Others · 7 buildings · 727 unitsRERA P52100051235

Nyati Emerald I

Deedo IDDP-PUN-CKG0

Completion was pushed back 4 months, to Sep 2027; no MahaRERA orders on record.

Baner, Pune 411045 · Property rates in Baner · by Nyati Builders Private Limited · 53% of its projects kept the RERA date

DeliveryExtended 4 moPromised May 2027 · now due Sep 2027RegulatoryNo ordersNot in any MahaRERA list or order Deedo has readPrice₹11,350 /sq ft0.2% above Baner · 663 registered sales

Buying a flat here?

See every deed registered on it.

Completion was pushed back 4 months, to Sep 2027

  • This projectRegistered 8 Jun 2023, completion promised 31 May 2027, revised to 30 Sep 2027.

No extension certificate on record.

1 registration · Source: MahaRERA registration and extension certificates

Latest registered deeds

Sales first, then rentals and mortgages matched to this project · the free view shows a price band

All 684 deeds →
Latest registered deeds in this project
MonthFlatKindAreaPriceRecord
Oct 2026Unit 804Primary sale1,094 sq ftView Primary sale, Oct 2026
Sep 2026Wing A3 · 28Primary sale3,097 sq ftView Primary sale, Sep 2026
Sep 2026Unit 803Primary sale1,094 sq ftView Primary sale, Sep 2026
Sep 2026Unit 501Primary sale744 sq ftView Primary sale, Sep 2026
Sep 2026Unit 1502Primary sale744 sq ftView Primary sale, Sep 2026
Aug 2026Unit 2902Primary sale744 sq ftView Primary sale, Aug 2026
Aug 2026Unit 2703Primary sale1,094 sq ftView Primary sale, Aug 2026
Jul 2026Unit 2901Primary sale744 sq ftView Primary sale, Jul 2026
Jul 2026Unit 1803Primary sale1,094 sq ftView Primary sale, Jul 2026
Jul 2026Unit 101Primary sale744 sq ftView Primary sale, Jul 2026

7 buildings

Open a building to see every flat, floor by floor.

Floors and units from the registration certificate annexures and MahaRERA's project page.

Regulatory recordNone found

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

RERA registrationP52100051235
RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P521000512358 Jun 202331 May 202730 Sep 2027Nyati Builders Private LimitedProject page
Documents200

1 document held by Deedo, 199 filings listed on MahaRERA's project page

Registration certificate

Finance

  • PAN CardPAN NBPL.pdf · uploaded 9 May 2023Source

Legal

  • Legal Title reportTitle 03052023.pdf · uploaded 9 May 2023Source
  • Declaration Form BForm B Affidavit Cum Declaration 09052023.pdf · uploaded 9 May 2023Source
  • Legal Title reportAddendum to Title Report 07122023.pdf · uploaded 11 Dec 2023Source
  • Legal Title reportLegal Title Report 04102024.pdf · uploaded 7 Oct 2024Source
  • Legal Title reportLegal Title Report 20012025.pdf · uploaded 21 Feb 2025Source

Migrated

  • 1 PAN CardPAN NBPL.pdf · uploaded 9 May 2023Source
Show all 200 documentsShow fewer documents

