Others · 1 building · 113 unitsRERA P52100029869

Onella Tower

Deedo IDDP-PUN-YNYT

MahaRERA shows it completed; no MahaRERA orders on record; 66% of its units are booked.

Charholi, Pune 412105 · by Sahara Constructions

DeliveryCompletedCompletion / occupancy certificate on MahaRERARegulatoryNo ordersNot in any MahaRERA list or order Deedo has readSales66% booked75 of 113 units · as the promoter reported to MahaRERA

Buying a flat here?

See every deed registered on it.

MahaRERA shows it completed

  • This projectRegistered 12 Jul 2021, completion promised 30 May 2026.

No extension certificate on record.

1 registration · Source: MahaRERA registration and extension certificates

Latest registered deeds

Sales first, then rentals and mortgages matched to this project · the free view shows a price band

No registered deeds matched to this project yet
Sales, resales, rentals and mortgages appear here once registered documents are matched to it by evidence.

The building

Open a building to see every flat, floor by floor.

Floors and units from the registration certificate annexures and MahaRERA's project page.

Regulatory recordNone found

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

RERA registrationP52100029869
RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5210002986912 Jul 202130 May 202630 May 2026Sahara ConstructionsProject page
Documents208

1 document held by Deedo, 207 filings listed on MahaRERA's project page

Registration certificate

Finance

  • PAN CardPan Card.pdf · uploaded 15 May 2021Source

Legal

  • Legal Title reportSearch.pdf · uploaded 15 May 2021Source
  • Declaration Form BForm B Builder.pdf · uploaded 4 Jun 2021Source
  • Legal Title reportFormate A Legal.pdf · uploaded 7 Jul 2021Source
  • Declaration Form BForm-B - converted.pdf · uploaded 13 May 2024Source

Migrated

  • 1 PAN CardPan Card.pdf · uploaded 15 May 2021Source
  • 1 Copy of the legal title reportSearch.pdf · uploaded 15 May 2021Source
Show all 208 documentsShow fewer documents

