Residential / Group Housing · 8 buildings · 134 unitsRERA P51600027094 +2

Rosewood

Deedo IDDP-NSK-GTKY

MahaRERA shows it completed; no MahaRERA orders on record; 93% of its units are booked.

Pimprisado, Nashik 422403 · by Ishanya Buildcon · 80% of its projects kept the RERA date

DeliveryCompletedCompletion / occupancy certificate on MahaRERARegulatoryNo ordersNot in any MahaRERA list or order Deedo has readSales93% booked125 of 134 units · as the promoter reported to MahaRERA

Buying a flat here?

See every deed registered on it.

MahaRERA shows it completed

  • P51600027094Registered 13 Nov 2020, completion promised 30 Jun 2025.
  • P51600031092Registered 5 Oct 2021, completion promised 31 Dec 2024.
  • P51600033295Registered 15 Feb 2022, completion promised 31 Mar 2025.

No extension certificate on record.

3 registrations · Source: MahaRERA registration and extension certificates

Latest registered deeds

Sales first, then rentals and mortgages matched to this project · the free view shows a price band

No registered deeds matched to this project yet
Sales, resales, rentals and mortgages appear here once registered documents are matched to it by evidence.

8 buildings

Open a building to see every flat, floor by floor.

Floors and units from the registration certificate annexures and MahaRERA's project page.

Regulatory recordNone found

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

RERA registrations3
RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5160002709413 Nov 202030 Jun 202530 Jun 2025Ishanya BuildconProject page
P516000310925 Oct 202131 Dec 202431 Dec 2024Ishanya BuildconProject page
P5160003329515 Feb 202231 Mar 202531 Mar 2025Ishanya BuildconProject page
Documents173

6 documents held by Deedo, 167 filings listed on MahaRERA's project page

Registration certificate (3)

  • Registration certificateP51600027094 · 8 Sep 2021ViewSource
  • Registration certificateP51600031092 · 5 Oct 2021ViewSource
  • Registration certificateP51600033295 · 15 Feb 2022ViewSource

Other (3)

  • OtherP51600027094 · Date not statedView
  • OtherP51600031092 · Date not statedView
  • OtherP51600033295 · Date not statedView

Finance

  • PAN CardP51600027094 · PAN - ISHANYA BUILDCON.pdf · uploaded 7 Nov 2020Source
  • PAN CardP51600031092 · PAN - Ishanya Buildcon.pdf · uploaded 21 Sep 2021Source
Show all 173 documentsShow fewer documents

Finance

  • PAN CardP51600033295 · PAN - Ishanya Buildcon.pdf · uploaded 24 Jan 2022Source

Legal

  • OtherP51600027094 · 7-12 Extracts.pdf · uploaded 7 Nov 2020Source
  • Legal Title reportP51600027094 · Title Report.pdf · uploaded 7 Nov 2020Source
  • Declaration Form BP51600027094 · Form B - Promoter.pdf · uploaded 7 Nov 2020Source
  • Declaration Form BP51600031092 · Form B - Developers.pdf · uploaded 21 Sep 2021Source
  • OtherP51600031092 · 7-12 Extracts.pdf · uploaded 24 Sep 2021Source
  • Legal Title reportP51600031092 · Title Report - Rosewood.pdf · uploaded 1 Oct 2021Source
  • Legal Title reportP51600033295 · Title Report.pdf · uploaded 4 Feb 2022Source
  • Declaration Form BP51600033295 · Form B - Developer.pdf · uploaded 4 Feb 2022Source

