Residential / Group Housing · 1 building · 87 unitsRERA P51700004654

Marigold B wing

Deedo IDDP-THN-ND6X

Completion was pushed back 4 months, to Oct 2028; 1 listing or order with MahaRERA on record; 67% of its units are booked.

Thane (M Corp.), Thane 400607 · by Shree Tirupati Greenfield Developers

DeliveryExtended 4 moPromised Jun 2028 · now due Oct 2028Regulatory1 listing or orderLatest: Regulatory order, 2024Sales67% booked58 of 87 units · as the promoter reported to MahaRERA

Buying a flat here?

See every deed registered on it.

Completion was pushed back 4 months, to Oct 2028

  • This projectRegistered 9 Aug 2017, completion promised 30 Jun 2028, revised to 30 Oct 2028.

1 extension certificate on record.

1 registration · Source: MahaRERA registration and extension certificates

Latest registered deeds

Sales first, then rentals and mortgages matched to this project · the free view shows a price band

No registered deeds matched to this project yet
Sales, resales, rentals and mortgages appear here once registered documents are matched to it by evidence.

The building

Open a building to see every flat, floor by floor.

Floors and units from the registration certificate annexures and MahaRERA's project page.

Regulatory record1

What MahaRERA has published about this project. A listing records what the authority published; it is not a judgment of the project.

  • Regulatory order21 Jun 2024Matched by RERA number

    Regulatory order: PROJECT NAME:MARIGOLD B WING (Regulatory Case No. 243 OF 2024) dated 21 June 2024.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

RERA registrationP51700004654
RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P517000046549 Aug 201730 Jun 202830 Oct 2028Shree Tirupati Greenfield DevelopersProject page
Documents213

1 document held by Deedo, 212 filings listed on MahaRERA's project page

Extension certificate

Finance

  • PAN CardSTGDPAN.pdf · uploaded 21 Aug 2021Source

Legal

  • Legal Title reportMarigold Title Certificate.pdf · uploaded 26 Jul 2017Source
  • OtherMarigold OC.pdf · uploaded 28 Jul 2017Source
  • OtherMarigold CC f2.pdf · uploaded 28 Jul 2017Source
  • OtherM OC Plan 1.pdf · uploaded 28 Jul 2017Source
  • Declaration Form BForm B Marigold_1 .pdf · uploaded 28 Jul 2017Source
  • Legal Title reportTitle 2008.pdf · uploaded 21 Aug 2017Source
Show all 213 documentsShow fewer documents

Legal

  • Legal Title reportTitle 2006.pdf · uploaded 21 Aug 2017Source
  • Legal Title reportTitle 2005.pdf · uploaded 21 Aug 2017Source