Migrated

  • 1 Copy of Layout Approval (in case of layout)Plan sanction first.pdf · uploaded 15 May 2021Source
  • 1 Building Plan Approval / NA Order for plotted developmentPlan sacntion second.pdf · uploaded 15 May 2021Source
  • 2 Building Plan Approval / NA Order for plotted developmentPlan Sacntion Third.pdf · uploaded 15 May 2021Source
  • 3 Building Plan Approval / NA Order for plotted developmentPlan Sanctin forth.pdf · uploaded 15 May 2021Source
  • 4 Building Plan Approval / NA Order for plotted developmentPlan Sanction fifth.pdf · uploaded 15 May 2021Source
  • 1 Commencement Certificates / NA Order for plotted developmentCC.pdf · uploaded 15 May 2021Source
  • 1 Declaration in FORM BForm B Builder.pdf · uploaded 4 Jun 2021Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 4 Jun 2021Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 SAHARA FINAL.pdf · uploaded 4 Jun 2021Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)RERA Certification Form 3.pdf · uploaded 4 Jun 2021Source
  • 1 Details of encumbrancesEncumbrancess Sahara.pdf · uploaded 29 Jun 2021Source
  • 1 Declaration about Commencement CertificateDeclaration of CC.pdf · uploaded 29 Jun 2021Source
  • 1 Proforma of Allotment letterSAHARA AGREEMENT FOR SALE.pdf · uploaded 29 Jun 2021Source
  • 2 Copy of the legal title reportFormate A Legal.pdf · uploaded 7 Jul 2021Source
  • 2 Details of encumbrancesEncumbrance Sahara.pdf · uploaded 4 May 2022Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)FORM 5 SAHARA CONSTRUCTIONS.pdf · uploaded 4 Apr 2023Source
  • 3 a Details of encumbrances concerned to FinanceEncumbrances Legal - Sahara Constuctions.pdf · uploaded 26 Apr 2023Source
  • 1 b Details of encumbrances concerned to LegalEncumbrances Legal - Sahara Constuctions.pdf · uploaded 26 Apr 2023Source
  • 2 Declaration in FORM BForm-B - converted.pdf · uploaded 13 May 2024Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)AR_Dec 2021.pdf · uploaded 13 May 2024Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Ar_Dec 2022.pdf · uploaded 13 May 2024Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)AR_Dec 2023.pdf · uploaded 13 May 2024Source
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Ar_June 2022.pdf · uploaded 13 May 2024Source
  • 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)AR_Mar 2022.pdf · uploaded 13 May 2024Source
  • 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)Ar_March 2023.pdf · uploaded 13 May 2024Source
  • 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)Ar_March 2024.pdf · uploaded 13 May 2024Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate-Mar-22.pdf · uploaded 13 May 2024Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate-Mar-23.pdf · uploaded 13 May 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form 2A.pdf · uploaded 13 May 2024Source
  • 1 Disclosure of sold/ booked inventoryDisclosure of sold booked inventory - converted.pdf · uploaded 13 May 2024Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate_Mar_22.pdf · uploaded 13 May 2024Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate_Mar_23.pdf · uploaded 13 May 2024Source
  • 1 Disclosure of Interest in Other Real Estate OrganizationsDisclosure of Interest.pdf · uploaded 13 May 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)RERA Audit Report_22-23.pdf · uploaded 13 May 2024Source
  • 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameSeprate Bank Account Declaration.pdf · uploaded 13 May 2024Source
  • 1 Deviation Report with respect to Allotment letterDeviation of Allotment Lettre.pdf · uploaded 13 May 2024Source
