Marigold B wing
Deedo IDDP-THN-ND6XCompletion was pushed back 4 months, to Oct 2028; 1 listing or order with MahaRERA on record; 67% of its units are booked.
Thane (M Corp.), Thane 400607 · by Shree Tirupati Greenfield Developers
Buying a flat here?
See every deed registered on it.
Completion was pushed back 4 months, to Oct 2028
- This projectRegistered 9 Aug 2017, completion promised 30 Jun 2028, revised to 30 Oct 2028.
1 extension certificate on record.
1 registration · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales first, then rentals and mortgages matched to this project · the free view shows a price band
The building
Open a building to see every flat, floor by floor.
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory record1
What MahaRERA has published about this project. A listing records what the authority published; it is not a judgment of the project.
- Regulatory order21 Jun 2024Matched by RERA number
Regulatory order: PROJECT NAME:MARIGOLD B WING (Regulatory Case No. 243 OF 2024) dated 21 June 2024.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrationP51700004654
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P51700004654 | 9 Aug 2017 | 30 Jun 2028 | 30 Oct 2028 | Shree Tirupati Greenfield Developers | Project page |
Documents213
1 document held by Deedo, 212 filings listed on MahaRERA's project page
Finance
- PAN CardSTGDPAN.pdf · uploaded 21 Aug 2021Source
Legal
- Legal Title reportMarigold Title Certificate.pdf · uploaded 26 Jul 2017Source
- OtherMarigold OC.pdf · uploaded 28 Jul 2017Source
- OtherMarigold CC f2.pdf · uploaded 28 Jul 2017Source
- OtherM OC Plan 1.pdf · uploaded 28 Jul 2017Source
- Declaration Form BForm B Marigold_1 .pdf · uploaded 28 Jul 2017Source
- Legal Title reportTitle 2008.pdf · uploaded 21 Aug 2017Source
Show all 213 documentsShow fewer documents
Legal
Migrated
- 1 Copy of the legal title reportMarigold Title Certificate.pdf · uploaded 26 Jul 2017Source
- 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 Marigold.pdf · uploaded 26 Jul 2017Source
- 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 Marigold.pdf · uploaded 26 Jul 2017Source
- 1 Certificates of CA (Form 3)FORM 3 CA FINAL Marigold.pdf · uploaded 26 Jul 2017Source
- 1 Details of encumbrancesDetails of Encumbrances.pdf · uploaded 28 Jul 2017Source
- 1 Copy of Layout Approval (in case of layout)Marigold Layout Plan 24 09 09.pdf · uploaded 28 Jul 2017Source
- 1 Building Plan Approval (IOD)Marigold IOD.pdf · uploaded 28 Jul 2017Source
- 2 Building Plan Approval (IOD)Siddeshwar 2 05 2008.pdf · uploaded 28 Jul 2017Source
- 1 Commencement Certificates / NA Order for plotted developmentMarigold CC.pdf · uploaded 28 Jul 2017Source
- 1 Declaration in FORM BForm B Marigold_1 .pdf · uploaded 28 Jul 2017Source
- 1 Proforma of Allotment letterDeclaration.pdf · uploaded 28 Jul 2017Source
- 1 OtherMarigold OC.pdf · uploaded 28 Jul 2017Source
- 2 OtherMarigold CC f2.pdf · uploaded 28 Jul 2017Source
- 3 OtherM OC Plan 1.pdf · uploaded 28 Jul 2017Source
- 2 Copy of the legal title reportTitle 2008.pdf · uploaded 21 Aug 2017Source
- 3 Copy of the legal title reportTitle 2006.pdf · uploaded 21 Aug 2017Source
- 4 Copy of the legal title reportTitle 2005.pdf · uploaded 21 Aug 2017Source
- 2 Certificates of CA (Form 3)FORM-3 REVISED MARIGOLD.pdf · uploaded 21 Aug 2017Source
- 2 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Marigold Form 2 R.pdf · uploaded 13 Oct 2017Source
- 2 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 Marigold R.pdf · uploaded 26 Oct 2017Source
- 2 Proforma of Allotment letterFinal Marigold Allotment Letter_26_10_2017.pdf · uploaded 28 Oct 2017Source
- 3 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architects Certificate MARIGOLD - Thakkar DEC 2017.pdf · uploaded 31 Jan 2018Source
- 3 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)ENGINEERS CERTIFICATE - Marigold.pdf · uploaded 31 Jan 2018Source
- 3 Certificates of CA (Form 3)Marigold.pdf · uploaded 31 Jan 2018Source
- 4 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Marigold.pdf · uploaded 30 Apr 2018Source
- 4 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Marigold.pdf · uploaded 30 Apr 2018Source
- 4 Certificates of CA (Form 3)Marigold CA Certificate.pdf · uploaded 30 Apr 2018Source
- 2 Commencement Certificates / NA Order for plotted developmentMarigold CC.pdf · uploaded 31 Jul 2018Source
- 5 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1_Architect Certificate.pdf · uploaded 31 Jul 2018Source
- 5 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2_Engineers Certificate.pdf · uploaded 31 Jul 2018Source
- 5 Certificates of CA (Form 3)Form 3_CA Certificate.pdf · uploaded 31 Jul 2018Source
- 1 Certificates of CA (Form 5)Marigold_Form 5.pdf · uploaded 30 Sep 2018Source
- 6 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1_Marigold.pdf · uploaded 31 Oct 2018Source
- 6 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2_Marigold.pdf · uploaded 1 Nov 2018Source
- 6 Certificates of CA (Form 3)Form 3_Marigold.pdf · uploaded 1 Nov 2018Source
- 7 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Marigold Form 1.pdf · uploaded 31 Jan 2019Source
- 7 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Marigold Form 2.pdf · uploaded 31 Jan 2019Source
- 7 Certificates of CA (Form 3)Marigold Form 3.pdf · uploaded 31 Jan 2019Source
- 8 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Marigold Form 1.pdf · uploaded 27 Apr 2019Source
- 8 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Marigold Form 2.pdf · uploaded 27 Apr 2019Source
- 8 Certificates of CA (Form 3)Marigold Form 3.pdf · uploaded 27 Apr 2019Source
- 9 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Marigold Form 1.pdf · uploaded 31 Jul 2019Source
- 9 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Marigold Form 2.pdf · uploaded 31 Jul 2019Source
- 9 Certificates of CA (Form 3)Marigold Form 3.pdf · uploaded 31 Jul 2019Source
- 10 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Marigold Form 1.pdf · uploaded 30 Nov 2019Source
- 10 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Marigold Form 2.pdf · uploaded 30 Nov 2019Source
- 10 Certificates of CA (Form 3)Marigold Form 3.pdf · uploaded 9 Dec 2019Source
- 11 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Marigold Form 1.pdf · uploaded 4 Feb 2020Source
- 11 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Marigold Form 2.pdf · uploaded 4 Feb 2020Source
- 11 Certificates of CA (Form 3)Marigold Form 3.pdf · uploaded 4 Feb 2020Source
- 12 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Marigold Form 2.pdf · uploaded 28 Jan 2021Source
- 12 Certificates of CA (Form 3)Marigold Form 3.pdf · uploaded 28 Jan 2021Source
- 13 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Marigold Form 2.pdf · uploaded 2 Feb 2021Source
- 13 Certificates of CA (Form 3)Marigold Form 3.pdf · uploaded 2 Feb 2021Source
- 14 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Marigold Form 2.pdf · uploaded 9 Feb 2021Source
- 14 Certificates of CA (Form 3)Marigold Form 3.pdf · uploaded 9 Feb 2021Source
- 15 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Marigold Form 2.pdf · uploaded 29 Jul 2021Source
- 15 Certificates of CA (Form 3)Marigold Form 3 March 2021.pdf · uploaded 29 Jul 2021Source
- 16 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Marigold Form 2.pdf · uploaded 12 Aug 2021Source
- 16 Certificates of CA (Form 3)Marigold Form 3- Final.pdf · uploaded 12 Aug 2021Source
- 1 Declaration about Commencement CertificateMarigold bw wing- Declaration of CC.pdf · uploaded 20 Aug 2021Source
- 1 Disclosure of sold/ booked inventoryInventory- Marigold b wing.pdf · uploaded 20 Aug 2021Source
- 1 PAN CardSTGDPAN.pdf · uploaded 21 Aug 2021Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)SUPERVISORS CERTIFICATE - Marigold June 2019.pdf · uploaded 21 Aug 2021Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)SUPERVISORS CERTIFICATE - Marigold Sept 2019.pdf · uploaded 21 Aug 2021Source
- 3 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)SUPERVISORS CERTIFICATE - Marigold Dec 2019.pdf · uploaded 21 Aug 2021Source
- 4 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)SUPERVISORS CERTIFICATE - Marigold Mar 2020.pdf · uploaded 21 Aug 2021Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Form 2A Marigold June 20.pdf · uploaded 21 Aug 2021Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Form 2A Marigold Sept 20.pdf · uploaded 21 Aug 2021Source
- 3 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Form 2A Marigold Dec 20.pdf · uploaded 21 Aug 2021Source
- 4 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Form 2A Marigold March21.pdf · uploaded 21 Aug 2021Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)STGD FORM 5 2018-2019.pdf · uploaded 25 Aug 2021Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)STGD Form 5 2019-20.pdf · uploaded 25 Aug 2021Source
- 17 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Marigold form 2.pdf · uploaded 1 Feb 2022Source
- 17 Certificates of CA (Form 3)Marigold - Form 3 (1).pdf · uploaded 1 Feb 2022Source
- 18 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 Marigold.pdf · uploaded 11 Feb 2022Source
- 18 Certificates of CA (Form 3)Revised Form-3 Marigold.pdf · uploaded 11 Feb 2022Source
- 19 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Marigold Form 2.pdf · uploaded 17 Feb 2022Source
- 19 Certificates of CA (Form 3)Marigold Form 3 Final.pdf · uploaded 17 Feb 2022Source
- 12 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Marigold Form 1 March 2020.pdf · uploaded 25 Feb 2022Source
- 13 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Marigold Form 1 June 2020.pdf · uploaded 25 Feb 2022Source
- 14 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Marigold Form 1 September 2020.pdf · uploaded 25 Feb 2022Source
- 15 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Marigold Form 1 December 2020.pdf · uploaded 25 Feb 2022Source
- 16 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Marigold Form 1 March 2021.pdf · uploaded 25 Feb 2022Source
- 17 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Marigold Form 1 June 2021.pdf · uploaded 25 Feb 2022Source
- 18 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Marigold Form 1 September 2021.pdf · uploaded 25 Feb 2022Source
- 19 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Marigold Form 1 December 2021.pdf · uploaded 25 Feb 2022Source
- 20 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Marigold Form 2.pdf · uploaded 30 Apr 2022Source
- 20 Certificates of CA (Form 3)Form 3 - Marigold.pdf · uploaded 30 Apr 2022Source
- 20 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Marigold Form 1.pdf · uploaded 2 May 2022Source
- 21 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Marigold Form 2.pdf · uploaded 30 Jul 2022Source
- 21 Certificates of CA (Form 3)Marigold Form 3.pdf · uploaded 30 Jul 2022Source
- 22 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 Marigold.pdf · uploaded 15 Oct 2022Source
- 22 Certificates of CA (Form 3)FORM 3 MARIGOLD_.pdf · uploaded 15 Oct 2022Source
- 21 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Trupti Ropvatika Form 1.pdf · uploaded 18 Nov 2022Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)Marigold Form 5.pdf · uploaded 9 Jan 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Marigold.pdf · uploaded 9 Jan 2023Source
- 23 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 Marigold.pdf · uploaded 17 Jan 2023Source
- 23 Certificates of CA (Form 3)Form 3 Marigold.pdf · uploaded 17 Jan 2023Source
- 22 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Marigold Form 1.pdf · uploaded 10 Apr 2023Source
- 23 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Marigold Form 1.pdf · uploaded 10 Apr 2023Source
- 24 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Marigold Form 1.pdf · uploaded 10 Apr 2023Source
- 25 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Marigold Form 1.pdf · uploaded 22 May 2023Source
- 24 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Marigold Form 2.pdf · uploaded 22 May 2023Source
- 24 Certificates of CA (Form 3)Marigold Form 3.pdf · uploaded 22 May 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Form 2A-June 21.pdf · uploaded 19 Jun 2023Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Form 2A-Sept 21.pdf · uploaded 19 Jun 2023Source
- 3 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Form 2A-Dec21.pdf · uploaded 19 Jun 2023Source
- 4 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Form 2A-Mar 22.pdf · uploaded 19 Jun 2023Source
- 5 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Form 2A March 2022.pdf · uploaded 19 Jun 2023Source
- 6 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Form 2A - Dec 21.pdf · uploaded 19 Jun 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form 2A -2023.pdf · uploaded 19 Jun 2023Source
- 25 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 Marigold.pdf · uploaded 18 Aug 2023Source
- 25 Certificates of CA (Form 3)Form 3 Marigold_compressed (2).pdf · uploaded 18 Aug 2023Source
- 26 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 June 2023 marigold.pdf · uploaded 19 Oct 2023Source
- 26 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Marigold Form 2 sept 2023.pdf · uploaded 21 Oct 2023Source
- 26 Certificates of CA (Form 3)Marigold Form - 3_compressed.pdf · uploaded 21 Oct 2023Source
- 27 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)FORM-2 marigold.pdf · uploaded 25 Jan 2024Source
- 27 Certificates of CA (Form 3)Form 3 Marigold signed.pdf · uploaded 25 Jan 2024Source
- 27 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 Marigold Sept 23.pdf · uploaded 30 Jan 2024Source
- 28 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 Marigold Dec 23.pdf · uploaded 30 Jan 2024Source
- 2 a Details of encumbrances concerned to Finance1 Details of encumbrances.pdf · uploaded 31 Jan 2024Source
- 1 b Details of encumbrances concerned to Legal1 Details of encumbrances.pdf · uploaded 31 Jan 2024Source
- 2 Disclosure of sold/ booked inventoryMarigold Disclosure of invenstory 310124.pdf · uploaded 31 Jan 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Form 5 for FY 2022-23.pdf · uploaded 1 Feb 2024Source
- 3 Disclosure of sold/ booked inventoryMarigold Disclosure of invenstory.pdf · uploaded 6 Mar 2024Source
- 29 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 Marigold Dec 23.pdf · uploaded 7 Mar 2024Source
- 28 Certificates of CA (Form 3)Final Form 3 Marigold 31122023.pdf · uploaded 12 Mar 2024Source
- 2 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Form 5 Marigold.pdf · uploaded 12 Mar 2024Source
- 30 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Marigold Form 1 Mar 23.pdf · uploaded 16 Mar 2024Source
- 31 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 June 2023 marigold.pdf · uploaded 16 Mar 2024Source
- 32 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 Marigold Sept 23.pdf · uploaded 16 Mar 2024Source
- 33 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 Marigold Dec 23.pdf · uploaded 16 Mar 2024Source
- 4 Disclosure of sold/ booked inventoryMarigold Disclosure of invenstory 160324.pdf · uploaded 16 Mar 2024Source
- 2 Certificates of CA (Form 5)Form 5 FY 17-18.pdf · uploaded 16 Mar 2024Source
- 2 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)Form 5 FY 18-19.pdf · uploaded 16 Mar 2024Source
- 2 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)Form 5 FY 19-20.pdf · uploaded 16 Mar 2024Source
- 2 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)Form 5 FY 20-21.pdf · uploaded 16 Mar 2024Source
- 2 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Form 5 FY 21-22.pdf · uploaded 16 Mar 2024Source
- 3 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Form 5 FY 22-23.pdf · uploaded 16 Mar 2024Source
- 28 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)24 Certificates of Engineer (Form 2)(Mandatory for only ongoing project) (1).pdf · uploaded 20 Mar 2024Source
- 29 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)25 Certificates of Engineer (Form 2)(Mandatory for only ongoing project).pdf · uploaded 20 Mar 2024Source
- 30 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)26 Certificates of Engineer (Form 2)(Mandatory for only ongoing project).pdf · uploaded 20 Mar 2024Source
- 31 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)27 Certificates of Engineer (Form 2)(Mandatory for only ongoing project).pdf · uploaded 20 Mar 2024Source
- 2 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form 2A -2023.pdf · uploaded 20 Mar 2024Source
- 29 Certificates of CA (Form 3)Final Form 3 Marigold 150324.pdf · uploaded 20 Mar 2024Source
- 30 Certificates of CA (Form 3)Form - 3 Marigold sept23.pdf · uploaded 20 Mar 2024Source
- 31 Certificates of CA (Form 3)Marigold Form 3 Mar 23.pdf · uploaded 21 Mar 2024Source
- 32 Certificates of CA (Form 3)Marigold Form 3 June 23.pdf · uploaded 21 Mar 2024Source
- 33 Certificates of CA (Form 3)Marigold form 3 Sept 23.pdf · uploaded 21 Mar 2024Source
- 34 Certificates of CA (Form 3)Final Form 3 Marigold dec 23.pdf · uploaded 21 Mar 2024Source
- 35 Certificates of CA (Form 3)Final Form 3 Marigold Dec 23.pdf · uploaded 22 Mar 2024Source
- 32 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 Marigold 31032024.pdf · uploaded 24 May 2024Source
- 36 Certificates of CA (Form 3)Form 3 Marigold 31032024_compressed.pdf · uploaded 24 May 2024Source
- 34 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 Marigold Mar 24.pdf · uploaded 5 Jun 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)SUPERVISORS CERTIFICATE - Marigold New Format Annual 2024.pdf · uploaded 5 Jun 2024Source
- 5 Disclosure of sold/ booked inventoryDisclosure of inventory Marigold.pdf · uploaded 5 Jun 2024Source
- 1 CERSAI detailsMarigold CERSAI_Search_Report.pdf · uploaded 5 Jun 2024Source
- 1 Certificates of CA (Form 3)Form 3 Marigold Cost Incurred 30062024 - final.pdf · uploaded 30 Nov 2024Source
- 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 Marigold 300624.pdf · uploaded 30 Nov 2024Source
- 1 Certificates of CA (Form 3)Form 3 Marigold 30092024.pdf · uploaded 15 Mar 2025Source
- 2 Certificates of CA (Form 3)Form 3 Marigold 31122024.pdf · uploaded 15 Mar 2025Source
- 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 Marigold Sept24.pdf · uploaded 15 Mar 2025Source
- 2 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 Marigold Dec 24.pdf · uploaded 15 Mar 2025Source
- Form 1Form 1 Marigold Jun 24.pdf · uploaded 8 Apr 2026Source
- Form 1Form 1 Marigold Sept 24.pdf · uploaded 8 Apr 2026Source
- Form 1Form 1 Marigold Dec 24.pdf · uploaded 8 Apr 2026Source
- Form 1Form 1 Marigold Mar 25.pdf · uploaded 8 Apr 2026Source
- Form 1Form 1 Marigold Jun 25.pdf · uploaded 8 Apr 2026Source
- Form 1Form 1 Marigold Sept 25.pdf · uploaded 8 Apr 2026Source
- Form 1Form 1 Marigold Dec 25.pdf · uploaded 8 Apr 2026Source
- Form 2Form 2 Marigold June 24.pdf · uploaded 8 Apr 2026Source
