Dwarka Euro

Deedo IDDP-KOL-HZHE

Completion was pushed back 4 months, to Jul 2027; no MahaRERA orders on record; 0% of its units are booked.

Uchgaon (Ct), Kolhapur 416005 · by Randive Builders And Developers · 0% of its projects kept the RERA date

DeliveryExtended 4 moPromised Mar 2027 · now due Jul 2027RegulatoryNo ordersNot in any MahaRERA list or order Deedo has readSales0% booked0 of 83 units · as the promoter reported to MahaRERA

Buying a flat here?

See every deed registered on it.

Completion was pushed back 4 months, to Jul 2027

  • This projectRegistered 8 Jul 2021, completion promised 31 Mar 2027, revised to 31 Jul 2027.

No extension certificate on record.

1 registration · Source: MahaRERA registration and extension certificates

Latest registered deeds

Sales first, then rentals and mortgages matched to this project · the free view shows a price band

No registered deeds matched to this project yet
Sales, resales, rentals and mortgages appear here once registered documents are matched to it by evidence.

The building

Open a building to see every flat, floor by floor.

Floors and units from the registration certificate annexures and MahaRERA's project page.

Regulatory recordNone found

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

RERA registrationP53000029821
RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P530000298218 Jul 202131 Mar 202731 Jul 2027Randive Builders and DevelopersProject page
Documents128

1 document held by Deedo, 127 filings listed on MahaRERA's project page

Registration certificate

Finance

  • PAN CardRandive- PAN Firm.pdf · uploaded 30 Jun 2021Source
  • OthersFORM-3 (9).pdf · uploaded 25 Jul 2025Source
  • OthersForm 5 (28).pdf · uploaded 25 Jul 2025Source

Legal

  • Legal Title reportLeagal Tittle Report.pdf · uploaded 30 Jun 2021Source
  • Declaration Form BForm B Randive Builders.pdf · uploaded 30 Jun 2021Source
  • Legal Title reportSearch Report.pdf · uploaded 3 Jul 2021Source
  • OtherSupplemrntary Development Agreement -compressed.pdf · uploaded 3 Aug 2021Source
Show all 128 documentsShow fewer documents

Legal

  • OtherForm B Eurotex.pdf · uploaded 22 Dec 2021Source
  • OtherBank Account for RERA.pdf · uploaded 26 Jul 2022Source