  • 1 Deviation Report with respect to model copy of AgreementDeviation of AFS.pdf · uploaded 13 May 2024Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate - Sep 2024.pdf · uploaded 30 Jan 2025Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Ar_June 2023.pdf · uploaded 30 Jan 2025Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)AR_Mar 2022.pdf · uploaded 30 Jan 2025Source
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Ar_Sep 2022.pdf · uploaded 30 Jan 2025Source
  • 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)Ar_Sep 2023.pdf · uploaded 30 Jan 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate - June 2024.pdf · uploaded 30 Jan 2025Source
  • 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate_Sep_24.pdf · uploaded 30 Jan 2025Source
  • 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate_Jun 24.pdf · uploaded 30 Jan 2025Source
  • 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate_Jun 24.pdf · uploaded 30 Jan 2025Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate_Mar 24.pdf · uploaded 30 Jan 2025Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate_Dec_23.pdf · uploaded 30 Jan 2025Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate_Sep_23.pdf · uploaded 30 Jan 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate_Jun_23.pdf · uploaded 30 Jan 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate-Mar-23.pdf · uploaded 30 Jan 2025Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate-Mar-23.pdf · uploaded 30 Jan 2025Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 2A.pdf · uploaded 30 Jan 2025Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2_June 23.pdf · uploaded 31 Jan 2025Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2_Sep 23.pdf · uploaded 31 Jan 2025Source
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2_Dec 23.pdf · uploaded 31 Jan 2025Source
  • 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2_March 24.pdf · uploaded 31 Jan 2025Source
  • 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2_June 24.pdf · uploaded 31 Jan 2025Source
  • 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2_Sep 24.pdf · uploaded 31 Jan 2025Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)RERA Audit Report_23-24.pdf · uploaded 31 Jan 2025Source
  • 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate - Dec 2024.pdf · uploaded 15 Feb 2025Source
  • 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate_Dec_24.pdf · uploaded 15 Feb 2025Source
  • 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate - Onella Tower - Dec 24.pdf · uploaded 15 Feb 2025Source
  • 1 Disclosure of sold/ booked inventorySold unsold inventory_Dec 2024.pdf · uploaded 15 Feb 2025Source
  • 1 Commencement Certificates / NA Order for plotted developmentCC .pdf · uploaded 28 Feb 2025Source
  • 1 Building Plan Approval / NA Order for plotted development1.pdf · uploaded 28 Feb 2025Source
  • 2 Building Plan Approval / NA Order for plotted development2.pdf · uploaded 28 Feb 2025Source
  • 3 Building Plan Approval / NA Order for plotted development3.pdf · uploaded 28 Feb 2025Source
  • 4 Building Plan Approval / NA Order for plotted development4.pdf · uploaded 28 Feb 2025Source
  • 5 Building Plan Approval / NA Order for plotted development5.pdf · uploaded 28 Feb 2025Source
  • 6 Building Plan Approval / NA Order for plotted development6.pdf · uploaded 28 Feb 2025Source
  • 1 Declaration about Commencement CertificateLetter To Rera.pdf · uploaded 28 Feb 2025Source
  • 2 Declaration about Commencement CertificateFormat D.pdf · uploaded 28 Feb 2025Source
  • Form 1Form-1.pdf · uploaded 25 Jun 2025Source
  • Form 2Form-2.pdf · uploaded 25 Jun 2025Source
  • Form 3Form-3.pdf · uploaded 25 Jun 2025Source
  • Disclosure of Sold and Booked InventoryDisclosure of Sold Booked Inventory - Mar 25.pdf · uploaded 25 Jun 2025Source
  • Self-declaration of Quarterly ProgressSelf-Declaration for Quarterly Progress.pdf · uploaded 25 Jun 2025Source
  • Form 1Form 01.pdf · uploaded 25 Jun 2025Source
  • Form 2Form 02.pdf · uploaded 25 Jun 2025Source
  • Form 3Form 03.pdf · uploaded 25 Jun 2025Source
  • Disclosure of Sold and Booked InventoryDisclosure.pdf · uploaded 25 Jun 2025Source
  • Self-declaration of Quarterly ProgressSelf-Declaration for Quarterly Progress.pdf · uploaded 25 Jun 2025Source
  • Form 1Form 01 - Sep 24.pdf · uploaded 25 Jun 2025Source
  • Form 2Form 02 - Sep 24.pdf · uploaded 25 Jun 2025Source
  • Form 3Form 03 - Sep 24.pdf · uploaded 25 Jun 2025Source
  • Disclosure of Sold and Booked InventoryDisclosure - Sep 24.pdf · uploaded 25 Jun 2025Source
  • Self-declaration of Quarterly ProgressSelf-Declaration for Quarterly Progress.pdf · uploaded 25 Jun 2025Source
  • Form 1Form 01 - June 24.pdf · uploaded 25 Jun 2025Source
  • Form 2Form 02 - June 24.pdf · uploaded 25 Jun 2025Source
  • Form 3Form 03 - June 24.pdf · uploaded 25 Jun 2025Source
  • Disclosure of Sold and Booked InventoryDisclosure - June 24.pdf · uploaded 25 Jun 2025Source
  • Self-declaration of Quarterly ProgressSelf-Declaration for Quarterly Progress.pdf · uploaded 25 Jun 2025Source
  • Form 1Form 1 - Mar 24.pdf · uploaded 25 Jun 2025Source
  • Form 2Form 2 - Mar 24.pdf · uploaded 25 Jun 2025Source
  • Form 3Form 3 - Mar 24.pdf · uploaded 25 Jun 2025Source
  • Disclosure of Sold and Booked InventoryDisclosure - Mar 24.pdf · uploaded 25 Jun 2025Source
  • Self-declaration of Quarterly ProgressSelf-Declaration for Quarterly Progress.pdf · uploaded 25 Jun 2025Source
  • Form 1Form 1 - Dec 23.pdf · uploaded 25 Jun 2025Source
  • Form 2Form 2 - Dec 23.pdf · uploaded 25 Jun 2025Source
  • Form 3Form 3 - Dec 23.pdf · uploaded 25 Jun 2025Source
  • Disclosure of Sold and Booked InventoryDislcosure - Dec 23.pdf · uploaded 25 Jun 2025Source
  • Self-declaration of Quarterly ProgressSelf-Declaration for Quarterly Progress.pdf · uploaded 25 Jun 2025Source
  • Form 1Form 1 - Sep 23.pdf · uploaded 25 Jun 2025Source
  • Form 2Form 2 - Sep 23.pdf · uploaded 25 Jun 2025Source
  • Form 3Form 3 - Sep 23.pdf · uploaded 25 Jun 2025Source
  • Disclosure of Sold and Booked InventoryDisclosure - Sep 23.pdf · uploaded 25 Jun 2025Source
  • Self-declaration of Quarterly ProgressSelf-Declaration for Quarterly Progress.pdf · uploaded 25 Jun 2025Source
  • Form 1Form 1 - Sep 23.pdf · uploaded 25 Jun 2025Source
  • Form 2Form 2 - Sep 23.pdf · uploaded 25 Jun 2025Source
  • Form 3Form 3 - Sep 23.pdf · uploaded 25 Jun 2025Source
  • Disclosure of Sold and Booked InventoryDisclosure - Sep 23.pdf · uploaded 25 Jun 2025Source
  • Self-declaration of Quarterly ProgressSelf-Declaration for Quarterly Progress.pdf · uploaded 25 Jun 2025Source
  • Form 1Form 1 - Mar 23.pdf · uploaded 25 Jun 2025Source
  • Form 2Form 2 - Mar 23.pdf · uploaded 25 Jun 2025Source
  • Form 3Form 3 - Mar 23.pdf · uploaded 25 Jun 2025Source
  • Disclosure of Sold and Booked InventoryDisclosure - Mar 23.pdf · uploaded 25 Jun 2025Source
  • Self-declaration of Quarterly ProgressSelf-Declaration for Quarterly Progress.pdf · uploaded 25 Jun 2025Source
  • Form 1Form 1 - Mar 22.pdf · uploaded 25 Jun 2025Source
  • Form 2Form 2 - Mar 22.pdf · uploaded 25 Jun 2025Source
  • Form 3Form 3 - Mar 22.pdf · uploaded 25 Jun 2025Source
  • Disclosure of Sold and Booked InventoryDisclosure - Mar 22.pdf · uploaded 25 Jun 2025Source
  • Self-declaration of Quarterly ProgressSelf-Declaration for Quarterly Progress.pdf · uploaded 25 Jun 2025Source
  • Form 1Form 01 - Sep 21.pdf · uploaded 25 Jun 2025Source