Migrated

  • 1 Copy of the legal title reportTitle 03052023.pdf · uploaded 9 May 2023Source
  • 1 a Details of encumbrances concerned to FinanceCersai Undertaking.pdf · uploaded 9 May 2023Source
  • 2 a Details of encumbrances concerned to FinanceEncumbrance Details.pdf · uploaded 9 May 2023Source
  • 1 b Details of encumbrances concerned to LegalCersai Undertaking.pdf · uploaded 9 May 2023Source
  • 2 b Details of encumbrances concerned to LegalEncumbrance Details.pdf · uploaded 9 May 2023Source
  • 1 Commencement Certificates / NA Order for plotted developmentBP Comencement Certificate.pdf · uploaded 9 May 2023Source
  • 1 Declaration in FORM BForm B Affidavit Cum Declaration 09052023.pdf · uploaded 9 May 2023Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)ENGINEER CERTIFICATE NYATI EMERALD.pdf · uploaded 9 May 2023Source
  • 1 CERSAI detailsCersai Undertaking.pdf · uploaded 9 May 2023Source
  • 2 CERSAI detailsAll CERSAI Search Report 55.pdf · uploaded 9 May 2023Source
  • 1 Disclosure of Interest in Other Real Estate OrganizationsNDN Disclosure of Interest in other Real Estate Organizations.pdf · uploaded 9 May 2023Source
  • 2 Disclosure of Interest in Other Real Estate OrganizationsPNN Disclosure of Interest in other Real Estate Organizations.pdf · uploaded 9 May 2023Source
  • 1 Copy of Layout Approval (in case of layout)BP LAYOUT.pdf · uploaded 10 May 2023Source
  • 1 Building Plan Approval / NA Order for plotted developmentBASEMENT 1.pdf · uploaded 10 May 2023Source
  • 2 Building Plan Approval / NA Order for plotted developmentBASEMENT 2.pdf · uploaded 10 May 2023Source
  • 3 Building Plan Approval / NA Order for plotted developmentGR PARK PLAN.pdf · uploaded 10 May 2023Source
  • 4 Building Plan Approval / NA Order for plotted developmentWING A1 SECTION AA.pdf · uploaded 10 May 2023Source
  • 5 Building Plan Approval / NA Order for plotted developmentWING A1 ELEV.pdf · uploaded 10 May 2023Source
  • 6 Building Plan Approval / NA Order for plotted developmentWING A1 MAZZ.pdf · uploaded 10 May 2023Source
  • 7 Building Plan Approval / NA Order for plotted developmentWING A1 TYPICAL 8TH 13TH.pdf · uploaded 10 May 2023Source
  • 8 Building Plan Approval / NA Order for plotted developmentWing A2 Ele Sect.pdf · uploaded 10 May 2023Source
  • 9 Building Plan Approval / NA Order for plotted developmentWING A2 MEZZN.pdf · uploaded 10 May 2023Source
  • 10 Building Plan Approval / NA Order for plotted developmentWing A2 Sect.pdf · uploaded 10 May 2023Source
  • 11 Building Plan Approval / NA Order for plotted developmentWING A2 TYPE 8TH.pdf · uploaded 10 May 2023Source
  • 12 Building Plan Approval / NA Order for plotted developmentWing A3 Ele Sect.pdf · uploaded 10 May 2023Source
  • 13 Building Plan Approval / NA Order for plotted developmentWing A3 Ground.pdf · uploaded 10 May 2023Source
  • 14 Building Plan Approval / NA Order for plotted developmentWing A3 Plan.pdf · uploaded 10 May 2023Source
  • 15 Building Plan Approval / NA Order for plotted developmentWing A3 Sect.pdf · uploaded 10 May 2023Source
