Skip to content
Deedo home
Menu

Mauli Complex

Lapsed

Amravati (M Corp.), Amravati 444604 |Promoter: Mauli Associates

25 Mar 2021Registered with MahaRERA
15 Feb 2026Promised completion
3Buildings
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Others
Status on MahaRERA
Lapsed
Buildings
3
Land area for this project
1,394 sq m (15,005 sq ft)
Permissible built-up area
6,013 sq m (64,722 sq ft)
Sanctioned built-up area
6,013 sq m (64,722 sq ft)
Address
4/5/6, Walgaon Road, Parekh LayoutPIN 444604
Designated bank account
Icici Bank Limited
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 0.00000, 0.00000
Mauli Complex is at latitude 0.00000, longitude 0.00000.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 15 Feb 2026

The latest completion date on record passed 8 months ago.

Registered
25 Mar 2021
Promised
15 Feb 2026

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5030002862825 Mar 202115 Feb 2026—Mauli AssociatesProject page

3 buildings

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Building (P50300028628)——
Mauli Complex10—
Siath——

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

0 units registered

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered000024
Open Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Mauli Complex

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure55%
Show all 11 activitiesShow fewer activities
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises55%
  • Sanitary Fittings within the flats / premises60%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks60%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.60%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.60%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water SupplyBOARWELL100%
  • Sewerage (Chamber, Lines, Septic Tank , STP)SEPTIC TANK100%
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingTREE PLANTING50%
  • Street LightingNot applicable
Show all 15 activitiesShow fewer activities
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingRAIN WATER HARVESTING100%
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsFIRE PROTECTION0%
  • Electrical meter room, sub-station, receiving stationELECTRIC METER ROOM100%
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

81 documents held by Deedo, 109 filings listed on MahaRERA's project page

Title report

Encumbrance details (4)

Form B

Allotment letter (2)

Show all 190 documentsShow fewer documents

Form 2A (10)

Other (27)

Commencement certificate

Form 2 (14)

Form 5 (6)

Registration certificate

Form 1 (9)

Occupancy / completion certificate

  • Occupancy / completion certificate12 Apr 2023ViewSource

Layout plan (2)

Building plan (2)

