Residential / Group Housing · 10 buildings · 464 unitsRERA P99000024826 +1

Agami Infinity Park

Deedo IDDP-PAL-Z54Y

Completion was pushed back 1 year, to Aug 2028; MahaRERA lists it: deregistered; 12% of its units are booked.

Khairepada, Palghar 401501 · by Mayuresh Realty Private Limited

DeliveryExtended 1 yrPromised Apr 2028 · now due Aug 2028RegulatoryDeregistered1 MahaRERA listing or order on recordSales12% booked55 of 464 units · as the promoter reported to MahaRERA

Buying a flat here?

See every deed registered on it.

Completion was pushed back 1 year, to Aug 2028

  • P99000024826Registered 9 Mar 2020, completion promised 30 Mar 2024, revised to 30 Mar 2025, and still not shown completed today.
  • P99000027009Registered 10 Nov 2020, completion promised 30 Apr 2028, revised to 30 Aug 2028.

1 extension certificate on record.

2 registrations · Source: MahaRERA registration and extension certificates

Latest registered deeds

Sales first, then rentals and mortgages matched to this project · the free view shows a price band

No registered deeds matched to this project yet
Sales, resales, rentals and mortgages appear here once registered documents are matched to it by evidence.

10 buildings

Open a building to see every flat, floor by floor.

Floors and units from the registration certificate annexures and MahaRERA's project page.

Regulatory record1

What MahaRERA has published about this project. A listing records what the authority published; it is not a judgment of the project.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

RERA registrations2
RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P990000248269 Mar 202030 Mar 202430 Mar 2025Mayuresh Realty Private LimitedProject page
P9900002700910 Nov 202030 Apr 202830 Aug 2028Mayuresh Realty Private LimitedProject page
Documents244

3 documents held by Deedo, 241 filings listed on MahaRERA's project page

Registration certificate (2)

  • Registration certificateP99000024826 · 8 Sep 2021ViewSource
  • Registration certificateP99000027009 · 8 Sep 2021ViewSource

Extension certificate

  • Extension certificateP99000024826 · 19 Jan 2024ViewSource

Finance

  • PAN CardP99000024826 · Mayuresh Realty Pvt Ltd 001.pdf · uploaded 24 Feb 2020Source
  • PAN CardP99000027009 · PAN CARD MAYURESH REALTY PVT LTD.pdf · uploaded 17 Oct 2020Source

Legal

  • Declaration Form BP99000024826 · From B Affidavit Cum Declaration .pdf · uploaded 25 Feb 2020Source
  • Legal Title reportP99000024826 · Title Report.pdf · uploaded 29 Feb 2020Source
  • Legal Title reportP99000027009 · Title Report.pdf · uploaded 17 Oct 2020Source
Show all 244 documentsShow fewer documents

Legal

  • Declaration Form BP99000027009 · FORM B.pdf · uploaded 17 Oct 2020Source

Migrated

  • 1 PAN CardP99000024826 · Mayuresh Realty Pvt Ltd 001.pdf · uploaded 24 Feb 2020Source
  • 1 Copy of Layout Approval (in case of layout)P99000024826 · APPROVAL LAYOUT PLAN.pdf · uploaded 24 Feb 2020Source
  • 2 Copy of Layout Approval (in case of layout)P99000024826 · TYPE - D.PDF · uploaded 24 Feb 2020Source
  • 3 Copy of Layout Approval (in case of layout)P99000024826 · TYPE - E.PDF · uploaded 24 Feb 2020Source
  • 4 Copy of Layout Approval (in case of layout)P99000024826 · TYPE - E1.PDF · uploaded 24 Feb 2020Source
  • 1 Building Plan Approval / NA Order for plotted developmentP99000024826 · APPROVAL ORDER .pdf · uploaded 24 Feb 2020Source
  • 1 Commencement Certificates / NA Order for plotted developmentP99000024826 · TOWN PLANNING PERMISSION.pdf · uploaded 24 Feb 2020Source
  • 1 Declaration in FORM BP99000024826 · From B Affidavit Cum Declaration .pdf · uploaded 25 Feb 2020Source
  • 1 Copy of the legal title reportP99000024826 · Title Report.pdf · uploaded 29 Feb 2020Source
  • 1 Details of encumbrancesP99000024826 · No Encumbrances .pdf · uploaded 29 Feb 2020Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P99000024826 · From 1 Architect Certificate.pdf · uploaded 29 Feb 2020Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P99000024826 · From 2 Engineer Certifcate.pdf · uploaded 29 Feb 2020Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P99000024826 · Rera Certificate.pdf · uploaded 29 Feb 2020Source
  • 1 Proforma of Allotment letterP99000024826 · Agreement and Allotment Draft.pdf · uploaded 29 Feb 2020Source
  • 1 PAN CardP99000027009 · PAN CARD MAYURESH REALTY PVT LTD.pdf · uploaded 17 Oct 2020Source
  • 1 Copy of the legal title reportP99000027009 · Title Report.pdf · uploaded 17 Oct 2020Source
  • 1 Details of encumbrancesP99000027009 · No Encumbrances .pdf · uploaded 17 Oct 2020Source
  • 1 Copy of Layout Approval (in case of layout)P99000027009 · TYPE - H.pdf · uploaded 17 Oct 2020Source
  • 2 Copy of Layout Approval (in case of layout)P99000027009 · TYPE - H1.pdf · uploaded 17 Oct 2020Source
  • 1 Building Plan Approval / NA Order for plotted developmentP99000027009 · Building Plan Approval.pdf · uploaded 17 Oct 2020Source
  • 1 Commencement Certificates / NA Order for plotted developmentP99000027009 · Commencement Certificates.pdf · uploaded 17 Oct 2020Source
  • 1 Declaration in FORM BP99000027009 · FORM B.pdf · uploaded 17 Oct 2020Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P99000027009 · ARCHITECT.pdf · uploaded 17 Oct 2020Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P99000027009 · ARCHITECT.pdf · uploaded 17 Oct 2020Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)P99000027009 · ARCHITECT.pdf · uploaded 17 Oct 2020Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P99000027009 · ENGINEEERS.pdf · uploaded 17 Oct 2020Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P99000027009 · Rera Certificate CA.pdf · uploaded 17 Oct 2020Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P99000027009 · Rera Certificate CA.pdf · uploaded 17 Oct 2020Source
  • 3 Copy of Layout Approval (in case of layout)P99000027009 · APPROVED LAYOUT - 2018.pdf · uploaded 6 Nov 2020Source
  • 2 Commencement Certificates / NA Order for plotted developmentP99000027009 · Rera Letter.pdf · uploaded 6 Nov 2020Source
  • 1 Proforma of Allotment letterP99000027009 · Agreement and Allotment Draft.pdf · uploaded 6 Nov 2020Source
  • 1 Declaration about Commencement CertificateP99000027009 · Declearation of CC Agami Infinity Park 16-18-1.pdf · uploaded 17 Sep 2021Source
  • 1 Disclosure of sold/ booked inventoryP99000027009 · Agami Infinity Park Booking 16-18-1.pdf · uploaded 17 Sep 2021Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)P99000027009 · MRPL - AIP - 16-18 - FY 2020-21.pdf · uploaded 17 Sep 2021Source
  • 1 Declaration about Commencement CertificateP99000024826 · Declearation of CC Agami Infinity Park 14-15-1.pdf · uploaded 17 Sep 2021Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)P99000024826 · Form - 2A - March - 2021 Mayuresh Realty Pvt Ltd.pdf · uploaded 17 Sep 2021Source
