Shankheshwar Pristine
Deedo IDDP-THN-31MNIt is due for completion in Dec 2028, with no extension on record; no MahaRERA orders on record; 0% of its units are booked.
Wadeghar, Thane 421301 · by Shankheshwar Kreaters · 60% of its projects kept the RERA date
Buying a flat here?
See every deed registered on it.
It is due for completion in Dec 2028, with no extension on record
- This projectRegistered 23 Apr 2024, completion promised 31 Dec 2028.
No extension certificate on record.
1 registration · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales, rentals and mortgages matched to this project · the free view shows a price band
The building
Open a building to see every flat, floor by floor.
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrationP51700055853
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P51700055853 | 23 Apr 2024 | 31 Dec 2028 | 31 Dec 2028 | Shankheshwar Kreaters | Project page |
Documents118
1 document held by Deedo, 117 filings listed on MahaRERA's project page
Finance
- PAN CardCOMPANY KREATERS PANCARD COPY.pdf · uploaded 13 Mar 2024Source
Legal
- Declaration Form BFORM B DSM.pdf · uploaded 13 Mar 2024Source
- Declaration Form BFORM B LAND OWNERS.pdf · uploaded 13 Mar 2024Source
- Other – LegalRelease deed-Pristine (2).pdf · uploaded 5 Apr 2024Source
- Other – LegalPartnership Deed.pdf · uploaded 5 Apr 2024Source
- Other – LegalDeed of Declaration.pdf · uploaded 5 Apr 2024Source
- Legal Title reportFinal Legal Title Certificate -Pristine.pdf · uploaded 5 Apr 2024Source
Show all 118 documentsShow fewer documents
Legal
- OthersPRISTINE RERA AGREEMENT FOR SALE final-after revised.pdf · uploaded 2 Sep 2025Source
Migrated
- 1 PAN CardCOMPANY KREATERS PANCARD COPY.pdf · uploaded 13 Mar 2024Source
- 1 a Details of encumbrances concerned to FinanceNO ENCUMBRANCE LEGAL.pdf · uploaded 13 Mar 2024Source
- 1 b Details of encumbrances concerned to LegalNO ENCUMBRANCE LEGAL.pdf · uploaded 13 Mar 2024Source
- 1 Copy of Layout Approval (in case of layout)Layout Plan 090523.pdf · uploaded 13 Mar 2024Source
- 1 Building Plan Approval / NA Order for plotted developmentGround floor and Basement Plan 090523.pdf · uploaded 13 Mar 2024Source
- 2 Building Plan Approval / NA Order for plotted developmentTypical floor plan 090523.pdf · uploaded 13 Mar 2024Source
- 1 Commencement Certificates / NA Order for plotted developmentCC VADEGHAR.pdf · uploaded 13 Mar 2024Source
- 1 Declaration about Commencement CertificateFORMAT D DECLARATION ABOUT CC.pdf · uploaded 13 Mar 2024Source
- 1 Declaration in FORM BFORM B DSM.pdf · uploaded 13 Mar 2024Source
- 2 Declaration in FORM BFORM B LAND OWNERS.pdf · uploaded 13 Mar 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCHITECT CERTIFICATE.pdf · uploaded 13 Mar 2024Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 ENGINEER CERTIFICATE.pdf · uploaded 13 Mar 2024Source
- 1 CERSAI detailsDECLARATION FOR CERSAI.pdf · uploaded 13 Mar 2024Source
- 1 Proforma of Agreement for salePRISTINE RERA AGREEMENT FOR SALE final.pdf · uploaded 13 Mar 2024Source
- 1 Proforma of Allotment letterPristine allotment letter.pdf · uploaded 13 Mar 2024Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFORMAT A SEPARATE BANK ACC.pdf · uploaded 13 Mar 2024Source
- 1 Deviation Report with respect to Allotment letterDEVIATION ALLOTMENT LETTER.pdf · uploaded 13 Mar 2024Source
- 1 Copy of the legal title reportFinal Legal Title Certificate -Pristine.pdf · uploaded 5 Apr 2024Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 CA CERTIFICATE.pdf · uploaded 5 Apr 2024Source
- 1 Deviation Report with respect to model copy of AgreementDEVIATION FROM AFS COVERING LETTER.pdf · uploaded 5 Apr 2024Source
- 1 Other – LegalRelease deed-Pristine (2).pdf · uploaded 5 Apr 2024Source
- 2 Other – LegalPartnership Deed.pdf · uploaded 5 Apr 2024Source
- 3 Other – LegalDeed of Declaration.pdf · uploaded 5 Apr 2024Source
- 2 a Details of encumbrances concerned to FinanceNO Encumbrance Finance-Pristine.pdf · uploaded 8 Apr 2024Source
- 2 b Details of encumbrances concerned to LegalNO Encumbrance Finance-Pristine.pdf · uploaded 8 Apr 2024Source
- 1 Disclosure of Interest in Other Real Estate OrganizationsDSM ANNEXURE A.pdf · uploaded 8 Apr 2024Source
- 2 Disclosure of Interest in Other Real Estate OrganizationsSSM ANNEXURE A.pdf · uploaded 8 Apr 2024Source
- 3 Disclosure of Interest in Other Real Estate OrganizationsJDM ANNEXURE A.pdf · uploaded 8 Apr 2024Source
- 2 Commencement Certificates / NA Order for plotted developmentPHOTO-2024-03-21-13-54-09.pdf · uploaded 15 Apr 2024Source
- 1 Other – TechnicalANNEXURE A DECLRATION OF UNDERTAKING (1).pdf · uploaded 15 Apr 2024Source
- 2 Other – Technicaldisclosure of interes-Annexure A.pdf · uploaded 15 Apr 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Pristine F1 30-06.pdf · uploaded 15 Nov 2024Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Pristine F1 30-09.pdf · uploaded 15 Nov 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)F3 P JUNE.pdf · uploaded 15 Nov 2024Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)F3 P SEP.pdf · uploaded 15 Nov 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Pristine FORM 2 30-06.pdf · uploaded 15 Nov 2024Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Pristine FORM 2 30-09.pdf · uploaded 15 Nov 2024Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the samepristine-format A.pdf · uploaded 28 Jan 2025Source
- 1 Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)Pristine - Hdfc bank confirmation letter.pdf · uploaded 28 Jan 2025Source
- 2 Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)Pristine-hdfc bani account confirmation.pdf · uploaded 29 Jan 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Pristine Architect certificate form 1.pdf · uploaded 20 Feb 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Adobe Scan Pristine_11zon.pdf · uploaded 20 Feb 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Pristine Engineer certificate form 2.pdf · uploaded 20 Feb 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24).pdf · uploaded 24 Feb 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect certificate Pristine.pdf · uploaded 28 Apr 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 CA certificatepristine_11zon.pdf · uploaded 28 Apr 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Engineer certificate Pristine.pdf · uploaded 28 Apr 2025Source
- 1 Disclosure of sold/ booked inventorySold Unsold-pristine.pdf · uploaded 4 Jul 2025Source
- Form 1PT Architect’s (Form 1)J-24.pdf · uploaded 4 Aug 2025Source
- Form 2PT Engineer’s (Form 2) J-24.pdf · uploaded 4 Aug 2025Source
- Form 3PT CA Certificate (Form 3) J-24.pdf · uploaded 4 Aug 2025Source
- Disclosure of Sold and Booked InventoryPT CA Certificate (Form 3) J-24.pdf · uploaded 4 Aug 2025Source
- Form 1PT Architect’s (Form 1)S-24.pdf · uploaded 4 Aug 2025Source
- Form 2PT Engineer’s (Form 2) S-24.pdf · uploaded 4 Aug 2025Source
- Form 3PT CA Certificate (Form 3)S-24.pdf · uploaded 4 Aug 2025Source