Migrated

  • 1 PAN CardP51600027094 · PAN - ISHANYA BUILDCON.pdf · uploaded 7 Nov 2020Source
  • 1 Copy of the legal title reportP51600027094 · Title Report.pdf · uploaded 7 Nov 2020Source
  • 1 Details of encumbrancesP51600027094 · Non-Encumbrance certificate.pdf · uploaded 7 Nov 2020Source
  • 1 Copy of Layout Approval (in case of layout)P51600027094 · Rosewood - Layout Copy.pdf · uploaded 7 Nov 2020Source
  • 1 Building Plan Approval / NA Order for plotted developmentP51600027094 · Building Plan - Common.pdf · uploaded 7 Nov 2020Source
  • 2 Building Plan Approval / NA Order for plotted developmentP51600027094 · Building Plan - Wing A.pdf · uploaded 7 Nov 2020Source
  • 3 Building Plan Approval / NA Order for plotted developmentP51600027094 · Building Plan - Wing B.pdf · uploaded 7 Nov 2020Source
  • 1 Commencement Certificates / NA Order for plotted developmentP51600027094 · Commencement Certificate.pdf · uploaded 7 Nov 2020Source
  • 1 Declaration in FORM BP51600027094 · Form B - Promoter.pdf · uploaded 7 Nov 2020Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51600027094 · Form 1 - Architect Certificate.pdf · uploaded 7 Nov 2020Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51600027094 · Form 2 - Engineer Certificate.pdf · uploaded 7 Nov 2020Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51600027094 · Form 3 - CA Certificate.pdf · uploaded 7 Nov 2020Source
  • 1 Proforma of Allotment letterP51600027094 · Letter of Declaration.pdf · uploaded 7 Nov 2020Source
  • 1 OtherP51600027094 · 7-12 Extracts.pdf · uploaded 7 Nov 2020Source
  • 2 Commencement Certificates / NA Order for plotted developmentP51600027094 · Commencement Certificate v1.pdf · uploaded 12 Nov 2020Source
  • 4 Building Plan Approval / NA Order for plotted developmentP51600027094 · Rosewood - Common Building Plan.pdf · uploaded 21 Sep 2021Source
  • 5 Building Plan Approval / NA Order for plotted developmentP51600027094 · Rosewood - Wing A Plan.pdf · uploaded 21 Sep 2021Source
  • 6 Building Plan Approval / NA Order for plotted developmentP51600027094 · Rosewood - Wing B Plan.pdf · uploaded 21 Sep 2021Source
  • 3 Commencement Certificates / NA Order for plotted developmentP51600027094 · Commencement Certificate Sept 2021.pdf · uploaded 21 Sep 2021Source
  • 2 Proforma of Allotment letterP51600027094 · Draft Agreement for Sale - Rosewood.pdf · uploaded 21 Sep 2021Source
  • 3 Proforma of Allotment letterP51600027094 · Allotment Letter - Rosewood.pdf · uploaded 21 Sep 2021Source
  • 1 PAN CardP51600031092 · PAN - Ishanya Buildcon.pdf · uploaded 21 Sep 2021Source
  • 1 Details of encumbrancesP51600031092 · Non Encumbrance certificate.pdf · uploaded 21 Sep 2021Source
  • 1 Copy of Layout Approval (in case of layout)P51600031092 · Rosewood - Layout Copy.pdf · uploaded 21 Sep 2021Source
  • 1 Declaration about Commencement CertificateP51600031092 · Declaration about commencement.pdf · uploaded 21 Sep 2021Source
  • 1 Declaration in FORM BP51600031092 · Form B - Developers.pdf · uploaded 21 Sep 2021Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51600031092 · Form 3 - CA Certificate.pdf · uploaded 21 Sep 2021Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51600031092 · Form 1 - Architect's certificate.pdf · uploaded 22 Sep 2021Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51600031092 · Form 2 - Engineer's Certificate.pdf · uploaded 22 Sep 2021Source
  • 1 Proforma of Allotment letterP51600031092 · Draft Agreement for Sale - Rosewood.pdf · uploaded 22 Sep 2021Source
  • 2 Proforma of Allotment letterP51600031092 · Allotment Letter - Rosewood.pdf · uploaded 22 Sep 2021Source
  • 1 Building Plan Approval / NA Order for plotted developmentP51600031092 · Common Building Plan.pdf · uploaded 24 Sep 2021Source
  • 2 Building Plan Approval / NA Order for plotted developmentP51600031092 · Wing C - Building Plan.pdf · uploaded 24 Sep 2021Source
  • 1 OtherP51600031092 · 7-12 Extracts.pdf · uploaded 24 Sep 2021Source
  • 1 Copy of the legal title reportP51600031092 · Title Report - Rosewood.pdf · uploaded 1 Oct 2021Source