Document library

  • Copy of the legal title reportlegal title.pdf · uploaded 12 Mar 2021View
  • Details of encumbrancesencumbrance certi.pdf · uploaded 12 Mar 2021View
  • Copy of Layout Approval (in case of layout)AMALGAMATION.pdf · uploaded 12 Mar 2021View
  • Building Plan Approval / NA Order for plotted developmentsanction map 1.pdf · uploaded 12 Mar 2021View
  • Building Plan Approval / NA Order for plotted developmentsanction map 2.pdf · uploaded 12 Mar 2021View
  • Commencement Certificates / NA Order for plotted developmentmaulipermit1_compressed.pdf · uploaded 12 Mar 2021View
  • Declaration in FORM Bnotary.pdf · uploaded 12 Mar 2021View
  • Proforma of Allotment letterallotment.pdf · uploaded 12 Mar 2021View
  • Proforma of Allotment letterAGREEMENT TO SALE1.pdf · uploaded 12 Mar 2021View
  • Copy of Layout Approval (in case of layout)LAYOUT COPY.pdf · uploaded 19 Mar 2021View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)maulicomplex.pdf · uploaded 25 Jul 2021View
  • Status of Formation of Legal Entity (Society/Co Op etc.)DOD.pdf · uploaded 25 Jul 2021View
  • Declaration about Commencement Certificatemaulipermit1_compressed.pdf · uploaded 12 Aug 2021View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)engi cer mc.pdf · uploaded 12 Aug 2021View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)mauli complex.pdf · uploaded 12 Aug 2021View
  • Disclosure of sold/ booked inventorymcsoldunsoldinve-90.pdf · uploaded 13 Aug 2021View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)nil letter head.pdf · uploaded 13 Aug 2021View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)nil letter head.pdf · uploaded 13 Aug 2021View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)nil letter head.pdf · uploaded 13 Aug 2021View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)nil letter head.pdf · uploaded 13 Aug 2021View
  • Status of Conveyancemcsoldunsoldinve-90.pdf · uploaded 13 Aug 2021View
  • Details of Restarting of Construction work post lockdownnil letter head.pdf · uploaded 13 Aug 2021View
  • Othernil letter head.pdf · uploaded 13 Aug 2021View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)mauli complex.pdf · uploaded 14 Aug 2021View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)mc (CA 5).pdf · uploaded 14 Aug 2021View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)maulicomplex.pdf · uploaded 14 Aug 2021View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)mauli complex.pdf · uploaded 14 Aug 2021View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)gp engi.pdf · uploaded 24 Nov 2021View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)mc.pdf · uploaded 24 Nov 2021View
  • Disclosure of sold/ booked inventoryMC-compressed.pdf · uploaded 24 Nov 2021View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)MC.pdf · uploaded 24 Nov 2021View
  • Disclosure of sold/ booked inventorySold mc 1.pdf · uploaded 26 Jan 2022View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Mc engi.pdf · uploaded 28 Jan 2022View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)2 MC Quality assurance.pdf · uploaded 4 May 2022View
  • Disclosure of sold/ booked inventoryMC sold unsold.pdf · uploaded 4 May 2022View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer c MC.pdf · uploaded 4 May 2022View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)archi certi mc.pdf · uploaded 23 Jun 2022View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)engineer certifi mc.pdf · uploaded 23 Jun 2022View
  • Disclosure of sold/ booked inventorymc sold.pdf · uploaded 22 Sep 2022View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)mc architect.pdf · uploaded 22 Sep 2022View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)mc engineer certi.pdf · uploaded 22 Sep 2022View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)quality assurance mc.pdf · uploaded 10 Jan 2023View
  • Disclosure of sold/ booked inventorysold unsold mc.pdf · uploaded 10 Jan 2023View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)engi certi mc.pdf · uploaded 10 Jan 2023View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Archi certi mc.pdf · uploaded 10 Jan 2023View
  • a Details of encumbrances concerned to Financenoe mc.pdf · uploaded 13 Jan 2023View
  • b Details of encumbrances concerned to Legalnoe mc.pdf · uploaded 13 Jan 2023View
  • Disclosure of Interest in Other Real Estate Organizationsna mc.pdf · uploaded 13 Jan 2023View
  • Proforma of Agreement for saleAGREEMENTTOSALE.pdf · uploaded 13 Jan 2023View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)ca5 mc.pdf · uploaded 13 Jan 2023View
  • Foreclosure of the Projectna mc.pdf · uploaded 13 Jan 2023View
  • Other – Financena mc.pdf · uploaded 13 Jan 2023View
  • Other – Technicalna mc.pdf · uploaded 13 Jan 2023View
  • Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameformat a mauli.pdf · uploaded 13 Jan 2023View
  • Deviation Report with respect to Allotment letterna mc.pdf · uploaded 13 Jan 2023View
  • Deviation Report with respect to model copy of Agreementna mc.pdf · uploaded 13 Jan 2023View
  • CERSAI detailsna mc.pdf · uploaded 13 Jan 2023View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)ca mauli asso.pdf · uploaded 17 Jan 2023View
