Its promised completion date, Dec 2021, has passed and MahaRERA does not show it completed; 2 listings and orders with MahaRERA on record; 7% of its units are booked.

Pipla, Nagpur 440034 · by Luxora Infrastructure Private Limited · 46% of its projects kept the RERA date

Delivery4 yrs 11 mo past duePromised Dec 2021 · no extension on record · not shown completedRegulatory2 listings and ordersLatest: complaintSales7% booked11 of 159 units · as the promoter reported to MahaRERA

Buying a flat here?

See every deed registered on it.

Its promised completion date, Dec 2021, has passed and MahaRERA does not show it completed

  • This projectRegistered 5 Aug 2017, completion promised 30 Dec 2021, and still not shown completed today.

No extension certificate on record.

1 registration · Source: MahaRERA registration and extension certificates

Latest registered deeds

Sales first, then rentals and mortgages matched to this project · the free view shows a price band

No registered deeds matched to this project yet
Sales, resales, rentals and mortgages appear here once registered documents are matched to it by evidence.

2 buildings

Open a building to see every flat, floor by floor.

Floors and units from the registration certificate annexures and MahaRERA's project page. Construction % is the average of the developer's own declared activity progress to MahaRERA, not an inspection.

Regulatory record2

What MahaRERA has published about this project. A listing records what the authority published; it is not a judgment of the project.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

RERA registrationP50500003509
RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P505000035095 Aug 201730 Dec 2021—Luxora Infrastructure Private LimitedProject page
Documents178

59 documents held by Deedo, 119 filings listed on MahaRERA's project page

Form 1 (8)

Show all 178 documentsShow fewer documents

Form B

Form 5 (8)

Form 2 (15)

Form 2A (7)

Commencement certificate (2)

Registration certificate

Other (16)

