Madhulata Residency

Completed

Digras, Yavatmal 445203 |Promoter: Manish Madhusudan Agrawal

Residential / Group HousingRERAP51000011182
31 Aug 2017Registered with MahaRERA
30 Jun 2023Promised completion
4Buildings
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Completed
Buildings
4
Land area for this project
3,515 sq m (37,840 sq ft)
Permissible built-up area
5,273 sq m (56,760 sq ft)
Sanctioned built-up area
5,273 sq m (56,760 sq ft)
Address
SHEET NO 5C, PLOT NO 10/3 C, Main road, Near old bus standPIN 445203
Designated bank account
Bank Of Maharashtra
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 21.14553, 79.19259
Madhulata Residency is at latitude 21.14553, longitude 79.19259.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 30 Jun 2023

The latest completion date on record passed 3 years and 4 months ago.

Registered
31 Aug 2017
Promised
30 Jun 2023

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5100001118231 Aug 201730 Jun 2023—Manish Madhusudan AgrawalProject page

4 buildings

Buildings and wings named in the registration

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

0 units registered

Parking

BuildingTypeTwo-wheelerFour-wheelerBusVisitorTotal
Shree Krushna AppartmentClosed/Covered00000
Shree Krushna AppartmentOpen Space00000
Shree Rani Sati AppartmentClosed/Covered00000
Shree Rani Sati AppartmentOpen Space00000
Shree Sai AppartmentClosed/Covered00000
Shree Sai AppartmentOpen Space00000
Shree Salasar AppartmentClosed/Covered00000
Shree Salasar AppartmentOpen Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Shree Krushna Appartment

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.75%

Shree Rani Sati Appartment

  • Excavation0%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth0%
  • Stilt Floor0%
  • Slabs of Super Structure0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Shree Sai Appartment

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor0%
  • Slabs of Super Structure30%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Shree Salasar Appartment

  • Excavation0%
  • Basement (if any)0%
  • Podiums (if any)0%
  • Plinth0%
  • Stilt Floor0%
  • Slabs of Super Structure0%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
  • Sanitary Fittings within the flats / premises0%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Common areas and amenities

  • Internal Roads & FootpathsWILL BE DONE AS PER SANCTION20%
  • Water SupplyWILL BE DONE AS PER SANCTION50%
  • Sewerage (Chamber, Lines, Septic Tank , STP)WILL BE DONE AS PER SANCTION40%
  • Storm Water DrainsNot applicable
  • Landscaping & Tree PlantingNot applicable
  • Street LightingWILL BE DONE AS PER SANCTION75%
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterWILL BE DONE AS PER SANCTION20%
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingNot applicable
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsNot applicable
  • Electrical meter room, sub-station, receiving stationPANNEL BOARD PROVIDED40%
  • Aggregate area of recreational Open SpaceNot applicable
  • Open ParkingNot applicable

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

11 documents held by Deedo, 18 filings listed on MahaRERA's project page

Title

Form 1

Form 2

Registration certificate

Completions

Form 4

Other

Form b

Layout plan

Document library

  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)ilovepdf_jpg_to_pdf (6)-ilovepdf-compressed.pdf · uploaded 16 Aug 2017View
  • Copy of the legal title reportilovepdf_jpg_to_pdf (12)-ilovepdf-compressed (1).pdf · uploaded 16 Aug 2017View
  • Copy of Layout Approval (in case of layout)SACNTION MAP-ilovepdf-compressed.pdf · uploaded 16 Aug 2017View
  • Details of encumbrancesB MMA-ilovepdf-compressed.pdf · uploaded 16 Aug 2017View
  • Proforma of Allotment letterB MMA-ilovepdf-compressed.pdf · uploaded 16 Aug 2017View
  • Declaration in FORM BB MMA-ilovepdf-compressed.pdf · uploaded 16 Aug 2017View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)archi certificate-ilovepdf-compressed (1).pdf · uploaded 16 Aug 2017View
  • Building Plan Approval (IOD)SACNTION MAP-ilovepdf-compressed.pdf · uploaded 16 Aug 2017View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentNP COMPLETION CERTIFICATE.pdf · uploaded 5 Feb 2023View
  • Architect’s Certificate on Completion of Project (Form 4)Form 4.pdf · uploaded 12 Apr 2023View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentCompletion certificate tower 1.pdf · uploaded 12 Apr 2023View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentCompletion certificate tower 2.pdf · uploaded 12 Apr 2023View
  • Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentCompletion certificate tower 2.pdf · uploaded 12 Apr 2023View

Promoter documents

  • Legal Title reportilovepdf_jpg_to_pdf (12)-ilovepdf-compressed (1).pdf · uploaded 16 Aug 2017View
  • Declaration Form BB MMA-ilovepdf-compressed.pdf · uploaded 16 Aug 2017View

Technical documents

  • Layout ApprovalSACNTION MAP-ilovepdf-compressed.pdfView
  • Building Plan ApprovalSACNTION MAP-ilovepdf-compressed.pdfView

Proforma allotment letter

  • Proforma allotment letterB MMA-ilovepdf-compressed.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Digras, Digras taluka

Survey, CTS, gat or plot numbers

PLOT NO 10/3 CSHEET NO 5C

As published on MahaRERA's project page

SHEET NO 5C , PLOT NO 10/3 C

Boundaries

North
Land Of Manish Agrawal
South
Barabhai Mohalla
East
Shivaji Nagar
West
Jhunjhunwala

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectAshish Duddalwar—
OtherPrakash Nayar—

Source: MahaRERA project page. Contact details are not shown.

Data through10 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology