Residential / Group Housing · 1 building · 318 unitsRERA P51700048278

25HOURLIFE - Tower C1

Deedo IDDP-THN-TQHP

Completion was pushed back 4 months, to Apr 2030; no MahaRERA orders on record; 77% of its units are booked.

Panchpakhadi, Thane 400607 · by Runwal Developers Ltd · 0% of its projects kept the RERA date

DeliveryExtended 4 moPromised Dec 2029 · now due Apr 2030RegulatoryNo ordersNot in any MahaRERA list or order Deedo has readSales77% booked245 of 318 units · as the promoter reported to MahaRERA

Buying a flat here?

See every deed registered on it.

Completion was pushed back 4 months, to Apr 2030

  • This projectRegistered 22 Dec 2022, completion promised 31 Dec 2029, revised to 30 Apr 2030.

No extension certificate on record.

1 registration · Source: MahaRERA registration and extension certificates

Latest registered deeds

Sales first, then rentals and mortgages matched to this project · the free view shows a price band

No registered deeds matched to this project yet
Sales, resales, rentals and mortgages appear here once registered documents are matched to it by evidence.

The building

Open a building to see every flat, floor by floor.

Floors and units from the registration certificate annexures and MahaRERA's project page.

Regulatory recordNone found

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

RERA registrationP51700048278
RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5170004827822 Dec 202231 Dec 202930 Apr 2030Runwal Developers LimitedProject page
Documents150

1 document held by Deedo, 149 filings listed on MahaRERA's project page

Registration certificate

Finance

  • PAN CardPan Card - DWMPL.pdf · uploaded 5 Dec 2022Source
  • PAN CardPan Card - RDPL.pdf · uploaded 28 Oct 2024Source

Legal

  • Declaration Form BForm B Affidavit cum Declaration of Tower C1.pdf · uploaded 5 Dec 2022Source
  • Legal Title reportRERA TITLE CERTIFICATE P2.pdf · uploaded 7 Dec 2022Source
  • Legal Title reportSupplementary Title Certificate issued by Adv Ditendra Mishra dtd 31 10 2024.pdf · uploaded 20 Nov 2024Source
  • Legal Title reportSupplementary Title Certificate issued by Adv Ditendra Mishra dtd 31 10 2024.pdf · uploaded 20 Nov 2024Source

Migrated

  • 1 Copy of Layout Approval (in case of layout)Layout Plan_compressed.pdf · uploaded 3 Dec 2022Source
Show all 150 documentsShow fewer documents

Migrated

  • 1 Building Plan Approval / NA Order for plotted developmentBuilding Plan 12_compressed.pdf · uploaded 3 Dec 2022Source
  • 1 Commencement Certificates / NA Order for plotted developmentCompress Commencement Certificate.pdf · uploaded 3 Dec 2022Source
  • 1 CERSAI detailsCersai Report.pdf · uploaded 3 Dec 2022Source
  • 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameEscrow Account Declaration C1.pdf · uploaded 3 Dec 2022Source
  • 1 PAN CardPan Card - DWMPL.pdf · uploaded 5 Dec 2022Source
  • 1 Declaration in FORM BForm B Affidavit cum Declaration of Tower C1.pdf · uploaded 5 Dec 2022Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Engineer Certificate Tower C1.pdf · uploaded 6 Dec 2022Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Quality Assurance Certificate 22 23 for Tower C1.pdf · uploaded 6 Dec 2022Source
  • 1 Disclosure of sold/ booked inventorySold Unsold for Tower C1.pdf · uploaded 6 Dec 2022Source
  • 1 Deviation Report with respect to model copy of AgreementDeclaration on Deviation in AFS Part I.pdf · uploaded 6 Dec 2022Source
  • 2 Deviation Report with respect to model copy of AgreementDeclaration on Deviation in AFS Part II.pdf · uploaded 6 Dec 2022Source
  • 1 Copy of the legal title reportRERA TITLE CERTIFICATE P2.pdf · uploaded 7 Dec 2022Source
  • 1 a Details of encumbrances concerned to FinanceSelf Declaration for Encumbrance Finance for Tower C1 Merge file.pdf · uploaded 7 Dec 2022Source
  • 2 a Details of encumbrances concerned to Finance1b Self Declaration of Encumbrance Legal Tower C1 Merged file.pdf · uploaded 7 Dec 2022Source
  • 1 b Details of encumbrances concerned to LegalSelf Declaration for Encumbrance Finance for Tower C1 Merge file.pdf · uploaded 7 Dec 2022Source
  • 2 b Details of encumbrances concerned to Legal1b Self Declaration of Encumbrance Legal Tower C1 Merged file.pdf · uploaded 7 Dec 2022Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Architect Certificate for Tower C1.pdf · uploaded 7 Dec 2022Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Chartered Accountants Certificate for Tower C1.pdf · uploaded 7 Dec 2022Source
  • 1 Proforma of Allotment letterAllotment Letter for Tower C1.pdf · uploaded 7 Dec 2022Source
  • 1 Deviation Report with respect to Allotment letterDeclaration on Deviation in Allotment Ltr for Tower C1.pdf · uploaded 7 Dec 2022Source
  • 2 Copy of Layout Approval (in case of layout)Building Plan 3.pdf · uploaded 13 Dec 2022Source
  • 3 Copy of Layout Approval (in case of layout)Building Plan 4.pdf · uploaded 13 Dec 2022Source
  • 4 Copy of Layout Approval (in case of layout)Building Plan 5.pdf · uploaded 13 Dec 2022Source
  • 5 Copy of Layout Approval (in case of layout)LAYOUT FOR C1.pdf · uploaded 13 Dec 2022Source
  • 1 Declaration about Commencement CertificateDeclaration on CC Tower C1.pdf · uploaded 13 Dec 2022Source
  • 1 Proforma of Agreement for saleFIRST DRAFT OF AFS P B Global for C1 with payment schedule 6 dtd 13 12 2022_compressed.pdf · uploaded 13 Dec 2022Source
  • 3 Deviation Report with respect to model copy of AgreementDeclaration on Deviation in AFS Part III.pdf · uploaded 13 Dec 2022Source
  • 1 Other – TechnicalSelf Declaration - Layout Plan.pdf · uploaded 13 Dec 2022Source
  • 2 Other – TechnicalDWMPL - Self Declaration ( 25Housrlife - Tower C1 ).pdf · uploaded 4 Jan 2023Source
  • 3 Other – TechnicalC1.pdf · uploaded 4 Jan 2023Source
  • 3 a Details of encumbrances concerned to FinanceLegal Encumbrance- 25 Hour Life C1.pdf · uploaded 17 Feb 2023Source
  • 3 b Details of encumbrances concerned to LegalLegal Encumbrance- 25 Hour Life C1.pdf · uploaded 17 Feb 2023Source
  • 4 a Details of encumbrances concerned to FinanceSelf Declaration - 25Hourlife Tower C 1.pdf · uploaded 2 Mar 2023Source
  • 4 b Details of encumbrances concerned to LegalSelf Declaration - 25Hourlife Tower C 1.pdf · uploaded 2 Mar 2023Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 25hourlife Tower C1 31 03 2023.pdf · uploaded 20 Apr 2023Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 25Hourlife Tower C1 31 03 2023.pdf · uploaded 20 Apr 2023Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 25HourLife Tower C1 31 03 2023.pdf · uploaded 21 Apr 2023Source
  • 2 Disclosure of sold/ booked inventorySold Unsold for Tower C1 31 03 2023.pdf · uploaded 21 Apr 2023Source
  • 2 Proforma of Agreement for saleCompressed First Draft of AFS P B Global C1 26 5 2023.pdf · uploaded 26 May 2023Source
  • 4 Other – TechnicalTOWER-C1 PROPOSED FLOOR PLAN 25 5 2023.pdf · uploaded 26 May 2023Source
  • 5 a Details of encumbrances concerned to FinanceSelf Declaration of Encumbrance Legal C1 dtd 04 07 2023.pdf · uploaded 6 Jul 2023Source
  • 5 b Details of encumbrances concerned to LegalSelf Declaration of Encumbrance Legal C1 dtd 04 07 2023.pdf · uploaded 6 Jul 2023Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 25Hourlife Tower C1 as on 30 06 2023.pdf · uploaded 20 Jul 2023Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 TC1 as on 30 06 2023.pdf · uploaded 21 Jul 2023Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 TC as on 30 06 2023.pdf · uploaded 21 Jul 2023Source
  • 3 Disclosure of sold/ booked inventorySold Unsold list as on 30 06 2023 Pg 1 to 6_compressed.pdf · uploaded 21 Jul 2023Source
  • 4 Disclosure of sold/ booked inventorySold Unsold list as on 30 06 2023 Pgs 7 to 12.pdf · uploaded 21 Jul 2023Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 25Hourlife Tower C1.pdf · uploaded 19 Oct 2023Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 25Hourlife Tower C1 30 Sept 2023.pdf · uploaded 20 Oct 2023Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Tower C1.pdf · uploaded 23 Oct 2023Source
  • 1 Home Buyer /Allottee Grievance Redressal CellDeclaration 25Hourlife Tower C1.pdf · uploaded 23 Oct 2023Source
  • 5 Disclosure of sold/ booked inventorySold Unsold Tower C1 30 09 2023.pdf · uploaded 26 Oct 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Form 5.pdf · uploaded 16 Nov 2023Source
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 18 Jan 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form 2A.pdf · uploaded 18 Jan 2024Source
  • 6 Disclosure of sold/ booked inventorySold Unsold Inventory compressed.pdf · uploaded 19 Jan 2024Source
  • 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 compressed.pdf · uploaded 19 Jan 2024Source
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)From 2.pdf · uploaded 23 Jan 2024Source
  • 3 Proforma of Agreement for saleRevised AFS P B Global C1 18 11 2023.pdf · uploaded 5 Feb 2024Source
  • 2 Commencement Certificates / NA Order for plotted developmentCC dated 26 2 2024.pdf · uploaded 6 Mar 2024Source
  • 2 Declaration about Commencement CertificateP B GLOBAL C1 CC Declaration.pdf · uploaded 16 Mar 2024Source
  • 6 a Details of encumbrances concerned to FinanceFinance Encumbrance 29 02 2024 C1.pdf · uploaded 21 Mar 2024Source
  • 6 b Details of encumbrances concerned to LegalFinance Encumbrance 29 02 2024 C1.pdf · uploaded 21 Mar 2024Source
  • 7 Disclosure of sold/ booked inventorySold Unsold Inventory March 2024.pdf · uploaded 19 Apr 2024Source
  • 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 March 2024.pdf · uploaded 19 Apr 2024Source
  • 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 March 2024.pdf · uploaded 20 Apr 2024Source
  • 2 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)From 2A March 2024.pdf · uploaded 20 Apr 2024Source
  • 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 March 2024.pdf · uploaded 29 Apr 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)From 2A March 2024.pdf · uploaded 2 May 2024Source
  • 8 Disclosure of sold/ booked inventorySold Unsold Inventory June 2024.pdf · uploaded 19 Jul 2024Source
  • 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 June 2024.pdf · uploaded 22 Jul 2024Source
  • 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 June 2024.pdf · uploaded 22 Jul 2024Source
  • 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 June 2024.pdf · uploaded 23 Jul 2024Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Sep 2024.pdf · uploaded 21 Oct 2024Source
  • 2 Disclosure of sold/ booked inventorySold Unsold Inventory.pdf · uploaded 21 Oct 2024Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Sep 2024.pdf · uploaded 22 Oct 2024Source
  • 1 PAN CardPan Card - RDPL.pdf · uploaded 28 Oct 2024Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Sep 2024 25hourlife.pdf · uploaded 29 Oct 2024Source
  • 1 Proforma of Agreement for saleAFS 25Hourlife C1 1 to 100.pdf · uploaded 20 Nov 2024Source
  • 1 Proforma of Agreement for saleAFS 25Hourlife C1 101 to 132.pdf · uploaded 20 Nov 2024Source
  • 1 Copy of the legal title reportSupplementary Title Certificate issued by Adv Ditendra Mishra dtd 31 10 2024.pdf · uploaded 20 Nov 2024Source
  • 1 Copy of the legal title reportSupplementary Title Certificate issued by Adv Ditendra Mishra dtd 31 10 2024.pdf · uploaded 20 Nov 2024Source
  • 4 Proforma of Agreement for saleAFS 25Hourlife C1 1 to 100.pdf · uploaded 20 Nov 2024Source
  • 5 Proforma of Agreement for saleAFS 25Hourlife C1 101 to 132.pdf · uploaded 20 Nov 2024Source
  • 2 a Details of encumbrances concerned to FinanceLegal Encumbrance 25 Hourlife Tower C1.pdf · uploaded 6 Dec 2024Source
  • 2 b Details of encumbrances concerned to LegalLegal Encumbrance 25 Hourlife Tower C1.pdf · uploaded 6 Dec 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form 5 2023 24.pdf · uploaded 13 Jan 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Dec 2024.pdf · uploaded 21 Jan 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)From 3 Dec 2024.pdf · uploaded 21 Jan 2025Source
  • 1 a Details of encumbrances concerned to FinanceLegal Encumbrance Tower C1.pdf · uploaded 22 Jan 2025Source
  • 1 b Details of encumbrances concerned to LegalLegal Encumbrance Tower C1.pdf · uploaded 22 Jan 2025Source
  • 1 Disclosure of sold/ booked inventorySold Unsold Inventory Dec 2024.pdf · uploaded 23 Jan 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Dec 2024.pdf · uploaded 27 Jan 2025Source
  • 1 Proforma of Agreement for saleC1 -Revised AFS with 2nd Supplementary Title Certificate Part 1.pdf · uploaded 12 Feb 2025Source
  • 2 Proforma of Agreement for saleC1 -Revised AFS with 2nd Supplementary Title Certificate Part 2.pdf · uploaded 12 Feb 2025Source
  • 3 Proforma of Agreement for saleC1 -Revised AFS with 2nd Supplementary Title Certificate Part 3.pdf · uploaded 12 Feb 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)1.pdf · uploaded 18 Apr 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3.pdf · uploaded 18 Apr 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 18 Apr 2025Source
  • 1 Disclosure of sold/ booked inventorySold Unsold Inventory.pdf · uploaded 3 May 2025Source
  • Form 1Form 1 June 2025.pdf · uploaded 29 Jul 2025Source
  • Form 2Form 2.pdf · uploaded 29 Jul 2025Source
  • Form 3Form 3.pdf · uploaded 29 Jul 2025Source
  • Disclosure of Sold and Booked InventorySold Unsold Inventory June 2025.pdf · uploaded 29 Jul 2025Source
  • Form 1Form 1.pdf · uploaded 28 Oct 2025Source
  • Form 2Form 2.pdf · uploaded 28 Oct 2025Source
  • Form 3Form 3.pdf · uploaded 28 Oct 2025Source
  • Disclosure of Sold and Booked InventorySold Unsold Inventory.pdf · uploaded 28 Oct 2025Source
  • Form 5 (FY 2024-2025)Form 5.pdf · uploaded 3 Dec 2025Source
  • Form 2A (FY 2024-2025)Form 2A.pdf · uploaded 11 Dec 2025Source
  • Withdrawal Update Form 1Form 1.pdf · uploaded 20 Mar 2026Source
  • Withdrawal Update Form 2Form 2 June 2024.pdf · uploaded 20 Mar 2026Source
  • Withdrawal Update Form 3Form 3-C1.pdf · uploaded 20 Mar 2026Source
  • Withdrawal Update Form 1Form 1.pdf · uploaded 30 Apr 2026Source
  • Withdrawal Update Form 1Form 1.pdf · uploaded 30 Apr 2026Source
  • Withdrawal Update Form 2Form 2 June 2024.pdf · uploaded 30 Apr 2026Source
  • Withdrawal Update Form 2Form 2.pdf · uploaded 30 Apr 2026Source
  • Withdrawal Update Form 3Form 3-C1.pdf · uploaded 30 Apr 2026Source
  • Withdrawal Update Form 3FORM 3.pdf · uploaded 30 Apr 2026Source
  • Withdrawal Update Form 1Form 1.pdf · uploaded 13 Jul 2026Source
  • Withdrawal Update Form 2Form 2.pdf · uploaded 13 Jul 2026Source
  • Withdrawal Update Form 3Form 3.pdf · uploaded 13 Jul 2026Source
  • Form 2A (FY 2025-2026)From 2A.pdf · uploaded 17 Jul 2026Source
  • Form 5 (FY 2025-2026)Form 5-25HourLife-Tower C1.pdf · uploaded 5 Oct 2026Source

Technical

  • DocumentLayout Plan_compressed.pdf · uploaded 3 Dec 2022Source
  • DocumentBuilding Plan 12_compressed.pdf · uploaded 3 Dec 2022Source
  • DocumentBuilding Plan 3.pdf · uploaded 13 Dec 2022Source
  • DocumentBuilding Plan 4.pdf · uploaded 13 Dec 2022Source
  • DocumentBuilding Plan 5.pdf · uploaded 13 Dec 2022Source
  • DocumentLAYOUT FOR C1.pdf · uploaded 13 Dec 2022Source
  • Other – TechnicalSelf Declaration - Layout Plan.pdf · uploaded 13 Dec 2022Source
  • Other – TechnicalDWMPL - Self Declaration ( 25Housrlife - Tower C1 ).pdf · uploaded 4 Jan 2023Source
  • Other – TechnicalC1.pdf · uploaded 4 Jan 2023Source
  • Other – TechnicalTOWER-C1 PROPOSED FLOOR PLAN 25 5 2023.pdf · uploaded 26 May 2023Source

Technical (Architect)

  • DocumentForm 1 Sep 2024.pdf · uploaded 22 Oct 2024Source
  • DocumentForm 1 Dec 2024.pdf · uploaded 21 Jan 2025Source
  • Document1.pdf · uploaded 18 Apr 2025Source
  • DocumentForm 1.pdf · uploaded 13 Jul 2026Source

Technical (Engineer)

  • DocumentForm 2 Sep 2024 25hourlife.pdf · uploaded 29 Oct 2024Source
  • DocumentForm 2 Dec 2024.pdf · uploaded 27 Jan 2025Source
  • DocumentForm 2.pdf · uploaded 18 Apr 2025Source
  • DocumentForm 2.pdf · uploaded 13 Jul 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Land & approvalsLand parcel 2/2 (part), 2/5 (part)

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Certificate Signed
Unit types
—319 units in all
Address
2/2 (part) & 2/5 (part), Ghodbundar Road, PanchpakhadiPIN 400607
Village
Thane (M Corp.), Thane taluka
Land area for this project
1,675 sq m (18,030 sq ft)
Permissible built-up area
35,853 sq m (3,85,922 sq ft)
Sanctioned built-up area
27,441 sq m (2,95,373 sq ft)
Recreational open space
5,079 sq m (54,670 sq ft)
Designated bank account
85
Developed in phases
No

Survey, CTS, gat or plot numbers

2/2 (part)2/5 (part)

Land as published on MahaRERA's project page

2/2 (part) & 2/5 (part)

Boundaries

North
Gaothan
South
Podium Parking
East
Tower D1
West
Tower B1

Source: registration certificates and MahaRERA's project page, as stated there.

Units & parking319 units

319 units registered

— · 319 units
TypeCarpet areaUnits
——319

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Professionals31

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectBroadway Malyan—
ArchitectNinad Dinkar Mhaskar—
Chartered accountantS P Gunjal & Associates—
EngineerMadhusudan Narayan—
EngineerRaman Iyer—
EngineerSanjay Singh—
Registered real estate agent360 Realtors LLP—
Registered real estate agentAddressofchoice Realty Pvt Ltd—
Show all 31 professionalsShow fewer professionals
RoleNameRegistration no.
Registered real estate agentAdhik Balu Mahajan—
Registered real estate agentAmardeep Rajendra Tiwari—
Registered real estate agentAmol Maruti Dongare—
Registered real estate agentAnand Shrikant Khedlekar—
Registered real estate agentAtul Ganeshnandan Tiwari—
Registered real estate agentBullmen Realty India Private Limited—
Registered real estate agentCorazon Homes And Securities—
Registered real estate agentHomesfy Realty Private Limited—
Registered real estate agentHorizon Financial &Properties Advisers Private Limited—
Registered real estate agentJaya Pradeep Madhyani—
Registered real estate agentJM Financial Products Limited—
Registered real estate agentKanchan Ramesh Parmar—
Registered real estate agentLivnest Technologies Private Limited—
Registered real estate agentMachindra Choudhri—
Registered real estate agentManisha Lifespaces Consulting Pvt. Ltd.—
Registered real estate agentMarketing Space Private Limited—
Registered real estate agentMystic India Realtors LLP—
Registered real estate agentNobroker Technologies Solutions Private Limited—
Registered real estate agentPrelaunch Realty Private Limited—
Registered real estate agentProptiger Marketing Services Private Limited—
Registered real estate agentS. V. Incorporation—
Registered real estate agentUma Mohan Sanghvi—
Registered real estate agentWillow Stone Realty Private Limited—

Source: MahaRERA project page. Contact details are not shown.

Other projects in Panchpakhadi

All 65 projects in Panchpakhadi · Compare 25HOURLIFE - Tower C1 with another project

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Report a problemMethodology