  • 1 Disclosure of sold/ booked inventoryP99000024826 · Agami Infinity Park Booking 14-15.pdf · uploaded 17 Sep 2021Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)P99000024826 · MRPL- AIP- 14-15- FY 2019-20.pdf · uploaded 17 Sep 2021Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)P99000024826 · MRPL- AIP- 14-15- FY 2020-21.pdf · uploaded 17 Sep 2021Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)P99000027009 · GetUserDocumentFileContent.pdf · uploaded 21 Jan 2023Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)P99000027009 · Engineer Certificate_Form 2_March 2021-2022.pdf · uploaded 21 Jan 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)P99000027009 · MRPL Form 5_ 31-Mar-22.pdf · uploaded 21 Jan 2023Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)P99000024826 · Engineer Certificate_Form 2_March 2021-2022.pdf · uploaded 21 Jan 2023Source
  • 2 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)P99000027009 · Executed Form 5 FY 2021-22.pdf · uploaded 15 Feb 2023Source
  • 2 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)P99000024826 · Engineers Certificate.pdf · uploaded 15 Feb 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)P99000024826 · Executed Form 5 FY 2021-22.pdf · uploaded 15 Feb 2023Source
  • 2 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)P99000024826 · Executed Form 5 FY 2021-22.pdf · uploaded 15 Feb 2023Source
  • 2 Details of encumbrancesP99000027009 · Encumbrance Certificate- SMFG.pdf · uploaded 9 May 2024Source
  • 5 Disclosure of sold/ booked inventoryP99000024826 · 5Till31-3-23.pdf · uploaded 13 Nov 2024Source
  • 11 Disclosure of sold/ booked inventoryP99000024826 · 11Till30-9-24.pdf · uploaded 13 Nov 2024Source
  • 10 Disclosure of sold/ booked inventoryP99000024826 · 10Till30-6-24.pdf · uploaded 13 Nov 2024Source
  • 9 Disclosure of sold/ booked inventoryP99000024826 · 9Till31-03-24.pdf · uploaded 13 Nov 2024Source
  • 8 Disclosure of sold/ booked inventoryP99000024826 · 8Till31-12-23.pdf · uploaded 13 Nov 2024Source
  • 7 Disclosure of sold/ booked inventoryP99000024826 · 7Till30-9-23.pdf · uploaded 13 Nov 2024Source
  • 6 Disclosure of sold/ booked inventoryP99000024826 · 6Till30-6-23.pdf · uploaded 13 Nov 2024Source
  • 4 Disclosure of sold/ booked inventoryP99000024826 · 4Till30-9-22.pdf · uploaded 13 Nov 2024Source
  • 3 Disclosure of sold/ booked inventoryP99000024826 · 3Till30-6-22.pdf · uploaded 13 Nov 2024Source
  • 2 Disclosure of sold/ booked inventoryP99000024826 · 2Till31-3-22.pdf · uploaded 13 Nov 2024Source
  • 1 Disclosure of sold/ booked inventoryP99000024826 · 1Till31-12-21.pdf · uploaded 13 Nov 2024Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P99000024826 · Form 1 ARCHITECT'S CERTIFICATE for FY 23-24-FINAL.pdf · uploaded 27 Jan 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P99000024826 · Form 1 ARCHITECT'S CERTIFICATE for FY 22-23-FINAL.pdf · uploaded 27 Jan 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P99000024826 · FORM 3 22-23-final.pdf · uploaded 27 Jan 2025Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P99000024826 · FORM 3 23-24-FINAL.pdf · uploaded 27 Jan 2025Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)P99000024826 · Certificates of Engineer Form 2 _March-23_Singed.pdf · uploaded 27 Jan 2025Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)P99000024826 · Certificates of Engineer Form 2 _March-24-MRPL_Singed.pdf · uploaded 27 Jan 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P99000027009 · Form 1-31-03-23.pdf · uploaded 27 Feb 2025Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P99000027009 · Form 1-31-03-24.pdf · uploaded 27 Feb 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P99000027009 · Form 3-31-03-23.pdf · uploaded 27 Feb 2025Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P99000027009 · Form 3-31-03-24.pdf · uploaded 27 Feb 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P99000027009 · Form 2-31-03-23.pdf · uploaded 27 Feb 2025Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P99000027009 · Form 2-31-03-24.pdf · uploaded 27 Feb 2025Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)P99000027009 · Form 5-31-03-23.pdf · uploaded 27 Feb 2025Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)P99000027009 · Form 5-31-03-24.pdf · uploaded 27 Feb 2025Source
  • Form 1P99000027009 · Form 1 March 2025.pdf · uploaded 3 Jul 2026Source
  • Form 2P99000027009 · Form 2 March 2025.pdf · uploaded 3 Jul 2026Source
  • Form 3P99000027009 · FORM 3_March 2025.pdf · uploaded 3 Jul 2026Source
  • Disclosure of Sold and Booked InventoryP99000027009 · FORM 3_March 2025.pdf · uploaded 3 Jul 2026Source
  • Withdrawal Update Form 1P99000027009 · Form 1 March 2025.pdf · uploaded 3 Jul 2026Source
  • Withdrawal Update Form 2P99000027009 · Form 2 March 2025.pdf · uploaded 3 Jul 2026Source
  • Withdrawal Update Form 3P99000027009 · FORM 3_March 2025.pdf · uploaded 3 Jul 2026Source
  • Withdrawal Update Form 1P99000027009 · Form 1.pdf · uploaded 8 Jul 2026Source
  • Withdrawal Update Form 1P99000027009 · Form 1.pdf · uploaded 8 Jul 2026Source
  • Withdrawal Update Form 1P99000027009 · Form 1.pdf · uploaded 8 Jul 2026Source
  • Withdrawal Update Form 1P99000027009 · Form 1.pdf · uploaded 8 Jul 2026Source
  • Withdrawal Update Form 1P99000027009 · Form 1.pdf · uploaded 8 Jul 2026Source
  • Withdrawal Update Form 1P99000027009 · Form 1.pdf · uploaded 8 Jul 2026Source
  • Withdrawal Update Form 1P99000027009 · Form 1.pdf · uploaded 8 Jul 2026Source
  • Withdrawal Update Form 1P99000027009 · Form 1.pdf · uploaded 8 Jul 2026Source
  • Withdrawal Update Form 1P99000027009 · Form 1.pdf · uploaded 8 Jul 2026Source
  • Withdrawal Update Form 1P99000027009 · Form 1.pdf · uploaded 8 Jul 2026Source
  • Withdrawal Update Form 2P99000027009 · Form 2.pdf · uploaded 8 Jul 2026Source
  • Withdrawal Update Form 2P99000027009 · Form 2.pdf · uploaded 8 Jul 2026Source
  • Withdrawal Update Form 2P99000027009 · Form 2.pdf · uploaded 8 Jul 2026Source
  • Withdrawal Update Form 2P99000027009 · Form 2.pdf · uploaded 8 Jul 2026Source
  • Withdrawal Update Form 2P99000027009 · Form 2.pdf · uploaded 8 Jul 2026Source
  • Withdrawal Update Form 2P99000027009 · Form 2.pdf · uploaded 8 Jul 2026Source
  • Withdrawal Update Form 2P99000027009 · Form 2.pdf · uploaded 8 Jul 2026Source
  • Withdrawal Update Form 2P99000027009 · Form 2.pdf · uploaded 8 Jul 2026Source
  • Withdrawal Update Form 2P99000027009 · Form 2.pdf · uploaded 8 Jul 2026Source
  • Withdrawal Update Form 2P99000027009 · Form 2.pdf · uploaded 8 Jul 2026Source
  • Withdrawal Update Form 3P99000027009 · FORM 3 RERA_March 2026.pdf · uploaded 8 Jul 2026Source
  • Withdrawal Update Form 3P99000027009 · FORM 3 RERA_March 2026.pdf · uploaded 8 Jul 2026Source
  • Withdrawal Update Form 3P99000027009 · FORM 3 RERA_March 2026.pdf · uploaded 8 Jul 2026Source
  • Withdrawal Update Form 3P99000027009 · FORM 3 RERA_March 2026.pdf · uploaded 8 Jul 2026Source
  • Withdrawal Update Form 3P99000027009 · FORM 3 RERA_March 2026.pdf · uploaded 8 Jul 2026Source
  • Withdrawal Update Form 3P99000027009 · FORM 3 RERA_March 2026.pdf · uploaded 8 Jul 2026Source
  • Withdrawal Update Form 3P99000027009 · FORM 3 RERA_March 2026.pdf · uploaded 8 Jul 2026Source
  • Withdrawal Update Form 3P99000027009 · FORM 3 RERA_March 2026.pdf · uploaded 8 Jul 2026Source
  • Withdrawal Update Form 3P99000027009 · FORM 3 RERA_March 2026.pdf · uploaded 8 Jul 2026Source
  • Withdrawal Update Form 3P99000027009 · FORM 3 RERA_March 2026.pdf · uploaded 8 Jul 2026Source
  • Form 1P99000027009 · Form 1 March 2025.pdf · uploaded 20 Jul 2026Source
  • Form 2P99000027009 · Form 2 March 2025.pdf · uploaded 20 Jul 2026Source
  • Form 3P99000027009 · FORM 3_March 2025.pdf · uploaded 20 Jul 2026Source
  • Disclosure of Sold and Booked InventoryP99000027009 · Unsold Sold Inventory.pdf · uploaded 20 Jul 2026Source
  • Form 1P99000027009 · Form 1 March 2025.pdf · uploaded 20 Jul 2026Source
  • Form 2P99000027009 · Form 2 March 2025.pdf · uploaded 20 Jul 2026Source
  • Form 3P99000027009 · FORM 3_March 2025.pdf · uploaded 20 Jul 2026Source
  • Disclosure of Sold and Booked InventoryP99000027009 · Unsold Sold Inventory.pdf · uploaded 20 Jul 2026Source
  • Form 1P99000027009 · Form 1 March 2025.pdf · uploaded 20 Jul 2026Source
  • Form 2P99000027009 · Form 2 March 2025.pdf · uploaded 20 Jul 2026Source
  • Form 3P99000027009 · FORM 3_March 2025.pdf · uploaded 20 Jul 2026Source
  • Disclosure of Sold and Booked InventoryP99000027009 · Unsold Sold Inventory.pdf · uploaded 20 Jul 2026Source
  • Form 1P99000027009 · Form 1-31-03-24.pdf · uploaded 20 Jul 2026Source