Migrated

  • 1 Copy of the legal title reportMarigold Title Certificate.pdf · uploaded 26 Jul 2017Source
  • 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 Marigold.pdf · uploaded 26 Jul 2017Source
  • 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 Marigold.pdf · uploaded 26 Jul 2017Source
  • 1 Certificates of CA (Form 3)FORM 3 CA FINAL Marigold.pdf · uploaded 26 Jul 2017Source
  • 1 Details of encumbrancesDetails of Encumbrances.pdf · uploaded 28 Jul 2017Source
  • 1 Copy of Layout Approval (in case of layout)Marigold Layout Plan 24 09 09.pdf · uploaded 28 Jul 2017Source
  • 1 Building Plan Approval (IOD)Marigold IOD.pdf · uploaded 28 Jul 2017Source
  • 2 Building Plan Approval (IOD)Siddeshwar 2 05 2008.pdf · uploaded 28 Jul 2017Source
  • 1 Commencement Certificates / NA Order for plotted developmentMarigold CC.pdf · uploaded 28 Jul 2017Source
  • 1 Declaration in FORM BForm B Marigold_1 .pdf · uploaded 28 Jul 2017Source
  • 1 Proforma of Allotment letterDeclaration.pdf · uploaded 28 Jul 2017Source
  • 1 OtherMarigold OC.pdf · uploaded 28 Jul 2017Source
  • 2 OtherMarigold CC f2.pdf · uploaded 28 Jul 2017Source
  • 3 OtherM OC Plan 1.pdf · uploaded 28 Jul 2017Source
  • 2 Copy of the legal title reportTitle 2008.pdf · uploaded 21 Aug 2017Source
  • 3 Copy of the legal title reportTitle 2006.pdf · uploaded 21 Aug 2017Source
  • 4 Copy of the legal title reportTitle 2005.pdf · uploaded 21 Aug 2017Source
  • 2 Certificates of CA (Form 3)FORM-3 REVISED MARIGOLD.pdf · uploaded 21 Aug 2017Source
  • 2 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Marigold Form 2 R.pdf · uploaded 13 Oct 2017Source
  • 2 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 Marigold R.pdf · uploaded 26 Oct 2017Source
  • 2 Proforma of Allotment letterFinal Marigold Allotment Letter_26_10_2017.pdf · uploaded 28 Oct 2017Source
  • 3 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architects Certificate MARIGOLD - Thakkar DEC 2017.pdf · uploaded 31 Jan 2018Source
  • 3 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)ENGINEERS CERTIFICATE - Marigold.pdf · uploaded 31 Jan 2018Source
  • 3 Certificates of CA (Form 3)Marigold.pdf · uploaded 31 Jan 2018Source
  • 4 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Marigold.pdf · uploaded 30 Apr 2018Source
  • 4 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Marigold.pdf · uploaded 30 Apr 2018Source
  • 4 Certificates of CA (Form 3)Marigold CA Certificate.pdf · uploaded 30 Apr 2018Source
  • 2 Commencement Certificates / NA Order for plotted developmentMarigold CC.pdf · uploaded 31 Jul 2018Source
  • 5 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1_Architect Certificate.pdf · uploaded 31 Jul 2018Source
  • 5 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2_Engineers Certificate.pdf · uploaded 31 Jul 2018Source
  • 5 Certificates of CA (Form 3)Form 3_CA Certificate.pdf · uploaded 31 Jul 2018Source
  • 1 Certificates of CA (Form 5)Marigold_Form 5.pdf · uploaded 30 Sep 2018Source
  • 6 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1_Marigold.pdf · uploaded 31 Oct 2018Source
  • 6 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2_Marigold.pdf · uploaded 1 Nov 2018Source
  • 6 Certificates of CA (Form 3)Form 3_Marigold.pdf · uploaded 1 Nov 2018Source
  • 7 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Marigold Form 1.pdf · uploaded 31 Jan 2019Source
  • 7 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Marigold Form 2.pdf · uploaded 31 Jan 2019Source
  • 7 Certificates of CA (Form 3)Marigold Form 3.pdf · uploaded 31 Jan 2019Source
  • 8 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Marigold Form 1.pdf · uploaded 27 Apr 2019Source
  • 8 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Marigold Form 2.pdf · uploaded 27 Apr 2019Source
  • 8 Certificates of CA (Form 3)Marigold Form 3.pdf · uploaded 27 Apr 2019Source
  • 9 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Marigold Form 1.pdf · uploaded 31 Jul 2019Source
  • 9 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Marigold Form 2.pdf · uploaded 31 Jul 2019Source
  • 9 Certificates of CA (Form 3)Marigold Form 3.pdf · uploaded 31 Jul 2019Source
  • 10 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Marigold Form 1.pdf · uploaded 30 Nov 2019Source
  • 10 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Marigold Form 2.pdf · uploaded 30 Nov 2019Source
  • 10 Certificates of CA (Form 3)Marigold Form 3.pdf · uploaded 9 Dec 2019Source
  • 11 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Marigold Form 1.pdf · uploaded 4 Feb 2020Source
  • 11 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Marigold Form 2.pdf · uploaded 4 Feb 2020Source
  • 11 Certificates of CA (Form 3)Marigold Form 3.pdf · uploaded 4 Feb 2020Source