- Disclosure of Sold and Booked InventoryPT CA Certificate (Form 3)S-24.pdf · uploaded 4 Aug 2025Source
- Form 1PT Architect’s (Form 1) M-25.pdf · uploaded 4 Aug 2025Source
- Form 2PT Engineer’s (Form 2)M-25.pdf · uploaded 4 Aug 2025Source
- Form 3PT CA Certificate (Form 3)M-25.pdf · uploaded 4 Aug 2025Source
- Disclosure of Sold and Booked InventoryPT CA Certificate (Form 3)M-25.pdf · uploaded 4 Aug 2025Source
- Form 1PT Architect’s (Form 1)D-24.pdf · uploaded 4 Aug 2025Source
- Form 2PT Engineer’s (Form 2)D-24.pdf · uploaded 4 Aug 2025Source
- Form 3PT CA Certificate (Form 3)D-24.pdf · uploaded 4 Aug 2025Source
- Disclosure of Sold and Booked InventoryPT CA Certificate (Form 3)D-24.pdf · uploaded 4 Aug 2025Source
- Disclosure of Sold and Booked InventoryPrist sold unsold pristine 2.pdf · uploaded 4 Aug 2025Source
- Form 1Prist Architect form1 30-06.pdf · uploaded 4 Aug 2025Source
- Form 2Prist Engineer form-2 30-06.pdf · uploaded 4 Aug 2025Source
- Form 3PT-CA June 2025.pdf · uploaded 4 Aug 2025Source
- Form 2A (FY 2024-2025)pristine 2a form.pdf · uploaded 20 Aug 2025Source
- Form 5 (FY 2024-2025)Form 5 Pristine.pdf · uploaded 20 Aug 2025Source
- Withdrawal Update Form 1Architect F1 Pristine Sept25.pdf · uploaded 6 Nov 2025Source
- Withdrawal Update Form 1Architect F1 Pristine Sept25.pdf · uploaded 6 Nov 2025Source
- Withdrawal Update Form 1Architect F1 Pristine Sept25.pdf · uploaded 6 Nov 2025Source
- Withdrawal Update Form 2Engineer F2 Pristine Sept25.pdf · uploaded 6 Nov 2025Source
- Withdrawal Update Form 2Engineer F2 Pristine Sept25.pdf · uploaded 6 Nov 2025Source
- Withdrawal Update Form 2Engineer F2 Pristine Sept25.pdf · uploaded 6 Nov 2025Source
- Withdrawal Update Form 3CA-Form 3-Pristine -Sept25.pdf · uploaded 6 Nov 2025Source
- Withdrawal Update Form 3CA-Form 3-Pristine -Sept25.pdf · uploaded 6 Nov 2025Source
- Withdrawal Update Form 3CA-Form 3-Pristine -Sept25.pdf · uploaded 6 Nov 2025Source
- Withdrawal Update Form 1form 1.pdf · uploaded 28 Jan 2026Source
- Withdrawal Update Form 2form 2.pdf · uploaded 28 Jan 2026Source
- Withdrawal Update Form 3form 3.pdf · uploaded 28 Jan 2026Source
- Withdrawal Update Form 1Architect certificate Pristine March 26.pdf · uploaded 25 Apr 2026Source
- Withdrawal Update Form 2Engineer certificate Pristine Mar26.pdf · uploaded 25 Apr 2026Source
- Withdrawal Update Form 3CA CertificateForm 3 Pristine March26.pdf · uploaded 25 Apr 2026Source
- Form 2A (FY 2025-2026)Form 2A Pristine.pdf · uploaded 8 May 2026Source
- Form 5 (FY 2025-2026)Form-5 Pristine-25-26.pdf · uploaded 8 May 2026Source
- Withdrawal Update Form 1PRISTINE ARCHITECT CERTIFICATE FORM 1.pdf · uploaded 23 Jul 2026Source
- Withdrawal Update Form 2Form 2 Engineer Certificate- Pristine.pdf · uploaded 23 Jul 2026Source
- Withdrawal Update Form 3CA Certificate Form 3- Pristine.pdf · uploaded 23 Jul 2026Source
Technical
- DocumentLayout Plan 090523.pdf · uploaded 13 Mar 2024Source
- DocumentGround floor and Basement Plan 090523.pdf · uploaded 13 Mar 2024Source
- DocumentTypical floor plan 090523.pdf · uploaded 13 Mar 2024Source
- Other – TechnicalANNEXURE A DECLRATION OF UNDERTAKING (1).pdf · uploaded 15 Apr 2024Source
- Other – Technicaldisclosure of interes-Annexure A.pdf · uploaded 15 Apr 2024Source
- DocumentPRISTINE PLAN (1).pdf · uploaded 2 Sep 2025Source
- OthersPRISTINE RERA AGREEMENT FOR SALE final-after revised.pdf · uploaded 2 Sep 2025Source
- DocumentNEW REVISED CC PLAN MArch 28.pdf · uploaded 25 Apr 2026Source
- DocumentCC NEW REVISED March 28.pdf · uploaded 25 Apr 2026Source