  • Form 2P99000027009 · Form 2-31-03-24.pdf · uploaded 20 Jul 2026Source
  • Form 3P99000027009 · Form 3-31-03-24.pdf · uploaded 20 Jul 2026Source
  • Disclosure of Sold and Booked InventoryP99000027009 · Unsold Sold Inventory.pdf · uploaded 20 Jul 2026Source
  • Form 1P99000027009 · Form 1-31-03-24.pdf · uploaded 20 Jul 2026Source
  • Form 2P99000027009 · Form 2-31-03-24.pdf · uploaded 20 Jul 2026Source
  • Form 3P99000027009 · Form 3-31-03-24.pdf · uploaded 20 Jul 2026Source
  • Disclosure of Sold and Booked InventoryP99000027009 · Unsold Sold Inventory.pdf · uploaded 20 Jul 2026Source
  • Form 1P99000027009 · Form 1-31-03-24.pdf · uploaded 20 Jul 2026Source
  • Form 2P99000027009 · Form 2-31-03-24.pdf · uploaded 20 Jul 2026Source
  • Form 3P99000027009 · Form 3-31-03-24.pdf · uploaded 20 Jul 2026Source
  • Disclosure of Sold and Booked InventoryP99000027009 · Unsold Sold Inventory.pdf · uploaded 20 Jul 2026Source
  • Form 2P99000027009 · Form 1-31-03-24.pdf · uploaded 20 Jul 2026Source
  • Form 1P99000027009 · Form 2-31-03-24.pdf · uploaded 20 Jul 2026Source
  • Form 3P99000027009 · Form 3-31-03-24.pdf · uploaded 20 Jul 2026Source
  • Disclosure of Sold and Booked InventoryP99000027009 · Unsold Sold Inventory.pdf · uploaded 20 Jul 2026Source
  • Form 1P99000027009 · Form 1-31-03-23.pdf · uploaded 20 Jul 2026Source
  • Form 2P99000027009 · Form 2-31-03-23.pdf · uploaded 20 Jul 2026Source
  • Form 3P99000027009 · Form 3-31-03-23.pdf · uploaded 20 Jul 2026Source
  • Disclosure of Sold and Booked InventoryP99000027009 · Sold Unsold Inventory1.pdf · uploaded 20 Jul 2026Source
  • Form 1P99000027009 · Form 1-31-03-23.pdf · uploaded 20 Jul 2026Source
  • Form 2P99000027009 · Form 2-31-03-23.pdf · uploaded 20 Jul 2026Source
  • Form 3P99000027009 · Form 3-31-03-23.pdf · uploaded 20 Jul 2026Source
  • Disclosure of Sold and Booked InventoryP99000027009 · Sold Unsold Inventory1.pdf · uploaded 20 Jul 2026Source
  • Form 1P99000027009 · Form 1-31-03-23.pdf · uploaded 20 Jul 2026Source
  • Form 2P99000027009 · Form 2-31-03-23.pdf · uploaded 20 Jul 2026Source
  • Form 3P99000027009 · Form 3-31-03-23.pdf · uploaded 20 Jul 2026Source
  • Disclosure of Sold and Booked InventoryP99000027009 · Sold Unsold Inventory1.pdf · uploaded 20 Jul 2026Source
  • Form 1P99000027009 · Form 1-31-03-23.pdf · uploaded 20 Jul 2026Source
  • Form 2P99000027009 · Form 2-31-03-23.pdf · uploaded 20 Jul 2026Source
  • Form 3P99000027009 · Form 3-31-03-23.pdf · uploaded 20 Jul 2026Source
  • Disclosure of Sold and Booked InventoryP99000027009 · Sold Unsold Inventory1.pdf · uploaded 20 Jul 2026Source
  • Form 5 (FY 2020-2021)P99000027009 · Form 5_FY 2020-21.pdf · uploaded 20 Jul 2026Source
  • Form 5 (FY 2021-2022)P99000027009 · Form 5 FY 2021-22.pdf · uploaded 20 Jul 2026Source
  • Form 5 (FY 2022-2023)P99000027009 · Form 5-31-03-23.pdf · uploaded 20 Jul 2026Source
  • Form 5 (FY 2023-2024)P99000027009 · Form 5-31-03-24.pdf · uploaded 20 Jul 2026Source
  • Form 5 (FY 2024-2025)P99000027009 · Form 5.pdf · uploaded 20 Jul 2026Source
  • Form 3P99000024826 · FORM 3 RERA- PDF March 2025- Building no 14-151.pdf · uploaded 20 Jul 2026Source
  • Disclosure of Sold and Booked InventoryP99000024826 · Unsold Sold Inventory.pdf · uploaded 20 Jul 2026Source
  • Form 1P99000024826 · Form 1 ARCHITECT CERTIFICATE 24-25.pdf · uploaded 20 Jul 2026Source
  • Form 2P99000024826 · Form 1 ARCHITECT CERTIFICATE 24-25.pdf · uploaded 20 Jul 2026Source
  • Form 1P99000024826 · Form 1 ARCHITECT CERTIFICATE 24-25.pdf · uploaded 20 Jul 2026Source
  • Form 2P99000024826 · Form 2 March 2025.pdf · uploaded 20 Jul 2026Source
  • Form 3P99000024826 · FORM 3 RERA- PDF March 2025- Building no 14-151.pdf · uploaded 20 Jul 2026Source
  • Disclosure of Sold and Booked InventoryP99000024826 · Unsold Sold Inventory.pdf · uploaded 20 Jul 2026Source
  • Form 1P99000024826 · Form 1 ARCHITECT CERTIFICATE 24-25.pdf · uploaded 20 Jul 2026Source
  • Form 2P99000024826 · Form 2 March 2025.pdf · uploaded 20 Jul 2026Source
  • Form 3P99000024826 · FORM 3 RERA- PDF March 2025- Building no 14-151.pdf · uploaded 20 Jul 2026Source
  • Disclosure of Sold and Booked InventoryP99000024826 · FORM 3 RERA- PDF March 2025- Building no 14-151.pdf · uploaded 20 Jul 2026Source