  • Status of Conveyancesold unsold mc.pdf · uploaded 12 Apr 2023View
  • Status of Conveyancesold unsold new mc.pdf · uploaded 12 Apr 2023View
  • Disclosure of sold/ booked inventorysold unsold new mc.pdf · uploaded 12 Apr 2023View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)form 2a quality assurance mc.pdf · uploaded 12 Apr 2023View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)form 2 engi certi mc.pdf · uploaded 12 Apr 2023View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)form 1 archi certi mc.pdf · uploaded 12 Apr 2023View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentmauli complex oc.pdf · uploaded 12 Apr 2023View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCHcert1 MAULI COMPLEX.pdf · uploaded 5 Jul 2023View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)ERCert2 MAULI COMPLEX.pdf · uploaded 5 Jul 2023View
  • Disclosure of sold/ booked inventorySold-unsold inventory MAULI COMPLEX.pdf · uploaded 5 Jul 2023View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)GetUserDocumentFileContent (4).pdf · uploaded 19 Jul 2023View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)GetUserDocumentFileContent (4).pdf · uploaded 19 Jul 2023View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)architect mc 3oct.pdf · uploaded 9 Oct 2023View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)engineer mc 1.pdf · uploaded 9 Oct 2023View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)quality assurance mc 3oct.pdf · uploaded 9 Oct 2023View
  • Disclosure of sold/ booked inventorysold unsold mc 6 oct_11zon.pdf · uploaded 9 Oct 2023View
  • Home Buyer /Allottee Grievance Redressal Cellgrievance mc.pdf · uploaded 9 Oct 2023View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)ca5 mc new_11zon.pdf · uploaded 20 Oct 2023View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate MC.pdf · uploaded 15 Jan 2024View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate MC.pdf · uploaded 15 Jan 2024View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Engineer Certificate for Quality Assurance MC.pdf · uploaded 15 Jan 2024View
  • Disclosure of sold/ booked inventoryInformation of sold inventory MC.pdf · uploaded 15 Jan 2024View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)ARC.pdf · uploaded 18 Apr 2024View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate MC.pdf · uploaded 18 Apr 2024View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Quality Assurance MC.pdf · uploaded 18 Apr 2024View
  • Disclosure of sold/ booked inventorySold Inventory MC.pdf · uploaded 18 Apr 2024View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate MC.pdf · uploaded 17 Jul 2024View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate MC.pdf · uploaded 17 Jul 2024View
  • Disclosure of sold/ booked inventorySold Inventory MC.pdf · uploaded 17 Jul 2024View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate MC qtr 2.pdf · uploaded 15 Oct 2024View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate MC qtr 2.pdf · uploaded 15 Oct 2024View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Quality Assurance MC qtr 2.pdf · uploaded 15 Oct 2024View
  • Disclosure of sold/ booked inventorysold Inventory MC qtr 2.pdf · uploaded 15 Oct 2024View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)QAFY23-24.pdf · uploaded 15 Oct 2024View
  • Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Quality Assurance MC qtr 2.pdf · uploaded 15 Oct 2024View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)MC form 5.pdf · uploaded 19 Dec 2024View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate MC III.pdf · uploaded 4 Jan 2025View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)engineer certificate MC III.pdf · uploaded 4 Jan 2025View
  • Disclosure of sold/ booked inventorysold Inventory MC III.pdf · uploaded 4 Jan 2025View
  • Engineer’s Certificate on Cost Incurred on Project (Form 2)EC MC.pdf · uploaded 24 Jul 2025View
  • Disclosure of sold/ booked inventorysold Inventory MC.pdf · uploaded 24 Jul 2025View
  • Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate MC.pdf · uploaded 24 Jul 2025View

Promoter documents

  • Legal Title reportlegal title.pdf · uploaded 12 Mar 2021View
  • Declaration Form Bnotary.pdf · uploaded 12 Mar 2021View

Technical documents

  • Layout ApprovalAMALGAMATION.pdfView
  • Building Plan Approvalsanction map 1.pdfView
  • Building Plan Approvalsanction map 2.pdfView
  • Layout ApprovalLAYOUT COPY.pdfView

Other legal documents

  • Othernil letter head.pdfView

Financial documents

  • Other – Financena mc.pdf · uploaded 13 Jan 2023View

Proforma allotment letter

  • Proforma allotment letterallotment.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Amravati (M Corp.), Amravati taluka

Survey, CTS, gat or plot numbers

4/5/6

As published on MahaRERA's project page

4/5/6

Boundaries

North
Road
South
Service Lane
East
Plot No 7
West
Plot No 3

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectShraddha Sagane—
Chartered accountantTapesh Mundada—
EngineerAnkita Haridasji Bhombe—
EngineerMayuri Devidas Asole—
EngineerPratiksha Gurjar—

Source: MahaRERA project page. Contact details are not shown.

Data through9 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology