thakur—
OtherMr Ganesh Hinge—

Source: MahaRERA project page. Contact details are not shown.

Other projects in Charholi

All 171 projects in Charholi · Compare Raahi Kasturi with another project

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Report a problemMethodology