  • Form 1P99000024826 · Form 1 ARCHITECT CERTIFICATE 24-25.pdf · uploaded 20 Jul 2026Source
  • Form 2P99000024826 · Form 2 March 2025.pdf · uploaded 20 Jul 2026Source
  • Form 3P99000024826 · FORM 3 RERA- PDF March 2025- Building no 14-151.pdf · uploaded 20 Jul 2026Source
  • Disclosure of Sold and Booked InventoryP99000024826 · Unsold Sold Inventory.pdf · uploaded 20 Jul 2026Source
  • Form 1P99000024826 · Form 1 ARCHITECTS CERTIFICATE for FY 23-24-FINAL.pdf · uploaded 20 Jul 2026Source
  • Form 2P99000024826 · Engineer Form 2.pdf · uploaded 20 Jul 2026Source
  • Form 3P99000024826 · FORM 3 23-24-FINAL.pdf · uploaded 20 Jul 2026Source
  • Disclosure of Sold and Booked InventoryP99000024826 · Sold Unsold Inventroy.pdf · uploaded 20 Jul 2026Source
  • Form 1P99000024826 · Form 1 ARCHITECTS CERTIFICATE for FY 23-24-FINAL.pdf · uploaded 20 Jul 2026Source
  • Form 2P99000024826 · Engineer Form 2.pdf · uploaded 20 Jul 2026Source
  • Form 3P99000024826 · FORM 3 23-24-FINAL.pdf · uploaded 20 Jul 2026Source
  • Disclosure of Sold and Booked InventoryP99000024826 · Sold Unsold Inventroy.pdf · uploaded 20 Jul 2026Source
  • Form 1P99000024826 · Form 1 ARCHITECTS CERTIFICATE for FY 23-24-FINAL.pdf · uploaded 20 Jul 2026Source
  • Form 2P99000024826 · Engineer Form 2.pdf · uploaded 20 Jul 2026Source
  • Form 3P99000024826 · FORM 3 23-24-FINAL.pdf · uploaded 20 Jul 2026Source
  • Disclosure of Sold and Booked InventoryP99000024826 · Sold Unsold Inventroy.pdf · uploaded 20 Jul 2026Source
  • Form 1P99000024826 · Form 1 ARCHITECTS CERTIFICATE for FY 23-24-FINAL.pdf · uploaded 20 Jul 2026Source
  • Form 2P99000024826 · Engineer Form 2.pdf · uploaded 20 Jul 2026Source
  • Form 3P99000024826 · FORM 3 23-24-FINAL.pdf · uploaded 20 Jul 2026Source
  • Disclosure of Sold and Booked InventoryP99000024826 · Sold Unsold Inventroy.pdf · uploaded 20 Jul 2026Source
  • Form 1P99000024826 · Form 1 ARCHITECTS CERTIFICATE for FY 23-24-FINAL.pdf · uploaded 20 Jul 2026Source
  • Form 2P99000024826 · Engineer Form 2.pdf · uploaded 20 Jul 2026Source
  • Form 3P99000024826 · FORM 3 23-24-FINAL.pdf · uploaded 20 Jul 2026Source
  • Disclosure of Sold and Booked InventoryP99000024826 · Sold Unsold Inventroy.pdf · uploaded 20 Jul 2026Source
  • Form 1P99000024826 · Form 1 ARCHITECTS CERTIFICATE for FY 23-24-FINAL.pdf · uploaded 20 Jul 2026Source
  • Form 2P99000024826 · Engineer Form 2.pdf · uploaded 20 Jul 2026Source
  • Form 3P99000024826 · FORM 3 23-24-FINAL.pdf · uploaded 20 Jul 2026Source
  • Disclosure of Sold and Booked InventoryP99000024826 · Sold Unsold Inventroy.pdf · uploaded 20 Jul 2026Source
  • Form 1P99000024826 · Form 1 ARCHITECTS CERTIFICATE for FY 23-24-FINAL.pdf · uploaded 20 Jul 2026Source
  • Form 2P99000024826 · Engineer Form 2.pdf · uploaded 20 Jul 2026Source
  • Form 3P99000024826 · FORM 3 23-24-FINAL.pdf · uploaded 20 Jul 2026Source
  • Disclosure of Sold and Booked InventoryP99000024826 · Sold Unsold Inventroy.pdf · uploaded 20 Jul 2026Source
  • Form 1P99000024826 · Form 1 ARCHITECTS CERTIFICATE for FY 23-24-FINAL.pdf · uploaded 20 Jul 2026Source
  • Form 2P99000024826 · Engineer Form 2.pdf · uploaded 20 Jul 2026Source
  • Form 3P99000024826 · FORM 3 23-24-FINAL.pdf · uploaded 20 Jul 2026Source
  • Disclosure of Sold and Booked InventoryP99000024826 · Sold Unsold Inventroy.pdf · uploaded 20 Jul 2026Source
  • Form 5 (FY 2019-2020)P99000024826 · 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)-4826.pdf · uploaded 20 Jul 2026Source
  • Form 5 (FY 2020-2021)P99000024826 · 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)-4826.pdf · uploaded 20 Jul 2026Source
  • Form 5 (FY 2021-2022)P99000024826 · Form 5 FY 2021-22.pdf · uploaded 20 Jul 2026Source
  • Form 5 (FY 2022-2023)P99000024826 · MRPL Form-5 22-23-final.pdf · uploaded 20 Jul 2026Source
  • Form 5 (FY 2023-2024)P99000024826 · FORM 5 2023-24 FINAL.pdf · uploaded 20 Jul 2026Source
  • Form 5 (FY 2024-2025)P99000024826 · Form 5 FY 24-25 Building no 14-15.pdf · uploaded 20 Jul 2026Source
  • Withdrawal Update Form 1P99000027009 · Form 1.pdf · uploaded 8 Sep 2026Source
  • Withdrawal Update Form 2P99000027009 · Form 2.pdf · uploaded 8 Sep 2026Source
  • Withdrawal Update Form 3P99000027009 · FORM 3 RERA_March 2026.pdf · uploaded 8 Sep 2026Source

