Mixed · 16 buildings · 1,107 unitsRERA P51700019178 +1

Birla Vanya

Deedo IDDP-THN-V2PT

MahaRERA shows it completed, after its date was pushed back 3 months; no MahaRERA orders on record; 91% of its units are booked.

Shahad, Thane 421103 · by Century Textiles & Industries Ltd

DeliveryCompletedCompletion / occupancy certificate on MahaRERA · after a 3 mo extensionRegulatoryNo ordersNot in any MahaRERA list or order Deedo has readSales91% booked1,005 of 1,107 units · as the promoter reported to MahaRERA

Buying a flat here?

See every deed registered on it.

MahaRERA shows it completed, after its date was pushed back 3 months

  • P51700019178Registered 9 Jan 2019, completion promised 30 Jun 2025.
  • P51700029755Registered 29 Jun 2021, completion promised 31 Mar 2025, revised to 30 Jun 2025.

1 extension certificate on record.

2 registrations · Source: MahaRERA registration and extension certificates

Latest registered deeds

Sales first, then rentals and mortgages matched to this project · the free view shows a price band

No registered deeds matched to this project yet
Sales, resales, rentals and mortgages appear here once registered documents are matched to it by evidence.

16 buildings

Open a building to see every flat, floor by floor.

Show all 16 buildingsShow fewer buildings

Floors and units from the registration certificate annexures and MahaRERA's project page.

Regulatory recordNone found

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

RERA registrations2
RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P517000191789 Jan 201930 Jun 202530 Jun 2025Century Textiles & Industries LtdProject page
P5170002975529 Jun 202131 Mar 202530 Jun 2025Century Textiles & Industries LtdProject page
Documents457

5 documents held by Deedo, 452 filings listed on MahaRERA's project page

Registration certificate (2)

  • Registration certificateP51700029755 · 29 Jun 2021ViewSource
  • Registration certificateP51700019178 · 9 Sep 2021ViewSource

Extension certificate

  • Extension certificateP51700029755 · 26 Mar 2025ViewSource

Other (2)

  • OtherP51700019178 · Date not statedView
  • OtherP51700029755 · Date not statedView

Finance

  • PAN CardP51700019178 · CTIL PAN CARD.pdf · uploaded 27 Dec 2018Source
  • PAN CardP51700029755 · CTIL PAN CARD.pdf · uploaded 17 Jun 2021Source
  • PAN CardP51700029755 · BEPL-PANCARD.pdf · uploaded 17 Jun 2021Source
Show all 457 documentsShow fewer documents