Allotment letter

Document library

  • Details of encumbrancesEncumbrances Vista 3B.pdf · uploaded 29 Jul 2017Source
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect Certificate - Vista 3B.pdf · uploaded 29 Jul 2017View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineers Certificate Vista 3B.pdf · uploaded 29 Jul 2017Source
  • Copy of Layout Approval (in case of layout)Vista_3B.pdf · uploaded 29 Jul 2017Source
  • Proforma of Allotment letterVista 3B20170729172726.pdf · uploaded 31 Jul 2017View
  • Certificates of CA (Form 5)CA Certificate VISTA 3B.pdf · uploaded 31 Jul 2017View
  • Copy of the legal title reportTitle Certificate - Vista 3 B.pdf · uploaded 31 Jul 2017Source
  • Building Plan Approval (IOD)IOD Vista 3B.pdf · uploaded 31 Jul 2017Source
  • Declaration in FORM BDeclaration Form Vista 3B.pdf · uploaded 31 Jul 2017View
  • Othervista 3b20170731170949.pdf · uploaded 31 Jul 2017View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)02_RP-2B Architects Certificate_Vista 3B.pdf · uploaded 18 Jan 2019View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)02_RP-2B Engineers Certificate_Vista-3B.pdf · uploaded 18 Jan 2019Source
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)VISTA 3B ( ARCH )20181228120237.pdf · uploaded 21 Jan 2019View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)VISTA 3B ( ENG )20181228120127.pdf · uploaded 21 Jan 2019Source
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Arch-Certi-Vista-3B.pdf · uploaded 4 Jul 2019View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Eng-Certi-Vista-3B.pdf · uploaded 4 Jul 2019Source
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Arch Cert- Vista-3b.pdf · uploaded 5 Jul 2019View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Eng-Cert-Vista-3B.pdf · uploaded 5 Jul 2019Source
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Eng-Cert-Vista-3B.pdf · uploaded 4 Sep 2019Source
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Arch_Cert_Vist_3B_Dec_18.pdf · uploaded 5 Sep 2019View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engg_Cert_Vista_3B_Mar_19.pdf · uploaded 5 Sep 2019Source
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Vista 3B.pdf · uploaded 5 Sep 2019View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engg_Cert_Vista_3B_Mar_19.pdf · uploaded 6 Sep 2019Source
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Arch_cert_Vista_3B_Jun_19.pdf · uploaded 6 Sep 2019Source
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engg_Vista_3B_30_Jun_19.pdf · uploaded 6 Sep 2019Source
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Arch_Cert_Vista 3B_Sep_19.pdf · uploaded 8 Jan 2020Source
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Vista 3B_compressed.pdf · uploaded 7 Sep 2020View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engg_Cert_Vista 3B_Sep_19.pdf · uploaded 7 Sep 2020Source
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Vista 3B_compressed.pdf · uploaded 7 Sep 2020View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Vista 3B_compressed.pdf · uploaded 8 Sep 2020View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Vista 3B_compressed.pdf · uploaded 9 Sep 2020View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Vista 3B_compressed.pdf · uploaded 10 Sep 2020View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Vista 3B_compressed.pdf · uploaded 10 Sep 2020View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Arch_Cert_Mar 21_Vista 3B_compressed.pdf · uploaded 4 Aug 2021Source
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engg_Cert_MARCH -21_Vista 3B_compressed.pdf · uploaded 4 Aug 2021View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)Form 2A_Vista3B_Sep_2019_compressed.pdf · uploaded 16 Aug 2021View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)Form 2A_Vista3B_Mar_2020_compressed.pdf · uploaded 16 Aug 2021View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Form 2A_Vista3B_Sep_2020_compressed.pdf · uploaded 16 Aug 2021View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Form 2A_Vista3B_Mar_2021_compressed.pdf · uploaded 17 Aug 2021View
  • Declaration about Commencement CertificateDeclaration For Rera Vista 3B.pdf · uploaded 20 Aug 2021View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Arch Cert Vista 3B Sep 21_compressed.pdf · uploaded 17 Nov 2021Source
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Vista 3B_compressed.pdf · uploaded 23 Nov 2021View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)Form 5_Vista 3C (18-19).pdf · uploaded 18 Jan 2022View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)Form 5_Vista 3C (19-20).pdf · uploaded 18 Jan 2022View
  • Certificates of CA (Form 5)Form 5_Vista 3B(17-18).pdf · uploaded 18 Jan 2022View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)Form 5_Vista 3B (18-19).pdf · uploaded 18 Jan 2022View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)Form 5_Vista 3B (19-20).pdf · uploaded 18 Jan 2022View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Arch Cert_Vista 3B_Dec 21_compressed.pdf · uploaded 21 Apr 2022Source
  • CERSAI detailsCERSAI_Vista 3B_merged.pdf · uploaded 21 Apr 2022View
  • Commencement Certificates / NA Order for plotted developmentCommencement_Cert_Vista 3B.pdf · uploaded 21 Apr 2022View
  • Disclosure of sold/ booked inventorySold and Unsold Inventory_Vista 3B_31Dec_21.pdf · uploaded 27 Apr 2022View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Arch_Cert_Vista 3B_Mar_22_compressed.pdf · uploaded 9 Nov 2022Source
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Arch_Cert_Vista 3B_Sep_22.pdf · uploaded 9 Nov 2022Source
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect Certificate_Vista 3B.pdf · uploaded 21 Feb 2023Source
  • Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)QA_Cert_Vista 3B_Mar_22.pdf · uploaded 23 Feb 2023View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engg_Cert_Treeline 6_Dec 21_compressed.pdf · uploaded 7 Mar 2023View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Vista 3B_001.pdf · uploaded 7 Mar 2023View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engg_Cert_Vista 3B_Jun_22.pdf · uploaded 7 Mar 2023View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engg_Cert_Vista 3B_Sep_22.pdf · uploaded 7 Mar 2023View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)architect's Certificate_Vista 3B.pdf · uploaded 24 Mar 2023Source