Technical

  • DocumentP99000024826 · APPROVAL LAYOUT PLAN.pdf · uploaded 24 Feb 2020Source
  • DocumentP99000024826 · TYPE - D.PDF · uploaded 24 Feb 2020Source
  • DocumentP99000024826 · TYPE - E.PDF · uploaded 24 Feb 2020Source
  • DocumentP99000024826 · TYPE - E1.PDF · uploaded 24 Feb 2020Source
  • DocumentP99000024826 · APPROVAL ORDER .pdf · uploaded 24 Feb 2020Source
  • DocumentP99000027009 · TYPE - H.pdf · uploaded 17 Oct 2020Source
  • DocumentP99000027009 · TYPE - H1.pdf · uploaded 17 Oct 2020Source
  • DocumentP99000027009 · Building Plan Approval.pdf · uploaded 17 Oct 2020Source
  • DocumentP99000027009 · APPROVED LAYOUT - 2018.pdf · uploaded 6 Nov 2020Source

Technical (Architect)

  • DocumentP99000024826 · From 1 Architect Certificate.pdf · uploaded 29 Feb 2020Source
  • DocumentP99000024826 · Form 1 ARCHITECT'S CERTIFICATE for FY 22-23-FINAL.pdf · uploaded 27 Jan 2025Source
  • DocumentP99000024826 · Form 1 ARCHITECT'S CERTIFICATE for FY 23-24-FINAL.pdf · uploaded 27 Jan 2025Source
  • DocumentP99000027009 · Form 1-31-03-23.pdf · uploaded 27 Feb 2025Source
  • DocumentP99000027009 · Form 1-31-03-24.pdf · uploaded 27 Feb 2025Source
  • DocumentP99000027009 · Form 1.pdf · uploaded 8 Jul 2026Source

Technical (Engineer)

  • DocumentP99000024826 · From 2 Engineer Certifcate.pdf · uploaded 29 Feb 2020Source
  • DocumentP99000027009 · Form 2-31-03-23.pdf · uploaded 27 Feb 2025Source
  • DocumentP99000027009 · Form 2-31-03-24.pdf · uploaded 27 Feb 2025Source
  • DocumentP99000027009 · Form 2.pdf · uploaded 8 Jul 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Land & approvalsLand parcel 45 TO 47, 53 TO 75 S NO 63 HISS NO 1/80

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Certificate Signed
Phases
1
Unit types
3 BHK DUPLEX, 3BHK DUPLEX, 2BHK, 1BHK464 units in all
Address
Land Bearing S. No. 611, Bearing Plot No 1 To 43, 45 To 47 And Plot No 53 To 75, S. No. 63 Hissa No 180, S. No.63 Hissa 181, S. No.63 Hissa No 182, S. No. 63 Hissa No 183, S. No. 63 Hissa No 184, J K Irani Private Road, BoisarPIN 401501
Village
khairepada, Palghar taluka
Land area for this project
6,331 sq m (68,145 sq ft)
Permissible built-up area
6,331 sq m (68,145 sq ft)
Sanctioned built-up area
6,331 sq m (68,145 sq ft)
Recreational open space
705 sq m (7,586 sq ft)
Designated bank account
85
Developed in phases
Yes

Survey, CTS, gat or plot numbers

45 TO 4753 TO 75 S NO 63 HISS NO 1/80BEARING PLOT NO 1 TO 43LAND BEARING S. NO. 61/1LAND BEARING S. NO. 611LAND BEARING S NO 61/1 BEARING PLOT NO 1 TO43PLOT NO 53 TO 75S. NO.63 HISSA 1/81S. NO.63 HISSA 181S. NO. 63 HISSA NO 1/80S. NO. 63 HISSA NO 180S. NO.63 HISSA NO 1/82S. NO.63 HISSA NO 182S. NO. 63 HISSA NO 1/83S. NO. 63 HISSA NO 183S. NO. 63 HISSA NO 1/84S. NO. 63 HISSA NO 184S NO 63 HISS NO 1/81S NO 63 HISS NO 1/82S NO 63 HISS NO 1/83 S NO 63 HISS NO 1/84