  • 16 Building Plan Approval / NA Order for plotted developmentWing B1 Ele Sect.pdf · uploaded 10 May 2023Source
  • 17 Building Plan Approval / NA Order for plotted developmentWing B1 Plan.pdf · uploaded 10 May 2023Source
  • 18 Building Plan Approval / NA Order for plotted developmentWing B1 Sect.pdf · uploaded 10 May 2023Source
  • 19 Building Plan Approval / NA Order for plotted developmentWing B2 Ele Sect.pdf · uploaded 10 May 2023Source
  • 20 Building Plan Approval / NA Order for plotted developmentWing B2 Sect.pdf · uploaded 10 May 2023Source
  • 21 Building Plan Approval / NA Order for plotted developmentWing B2 Typ Floor.pdf · uploaded 10 May 2023Source
  • 22 Building Plan Approval / NA Order for plotted developmentWing B3 Ele Sect.pdf · uploaded 10 May 2023Source
  • 23 Building Plan Approval / NA Order for plotted developmentWing B3 Plan .pdf · uploaded 10 May 2023Source
  • 24 Building Plan Approval / NA Order for plotted developmentWing H Ele Sect.pdf · uploaded 10 May 2023Source
  • 25 Building Plan Approval / NA Order for plotted developmentWing H Plan.pdf · uploaded 10 May 2023Source
  • 1 Declaration about Commencement CertificateDeclaration About CC.pdf · uploaded 10 May 2023Source
  • 1 Proforma of Allotment letterNYATI EMERALD I ALLOT LETTER 100523 .pdf · uploaded 10 May 2023Source
  • 1 Deviation Report with respect to Allotment letterDeviation Sheet of Allotment Letter.pdf · uploaded 10 May 2023Source
  • 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameDeclaration of Separate Bank Account.pdf · uploaded 17 May 2023Source
  • 1 Other – TechnicalBP LAYOUT Plot.pdf · uploaded 24 May 2023Source
  • 2 Other – TechnicalNYATI EMERALD IUNIT AGREEMENT.pdf · uploaded 24 May 2023Source
  • 3 Other – TechnicalEMERAD I UNIT AGREE DEVI SHEET.pdf · uploaded 24 May 2023Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)R1 CA Certificate.pdf · uploaded 1 Jun 2023Source
  • 1 Proforma of Agreement for saleNYATI EMERALD I UNIT AGREEMENT REVISED 6623.pdf · uploaded 6 Jun 2023Source
  • 1 Deviation Report with respect to model copy of AgreementRevised Deviation Sheet of Agreement 06062023.pdf · uploaded 6 Jun 2023Source
  • 2 Proforma of Agreement for saleNYATI EMERALD I UNIT AGREEMENT REVISED 14623.pdf · uploaded 14 Jun 2023Source
  • 2 Proforma of Allotment letterNYATI EMERALD I ALLOT LETTER REVISED 14623.pdf · uploaded 14 Jun 2023Source
  • 2 Deviation Report with respect to model copy of AgreementRevised Deviation Sheet of Agreement 140623.pdf · uploaded 14 Jun 2023Source
  • 3 Proforma of Agreement for saleNYATI EMERALD- IUNIT AGREEMENT REVISED 27623.pdf · uploaded 28 Jun 2023Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Emerald-I.pdf · uploaded 27 Jul 2023Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2.pdf · uploaded 16 Oct 2023Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCHITECT CERTIFICATE.pdf · uploaded 19 Oct 2023Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1.pdf · uploaded 19 Oct 2023Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3.pdf · uploaded 19 Oct 2023Source