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Arch_Cert_Mar_21_Vista 3B.pdf · uploaded 24 Mar 2023Source
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Arch_Cert_Vista-3B_Jun_2021_compressed.pdf · uploaded 24 Mar 2023View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineer's Certificate_Dec -20_Vista 3B.pdf · uploaded 24 Mar 2023View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Arch_Cert_Vista-3B_Jun_2021_compressed.pdf · uploaded 24 Mar 2023View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engg_Cert_Vista 3B_Jun_2021_compressed.pdf · uploaded 24 Mar 2023View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)QA_Cert_Vista 3B_Mar_23.pdf · uploaded 20 Jun 2023View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)ARC Vista 3B_Mar_23.pdf · uploaded 21 Jun 2023Source
  • a Details of encumbrances concerned to FinanceLegal Encumbrance_Vista 3B.pdf · uploaded 12 Jul 2023Source
  • b Details of encumbrances concerned to LegalLegal Encumbrance_Vista 3B.pdf · uploaded 12 Jul 2023Source
  • Disclosure of Interest in Other Real Estate OrganizationsDisclosure of Interest in other Real Estate Organisations_DV.pdf · uploaded 12 Jul 2023View
  • Disclosure of Interest in Other Real Estate OrganizationsDisclosure of Interest in other Real Estate Organisations_TH.pdf · uploaded 12 Jul 2023View
  • Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameDeclaration of Bank Account_Vista 3B.pdf · uploaded 12 Jul 2023Source
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engg_Cert_Vista-3B_Dec_22.pdf · uploaded 29 Aug 2023View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)ENG Vista 3B_Mar_23.pdf · uploaded 29 Aug 2023View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)Form 5_Vista 3B(20-21)_compressed.pdf · uploaded 3 Oct 2023View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Form 5_Vista 3B(21-22)_compressed.pdf · uploaded 3 Oct 2023View
  • Proforma of Agreement for saleAFS_Flat_Generic to Vista 3B.pdf · uploaded 6 Oct 2023View
  • Proforma of Allotment letterAllotment Letter_Vista_3B_25Jul_23.pdf · uploaded 6 Oct 2023Source
  • Deviation Report with respect to Allotment letterDeviation for Allotment_Vista 3B.pdf · uploaded 6 Oct 2023Source
  • Deviation Report with respect to model copy of AgreementAFS_Flat_Generic to Vista 3B-1-22.pdf · uploaded 6 Oct 2023Source
  • Deviation Report with respect to model copy of AgreementAFS_Flat_Generic to Vista 3B-23-43.pdf · uploaded 6 Oct 2023Source
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Arch_Cert_VISTA 3B_Jun_23.pdf · uploaded 6 Oct 2023Source
  • Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Vista 3B FORM-5 ( FY 2022-23).pdf · uploaded 9 Oct 2023Source
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engg_Cert_Vista 3B_Jun_23.pdf · uploaded 9 Oct 2023View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Arch_Cert_Vista 3B_Sep_23.pdf · uploaded 18 Dec 2023Source
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engg_Cert_Vista 3B_Sep_23.pdf · uploaded 18 Dec 2023View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Arch Cert_VISTA 3B_Dec_23.pdf · uploaded 23 Feb 2024Source
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engg Vista 3B_Dec_23.pdf · uploaded 23 Feb 2024View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)QA_Cert_Vista 3B_Mar_24.pdf · uploaded 15 May 2024View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Arch_Cert_Vista 3B_Mar_24.pdf · uploaded 15 May 2024Source
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engg_Cert_Vista 3B_Mar_24.pdf · uploaded 27 May 2024View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Arch_Cert_Vista 3B_Jun_24.pdf · uploaded 5 Aug 2024Source
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engg_Cert_Vista 3B_Jun_24.pdf · uploaded 5 Aug 2024View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engg_Cert_Vista 3B_Sep_24.pdf · uploaded 31 Oct 2024Source
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Arch_Cert_Vista 3B_Sep_24.pdf · uploaded 31 Oct 2024Source
  • Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form 5_Vista 3B_FY(23_24).pdf · uploaded 20 Dec 2024Source
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Arch_Cert_Vista 3B_Dec_24.pdf · uploaded 7 Feb 2025Source
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engg_Cert_Vista 3B_Dec_24.pdf · uploaded 7 Feb 2025Source
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engg_Cert_Vista 3B_Mar_25.pdf · uploaded 15 Apr 2025Source
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)Arch_Cert_Vista 3B_Mar_25.pdf · uploaded 15 Apr 2025Source
  • Form 2A (FY 2024-2025)QA_Cert_Vista 3B_Mar_25.pdf · uploaded 10 Jul 2025Source
  • Withdrawal Update Form 1Arch_Cert_Vista 3B_Jun_25_Signed.pdf · uploaded 30 Jul 2025Source
  • Withdrawal Update Form 2Engg_Cert_Vista 3B_Jun_25_Signed.pdf · uploaded 30 Jul 2025Source
  • Withdrawal Update Form 1Arch_Cert_Vista 3B_Upload_Sep_25.pdf · uploaded 14 Nov 2025Source
  • Withdrawal Update Form 2Engg_Cert_Vista 3B_Upload_Sep_25.pdf · uploaded 14 Nov 2025Source
  • Form 5 (FY 2024-2025)Form 5_Upload_Vista 3B_FY24_25.pdf · uploaded 4 Jan 2026Source
  • Withdrawal Update Form 1Arch_Cert_Upload_Vista 3B_Dec_25.pdf · uploaded 24 Jan 2026Source
  • Withdrawal Update Form 2Engg_Cert_Vist 3B_Dec_25.pdf · uploaded 24 Jan 2026Source
  • Withdrawal Update Form 1Arch_Cert_Upload_Vista 3B_Mar_26.pdf · uploaded 5 May 2026Source
  • Withdrawal Update Form 2Engg_Cert_Upload_Vista 3B_Mar_26.pdf · uploaded 5 May 2026Source
  • Form 2A (FY 2025-2026)QA_Cert_Vista 3B_Mar_26.pdf · uploaded 11 Jun 2026Source
  • Withdrawal Update Form 1Arch_Cert_Upload_Vista 3B_Jun_26.pdf · uploaded 7 Aug 2026Source
  • Withdrawal Update Form 2Engg_Cert_Upload_Vista 3B_Jun_26.pdf · uploaded 7 Aug 2026Source

Promoter documents

  • Legal Title reportTitle Certificate - Vista 3 B.pdf · uploaded 31 Jul 2017Source
  • Declaration Form BDeclaration Form Vista 3B.pdf · uploaded 31 Jul 2017View

Technical documents

  • Layout ApprovalVista_3B.pdfSource
  • Building Plan ApprovalIOD Vista 3B.pdfSource

Other legal documents

  • Othervista 3b20170731170949.pdfView

Proforma allotment letter

  • Proforma allotment letterVista 3B20170729172726.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Land & approvalsLand parcel Kh No.97/1 Pt 97/2 Pt 97/3 pt 97/4 pt · Joint Director Town Planning/Collectors Office Nagpur

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Active
Address
Kh No.97/1 Pt 97/2 Pt 97/3 pt 97/4 pt, Kharsoli Road, MauzaPIN 440034
Village
Pipla, Nagpur (Rural) taluka
Land area for this project
3,558 sq m (38,298 sq ft)
Permissible built-up area
7,693 sq m (82,804 sq ft)
Sanctioned built-up area
7,693 sq m (82,804 sq ft)
Planning authority
Joint Director Town Planning/Collectors Office Nagpur
Designated bank account
Bank Of Baroda
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Survey, CTS, gat or plot numbers

Kh No.97/1 Pt 97/2 Pt 97/3 pt 97/4 pt

Land as published on MahaRERA's project page

Kh No.97/1 Pt 97/2 Pt 97/3 pt 97/4 pt

Boundaries

North
12 mt Wide Internal Road
South
Kh No 80 pt
East
Vista 3C
West
Proposed Vista 3A

Source: registration certificates and MahaRERA's project page, as stated there.

Units & parking36 parking spaces

0 units registered

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered06006
Open Space3000030

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress2 buildings and areas

Work completed, as the promoter reported it to MahaRERA (Form 1)

Vista 3B

  • Excavation100%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth57%
  • Stilt Floor0%
  • Slabs of Super Structure0%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Common areas and amenities

  • Internal Roads & FootpathsWIP62%
  • Water SupplyWIP35%
  • Sewerage (Chamber, Lines, Septic Tank , STP)WIP67%
  • Storm Water DrainsWIP67%
  • Landscaping & Tree PlantingWIP80%
  • Street LightingWIP10%
Show all 15 activitiesShow fewer activities
  • Community BuildingsWIP50%
  • Treatment And Disposal Of Sewage And Sullage WaterWIP100%
  • Solid Waste Management And DisposalWIP0%
  • Water conservation /Rain water harvestingWIP0%
  • Energy managemcntWIP0%
  • Fire protection and fire safety requirementsWIP0%
  • Electrical meter room, sub-station, receiving stationWIP37%
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingWIP0%

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Professionals4

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectStudio Eleven—
Chartered accountantJain Nirmal Kumar & Associates—
Chartered accountantNeha Joshi—
EngineerJeevan Ramkrishna Kute—

Source: MahaRERA project page. Contact details are not shown.

Other projects in Pipla

All 88 projects in Pipla · Compare Vista 3B with another project

Data through9 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project page · MahaRERA regulatory lists and ordersData through is when MahaRERA's project page was last read.Report a problemMethodology