Land as published on MahaRERA's project page

LAND BEARING S. NO. 611, BEARING PLOT NO 1 TO 43, 45 TO 47 AND PLOT NO 53 TO 75, S. NO. 63 HISSA NO 180, S. NO.63 HISSA 181, S. NO.63 HISSA NO 182, S. NO. 63 HISSA NO 183, S. NO. 63 HISSA NO 184

Boundaries

North
Boundary Of Boisar Village
South
New S No 63-2p Old S No 113-1p Of Village Khaira
East
New S No 64 Old S No 114 And New S No 69 Old S No
West
New S No 62 Old S No 112 And New S No 72 Old S No

Source: registration certificates and MahaRERA's project page, as stated there.

Units & parking464 units

55 of 464 units booked (12%), as the promoter reported to MahaRERA

3 BHK DUPLEX · 6 units3BHK DUPLEX · 2 units2BHK · 154 units1BHK · 302 units
RERABuildingTypeCarpet areaUnitsBooked
P99000024826Building No 14-D3 BHK DUPLEX83.12 sq m · 895 sq ft20
P99000024826Building No 14-D3BHK DUPLEX84.18 sq m · 906 sq ft20
P99000024826Building No- 14-D13 BHK DUPLEX83.12 sq m · 895 sq ft20
P99000024826Building No- 14-D13 BHK DUPLEX84.18 sq m · 906 sq ft20
P99000024826Building No-15 E2BHK39.02 sq m · 420 sq ft144
P99000024826Building No-15 E2BHK41.69 sq m · 449 sq ft72
P99000024826Building No-15 E2BHK41.79 sq m · 450 sq ft74
P99000024826Building No-15 E2BHK41.99 sq m · 452 sq ft144
Show all 36 unit rowsShow fewer unit rows
RERABuildingTypeCarpet areaUnitsBooked
P99000024826Building No-15 -E11BHK27.47 sq m · 296 sq ft1414
P99000024826Building No-15 -E12BHK41.67 sq m · 449 sq ft74
P99000024826Building No-15 -E12BHK41.77 sq m · 450 sq ft77
P99000024826Building No-15 -E12BHK41.99 sq m · 452 sq ft1410
P99000027009Building No 16 H1BHK26.68 sq m · 287 sq ft80
P99000027009Building No 16 H1BHK27.26 sq m · 293 sq ft80
P99000027009Building No 16 H1BHK27.46 sq m · 296 sq ft320
P99000027009Building No 16 H2BHK39.02 sq m · 420 sq ft140
P99000027009Building No 16 H11BHK26.68 sq m · 287 sq ft80
P99000027009Building No 16 H11BHK27.16 sq m · 292 sq ft320
P99000027009Building No 16 H11BHK27.26 sq m · 293 sq ft80
P99000027009Building No 16 H12BHK39.02 sq m · 420 sq ft140
P99000027009Building No 17 H1BHK26.68 sq m · 287 sq ft80
P99000027009Building No 17 H1BHK27.26 sq m · 293 sq ft83
P99000027009Building No 17 H1BHK27.46 sq m · 296 sq ft320
P99000027009Building No 17 H2BHK39.02 sq m · 420 sq ft143
P99000027009Building No 17 H11BHK26.68 sq m · 287 sq ft80
P99000027009Building No 17 H11BHK27.26 sq m · 293 sq ft80
P99000027009Building No 17 H11BHK27.46 sq m · 296 sq ft320
P99000027009Building No 17 H12BHK39.02 sq m · 420 sq ft140
P99000027009Building No 18 H1BHK26.68 sq m · 287 sq ft80
P99000027009Building No 18 H1BHK27.26 sq m · 293 sq ft80
P99000027009Building No 18 H1BHK27.46 sq m · 296 sq ft320
P99000027009Building No 18 H2BHK39.02 sq m · 420 sq ft140
P99000027009Building No 18 H11BHK26.68 sq m · 287 sq ft80
P99000027009Building No 18 H11BHK27.26 sq m · 293 sq ft80
P99000027009Building No 18 H11BHK27.46 sq m · 296 sq ft320
P99000027009Building No 18 H12BHK39.02 sq m · 420 sq ft140

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Professionals7

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.RERA
ArchitectJanardan Shantaram Sankhe—P99000027009
Chartered accountantAVPR & Associates—P99000024826
Chartered accountantAVPR & Associates—P99000027009
EngineerJanardan Shantaram Sankhe—P99000027009
EngineerJanardan Shantaram Sankhe—P99000024826
EngineerMitesh Parasiya—P99000024826
EngineerMitesh Parasiya—P99000027009

Source: MahaRERA project page. Contact details are not shown.