  • 1 Disclosure of sold/ booked inventoryDISCLOSURE OF SOLD UNSOLD INVERTORY.pdf · uploaded 20 Oct 2023Source
  • 4 Proforma of Agreement for saleEMERALD I UNIT AGR-27623 REVISED 071123 CLEAN.pdf · uploaded 7 Nov 2023Source
  • 5 Proforma of Agreement for saleEMERALD I UNIT AGR 27623 REVISED 011223 CLEAN.pdf · uploaded 1 Dec 2023Source
  • 3 CERSAI detailsCERSAI REPORT EMERALD.pdf · uploaded 5 Dec 2023Source
  • 2 Copy of the legal title reportAddendum to Title Report 07122023.pdf · uploaded 11 Dec 2023Source
  • 3 a Details of encumbrances concerned to FinanceUndertaking Emerald I.pdf · uploaded 14 Dec 2023Source
  • 3 b Details of encumbrances concerned to LegalUndertaking Emerald I.pdf · uploaded 14 Dec 2023Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1.pdf · uploaded 16 Jan 2024Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2.pdf · uploaded 16 Jan 2024Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3.pdf · uploaded 16 Jan 2024Source
  • 2 Disclosure of sold/ booked inventoryDISCLOSURE OF SOLD UNSOLD INVENTORY.pdf · uploaded 17 Jan 2024Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 6 Apr 2024Source
  • 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 - NBPL Emerald_11zon.pdf · uploaded 6 Apr 2024Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1.pdf · uploaded 8 Apr 2024Source
  • 3 Disclosure of sold/ booked inventoryDISCLOSURE OF SOLD UNSOLD INVENTORY.pdf · uploaded 17 Apr 2024Source
  • 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3.pdf · uploaded 20 Apr 2024Source
  • 3 Proforma of Allotment letterNYATI EMERALD I ALLOT LETTER DRAFT REVISED 040524.pdf · uploaded 8 May 2024Source
  • 6 Proforma of Agreement for saleEMERALD I UNIT AGR REVISED 4524.pdf · uploaded 8 May 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)FORM 2A.pdf · uploaded 18 May 2024Source
  • 4 Disclosure of sold/ booked inventoryDISCLOSURE OF SOLD UNSOLD INVENTORY.pdf · uploaded 21 Jun 2024Source
  • 7 Proforma of Agreement for saleEMERALD I UNIT AGR 29623 REVISED 03072024 CLEAN.pdf · uploaded 6 Jul 2024Source
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1.pdf · uploaded 12 Jul 2024Source
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2.pdf · uploaded 12 Jul 2024Source
  • 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3.pdf · uploaded 17 Jul 2024Source
  • 5 Disclosure of sold/ booked inventoryDISCLOSURE OF SOLD UNSOLD INVENTORY.pdf · uploaded 20 Jul 2024Source
  • 2 Copy of the legal title reportLegal Title Report 04102024.pdf · uploaded 7 Oct 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Nyati Emerlad I - Form 5.pdf · uploaded 7 Oct 2024Source
  • 1 Copy of Layout Approval (in case of layout)BP LAYOUT_11zon.pdf · uploaded 11 Oct 2024Source
  • 1 Commencement Certificates / NA Order for plotted developmentCC.pdf · uploaded 11 Oct 2024Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1.pdf · uploaded 18 Oct 2024Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2.pdf · uploaded 22 Oct 2024Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2.pdf · uploaded 7 Nov 2024Source
  • 2 Disclosure of sold/ booked inventoryDISCLOSURE OF SOLD UNSOLD INVENTORY.pdf · uploaded 7 Nov 2024Source
  • 1 Proforma of Agreement for saleEMERALD I UNIT AGR 191224.pdf · uploaded 19 Dec 2024Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2.pdf · uploaded 3 Jan 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1.pdf · uploaded 6 Jan 2025Source
  • 1 a Details of encumbrances concerned to FinanceFincance Declaration Emerald I.pdf · uploaded 8 Jan 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3.pdf · uploaded 8 Jan 2025Source
  • 1 b Details of encumbrances concerned to LegalFincance Declaration Emerald I.pdf · uploaded 8 Jan 2025Source
  • 1 Disclosure of sold/ booked inventoryDISCLOSURE OF SOLD UNSOLD INVENTORY.pdf · uploaded 14 Jan 2025Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3.pdf · uploaded 16 Jan 2025Source
  • 1 Copy of the legal title reportLegal Title Report 20012025.pdf · uploaded 21 Feb 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1.pdf · uploaded 2 Apr 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2.pdf · uploaded 2 Apr 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3.pdf · uploaded 8 Apr 2025Source
  • 1 Disclosure of sold/ booked inventoryDISCLOSURE OF SOLD UNSOLD INVENTORY.pdf · uploaded 11 Apr 2025Source
  • Form 2A (FY 2024-2025)Nyati Emerald I Form 2A 2024-2025.pdf · uploaded 23 Sep 2025Source
  • Form 5 (FY 2024-2025)Nyati Emerald I - Form 5.pdf · uploaded 23 Sep 2025Source
  • Withdrawal Update Form 1FORM 1.pdf · uploaded 29 Oct 2025Source
  • Withdrawal Update Form 1FORM 1.pdf · uploaded 29 Oct 2025Source
  • Withdrawal Update Form 2Form 2.pdf · uploaded 29 Oct 2025Source
  • Withdrawal Update Form 2Form 2.pdf · uploaded 29 Oct 2025Source
  • Withdrawal Update Form 3FORM 3.pdf · uploaded 29 Oct 2025Source
  • Withdrawal Update Form 3FORM 3.pdf · uploaded 29 Oct 2025Source
  • Withdrawal Update Form 1FORM 1.pdf · uploaded 23 Jan 2026Source
  • Withdrawal Update Form 1FORM 1.pdf · uploaded 23 Jan 2026Source
  • Withdrawal Update Form 2FORM 2.pdf · uploaded 23 Jan 2026Source
  • Withdrawal Update Form 2FORM 2.pdf · uploaded 23 Jan 2026Source
  • Withdrawal Update Form 3FORM 3.pdf · uploaded 23 Jan 2026Source
  • Withdrawal Update Form 3FORM 3.pdf · uploaded 23 Jan 2026Source
  • Form 2A (FY 2023-2024)FORM 2A.pdf · uploaded 25 Mar 2026Source
  • Withdrawal Update Form 1FORM 1.pdf · uploaded 20 Apr 2026Source
  • Withdrawal Update Form 2FORM 2.pdf · uploaded 20 Apr 2026Source
  • Withdrawal Update Form 3FORM 3.pdf · uploaded 20 Apr 2026Source
  • Form 2A (FY 2025-2026)Nyati Emerald I Form 2A 2025-2026.pdf · uploaded 23 Apr 2026Source
  • Withdrawal Update Form 1FORM 1.pdf · uploaded 20 Jul 2026Source
  • Withdrawal Update Form 2FORM 2.pdf · uploaded 20 Jul 2026Source
  • Withdrawal Update Form 3FORM 3.pdf · uploaded 20 Jul 2026Source
  • Form 5 (FY 2025-2026)Form 5 Emerald I DSC.pdf · uploaded 17 Sep 2026Source