  • 12 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Marigold Form 2.pdf · uploaded 28 Jan 2021Source
  • 12 Certificates of CA (Form 3)Marigold Form 3.pdf · uploaded 28 Jan 2021Source
  • 13 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Marigold Form 2.pdf · uploaded 2 Feb 2021Source
  • 13 Certificates of CA (Form 3)Marigold Form 3.pdf · uploaded 2 Feb 2021Source
  • 14 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Marigold Form 2.pdf · uploaded 9 Feb 2021Source
  • 14 Certificates of CA (Form 3)Marigold Form 3.pdf · uploaded 9 Feb 2021Source
  • 15 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Marigold Form 2.pdf · uploaded 29 Jul 2021Source
  • 15 Certificates of CA (Form 3)Marigold Form 3 March 2021.pdf · uploaded 29 Jul 2021Source
  • 16 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Marigold Form 2.pdf · uploaded 12 Aug 2021Source
  • 16 Certificates of CA (Form 3)Marigold Form 3- Final.pdf · uploaded 12 Aug 2021Source
  • 1 Declaration about Commencement CertificateMarigold bw wing- Declaration of CC.pdf · uploaded 20 Aug 2021Source
  • 1 Disclosure of sold/ booked inventoryInventory- Marigold b wing.pdf · uploaded 20 Aug 2021Source
  • 1 PAN CardSTGDPAN.pdf · uploaded 21 Aug 2021Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)SUPERVISORS CERTIFICATE - Marigold June 2019.pdf · uploaded 21 Aug 2021Source
  • 2 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)SUPERVISORS CERTIFICATE - Marigold Sept 2019.pdf · uploaded 21 Aug 2021Source
  • 3 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)SUPERVISORS CERTIFICATE - Marigold Dec 2019.pdf · uploaded 21 Aug 2021Source
  • 4 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)SUPERVISORS CERTIFICATE - Marigold Mar 2020.pdf · uploaded 21 Aug 2021Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Form 2A Marigold June 20.pdf · uploaded 21 Aug 2021Source
  • 2 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Form 2A Marigold Sept 20.pdf · uploaded 21 Aug 2021Source
  • 3 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Form 2A Marigold Dec 20.pdf · uploaded 21 Aug 2021Source
  • 4 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Form 2A Marigold March21.pdf · uploaded 21 Aug 2021Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)STGD FORM 5 2018-2019.pdf · uploaded 25 Aug 2021Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)STGD Form 5 2019-20.pdf · uploaded 25 Aug 2021Source
  • 17 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Marigold form 2.pdf · uploaded 1 Feb 2022Source
  • 17 Certificates of CA (Form 3)Marigold - Form 3 (1).pdf · uploaded 1 Feb 2022Source
  • 18 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 Marigold.pdf · uploaded 11 Feb 2022Source
  • 18 Certificates of CA (Form 3)Revised Form-3 Marigold.pdf · uploaded 11 Feb 2022Source
  • 19 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Marigold Form 2.pdf · uploaded 17 Feb 2022Source
  • 19 Certificates of CA (Form 3)Marigold Form 3 Final.pdf · uploaded 17 Feb 2022Source
  • 12 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Marigold Form 1 March 2020.pdf · uploaded 25 Feb 2022Source
  • 13 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Marigold Form 1 June 2020.pdf · uploaded 25 Feb 2022Source
  • 14 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Marigold Form 1 September 2020.pdf · uploaded 25 Feb 2022Source
  • 15 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Marigold Form 1 December 2020.pdf · uploaded 25 Feb 2022Source
  • 16 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Marigold Form 1 March 2021.pdf · uploaded 25 Feb 2022Source
  • 17 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Marigold Form 1 June 2021.pdf · uploaded 25 Feb 2022Source
  • 18 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Marigold Form 1 September 2021.pdf · uploaded 25 Feb 2022Source
  • 19 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Marigold Form 1 December 2021.pdf · uploaded 25 Feb 2022Source
  • 20 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Marigold Form 2.pdf · uploaded 30 Apr 2022Source
  • 20 Certificates of CA (Form 3)Form 3 - Marigold.pdf · uploaded 30 Apr 2022Source
  • 20 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Marigold Form 1.pdf · uploaded 2 May 2022Source
  • 21 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Marigold Form 2.pdf · uploaded 30 Jul 2022Source
  • 21 Certificates of CA (Form 3)Marigold Form 3.pdf · uploaded 30 Jul 2022Source
  • 22 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 Marigold.pdf · uploaded 15 Oct 2022Source
  • 22 Certificates of CA (Form 3)FORM 3 MARIGOLD_.pdf · uploaded 15 Oct 2022Source
  • 21 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Trupti Ropvatika Form 1.pdf · uploaded 18 Nov 2022Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)Marigold Form 5.pdf · uploaded 9 Jan 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Marigold.pdf · uploaded 9 Jan 2023Source
  • 23 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 Marigold.pdf · uploaded 17 Jan 2023Source
  • 23 Certificates of CA (Form 3)Form 3 Marigold.pdf · uploaded 17 Jan 2023Source
  • 22 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Marigold Form 1.pdf · uploaded 10 Apr 2023Source
  • 23 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Marigold Form 1.pdf · uploaded 10 Apr 2023Source
  • 24 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Marigold Form 1.pdf · uploaded 10 Apr 2023Source
  • 25 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Marigold Form 1.pdf · uploaded 22 May 2023Source
  • 24 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Marigold Form 2.pdf · uploaded 22 May 2023Source
  • 24 Certificates of CA (Form 3)Marigold Form 3.pdf · uploaded 22 May 2023Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Form 2A-June 21.pdf · uploaded 19 Jun 2023Source
  • 2 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Form 2A-Sept 21.pdf · uploaded 19 Jun 2023Source
  • 3 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Form 2A-Dec21.pdf · uploaded 19 Jun 2023Source
  • 4 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Form 2A-Mar 22.pdf · uploaded 19 Jun 2023Source
  • 5 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Form 2A March 2022.pdf · uploaded 19 Jun 2023Source
  • 6 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Form 2A - Dec 21.pdf · uploaded 19 Jun 2023Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form 2A -2023.pdf · uploaded 19 Jun 2023Source
  • 25 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 Marigold.pdf · uploaded 18 Aug 2023Source
  • 25 Certificates of CA (Form 3)Form 3 Marigold_compressed (2).pdf · uploaded 18 Aug 2023Source
  • 26 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 June 2023 marigold.pdf · uploaded 19 Oct 2023Source
  • 26 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Marigold Form 2 sept 2023.pdf · uploaded 21 Oct 2023Source
  • 26 Certificates of CA (Form 3)Marigold Form - 3_compressed.pdf · uploaded 21 Oct 2023Source
  • 27 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)FORM-2 marigold.pdf · uploaded 25 Jan 2024Source
  • 27 Certificates of CA (Form 3)Form 3 Marigold signed.pdf · uploaded 25 Jan 2024Source
  • 27 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 Marigold Sept 23.pdf · uploaded 30 Jan 2024Source
  • 28 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 Marigold Dec 23.pdf · uploaded 30 Jan 2024Source
  • 2 a Details of encumbrances concerned to Finance1 Details of encumbrances.pdf · uploaded 31 Jan 2024Source
  • 1 b Details of encumbrances concerned to Legal1 Details of encumbrances.pdf · uploaded 31 Jan 2024Source
  • 2 Disclosure of sold/ booked inventoryMarigold Disclosure of invenstory 310124.pdf · uploaded 31 Jan 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Form 5 for FY 2022-23.pdf · uploaded 1 Feb 2024Source
  • 3 Disclosure of sold/ booked inventoryMarigold Disclosure of invenstory.pdf · uploaded 6 Mar 2024Source
  • 29 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 Marigold Dec 23.pdf · uploaded 7 Mar 2024Source
  • 28 Certificates of CA (Form 3)Final Form 3 Marigold 31122023.pdf · uploaded 12 Mar 2024Source
  • 2 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Form 5 Marigold.pdf · uploaded 12 Mar 2024Source
  • 30 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Marigold Form 1 Mar 23.pdf · uploaded 16 Mar 2024Source
  • 31 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 June 2023 marigold.pdf · uploaded 16 Mar 2024Source
  • 32 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 Marigold Sept 23.pdf · uploaded 16 Mar 2024Source
  • 33 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 Marigold Dec 23.pdf · uploaded 16 Mar 2024Source
  • 4 Disclosure of sold/ booked inventoryMarigold Disclosure of invenstory 160324.pdf · uploaded 16 Mar 2024Source
  • 2 Certificates of CA (Form 5)Form 5 FY 17-18.pdf · uploaded 16 Mar 2024Source
  • 2 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)Form 5 FY 18-19.pdf · uploaded 16 Mar 2024Source
  • 2 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)Form 5 FY 19-20.pdf · uploaded 16 Mar 2024Source
  • 2 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)Form 5 FY 20-21.pdf · uploaded 16 Mar 2024Source
  • 2 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Form 5 FY 21-22.pdf · uploaded 16 Mar 2024Source
  • 3 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Form 5 FY 22-23.pdf · uploaded 16 Mar 2024Source
  • 28 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)24 Certificates of Engineer (Form 2)(Mandatory for only ongoing project) (1).pdf · uploaded 20 Mar 2024Source