Migrated

  • 1 PAN CardRandive- PAN Firm.pdf · uploaded 30 Jun 2021Source
  • 1 Copy of the legal title reportLeagal Tittle Report.pdf · uploaded 30 Jun 2021Source
  • 1 Details of encumbrancesEncumbrances Certificate.pdf · uploaded 30 Jun 2021Source
  • 1 Copy of Layout Approval (in case of layout)Layout 1.pdf · uploaded 30 Jun 2021Source
  • 2 Copy of Layout Approval (in case of layout)Layout 2.pdf · uploaded 30 Jun 2021Source
  • 1 Building Plan Approval / NA Order for plotted developmentSanctioned Plan 1.pdf · uploaded 30 Jun 2021Source
  • 2 Building Plan Approval / NA Order for plotted developmentSanctioned Plan 2.pdf · uploaded 30 Jun 2021Source
  • 3 Building Plan Approval / NA Order for plotted developmentSanctioned Plan 3.pdf · uploaded 30 Jun 2021Source
  • 4 Building Plan Approval / NA Order for plotted developmentSanctioned Plan 4.pdf · uploaded 30 Jun 2021Source
  • 5 Building Plan Approval / NA Order for plotted developmentSanctioned Plan 5.pdf · uploaded 30 Jun 2021Source
  • 6 Building Plan Approval / NA Order for plotted developmentSanctioned Plan 6.pdf · uploaded 30 Jun 2021Source
  • 7 Building Plan Approval / NA Order for plotted developmentSanctioned Plan 7.pdf · uploaded 30 Jun 2021Source
  • 8 Building Plan Approval / NA Order for plotted developmentSanctioned Plan 8.pdf · uploaded 30 Jun 2021Source
  • 1 Commencement Certificates / NA Order for plotted developmentCommencement Certificate.pdf · uploaded 30 Jun 2021Source
  • 2 Commencement Certificates / NA Order for plotted developmentNA order.pdf · uploaded 30 Jun 2021Source
  • 3 Commencement Certificates / NA Order for plotted developmentULC Order.pdf · uploaded 30 Jun 2021Source
  • 1 Declaration about Commencement CertificateDeclaration About Commencement Certificate.pdf · uploaded 30 Jun 2021Source
  • 1 Declaration in FORM BForm B Randive Builders.pdf · uploaded 30 Jun 2021Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate.pdf · uploaded 30 Jun 2021Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate.pdf · uploaded 30 Jun 2021Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate.pdf · uploaded 30 Jun 2021Source
  • 1 Proforma of Allotment letterAgreement - Dwarka Euro.pdf · uploaded 30 Jun 2021Source
  • 2 Proforma of Allotment letterAllotment Letter.pdf · uploaded 30 Jun 2021Source
  • 2 Copy of the legal title reportSearch Report.pdf · uploaded 3 Jul 2021Source
  • 4 Commencement Certificates / NA Order for plotted development2018 Commencement Certificate.pdf · uploaded 3 Jul 2021Source
  • 1 OtherSupplemrntary Development Agreement -compressed.pdf · uploaded 3 Aug 2021Source
  • 3 Proforma of Allotment letterDWARKA EURO Flat No 107 salokhe-converted.pdf · uploaded 27 Oct 2021Source
  • 4 Proforma of Allotment letterEIEL-Flat Agreement -.pdf · uploaded 27 Oct 2021Source
  • 5 Proforma of Allotment letterLetter of intent - Eurotex.pdf · uploaded 27 Oct 2021Source
  • 2 OtherForm B Eurotex.pdf · uploaded 22 Dec 2021Source
  • 3 OtherBank Account for RERA.pdf · uploaded 26 Jul 2022Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)form 2 A 19-20.pdf · uploaded 4 Mar 2023Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)form 2a 20-21.pdf · uploaded 4 Mar 2023Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Form 2a 21-22.pdf · uploaded 4 Mar 2023Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1- 01-01-22.pdf · uploaded 7 Apr 2023Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 31-01-22.pdf · uploaded 7 Apr 2023Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 1-27-05-22.pdf · uploaded 7 Apr 2023Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)form 1 31-03-23.pdf · uploaded 13 Apr 2023Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form_3_Dwarka_Euro_11zon.pdf · uploaded 6 Jun 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)form 5 21-22_11zon.pdf · uploaded 6 Jun 2023Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)RERA Form 3.pdf · uploaded 24 Jul 2023Source
  • 2 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)RERA Form 5 21-22.pdf · uploaded 24 Jul 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)RERA Form 5 22-23.pdf · uploaded 24 Jul 2023Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)form 2 22-23.pdf · uploaded 4 Oct 2023Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)FORM 2A 22-23.pdf · uploaded 4 Oct 2023Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form_3_31032023 Dwarka Euro.pdf · uploaded 3 Feb 2024Source
  • 2 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)dwarka euro form 5 22-23.pdf · uploaded 22 Feb 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Scan form 2A 23-24.pdf · uploaded 3 Jul 2024Source
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)form-2 23-24.pdf · uploaded 20 Jul 2024Source
  • 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)RERA-Form-3 ( 23-24 )_compressed.pdf · uploaded 29 Jul 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)RERA Form-5 ( 23-24 ).pdf · uploaded 29 Jul 2024Source
  • 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form-3 (7)_compressed.pdf · uploaded 1 Aug 2024Source
  • 2 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form-5.pdf · uploaded 1 Aug 2024Source
  • 2 Disclosure of sold/ booked inventorysold unsold 31032020_compressed.pdf · uploaded 15 Nov 2024Source
  • 3 Disclosure of sold/ booked inventorysold unsold 31032021_compressed.pdf · uploaded 15 Nov 2024Source
  • 4 Disclosure of sold/ booked inventorysold unsold 31032022_compressed.pdf · uploaded 15 Nov 2024Source
  • 5 Disclosure of sold/ booked inventorysold unsold 31032023_compressed.pdf · uploaded 15 Nov 2024Source
  • 6 Disclosure of sold/ booked inventorysold unsold 31032024_compressed.pdf · uploaded 15 Nov 2024Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 31032024-compressed.pdf · uploaded 22 Feb 2025Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)form 3 31122024-compressed.pdf · uploaded 22 Feb 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)from 1 december 2024.pdf · uploaded 24 Feb 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)form 2 31122024(1)_compressed.pdf · uploaded 24 Feb 2025Source
  • 1 Disclosure of sold/ booked inventorysold unsold 31122024_11zon.pdf · uploaded 24 Feb 2025Source
  • Form 1form 1 31032025.pdf · uploaded 26 Jul 2025Source
  • Form 2form 2 31032025.pdf · uploaded 26 Jul 2025Source
  • Form 3form 3 31032025.pdf · uploaded 26 Jul 2025Source
  • Disclosure of Sold and Booked Inventorysold unsold 31032025.pdf · uploaded 26 Jul 2025Source
  • Withdrawal Update Form 1form 1 31-03-23.pdf · uploaded 3 Sep 2025Source
  • Withdrawal Update Form 1Form 1.pdf · uploaded 3 Sep 2025Source
  • Withdrawal Update Form 2form-2 23-24.pdf · uploaded 3 Sep 2025Source
  • Withdrawal Update Form 2Form 2.pdf · uploaded 3 Sep 2025Source
  • Withdrawal Update Form 3Form-3 (7)_compressed.pdf · uploaded 3 Sep 2025Source
  • Withdrawal Update Form 3Form 3.pdf · uploaded 3 Sep 2025Source
  • Withdrawal Update Form 1Form 1.pdf · uploaded 4 Sep 2025Source
  • Withdrawal Update Form 2Form 2.pdf · uploaded 4 Sep 2025Source
  • Withdrawal Update Form 3Form 3.pdf · uploaded 4 Sep 2025Source
  • Withdrawal Update Form 1Architect Certificate 15102025.pdf · uploaded 12 Feb 2026Source
  • Withdrawal Update Form 1Architect Certificate 15102025.pdf · uploaded 12 Feb 2026Source
  • Withdrawal Update Form 1Architect Certificate13012026.pdf · uploaded 12 Feb 2026Source
  • Withdrawal Update Form 1Architect Certificate13012026.pdf · uploaded 12 Feb 2026Source
  • Withdrawal Update Form 230092025.pdf · uploaded 12 Feb 2026Source
  • Withdrawal Update Form 230092025.pdf · uploaded 12 Feb 2026Source
  • Withdrawal Update Form 230092025.pdf · uploaded 12 Feb 2026Source
  • Withdrawal Update Form 231122025.pdf · uploaded 12 Feb 2026Source
  • Withdrawal Update Form 3ilovepdf_merged (1).pdf · uploaded 12 Feb 2026Source
  • Withdrawal Update Form 3ilovepdf_merged (1).pdf · uploaded 12 Feb 2026Source
  • Withdrawal Update Form 3ilovepdf_merged.pdf · uploaded 12 Feb 2026Source
  • Withdrawal Update Form 3ilovepdf_merged.pdf · uploaded 12 Feb 2026Source
  • Form 2A (FY 2025-2026)form 2A 31032026.pdf · uploaded 30 Apr 2026Source
  • Withdrawal Update Form 1form 1.pdf · uploaded 6 May 2026Source
  • Withdrawal Update Form 231122025.pdf · uploaded 6 May 2026Source
  • Withdrawal Update Form 3FORM 3_DWARAKA EURO_MAR2026.pdf · uploaded 6 May 2026Source
  • Withdrawal Update Form 1form 1.pdf · uploaded 20 Jul 2026Source
  • Withdrawal Update Form 2form 2.pdf · uploaded 20 Jul 2026Source
  • Withdrawal Update Form 3form 3.pdf · uploaded 20 Jul 2026Source

