Shriniwasa 63 Complex

Completed

Amravati (M Corp.), Amravati 444601 |Promoter: Shriniwasa Construction

4 Sep 2017Registered with MahaRERA
12 Apr 2023Promised completion
1Building
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Commercial
Status on MahaRERA
Completed
Buildings
1
Unit types
00 units in all
Land area for this project
1,524 sq m (16,407 sq ft)
Permissible built-up area
3,621 sq m (38,976 sq ft)
Sanctioned built-up area
3,621 sq m (38,976 sq ft)
Address
Nazul sheet no.67-c, plot no.-63, 49, 50, 59, 60, 62, 47PIN 444601
Designated bank account
Yes Bank
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 20.92720, 77.75318
Shriniwasa 63 Complex is at latitude 20.92720, longitude 77.75318.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 12 Apr 2023

The latest completion date on record passed 3 years and 6 months ago.

Registered
4 Sep 2017
Promised
12 Apr 2023

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P503000125884 Sep 201712 Apr 2023—Shriniwasa ConstructionProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Shriniwasa 63 Complex420

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

0 units registered

0 · 0 units
TypeCarpet areaUnits
00 sq m · 0 sq ft0

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered000033
Open Space00001

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Shriniwasa 63 Complex

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure100%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water Supplywork done100%
  • Sewerage (Chamber, Lines, Septic Tank , STP)work done100%
  • Storm Water Drainswork done100%
  • Landscaping & Tree PlantingNot applicable
  • Street LightingNot applicable
Show all 15 activitiesShow fewer activities
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And Disposaldone100%
  • Water conservation /Rain water harvestingdone100%
  • Energy managemcntdone100%
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationyes100%
  • Aggregate area of recreational Open Spaceseparate dp has been takenNot applicable
  • Open Parking100%

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

11 documents held by Deedo, 14 filings listed on MahaRERA's project page

Form B

Title report

Encumbrance details

Form 1

Form 2

Form 4

Registration certificate

Other

Show all 25 documentsShow fewer documents

Layout plan

Building plan

Allotment letter

Document library

  • Declaration in FORM BNew Doc 2017-07-31 (2) (1).pdf · uploaded 30 Jul 2017View
  • Building Plan Approval (IOD)New Doc 2017-07-31 (3).pdf · uploaded 30 Jul 2017View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)form 1 architecture.pdf · uploaded 12 Aug 2017View
  • Certificates of Architect (Form 4)orm 4 architecture.pdf · uploaded 12 Aug 2017View
  • Copy of the legal title reportNew Doc 2017-07-31 (1) (1).pdf · uploaded 12 Aug 2017View
  • Details of encumbrancesNew Doc 2017-08-12.pdf · uploaded 12 Aug 2017View
  • Proforma of Allotment letterallotment letter.pdf · uploaded 12 Aug 2017View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)engineer belankar.pdf · uploaded 12 Aug 2017View
  • Copy of Layout Approval (in case of layout)New Doc 2017-07-30 (1) (1).pdf · uploaded 16 Aug 2017View

Promoter documents

  • Declaration Form BNew Doc 2017-07-31 (2) (1).pdf · uploaded 30 Jul 2017View
  • Legal Title reportNew Doc 2017-07-31 (1) (1).pdf · uploaded 12 Aug 2017View

Technical documents

  • Building Plan ApprovalNew Doc 2017-07-31 (3).pdfView
  • Layout ApprovalNew Doc 2017-07-30 (1) (1).pdfView

Proforma allotment letter

  • Proforma allotment letterallotment letter.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Amravati (M Corp.), Amravati taluka

Survey, CTS, gat or plot numbers

474950596062Nazul sheet no.67cplot no. 63

As published on MahaRERA's project page

Nazul sheet no.67-c,plot no.-63,49,50,59,60,62,47

Boundaries

North
road
South
road
East
road
West
service line

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
Architectravindra belankar—

Source: MahaRERA project page. Contact details are not shown.