Technical

  • DocumentBP LAYOUT.pdf · uploaded 10 May 2023Source
  • DocumentBASEMENT 1.pdf · uploaded 10 May 2023Source
  • DocumentBASEMENT 2.pdf · uploaded 10 May 2023Source
  • DocumentGR PARK PLAN.pdf · uploaded 10 May 2023Source
  • DocumentWING A1 SECTION AA.pdf · uploaded 10 May 2023Source
  • DocumentWING A1 ELEV.pdf · uploaded 10 May 2023Source
  • DocumentWING A1 MAZZ.pdf · uploaded 10 May 2023Source
  • DocumentWING A1 TYPICAL 8TH 13TH.pdf · uploaded 10 May 2023Source
  • DocumentWing A2 Ele Sect.pdf · uploaded 10 May 2023Source
  • DocumentWING A2 MEZZN.pdf · uploaded 10 May 2023Source
  • DocumentWing A2 Sect.pdf · uploaded 10 May 2023Source
  • DocumentWING A2 TYPE 8TH.pdf · uploaded 10 May 2023Source
  • DocumentWing A3 Ele Sect.pdf · uploaded 10 May 2023Source
  • DocumentWing A3 Ground.pdf · uploaded 10 May 2023Source
  • DocumentWing A3 Plan.pdf · uploaded 10 May 2023Source
  • DocumentWing A3 Sect.pdf · uploaded 10 May 2023Source
  • DocumentWing B1 Ele Sect.pdf · uploaded 10 May 2023Source
  • DocumentWing B1 Plan.pdf · uploaded 10 May 2023Source
  • DocumentWing B1 Sect.pdf · uploaded 10 May 2023Source
  • DocumentWing B2 Ele Sect.pdf · uploaded 10 May 2023Source
  • DocumentWing B2 Sect.pdf · uploaded 10 May 2023Source
  • DocumentWing B2 Typ Floor.pdf · uploaded 10 May 2023Source
  • DocumentWing B3 Ele Sect.pdf · uploaded 10 May 2023Source
  • DocumentWing B3 Plan .pdf · uploaded 10 May 2023Source
  • DocumentWing H Ele Sect.pdf · uploaded 10 May 2023Source
  • DocumentWing H Plan.pdf · uploaded 10 May 2023Source
  • Other – TechnicalBP LAYOUT Plot.pdf · uploaded 24 May 2023Source
  • Other – TechnicalNYATI EMERALD IUNIT AGREEMENT.pdf · uploaded 24 May 2023Source
  • Other – TechnicalEMERAD I UNIT AGREE DEVI SHEET.pdf · uploaded 24 May 2023Source
  • DocumentBP LAYOUT_11zon.pdf · uploaded 11 Oct 2024Source
  • DocumentBP LAYOUT.pdf · uploaded 6 Feb 2026Source
  • DocumentA1 ELEVATION.pdf · uploaded 6 Feb 2026Source
  • DocumentA1 GR 1st FLR.pdf · uploaded 6 Feb 2026Source
  • DocumentA1 SECTION BB.pdf · uploaded 6 Feb 2026Source
  • DocumentA1 TYPICAL FLR.pdf · uploaded 6 Feb 2026Source
  • DocumentA2 ELEVATION.pdf · uploaded 6 Feb 2026Source
  • DocumentA2 GR 1st Flr.pdf · uploaded 6 Feb 2026Source
  • DocumentA2 SECTION A B.pdf · uploaded 6 Feb 2026Source
  • DocumentA2 TYPICAL FLR.pdf · uploaded 6 Feb 2026Source
  • DocumentA3 ELEVATION.pdf · uploaded 6 Feb 2026Source
  • DocumentA3 GR 1st Flr.pdf · uploaded 6 Feb 2026Source
  • DocumentA3 SECTION A B.pdf · uploaded 6 Feb 2026Source
  • DocumentA3 TYPICAL FLR.pdf · uploaded 6 Feb 2026Source
  • DocumentB1 ELEVATION.pdf · uploaded 6 Feb 2026Source
  • DocumentB1 GR TYPICAL FLR.pdf · uploaded 6 Feb 2026Source
  • DocumentB1 SECTION A B.pdf · uploaded 6 Feb 2026Source
  • DocumentB2 ELEVATION.pdf · uploaded 6 Feb 2026Source
  • DocumentB2 GR TYPICAL FLR.pdf · uploaded 6 Feb 2026Source
  • DocumentB2 SECTION A B.pdf · uploaded 6 Feb 2026Source
  • DocumentB3 ELEVATION.pdf · uploaded 6 Feb 2026Source
  • DocumentB3 GR TYPICAL FLR.pdf · uploaded 6 Feb 2026Source
  • DocumentB3 SECTION A B.pdf · uploaded 6 Feb 2026Source
  • DocumentBASEMENT 1 PLAN.pdf · uploaded 6 Feb 2026Source
  • DocumentGR PARKING PLAN.pdf · uploaded 6 Feb 2026Source
  • DocumentH GR 1st FLR.pdf · uploaded 6 Feb 2026Source
  • DocumentH SECTION ELEVATION.pdf · uploaded 6 Feb 2026Source
  • DocumentCC.pdf · uploaded 6 Feb 2026Source

Technical (Architect)

  • DocumentFORM 1.pdf · uploaded 18 Oct 2024Source
  • DocumentFORM 1.pdf · uploaded 6 Jan 2025Source
  • DocumentFORM 1.pdf · uploaded 2 Apr 2025Source
  • DocumentFORM 1.pdf · uploaded 13 Oct 2026Source

Technical (Engineer)