  • 1 Commencement Certificates / NA Order for plotted developmentP51600031092 · Commencement Certificate - Final.pdf · uploaded 1 Oct 2021Source
  • 2 Commencement Certificates / NA Order for plotted developmentP51600031092 · Commencement Letter - Sept 2021.pdf · uploaded 1 Oct 2021Source
  • 1 PAN CardP51600033295 · PAN - Ishanya Buildcon.pdf · uploaded 24 Jan 2022Source
  • 1 Commencement Certificates / NA Order for plotted developmentP51600033295 · Commencement Certificate.pdf · uploaded 3 Feb 2022Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51600033295 · Form 1 - Architect's Certificate.pdf · uploaded 3 Feb 2022Source
  • 1 Proforma of Allotment letterP51600033295 · Agreement for sale.pdf · uploaded 3 Feb 2022Source
  • 1 Copy of the legal title reportP51600033295 · Title Report.pdf · uploaded 4 Feb 2022Source
  • 1 Details of encumbrancesP51600033295 · Non Encumbrance Certificate.pdf · uploaded 4 Feb 2022Source
  • 1 Copy of Layout Approval (in case of layout)P51600033295 · Approved Building Plan 1.pdf · uploaded 4 Feb 2022Source
  • 1 Building Plan Approval / NA Order for plotted developmentP51600033295 · Approved Building Plan 1.pdf · uploaded 4 Feb 2022Source
  • 2 Building Plan Approval / NA Order for plotted developmentP51600033295 · Approved Building Plan 2.pdf · uploaded 4 Feb 2022Source
  • 1 Declaration about Commencement CertificateP51600033295 · Declaration - Commencement Certificate.pdf · uploaded 4 Feb 2022Source
  • 1 Declaration in FORM BP51600033295 · Form B - Developer.pdf · uploaded 4 Feb 2022Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51600033295 · Form 2 - Engineer Certificate.pdf · uploaded 4 Feb 2022Source
  • 1 CERSAI detailsP51600033295 · CERSAI - Search Report.pdf · uploaded 4 Feb 2022Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51600033295 · Form 3 - CA Certificate.pdf · uploaded 4 Feb 2022Source
  • 2 Proforma of Allotment letterP51600033295 · Draft Allotment Letter.pdf · uploaded 4 Feb 2022Source
  • 1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentP51600027094 · Wing A - Bhogwata Pramanpatra.pdf · uploaded 16 Aug 2022Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)P51600027094 · Form 5 - A and B Wing - Mar 2021 v1.pdf · uploaded 9 Mar 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)P51600027094 · Form 5 - A and B Wing - Mar 2022 v1.pdf · uploaded 9 Mar 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)P51600031092 · Form 5 - C Wing - FY 2021-22 v1.pdf · uploaded 9 Mar 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)P51600033295 · Form 5 - D Wing - FY 2021-22 v1.pdf · uploaded 10 Mar 2023Source
  • 2 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentP51600027094 · Occupancy Certificate Wing B And C.pdf · uploaded 26 May 2023Source
  • 2 Architect’s Certificate on Completion of Project (Form 4)P51600027094 · Form 4 - Rosewood.pdf · uploaded 26 May 2023Source
  • 1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentP51600031092 · Occupancy Certificate Wing B And C.pdf · uploaded 26 May 2023Source
  • 2 Architect’s Certificate on Completion of Project (Form 4)P51600031092 · Form 4 - Rosewood Phase II.pdf · uploaded 1 Jun 2023Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51600027094 · Form 3 - Rosewood AB - Mar 2022 v1.pdf · uploaded 16 Oct 2023Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51600027094 · Form 3 - Rosewood AB.pdf · uploaded 16 Oct 2023Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51600031092 · Form 3 - Rosewood C - Mar 2022 v1.pdf · uploaded 16 Oct 2023Source
  • 1 Status of Formation of Legal Entity (Society/Co Op etc.)P51600027094 · Final Declaration Deed - A B C pages 1.pdf · uploaded 7 Nov 2023Source
  • 2 Status of Formation of Legal Entity (Society/Co Op etc.)P51600027094 · Final Declaration Deed - A B C pages 2.pdf · uploaded 7 Nov 2023Source
  • 3 Status of Formation of Legal Entity (Society/Co Op etc.)P51600027094 · Final Declaration Deed - A B C pages 3.pdf · uploaded 7 Nov 2023Source
  • 4 Status of Formation of Legal Entity (Society/Co Op etc.)P51600027094 · Final Declaration Deed - A B C pages 4.pdf · uploaded 7 Nov 2023Source
