Not yet due6 floorsRERA P49800079214
Main building, Samata Tower
Deedo IDDP-DHU-6SXQ-SAMATAMahaRERA has not published a flat-by-flat record for this tower, and no registered deed names it yet.
Median saleNot on recordneeds 3 or more sales
Completion30 Aug 2027as registered
Units & parking in Main building
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| 3BHK | 67 m² (721 sq.ft) | 1 | Not on record |
| 3BHK | 67.1 m² (722 sq.ft) | 1 | Not on record |
| 3BHK | 73.7 m² (794 sq.ft) | 1 | Not on record |
| 3BHK | 73.8 m² (794 sq.ft) | 1 | Not on record |
| 3BHK | 95.5 m² (1,028 sq.ft) | 2 | Not on record |
| 3BHK | 96.8 m² (1,042 sq.ft) | 6 | Not on record |
| Office space | 35.7 m² (384 sq.ft) | 2 | Not on record |
| Office space | 35.7 m² (384 sq.ft) | 2 | Not on record |
| Office space | 44.3 m² (477 sq.ft) | 4 | Not on record |
| Office space | 52.6 m² (566 sq.ft) | 2 | Not on record |
| Office space | 63.4 m² (683 sq.ft) | 2 | Not on record |
| Office space | 63.6 m² (685 sq.ft) | 2 | Not on record |
| Shop | 17.9 m² (192 sq.ft) | 4 | Not on record |
| Shop | 20.5 m² (221 sq.ft) | 1 | Not on record |
| Shop | 20.9 m² (225 sq.ft) | 4 | Not on record |
| Shop | 21.8 m² (235 sq.ft) | 2 | Not on record |
| Shop | 24.1 m² (259 sq.ft) | 2 | Not on record |
| Shop | 24.1 m² (260 sq.ft) | 2 | Not on record |
| Shop | 24.9 m² (268 sq.ft) | 1 | Not on record |
| Shop | 26.3 m² (283 sq.ft) | 2 | Not on record |
| Shop | 26.4 m² (284 sq.ft) | 2 | Not on record |
| Shop | 26.7 m² (287 sq.ft) | 2 | Not on record |
| Shop | 27.7 m² (299 sq.ft) | 1 | Not on record |
| Shop | 29.9 m² (322 sq.ft) | 1 | Not on record |
| Shop | 30.3 m² (326 sq.ft) | 1 | Not on record |
| Shop | 30.7 m² (330 sq.ft) | 1 | Not on record |
| Shop | 33.2 m² (358 sq.ft) | 1 | Not on record |
| Shop | 33.6 m² (361 sq.ft) | 1 | Not on record |
Parking: Closed/Covered 126 · Open Space 0 (as declared to MahaRERA)
Construction progress (declared)
Work completed, as the promoter reported it to MahaRERA (Form 1). Not verified on site.
- Excavation100%
- Basement (if any)0%
- Podiums (if any)0%
- Plinth0%
- Stilt Floor0%
- Slabs of Super Structure0%
- Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
- Sanitary Fittings within the flats / premises0%
- Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
- External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
- Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
As registered with MahaRERA
- Sanctioned habitable floors
- 6
- Also named
- Samata Tower
- Deedo ID
- DP-DHU-6SXQ-SAMATA
Questions about Main building
When is Main building due for completion?
The MahaRERA registration promises 30 Aug 2027.
How many floors does Main building have?
6 sanctioned habitable floors, as registered with MahaRERA.
Data through9 Oct 2026SourcesMahaRERA registration and project page · IGR Maharashtra Index IIFloors and units are as registered; a promoter can revise them in later filings. Party names appear only inside an unlocked Index II.Report a problemMethodology