Technical

  • DocumentLayout 1.pdf · uploaded 30 Jun 2021Source
  • DocumentLayout 2.pdf · uploaded 30 Jun 2021Source
  • DocumentSanctioned Plan 1.pdf · uploaded 30 Jun 2021Source
  • DocumentSanctioned Plan 2.pdf · uploaded 30 Jun 2021Source
  • DocumentSanctioned Plan 3.pdf · uploaded 30 Jun 2021Source
  • DocumentSanctioned Plan 4.pdf · uploaded 30 Jun 2021Source
  • DocumentSanctioned Plan 5.pdf · uploaded 30 Jun 2021Source
  • DocumentSanctioned Plan 6.pdf · uploaded 30 Jun 2021Source
  • DocumentSanctioned Plan 7.pdf · uploaded 30 Jun 2021Source
  • DocumentSanctioned Plan 8.pdf · uploaded 30 Jun 2021Source
  • Documentscan0444_compressed.pdf · uploaded 28 Jul 2025Source
  • Documentscan0443_compressed.pdf · uploaded 28 Jul 2025Source
  • Documentscan0442_compressed.pdf · uploaded 28 Jul 2025Source
  • Documentscan0441_compressed.pdf · uploaded 28 Jul 2025Source
  • Documentsudharit pramanpatra.pdf · uploaded 28 Jul 2025Source
  • DocumentSanctioned Plan 1.pdf · uploaded 4 Sep 2025Source
  • DocumentSanctioned Plan 2.pdf · uploaded 4 Sep 2025Source
  • DocumentSanctioned Plan 3.pdf · uploaded 4 Sep 2025Source
  • DocumentSanctioned Plan 4.pdf · uploaded 4 Sep 2025Source