  • 5 Status of Formation of Legal Entity (Society/Co Op etc.)P51600027094 · Final Declaration Deed - A B C pages 5.pdf · uploaded 7 Nov 2023Source
  • 1 Status of Formation of Legal Entity (Society/Co Op etc.)P51600031092 · Final Declaration Deed - A B C pages 1.pdf · uploaded 7 Nov 2023Source
  • 2 Status of Formation of Legal Entity (Society/Co Op etc.)P51600031092 · Final Declaration Deed - A B C pages 2.pdf · uploaded 7 Nov 2023Source
  • 3 Status of Formation of Legal Entity (Society/Co Op etc.)P51600031092 · Final Declaration Deed - A B C pages 3.pdf · uploaded 7 Nov 2023Source
  • 4 Status of Formation of Legal Entity (Society/Co Op etc.)P51600031092 · Final Declaration Deed - A B C pages 4.pdf · uploaded 7 Nov 2023Source
  • 5 Status of Formation of Legal Entity (Society/Co Op etc.)P51600031092 · Final Declaration Deed - A B C pages 5.pdf · uploaded 7 Nov 2023Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51600027094 · Form 1 - March 2021.pdf · uploaded 1 Feb 2024Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51600027094 · Form 1 - March 2022.pdf · uploaded 1 Feb 2024Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51600027094 · Form 2 - March 2021.pdf · uploaded 1 Feb 2024Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51600027094 · Form 2 - March 2022.pdf · uploaded 1 Feb 2024Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51600027094 · Form 3 - Rosewood AB - Mar 2021.pdf · uploaded 1 Feb 2024Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51600033295 · Form 1 - March 2022.pdf · uploaded 1 Feb 2024Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51600033295 · Form 2 - March 2022.pdf · uploaded 1 Feb 2024Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51600033295 · Form 3 - Rosewood D Wing - Mar 2022.pdf · uploaded 1 Feb 2024Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51600031092 · Form 1 - March 2022.pdf · uploaded 1 Feb 2024Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51600031092 · Form 2 - March 2022.pdf · uploaded 1 Feb 2024Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51600027094 · Form 1 - Rosewood A B WING.pdf · uploaded 17 Feb 2024Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51600027094 · Form 2 - Rosewood Wing A B.pdf · uploaded 17 Feb 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)P51600027094 · Form 2A - Rosewood Wing A B.pdf · uploaded 17 Feb 2024Source
  • 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51600027094 · Form 3 - Rosewood A B March 2023.pdf · uploaded 17 Feb 2024Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51600031092 · Form 1 - Rosewood Wing C.pdf · uploaded 17 Feb 2024Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51600031092 · Form 2 - Rosewood Wing C.pdf · uploaded 17 Feb 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)P51600031092 · Form 2A - Rosewood Wing C.pdf · uploaded 17 Feb 2024Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51600031092 · Form 3 - Rosewood C - Mar 2023.pdf · uploaded 17 Feb 2024Source
  • 1 Disclosure of sold/ booked inventoryP51600027094 · Disclosure of Sold - Booked Inventory - Mar 2023.pdf · uploaded 21 Feb 2024View
  • 1 Disclosure of sold/ booked inventoryP51600031092 · Disclosure of Sold - Booked Inventory - Mar 2023.pdf · uploaded 21 Feb 2024View
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51600033295 · FORM 1 D WING - Mar 23.pdf · uploaded 27 Feb 2024Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51600033295 · Form 2 - March 23.pdf · uploaded 27 Feb 2024Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51600033295 · Form 2 - Sept 23.pdf · uploaded 27 Feb 2024Source
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51600033295 · Form 2 - Dec 23.pdf · uploaded 27 Feb 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)P51600033295 · Form 2A - March 23.pdf · uploaded 27 Feb 2024Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51600033295 · Form 3 - Rosewood D Wing - Mar 2023.pdf · uploaded 27 Feb 2024Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51600033295 · Form 3 - Rosewood D Wing - Sept 2023.pdf · uploaded 27 Feb 2024Source
  • 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51600033295 · Form 3 - Rosewood D Wing - Dec 2023.pdf · uploaded 27 Feb 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)P51600027094 · Form 5 - March 23.pdf · uploaded 4 Mar 2024Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51600033295 · Form 1- D Wing Sept 23.pdf · uploaded 4 Mar 2024Source
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51600033295 · Form 1 - D Wing Dec 23.pdf · uploaded 4 Mar 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)P51600031092 · Form 5 - March 23.pdf · uploaded 4 Mar 2024Source
  • 1 Disclosure of sold/ booked inventoryP51600033295 · Disclosure of Sold - Booked Inventory - Mar 2023.pdf · uploaded 6 Mar 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)P51600033295 · D Wing Final.PDF · uploaded 9 Mar 2024Source
  • 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51600033295 · Form 1 - D Wing March 24.pdf · uploaded 4 May 2024Source
  • 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51600033295 · Form 2 - D Wing March 24.pdf · uploaded 4 May 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)P51600033295 · Form 2A - D Wing March 24.pdf · uploaded 4 May 2024Source
  • 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51600033295 · Form 3 - Rosewood D Wing - March 2024.pdf · uploaded 4 May 2024Source
  • 2 Disclosure of sold/ booked inventoryP51600033295 · Disclosure of Sold - Booked Inventory D Wing- Mar 2024.pdf · uploaded 16 May 2024View
  • 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51600033295 · Form 3 - Rosewood D Wing - June 2024.pdf · uploaded 13 Aug 2024Source
  • 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51600033295 · Form 1 - Rosewood D Wing - June 2024.pdf · uploaded 14 Aug 2024Source
  • 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51600033295 · Form 2 - Rosewood D Wing - June 2024.pdf · uploaded 14 Aug 2024Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51600033295 · Form 1 - Rosewood D Wing - Sept 2024.pdf · uploaded 2 Dec 2024Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51600033295 · Form 3 - Rosewood D Wing - Sept 2024.pdf · uploaded 2 Dec 2024Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51600033295 · Form 2 - Rosewood D Wing - Sept 2024.pdf · uploaded 2 Dec 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)P51600033295 · Form 5 Wing D_March 24.pdf · uploaded 20 Dec 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51600033295 · Form 1 - Rosewood D Wing - Dec 2024.pdf · uploaded 17 Feb 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51600033295 · Form 3 - Rosewood D Wing - Dec 2024.pdf · uploaded 17 Feb 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51600033295 · Form 2 - Rosewood D Wing - Dec 24.pdf · uploaded 17 Feb 2025Source
  • 1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentP51600033295 · D WING OCCUPANCY.pdf · uploaded 17 Feb 2025Source
  • 1 Status of Formation of Legal Entity (Society/Co Op etc.)P51600033295 · Delclaration Deed - Wing D-1-20.pdf · uploaded 28 Jun 2025Source
  • 2 Status of Formation of Legal Entity (Society/Co Op etc.)P51600033295 · Delclaration Deed - Wing D-20-40.pdf · uploaded 28 Jun 2025Source
  • 3 Status of Formation of Legal Entity (Society/Co Op etc.)P51600033295 · Delclaration Deed - Wing D-41-54.pdf · uploaded 28 Jun 2025Source
  • 1 Status of Formation of Legal Entity (Society/Co Op etc.)P51600033295 · Declaration Deed - D Wing-1-20.pdf · uploaded 8 Jul 2025Source
  • 2 Status of Formation of Legal Entity (Society/Co Op etc.)P51600033295 · Declaration Deed - D Wing-21-40.pdf · uploaded 8 Jul 2025Source
  • 3 Status of Formation of Legal Entity (Society/Co Op etc.)P51600033295 · Declaration Deed - D Wing-41-58.pdf · uploaded 8 Jul 2025Source
  • Form 5 (FY 2024-2025)P51600033295 · Form 5 - D Wing - FY 2024-25.pdf · uploaded 8 May 2026Source
  • Occupational CertificateP51600033295 · D WING - Full Occupancy.pdf · uploaded 20 Aug 2026Source
  • Occupational CertificateP51600033295 · Gmail - APPROVAL COMPLETION CERTIFICATE.pdf · uploaded 20 Aug 2026Source

