Main building, Bhalchandra Regency

Deedo IDDP-DHU-302F-BR

1 flat has a sale on record, 4 are booked without a sale deed yet and 14 are unsold, per MahaRERA's Oct 2026 disclosure and the registered deeds.

Median saleNot on recordneeds 3 or more sales
Booked16%5 of 32 · Oct 2026
Completion31 Dec 2028as registered

Every flat, floor by floor

Tap a flat to see its record.

  • Sale registered
  • Booked, no deed yet
  • Unsold
  • Reserved, rehab or other
Fl 7
Fl 6
Fl 5
Fl 4
Fl 3
Fl 2
Fl 1
Fl G

Sale status from MahaRERA's Oct 2026 disclosure; deeds from IGR Index II, placed on a flat only when the deed names this tower and flat. “Listed by developer” comes from the developer and is labelled as such.

SelectedOther

Flat 32

2 BHK · 585 sq ft · floor 4

Deeds
0
Last activity
None on record
Last sale
None registered
Units & parking in Main building

MahaRERA's project page with unit types hasn't been imported for this registration.

Parking: Closed/Covered 0 · Open Space 90 (as declared to MahaRERA)

Construction progress (declared)

Work completed, as the promoter reported it to MahaRERA (Form 1). Not verified on site.

  • Excavation100%
  • Basement (if any)70%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor88%
  • Slabs of Super Structure75%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks55%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.10%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.10%
As registered with MahaRERA
RERA registration
P49800080433 · registered 4 Jun 2025
Promised completion
31 Dec 2028
Sanctioned habitable floors
7
Also named
Bhalchandra Regency
Deedo ID
DP-DHU-302F-BR
Questions about Main building

How many flats in Main building are sold?

1 flat has a sale on record, 4 are booked without a sale deed yet and 14 are unsold, per MahaRERA's Oct 2026 disclosure and the registered deeds.

When is Main building due for completion?

The MahaRERA registration promises 31 Dec 2028.

How many floors does Main building have?

7 sanctioned habitable floors, as registered with MahaRERA.

Data through9 Oct 2026SourcesMahaRERA registration and project page · IGR Maharashtra Index IIFloors and units are as registered; a promoter can revise them in later filings. Party names appear only inside an unlocked Index II.Report a problemMethodology