Technical (Architect)

  • Documentfrom 1 december 2024.pdf · uploaded 24 Feb 2025Source
  • Documentform 1.pdf · uploaded 20 Jul 2026Source

Technical (Engineer)

  • Documentform 2 31122024(1)_compressed.pdf · uploaded 24 Feb 2025Source
  • Documentform 2.pdf · uploaded 20 Jul 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Land & approvalsLand parcel R.S.No. 363 2 A old R.S.No. 363 2 A, R.S.No.364 2

As registered with MahaRERA and published on its project page

Project type
Others
Status on MahaRERA
Certificate Signed
Unit types
1BHK, 2BHK, Godown, Office space, Shop83 units in all
Address
R.S.No. 363 2 A old R.S.No. 363 2 A, R.S.No.364 2 and R.S.No.365 B 1, Kolhapur Hupari road, UchgaonPIN 416005
Village
Uchgaon (CT), Karvir taluka
Land area for this project
3,810 sq m (41,010 sq ft)
Permissible built-up area
5,376 sq m (57,865 sq ft)
Sanctioned built-up area
5,376 sq m (57,865 sq ft)
Designated bank account
82
Developed in phases
No

Survey, CTS, gat or plot numbers

R.S.No. 363 2 A old R.S.No. 363 2 AR.S.No.364 2R.S.No.365 B 1

Land as published on MahaRERA's project page

R.S.No. 363 2 A old R.S.No. 363 2 A, R.S.No.364 2 and R.S.No.365 B 1

Boundaries

North
Property of Ghatage Patil Industries ltd
South
Kolhapur Hupari road
East
R S No 363 2B
West
R S No 364 2

Source: registration certificates and MahaRERA's project page, as stated there.

Units & parking83 units

0 of 83 units booked (0%), as the promoter reported to MahaRERA

1BHK · 46 units2BHK · 24 unitsGodown · 1 unitOffice space · 2 unitsShop · 10 units
TypeCarpet areaUnitsBooked
1BHK37.14 sq m · 400 sq ft120
1BHK37.27 sq m · 401 sq ft160
1BHK40.36 sq m · 434 sq ft60
1BHK40.43 sq m · 435 sq ft40
1BHK40.66 sq m · 438 sq ft20
1BHK47.47 sq m · 511 sq ft50
1BHK47.61 sq m · 512 sq ft10
2BHK54.08 sq m · 582 sq ft80
Show all 20 unit rowsShow fewer unit rows
TypeCarpet areaUnitsBooked
2BHK54.24 sq m · 584 sq ft60
2BHK55.11 sq m · 593 sq ft70
2BHK62.01 sq m · 667 sq ft10
2BHK64.14 sq m · 690 sq ft20
Godown411.45 sq m · 4,429 sq ft10
Office space185.13 sq m · 1,993 sq ft10
Office space199.41 sq m · 2,146 sq ft10
Shop27.87 sq m · 300 sq ft20
Shop31.83 sq m · 343 sq ft10
Shop35.84 sq m · 386 sq ft20
Shop43.6 sq m · 469 sq ft40
Shop46.44 sq m · 500 sq ft10

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Professionals3

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectGAP Architects and Interior Designers—
Chartered accountantShankar Patil and Associates—
EngineerAnu Abaji Construction and Swara Consultancy through Ashutosh Powar—

Source: MahaRERA project page. Contact details are not shown.

Other projects in Uchgaon (Ct)

All 7 projects in Uchgaon (Ct) · Compare Dwarka Euro with another project

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Report a problemMethodology