Technical

  • DocumentP51600027094 · Rosewood - Layout Copy.pdf · uploaded 7 Nov 2020Source
  • DocumentP51600027094 · Building Plan - Common.pdf · uploaded 7 Nov 2020Source
  • DocumentP51600027094 · Building Plan - Wing A.pdf · uploaded 7 Nov 2020Source
  • DocumentP51600027094 · Building Plan - Wing B.pdf · uploaded 7 Nov 2020Source
  • DocumentP51600027094 · Rosewood - Common Building Plan.pdf · uploaded 21 Sep 2021Source
  • DocumentP51600027094 · Rosewood - Wing A Plan.pdf · uploaded 21 Sep 2021Source
  • DocumentP51600027094 · Rosewood - Wing B Plan.pdf · uploaded 21 Sep 2021Source
  • DocumentP51600031092 · Rosewood - Layout Copy.pdf · uploaded 21 Sep 2021Source
  • DocumentP51600031092 · Common Building Plan.pdf · uploaded 24 Sep 2021Source
  • DocumentP51600031092 · Wing C - Building Plan.pdf · uploaded 24 Sep 2021Source
  • DocumentP51600033295 · Approved Building Plan 1.pdf · uploaded 4 Feb 2022Source
  • DocumentP51600033295 · Approved Building Plan 1.pdf · uploaded 4 Feb 2022Source
  • DocumentP51600033295 · Approved Building Plan 2.pdf · uploaded 4 Feb 2022Source

Technical (Architect)

  • DocumentP51600027094 · Form 1 - Rosewood A B WING.pdf · uploaded 17 Feb 2024Source
  • DocumentP51600031092 · Form 1 - Rosewood Wing C.pdf · uploaded 17 Feb 2024Source
  • DocumentP51600033295 · Form 1 - Rosewood D Wing - June 2024.pdf · uploaded 14 Aug 2024Source
  • DocumentP51600033295 · Form 1 - Rosewood D Wing - Sept 2024.pdf · uploaded 2 Dec 2024Source
  • DocumentP51600033295 · Form 1 - Rosewood D Wing - Dec 2024.pdf · uploaded 17 Feb 2025Source

Technical (Engineer)

  • DocumentP51600027094 · Form 2 - Rosewood Wing A B.pdf · uploaded 17 Feb 2024Source
  • DocumentP51600031092 · Form 2 - Rosewood Wing C.pdf · uploaded 17 Feb 2024Source
  • DocumentP51600033295 · Form 2 - Rosewood D Wing - June 2024.pdf · uploaded 14 Aug 2024Source
  • DocumentP51600033295 · Form 2 - Rosewood D Wing - Sept 2024.pdf · uploaded 2 Dec 2024Source
  • DocumentP51600033295 · Form 2 - Rosewood D Wing - Dec 24.pdf · uploaded 17 Feb 2025Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Land & approvalsLand parcel Gat No.154, Plot No. 1/2/3