Technical (Architect)
- DocumentPristine F1 30-06.pdf · uploaded 15 Nov 2024Source
- DocumentPristine F1 30-09.pdf · uploaded 15 Nov 2024Source
- DocumentPristine Architect certificate form 1.pdf · uploaded 20 Feb 2025Source
- DocumentArchitect certificate Pristine.pdf · uploaded 28 Apr 2025Source
- DocumentPRISTINE ARCHITECT CERTIFICATE FORM 1.pdf · uploaded 23 Jul 2026Source
Technical (Engineer)
- DocumentPristine FORM 2 30-06.pdf · uploaded 15 Nov 2024Source
- DocumentPristine FORM 2 30-09.pdf · uploaded 15 Nov 2024Source
- DocumentPristine Engineer certificate form 2.pdf · uploaded 20 Feb 2025Source
- DocumentForm 2 Engineer certificate Pristine.pdf · uploaded 28 Apr 2025Source
- DocumentForm 2 Engineer Certificate- Pristine.pdf · uploaded 23 Jul 2026Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvalsLand parcel Survey No. 51 Hisa No.4, Survey No.52
As registered with MahaRERA and published on its project page
- Project type
- Others
- Status on MahaRERA
- Certificate Signed
- Unit types
- 2BHK, 2BHK LANDOWNERS, 3BHK, 3BHK LANDOWNERS, Bungalow, Office space, Shop, Shop landowner, Shop landwoner33 units in all
- Address
- Survey No. 51 Hisa No.4 and Survey No.52, Umbarde Road, WadegharPIN 421301
- Village
- Kalyan-Dombivali (M Corp.), Kalyan taluka
- Land area for this project
- 1,900 sq m (20,451 sq ft)
- Permissible built-up area
- 9,226 sq m (99,302 sq ft)
- Sanctioned built-up area
- 9,226 sq m (99,302 sq ft)
- Recreational open space
- 0 sq m (0 sq ft)
- Designated bank account
- 76
- Developed in phases
- No
Survey, CTS, gat or plot numbers
Land as published on MahaRERA's project page
Survey No. 51 Hisa No.4 and Survey No.52
Boundaries
- North
- Survey No 51 Part
- South
- 45 Metres Wide DP Road
- East
- 24 Metres Wide DP Road
- West
- Survey No 51 Part
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking33 units
0 of 33 units booked (0%), as the promoter reported to MahaRERA
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| 2BHK | 60.16 sq m · 648 sq ft | 1 | 0 |
| 2BHK | 60.7 sq m · 653 sq ft | 1 | 0 |
| 2BHK | 61.96 sq m · 667 sq ft | 1 | 0 |
| 2BHK LANDOWNERS | 55.61 sq m · 599 sq ft | 3 | 0 |
| 2BHK LANDOWNERS | 60.16 sq m · 648 sq ft | 2 | 0 |
| 2BHK LANDOWNERS | 60.7 sq m · 653 sq ft | 2 | 0 |
| 2BHK LANDOWNERS | 61.96 sq m · 667 sq ft | 2 | 0 |
| 3BHK | 70.66 sq m · 761 sq ft | 1 | 0 |
Show all 22 unit rowsShow fewer unit rows
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| 3BHK | 77.82 sq m · 838 sq ft | 3 | 0 |
| 3BHK LANDOWNERS | 70.66 sq m · 761 sq ft | 2 | 0 |
| Bungalow | 138.31 sq m · 1,489 sq ft | 2 | 0 |
| Office space | 348.56 sq m · 3,752 sq ft | 2 | 0 |
| Shop | 21.36 sq m · 230 sq ft | 1 | 0 |
| Shop | 22.26 sq m · 240 sq ft | 1 | 0 |
| Shop | 28.94 sq m · 312 sq ft | 1 | 0 |
| Shop | 30.07 sq m · 324 sq ft | 1 | 0 |
| Shop | 30.56 sq m · 329 sq ft | 1 | 0 |
| Shop | 37.17 sq m · 400 sq ft | 1 | 0 |
| Shop | 58.21 sq m · 627 sq ft | 1 | 0 |
| Shop landowner | 30.56 sq m · 329 sq ft | 2 | 0 |
| Shop landowner | 38.45 sq m · 414 sq ft | 1 | 0 |
| Shop landwoner | 23.28 sq m · 251 sq ft | 1 | 0 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Professionals5
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Tejas Anil Nirgude | — |
| Chartered accountant | Chandrakant Valku Bhoir | — |
| Chartered accountant | Kranti Chandrakant Bhoir | — |
| Engineer | Madhu Keshvan Janardhanan | — |
| Engineer | Rajesh Thakare | — |
Source: MahaRERA project page. Contact details are not shown.