  • 29 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)25 Certificates of Engineer (Form 2)(Mandatory for only ongoing project).pdf · uploaded 20 Mar 2024Source
  • 30 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)26 Certificates of Engineer (Form 2)(Mandatory for only ongoing project).pdf · uploaded 20 Mar 2024Source
  • 31 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)27 Certificates of Engineer (Form 2)(Mandatory for only ongoing project).pdf · uploaded 20 Mar 2024Source
  • 2 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form 2A -2023.pdf · uploaded 20 Mar 2024Source
  • 29 Certificates of CA (Form 3)Final Form 3 Marigold 150324.pdf · uploaded 20 Mar 2024Source
  • 30 Certificates of CA (Form 3)Form - 3 Marigold sept23.pdf · uploaded 20 Mar 2024Source
  • 31 Certificates of CA (Form 3)Marigold Form 3 Mar 23.pdf · uploaded 21 Mar 2024Source
  • 32 Certificates of CA (Form 3)Marigold Form 3 June 23.pdf · uploaded 21 Mar 2024Source
  • 33 Certificates of CA (Form 3)Marigold form 3 Sept 23.pdf · uploaded 21 Mar 2024Source
  • 34 Certificates of CA (Form 3)Final Form 3 Marigold dec 23.pdf · uploaded 21 Mar 2024Source
  • 35 Certificates of CA (Form 3)Final Form 3 Marigold Dec 23.pdf · uploaded 22 Mar 2024Source
  • 32 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 Marigold 31032024.pdf · uploaded 24 May 2024Source
  • 36 Certificates of CA (Form 3)Form 3 Marigold 31032024_compressed.pdf · uploaded 24 May 2024Source
  • 34 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 Marigold Mar 24.pdf · uploaded 5 Jun 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)SUPERVISORS CERTIFICATE - Marigold New Format Annual 2024.pdf · uploaded 5 Jun 2024Source
  • 5 Disclosure of sold/ booked inventoryDisclosure of inventory Marigold.pdf · uploaded 5 Jun 2024Source
  • 1 CERSAI detailsMarigold CERSAI_Search_Report.pdf · uploaded 5 Jun 2024Source
  • 1 Certificates of CA (Form 3)Form 3 Marigold Cost Incurred 30062024 - final.pdf · uploaded 30 Nov 2024Source
  • 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 Marigold 300624.pdf · uploaded 30 Nov 2024Source
  • 1 Certificates of CA (Form 3)Form 3 Marigold 30092024.pdf · uploaded 15 Mar 2025Source
  • 2 Certificates of CA (Form 3)Form 3 Marigold 31122024.pdf · uploaded 15 Mar 2025Source
  • 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 Marigold Sept24.pdf · uploaded 15 Mar 2025Source
  • 2 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 Marigold Dec 24.pdf · uploaded 15 Mar 2025Source
  • Form 1Form 1 Marigold Jun 24.pdf · uploaded 8 Apr 2026Source
  • Form 1Form 1 Marigold Sept 24.pdf · uploaded 8 Apr 2026Source
  • Form 1Form 1 Marigold Dec 24.pdf · uploaded 8 Apr 2026Source
  • Form 1Form 1 Marigold Mar 25.pdf · uploaded 8 Apr 2026Source
  • Form 1Form 1 Marigold Jun 25.pdf · uploaded 8 Apr 2026Source
  • Form 1Form 1 Marigold Sept 25.pdf · uploaded 8 Apr 2026Source
  • Form 1Form 1 Marigold Dec 25.pdf · uploaded 8 Apr 2026Source
  • Form 2Form 2 Marigold June 24.pdf · uploaded 8 Apr 2026Source
  • Form 2Form 2 marigold Sept 24.pdf · uploaded 8 Apr 2026Source
  • Form 2Form 2 Marigold Dec 24.pdf · uploaded 8 Apr 2026Source
  • Form 2Form 2 Marigold Mar 25.pdf · uploaded 8 Apr 2026Source
  • Form 2Form 2 Marigold Jun25.pdf · uploaded 8 Apr 2026Source
  • Form 2Form 2 Marigold Sep25.pdf · uploaded 8 Apr 2026Source
  • Form 2Form 2 Marigold Dec 25.pdf · uploaded 8 Apr 2026Source
  • Form 3Form 3 Marigold June 2024.pdf · uploaded 8 Apr 2026Source
  • Form 3Form 3 Sep 24 Marigold.pdf · uploaded 8 Apr 2026Source
  • Form 3Form 3 Marigold Dec 24.pdf · uploaded 8 Apr 2026Source
  • Form 3Form 3.pdf · uploaded 8 Apr 2026Source
  • Form 3Form 3 of marigold Jun 25.pdf · uploaded 8 Apr 2026Source
  • Form 3Form 3.pdf · uploaded 8 Apr 2026Source
  • Form 3Form 3 Dec 2025.pdf · uploaded 8 Apr 2026Source
  • Disclosure of Sold and Booked InventoryDisclosure of sold booked inventory june 2024.pdf · uploaded 8 Apr 2026Source
  • Disclosure of Sold and Booked InventoryInventory Marigold Sep 2024.pdf · uploaded 8 Apr 2026Source
  • Disclosure of Sold and Booked InventoryInventory Dec 2024.pdf · uploaded 8 Apr 2026Source
  • Disclosure of Sold and Booked InventorySold Unsold Inventory Mar 25.pdf · uploaded 8 Apr 2026Source
  • Disclosure of Sold and Booked InventoryInventory as at June 2025.pdf · uploaded 8 Apr 2026Source
  • Disclosure of Sold and Booked InventoryInventory as at Sep 2025.pdf · uploaded 8 Apr 2026Source
  • Disclosure of Sold and Booked InventoryInventory as at Dec 2025.pdf · uploaded 8 Apr 2026Source
  • Form 2A (FY 2024-2025)Form2A - Marigold 24-25.pdf · uploaded 2 Jul 2026Source
  • Form 2A (FY 2025-2026)Form 2A- Marigold 25-26.pdf · uploaded 2 Jul 2026Source
  • Form 5 (FY 2024-2025)Form 5 FY 24-25 marigold.pdf · uploaded 2 Jul 2026Source