  • Form 2Form 02 - Sep 21.pdf · uploaded 25 Jun 2025Source
  • Form 3Form 03 - Sep 21.pdf · uploaded 25 Jun 2025Source
  • Disclosure of Sold and Booked InventoryDisclosure - Sep 21.pdf · uploaded 25 Jun 2025Source
  • Self-declaration of Quarterly ProgressSelf-Declaration for Quarterly Progress.pdf · uploaded 25 Jun 2025Source
  • Form 1Form 1 - Dec 21.pdf · uploaded 25 Jun 2025Source
  • Form 2Form 02 - Dec 21.pdf · uploaded 25 Jun 2025Source
  • Form 3Form 03 - Dec 21.pdf · uploaded 25 Jun 2025Source
  • Disclosure of Sold and Booked InventoryDisclosure - Dec 21.pdf · uploaded 25 Jun 2025Source
  • Self-declaration of Quarterly ProgressSelf-Declaration for Quarterly Progress.pdf · uploaded 25 Jun 2025Source
  • Form 1Form 1 - Jun 22.pdf · uploaded 25 Jun 2025Source
  • Form 2Form 2 - Jun 22.pdf · uploaded 25 Jun 2025Source
  • Form 3Form 3 - Jun 22.pdf · uploaded 25 Jun 2025Source
  • Disclosure of Sold and Booked InventoryDisclosure - Jun 22.pdf · uploaded 25 Jun 2025Source
  • Self-declaration of Quarterly ProgressSelf-Declaration for Quarterly Progress.pdf · uploaded 25 Jun 2025Source
  • Form 1Form 1 - Sep 22.pdf · uploaded 25 Jun 2025Source
  • Form 2Form 2 - Sep 22.pdf · uploaded 25 Jun 2025Source
  • Form 3Form 3 - Sep 22.pdf · uploaded 25 Jun 2025Source
  • Disclosure of Sold and Booked InventoryDisclosure - Sep 22.pdf · uploaded 25 Jun 2025Source
  • Self-declaration of Quarterly ProgressSelf-Declaration for Quarterly Progress.pdf · uploaded 25 Jun 2025Source
  • Form 1Form 1 - Dec 22.pdf · uploaded 25 Jun 2025Source
  • Form 2Form 2 - Dec 22.pdf · uploaded 25 Jun 2025Source
  • Form 3Form 3 - Dec 22.pdf · uploaded 25 Jun 2025Source
  • Disclosure of Sold and Booked InventoryDisclosure - Dec 22.pdf · uploaded 25 Jun 2025Source
  • Self-declaration of Quarterly ProgressSelf-Declaration for Quarterly Progress.pdf · uploaded 25 Jun 2025Source
  • Form 2A (FY 2021-2022)Form 2A FY 2021-22.pdf · uploaded 25 Jun 2025Source
  • Form 2A (FY 2022-2023)Form 2A FY 2022-23.pdf · uploaded 25 Jun 2025Source
  • Form 2A (FY 2023-2024)Form 2A FY 2023-24.pdf · uploaded 25 Jun 2025Source
  • Form 2A (FY 2024-2025)Form 2A FY 2024-25.pdf · uploaded 25 Jun 2025Source
  • Form 5 (FY 2021-2022)1 Form 5 FY 2021-22.pdf · uploaded 25 Jun 2025Source
  • Form 5 (FY 2022-2023)2 Form 5 FY 2022-23.pdf · uploaded 25 Jun 2025Source
  • Form 5 (FY 2023-2024)3 Form 5 FY 2023-24.pdf · uploaded 25 Jun 2025Source
  • Withdrawal Update Form 1SCO_Arch certificate _sep2025.pdf · uploaded 15 Feb 2026Source
  • Withdrawal Update Form 2Engineer Certificate Onella Tower .pdf · uploaded 15 Feb 2026Source
  • Withdrawal Update Form 3SCO_CA_Sep 2025_compressed.pdf · uploaded 15 Feb 2026Source
  • Withdrawal Update Form 1SCO_Architect certificate_Dec2025.pdf · uploaded 16 Feb 2026Source
  • Withdrawal Update Form 2Engineers Certificate .pdf · uploaded 16 Feb 2026Source
  • Withdrawal Update Form 3F3-SAHARA (1)_compressed.pdf · uploaded 16 Feb 2026Source
  • Withdrawal Update Form 1FORM 1_March_26.pdf · uploaded 29 Apr 2026Source
  • Withdrawal Update Form 2engineer certificate.pdf · uploaded 29 Apr 2026Source
  • Withdrawal Update Form 3IMG_0004.pdf · uploaded 29 Apr 2026Source
  • Form 2A (FY 2025-2026)Form 2A FY-2025-2026.pdf · uploaded 19 May 2026Source
  • Withdrawal Update Form 1FORM 1_March_26.pdf · uploaded 3 Jul 2026Source
  • Withdrawal Update Form 2engineer certificate.pdf · uploaded 3 Jul 2026Source
  • Withdrawal Update Form 3IMG_0004.pdf · uploaded 3 Jul 2026Source
  • Form 2A (FY 2025-2026)Form 2A.pdf · uploaded 6 Jul 2026Source
  • Form 5 (FY 2024-2025)Form 5.pdf · uploaded 6 Jul 2026Source
  • Occupational CertificateOccupancy Certificate.pdf · uploaded 6 Jul 2026Source