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Certificate Signed
Phases
3
Unit types
1BHK, 2BHK134 units in all
Address
Plot No. 1/2/3, Gat No.154, Near Bhavli Dam, Shree Venkatesh NagarPIN 422403
Village
PimpriSado, Igatpuri taluka
Land area for this project
2,911 sq m (31,338 sq ft)
Permissible built-up area
2,983 sq m (32,104 sq ft)
Sanctioned built-up area
2,983 sq m (32,104 sq ft)
Designated bank account
117
Developed in phases
Yes
Also registered as
Rosewood - Phase II, Rosewood - D Wing

Survey, CTS, gat or plot numbers

Gat No.154Plot No. 1/2/3Plot No. 5

Land as published on MahaRERA's project page

Plot No. 1/2/3, Gat No.154

Boundaries

North
Gat No 153
South
9 Mtr Colony Road
East
12 Mtr Colony Road
West
Ambewadi Road

Source: registration certificates and MahaRERA's project page, as stated there.

Units & parking134 units

125 of 134 units booked (93%), as the promoter reported to MahaRERA

1BHK · 121 units2BHK · 13 units
RERABuildingTypeCarpet areaUnitsBooked
P51600033295Rosewood - D Wing1BHK36.15 sq m · 389 sq ft65
P51600033295Rosewood - D Wing1BHK36.72 sq m · 395 sq ft109
P51600033295Rosewood - D Wing2BHK51.66 sq m · 556 sq ft1212
P51600027094Wing A1BHK36.25 sq m · 390 sq ft109
P51600027094Wing A1BHK38.39 sq m · 413 sq ft43
P51600027094Wing A1BHK38.85 sq m · 418 sq ft86
P51600027094Wing A1BHK39.44 sq m · 425 sq ft44
P51600027094Wing A1BHK39.96 sq m · 430 sq ft55
Show all 21 unit rowsShow fewer unit rows
RERABuildingTypeCarpet areaUnitsBooked
P51600027094Wing A1BHK40 sq m · 431 sq ft55
P51600027094Wing B1BHK34.98 sq m · 377 sq ft55
P51600027094Wing B1BHK38.03 sq m · 409 sq ft55
P51600027094Wing B1BHK38.36 sq m · 413 sq ft1010
P51600027094Wing B1BHK38.51 sq m · 415 sq ft1111
P51600027094Wing B2BHK73.56 sq m · 792 sq ft11
P51600031092Wing C1BHK37.05 sq m · 399 sq ft65
P51600031092Wing C1BHK38.31 sq m · 412 sq ft11
P51600031092Wing C1BHK38.36 sq m · 413 sq ft55
P51600031092Wing C1BHK38.65 sq m · 416 sq ft55
P51600031092Wing C1BHK38.77 sq m · 417 sq ft54
P51600031092Wing C1BHK38.9 sq m · 419 sq ft1111
P51600031092Wing C1BHK39.65 sq m · 427 sq ft54

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Professionals12

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.RERA
ArchitectUmesh Bagul—P51600033295
ArchitectUmesh Bagul—P51600027094
ArchitectUmesh Bagul—P51600031092
Chartered accountantJain Chhajed & Associates—P51600027094
Chartered accountantJain Chhajed & Associates—P51600033295
Chartered accountantJain Chhajed & Associates—P51600031092
EngineerAshfaq Malik—P51600033295
EngineerAshfaq Malik—P51600031092
Show all 12 professionalsShow fewer professionals
RoleNameRegistration no.RERA
EngineerMahesh Ramdas Rao—P51600027094
OtherChandrama Singh—P51600031092
OtherIshant Enterprises (Prop. Ganesh Dubhase)—P51600033295
OtherTarnish Singh—P51600027094

Source: MahaRERA project page. Contact details are not shown.

Other projects in Pimprisado

All 7 projects in Pimprisado · Compare Rosewood with another project

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Report a problemMethodology