  • DocumentFORM 2.pdf · uploaded 22 Oct 2024Source
  • DocumentFORM 2.pdf · uploaded 7 Nov 2024Source
  • DocumentFORM 2.pdf · uploaded 3 Jan 2025Source
  • DocumentFORM 2.pdf · uploaded 2 Apr 2025Source
  • DocumentFORM 2.pdf · uploaded 16 Jul 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Land & approvalsLand parcel 55/2/1+2, 55/4/10 to 38

As registered with MahaRERA and published on its project page

Project type
Others
Status on MahaRERA
Certificate Signed
Unit types
—727 units in all
Address
SURVEY NO 55/2(P), 55/2/1+2, 55/4/1+2, 55/4/4 to 8, 55/4/10 to 38, 55/4/40 to 49, 55/4/51 to 61, 55/4/63, 55/4/67 to 73, 55/4/76+77, 55/4/78(P), 55/4/78/10+11, 55/4/79, BANER, TAL-HAVELI, DIST-PUNE-411045, BANER, BANERPIN 411045
Village
Baner, Haveli taluka
Land area for this project
18,027 sq m (1,94,044 sq ft)
Approved layout area
60,606 sq m (6,52,357 sq ft)
Permissible built-up area
85,487 sq m (9,20,173 sq ft)
Sanctioned built-up area
85,487 sq m (9,20,173 sq ft)
Recreational open space
4,363 sq m (46,964 sq ft)
Designated bank account
76
Developed in phases
Yes

Survey, CTS, gat or plot numbers

55/2/1+255/4/10 to 3855/4/1+255/4/40 to 4955/4/4 to 855/4/51 to 6155/4/6355/4/67 to 7355/4/76+7755/4/78/10+1155/4/78(P)55/4/79SURVEY NO 55/2(P)

Land as published on MahaRERA's project page

SURVEY NO 55/2(P), 55/2/1+2, 55/4/1+2, 55/4/4 to 8, 55/4/10 to 38, 55/4/40 to 49, 55/4/51 to 61, 55/4/63, 55/4/67 to 73, 55/4/76+77, 55/4/78(P), 55/4/78/10+11, 55/4/79, BANER, TAL-HAVELI, DIST-PUNE-411045

Boundaries

North
Open Space And C1 E2 Bldg
South
Survey No 55 Part And 18m Dp Road
East
Survey No 53 And Open Space
West
18m Dp Road

Source: registration certificates and MahaRERA's project page, as stated there.

Units & parking727 units

727 units registered

— · 727 units
BuildingTypeCarpet areaUnits
Wing A1——122
Wing A2——122
Wing A3——123
Wing B1——118
Wing B2——118
Wing B3——118
Wing H Commercial——6

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Professionals3

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectMilind Patil—
EngineerRahul Mane—
EngineerVishwanath Dhande—

Source: MahaRERA project page. Contact details are not shown.

Other projects in Baner

All 3,195 projects in Baner · Compare Nyati Emerald I with another project

Nyati Emerald I in numbers

Registered deals, summarised

Deedo has 684 registered documents at Nyati Emerald I, from Jun 2023 to Oct 2026: 663 sales, 9 mortgages. The median registered sale since Jun 2023 works out to about ₹11,300 per sq ft, at a median of ₹93 L a deal; 0% of sales were resales.

What is the price per sq ft at Nyati Emerald I?
The median registered sale since Jun 2023 works out to about ₹11,300 per sq ft, at a median of ₹93 L a deal; 0% of sales were resales.
How many properties have been sold at Nyati Emerald I?
663 sales are registered at Nyati Emerald I, 2 of them resales.
Where does this data come from?
The figures come from registered documents (Index II) at the Maharashtra sub-registrar offices, matched at Nyati Emerald I by Deedo, last updated with deals registered in Oct 2026.

Latest deal · Primary sale · Oct 2026

₹1–1.5 Cr

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project page · registered documents (Index II)Data through is when MahaRERA's project page was last read.Report a problemMethodology