- Form 2Form 2 marigold Sept 24.pdf · uploaded 8 Apr 2026Source
- Form 2Form 2 Marigold Dec 24.pdf · uploaded 8 Apr 2026Source
- Form 2Form 2 Marigold Mar 25.pdf · uploaded 8 Apr 2026Source
- Form 2Form 2 Marigold Jun25.pdf · uploaded 8 Apr 2026Source
- Form 2Form 2 Marigold Sep25.pdf · uploaded 8 Apr 2026Source
- Form 2Form 2 Marigold Dec 25.pdf · uploaded 8 Apr 2026Source
- Form 3Form 3 Marigold June 2024.pdf · uploaded 8 Apr 2026Source
- Form 3Form 3 Sep 24 Marigold.pdf · uploaded 8 Apr 2026Source
- Form 3Form 3 Marigold Dec 24.pdf · uploaded 8 Apr 2026Source
- Form 3Form 3.pdf · uploaded 8 Apr 2026Source
- Form 3Form 3 of marigold Jun 25.pdf · uploaded 8 Apr 2026Source
- Form 3Form 3.pdf · uploaded 8 Apr 2026Source
- Form 3Form 3 Dec 2025.pdf · uploaded 8 Apr 2026Source
- Disclosure of Sold and Booked InventoryDisclosure of sold booked inventory june 2024.pdf · uploaded 8 Apr 2026Source
- Disclosure of Sold and Booked InventoryInventory Marigold Sep 2024.pdf · uploaded 8 Apr 2026Source
- Disclosure of Sold and Booked InventoryInventory Dec 2024.pdf · uploaded 8 Apr 2026Source
- Disclosure of Sold and Booked InventorySold Unsold Inventory Mar 25.pdf · uploaded 8 Apr 2026Source
- Disclosure of Sold and Booked InventoryInventory as at June 2025.pdf · uploaded 8 Apr 2026Source
- Disclosure of Sold and Booked InventoryInventory as at Sep 2025.pdf · uploaded 8 Apr 2026Source
- Disclosure of Sold and Booked InventoryInventory as at Dec 2025.pdf · uploaded 8 Apr 2026Source
- Form 2A (FY 2024-2025)Form2A - Marigold 24-25.pdf · uploaded 2 Jul 2026Source
- Form 2A (FY 2025-2026)Form 2A- Marigold 25-26.pdf · uploaded 2 Jul 2026Source
- Form 5 (FY 2024-2025)Form 5 FY 24-25 marigold.pdf · uploaded 2 Jul 2026Source
Technical
Technical (Architect)
- DocumentForm 1 Marigold Mar 24.pdf · uploaded 5 Jun 2024Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvalsLand parcel 1/1C, 1/1D
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Certificate Signed
- Unit types
- 2 BHK, 3 BHK87 units in all
- Address
- 1/1c, 1/1d, 1/1e, 1/1f, 1/1g, 2/1, 2/2, 3, ThanePIN 400607
- Village
- Thane (M Corp.), Thane taluka
- Location
- 19.23022, 72.98290
- Land area for this project
- 450 sq m (4,844 sq ft)
- Permissible built-up area
- 7,763 sq m (83,556 sq ft)
- Sanctioned built-up area
- 263 sq m (2,827 sq ft)
- Designated bank account
- 76
- Developed in phases
- No
Survey, CTS, gat or plot numbers
Land as published on MahaRERA's project page
1/1C, 1/1D, 1/1E, 1/1F, 1/1G, 2/1, 2/2, 3
Boundaries
- North
- Everest World CHS
- South
- Prathamesh Hill
- East
- 40 m DP road
- West
- Village Chitalsar Manpada
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking87 units
58 of 87 units booked (67%), as the promoter reported to MahaRERA
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| 2 BHK | 56.65 sq m · 610 sq ft | 23 | 16 |
| 2 BHK | 61.31 sq m · 660 sq ft | 18 | 12 |
| 2 BHK | 61.92 sq m · 667 sq ft | 23 | 17 |
| 3 BHK | 76 sq m · 818 sq ft | 23 | 13 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Professionals5
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Manav Consulatants | — |
| Architect | Nav Rachna | — |
| Chartered accountant | Shashank Rajendra Jain | — |
| Engineer | R C Tipnis | — |
| Engineer | Vijay Salunke | — |
Source: MahaRERA project page. Contact details are not shown.
Other projects in Thane (M Corp.)
- Metro MilleniaRERA PM1330002602679
- Kalyani Krupa Co.op Hsg Soc LtdRERA PR1330002602399
- Shreeji's Laxmi Jyot CHSLRERA PR1330002602306
- RivantaRERA PM1330002601984
- Shree Gangadhar ChslRERA PM1330002601922
- The Lake CornerRERA PM1330002601899
- Shree AudumbarRERA PR1330002601484
- Shreyas Co-Op Hsg. Soc. Ltd.RERA PR1330002601418
All 898 projects in Thane (M Corp.) · Compare Marigold B wing with another project