Technical

  • DocumentMarigold Layout Plan 24 09 09.pdf · uploaded 28 Jul 2017Source
  • DocumentSiddeshwar 2 05 2008.pdf · uploaded 28 Jul 2017Source
  • DocumentMarigold IOD.pdf · uploaded 28 Jul 2017Source

Technical (Architect)

  • DocumentForm 1 Marigold Mar 24.pdf · uploaded 5 Jun 2024Source

Technical (Engineer)

  • DocumentForm 2 Marigold 31032024.pdf · uploaded 24 May 2024Source
  • DocumentForm 2 Marigold 300624.pdf · uploaded 30 Nov 2024Source
  • DocumentForm 2 Marigold Sept24.pdf · uploaded 15 Mar 2025Source
  • DocumentForm 2 Marigold Dec 24.pdf · uploaded 15 Mar 2025Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Land & approvalsLand parcel 1/1C, 1/1D

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Certificate Signed
Unit types
2 BHK, 3 BHK87 units in all
Address
1/1c, 1/1d, 1/1e, 1/1f, 1/1g, 2/1, 2/2, 3, ThanePIN 400607
Village
Thane (M Corp.), Thane taluka
Land area for this project
450 sq m (4,844 sq ft)
Permissible built-up area
7,763 sq m (83,556 sq ft)
Sanctioned built-up area
263 sq m (2,827 sq ft)
Designated bank account
76
Developed in phases
No

Survey, CTS, gat or plot numbers

1/1C1/1D1/1E1/1F1/1G2/12/23

Land as published on MahaRERA's project page

1/1C, 1/1D, 1/1E, 1/1F, 1/1G, 2/1, 2/2, 3

Boundaries

North
Everest World CHS
South
Prathamesh Hill
East
40 m DP road
West
Village Chitalsar Manpada

Source: registration certificates and MahaRERA's project page, as stated there.

Units & parking87 units

58 of 87 units booked (67%), as the promoter reported to MahaRERA

2 BHK · 64 units3 BHK · 23 units
TypeCarpet areaUnitsBooked
2 BHK56.65 sq m · 610 sq ft2316
2 BHK61.31 sq m · 660 sq ft1812
2 BHK61.92 sq m · 667 sq ft2317
3 BHK76 sq m · 818 sq ft2313

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Professionals5

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectManav Consulatants—
ArchitectNav Rachna—
Chartered accountantShashank Rajendra Jain—
EngineerR C Tipnis—
EngineerVijay Salunke—

Source: MahaRERA project page. Contact details are not shown.

Other projects in Thane (M Corp.)

All 898 projects in Thane (M Corp.) · Compare Marigold B wing with another project

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project page · MahaRERA regulatory lists and ordersData through is when MahaRERA's project page was last read.Report a problemMethodology