Technical

  • DocumentPlan sanction first.pdf · uploaded 15 May 2021Source
  • DocumentPlan sacntion second.pdf · uploaded 15 May 2021Source
  • DocumentPlan Sacntion Third.pdf · uploaded 15 May 2021Source
  • DocumentPlan Sanctin forth.pdf · uploaded 15 May 2021Source
  • DocumentPlan Sanction fifth.pdf · uploaded 15 May 2021Source
  • Document1.pdf · uploaded 28 Feb 2025Source
  • Document2.pdf · uploaded 28 Feb 2025Source
  • Document3.pdf · uploaded 28 Feb 2025Source
  • Document4.pdf · uploaded 28 Feb 2025Source
  • Document5.pdf · uploaded 28 Feb 2025Source
  • Document6.pdf · uploaded 28 Feb 2025Source

Technical (Architect)

  • DocumentArchitect Certificate - June 2024.pdf · uploaded 30 Jan 2025Source
  • DocumentArchitect Certificate - Sep 2024.pdf · uploaded 30 Jan 2025Source
  • DocumentAr_June 2023.pdf · uploaded 30 Jan 2025Source
  • DocumentAR_Mar 2022.pdf · uploaded 30 Jan 2025Source
  • DocumentAr_Sep 2022.pdf · uploaded 30 Jan 2025Source
  • DocumentAr_Sep 2023.pdf · uploaded 30 Jan 2025Source
  • DocumentArchitect Certificate - Dec 2024.pdf · uploaded 15 Feb 2025Source
  • DocumentFORM 1_March_26.pdf · uploaded 29 Apr 2026Source

Technical (Engineer)

  • DocumentEngineer Certificate-Mar-23.pdf · uploaded 30 Jan 2025Source
  • DocumentEngineer Certificate-Mar-23.pdf · uploaded 30 Jan 2025Source
  • DocumentForm 2_June 23.pdf · uploaded 31 Jan 2025Source
  • DocumentForm 2_Sep 23.pdf · uploaded 31 Jan 2025Source
  • DocumentForm 2_Dec 23.pdf · uploaded 31 Jan 2025Source
  • DocumentForm 2_March 24.pdf · uploaded 31 Jan 2025Source
  • DocumentForm 2_June 24.pdf · uploaded 31 Jan 2025Source
  • DocumentForm 2_Sep 24.pdf · uploaded 31 Jan 2025Source
  • DocumentEngineer Certificate - Onella Tower - Dec 24.pdf · uploaded 15 Feb 2025Source
  • Documentengineer certificate.pdf · uploaded 29 Apr 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Land & approvalsLand parcel 514 15 514 14

As registered with MahaRERA and published on its project page

Project type
Others
Status on MahaRERA
Certificate Signed
Unit types
1BHK, 2BHK, Shop113 units in all
Address
514 15 514 14, Charholi Road, Dabhade WastiPIN 412105
Village
Charholi, Haveli taluka
Land area for this project
2,200 sq m (23,681 sq ft)
Permissible built-up area
7,588 sq m (81,679 sq ft)
Sanctioned built-up area
7,588 sq m (81,679 sq ft)
Recreational open space
220 sq m (2,368 sq ft)
Designated bank account
51
Developed in phases
No

Survey, CTS, gat or plot numbers

514 15 514 14

Land as published on MahaRERA's project page

514 15 514 14

Boundaries

North
Adj S No 514 Part
South
Adj S No 514 Part
East
18 M Wide Road
West
Adj S No 515

Source: registration certificates and MahaRERA's project page, as stated there.

Units & parking113 units

75 of 113 units booked (66%), as the promoter reported to MahaRERA

1BHK · 86 units2BHK · 23 unitsShop · 4 units
TypeCarpet areaUnitsBooked
1BHK30.5 sq m · 328 sq ft88
1BHK31.81 sq m · 342 sq ft3636
1BHK35.19 sq m · 379 sq ft90
1BHK36.48 sq m · 393 sq ft120
1BHK49.82 sq m · 536 sq ft1313
1BHK53.99 sq m · 581 sq ft80
2BHK50.16 sq m · 540 sq ft11
2BHK51.41 sq m · 553 sq ft1313
Show all 13 unit rowsShow fewer unit rows
TypeCarpet areaUnitsBooked
2BHK52.4 sq m · 564 sq ft50
2BHK52.4 sq m · 564 sq ft33
2BHK553.38 sq m · 5,957 sq ft11
Shop22.72 sq m · 245 sq ft20
Shop26.69 sq m · 287 sq ft20

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Professionals5

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectRajas Designers—
Chartered accountantAvinash Pawar—
Chartered accountantPravin Pise—
EngineerR K Randhave Consultant—
EngineerSwapnil Dawalkar—

Source: MahaRERA project page. Contact details are not shown.