Legal

  • Legal Title reportP51700019178 · Title Certificate.pdf · uploaded 27 Dec 2018Source
  • Declaration Form BP51700019178 · Form B- Century Estates final.pdf · uploaded 27 Dec 2018Source
  • OtherP51700019178 · ELEVATION-A-.pdf · uploaded 3 Jan 2019Source
  • OtherP51700019178 · MASTER PLAN WITH TYPICAL FLOOR.pdf · uploaded 3 Jan 2019Source
  • OtherP51700019178 · MASTER PLAN WITH REFUGE FLOOR.pdf · uploaded 3 Jan 2019Source
  • OtherP51700019178 · PODIUM- FIRST LEVEL.pdf · uploaded 3 Jan 2019Source
  • OtherP51700019178 · PODIUM- SECOND LEVEL - compressed.pdf · uploaded 3 Jan 2019Source
  • OtherP51700019178 · PODIUM- THIRD LEVEL - compressed.pdf · uploaded 3 Jan 2019Source
  • OtherP51700019178 · PODIUM- FOURTH LEVEL - compressed.pdf · uploaded 3 Jan 2019Source
  • OtherP51700019178 · PODIUM- FIFTHLEVEL.pdf · uploaded 3 Jan 2019Source
  • OtherP51700019178 · PODIUM- SIXTH - LANDSCAPE EVEL.pdf · uploaded 3 Jan 2019Source
  • OtherP51700019178 · PODIUM- STILT LEVEL.pdf · uploaded 3 Jan 2019Source
  • OtherP51700019178 · TYPICAL FLOOR PLAN-Tower A.pdf · uploaded 3 Jan 2019Source
  • OtherP51700019178 · TYPICAL FLOOR PLAN-Tower B.pdf · uploaded 3 Jan 2019Source
  • OtherP51700019178 · TYPICAL FLOOR PLAN-Tower F.pdf · uploaded 3 Jan 2019Source
  • OtherP51700019178 · TYPICAL FLOOR PLAN-Tower G.pdf · uploaded 3 Jan 2019Source
  • OtherP51700019178 · TYPICAL REFUGE FLOOR PLAN-Tower A.pdf · uploaded 3 Jan 2019Source
  • OtherP51700019178 · TYPICAL REFUGE FLOOR PLAN-Tower B.pdf · uploaded 3 Jan 2019Source
  • OtherP51700019178 · TYPICAL REFUGE FLOOR PLAN-Tower F.pdf · uploaded 3 Jan 2019Source
  • OtherP51700019178 · TYPICAL REFUGE FLOOR PLAN-Tower G.pdf · uploaded 3 Jan 2019Source
  • OtherP51700019178 · TYPICAL SECTION-Model.pdf · uploaded 3 Jan 2019Source
  • OtherP51700019178 · Name Change- BE to CE 211218.pdf · uploaded 3 Jan 2019Source
  • OtherP51700019178 · BEPL - PROPOSED PLAN.pdf · uploaded 4 Apr 2019Source
  • OtherP51700019178 · ELEVATION-A.pdf · uploaded 4 Apr 2019Source
  • OtherP51700019178 · MASTER PLAN WITH TYPICAL.pdf · uploaded 4 Apr 2019Source
  • OtherP51700019178 · Podium- Level 1.pdf · uploaded 4 Apr 2019Source
  • OtherP51700019178 · Podium- Level 2.pdf · uploaded 4 Apr 2019Source
  • OtherP51700019178 · Podium- Level 3.pdf · uploaded 4 Apr 2019Source
  • OtherP51700019178 · Podium- Level 4.pdf · uploaded 4 Apr 2019Source
  • OtherP51700019178 · Podium- Level 5.pdf · uploaded 4 Apr 2019Source
  • OtherP51700019178 · Podium- Level 6-Landscape Level.pdf · uploaded 4 Apr 2019Source
  • OtherP51700019178 · Podium- Stilt Level.pdf · uploaded 4 Apr 2019Source
  • OtherP51700019178 · Tower A- Refuge Floor.pdf · uploaded 4 Apr 2019Source
  • OtherP51700019178 · Tower A- Typical Floor.pdf · uploaded 4 Apr 2019Source
  • OtherP51700019178 · Tower B- Refuge Floor.pdf · uploaded 4 Apr 2019Source
  • OtherP51700019178 · Tower B- Typical Floor.pdf · uploaded 4 Apr 2019Source
  • OtherP51700019178 · Tower F- Refuge Floor.pdf · uploaded 4 Apr 2019Source
  • OtherP51700019178 · Tower F- Typical Floor.pdf · uploaded 4 Apr 2019Source
  • OtherP51700019178 · Tower G- Refuge Floor.pdf · uploaded 4 Apr 2019Source
  • OtherP51700019178 · Tower G- Typical Floor.pdf · uploaded 4 Apr 2019Source
  • OtherP51700019178 · Typical Section.pdf · uploaded 4 Apr 2019Source
  • Declaration Form BP51700019178 · affidavit bepl.pdf · uploaded 4 Apr 2019Source
  • Declaration Form BP51700019178 · Affidavit CTIL -_compressed.pdf · uploaded 4 Apr 2019Source
  • Legal Title reportP51700019178 · Supplement Title Certificate.pdf · uploaded 15 Jul 2019Source
  • OtherP51700019178 · Writ Petition Letter.pdf · uploaded 12 Nov 2019Source
  • Legal Title reportP51700019178 · Second Supplemental Certificate dated 26 November 2019.pdf · uploaded 27 Nov 2019Source
  • Declaration Form BP51700029755 · Declaration- Form B - CE.pdf · uploaded 17 Jun 2021Source
  • Declaration Form BP51700029755 · Declaration- Form B - BEPL.pdf · uploaded 17 Jun 2021Source
  • OtherP51700029755 · Proposed Master Plan.pdf · uploaded 18 Jun 2021Source
  • OtherP51700029755 · Proposed Elevation.pdf · uploaded 18 Jun 2021Source
  • OtherP51700029755 · Tower C- Proposed Refuge.pdf · uploaded 18 Jun 2021Source
  • OtherP51700029755 · Tower C- Proposed Typical.pdf · uploaded 18 Jun 2021Source
  • OtherP51700029755 · Tower D- Proposed Refuge.pdf · uploaded 18 Jun 2021Source
  • OtherP51700029755 · Tower D- Proposed Typical.pdf · uploaded 18 Jun 2021Source
  • OtherP51700029755 · Tower E- Proposed Refuge.pdf · uploaded 18 Jun 2021Source
  • OtherP51700029755 · Tower E- Proposed Typical.pdf · uploaded 18 Jun 2021Source
  • OtherP51700029755 · TYPICAL SECTION.PDF · uploaded 18 Jun 2021Source
  • Legal Title reportP51700029755 · Legal Title Report - Century Estates - 250621.pdf · uploaded 25 Jun 2021Source
  • Legal Title reportP51700019178 · Legal Title Report - Century Estates - 250621.pdf · uploaded 7 Dec 2021Source
  • Declaration Form BP51700029755 · Affidavit cum Declaration (6).pdf · uploaded 20 Mar 2025Source
  • Declaration Form BP51700029755 · Affidavit cum Declaration (6)_organized.pdf · uploaded 20 Mar 2025Source
  • Declaration Form BP51700029755 · Affidavit cum Declaration (6) (1).pdf · uploaded 20 Mar 2025Source

Migrated

  • 1 PAN CardP51700019178 · CTIL PAN CARD.pdf · uploaded 27 Dec 2018Source
  • 1 Copy of the legal title reportP51700019178 · Title Certificate.pdf · uploaded 27 Dec 2018Source
  • 1 Details of encumbrancesP51700019178 · Self Declaration for Encumbrances - CTIL.pdf · uploaded 27 Dec 2018Source
  • 1 Copy of Layout Approval (in case of layout)P51700019178 · CC PLAN SHEET NO 01.pdf · uploaded 27 Dec 2018Source
  • 1 Building Plan Approval (IOD)P51700019178 · CC Copy.pdf · uploaded 27 Dec 2018Source
  • 1 Commencement Certificates / NA Order for plotted developmentP51700019178 · CC Copy.pdf · uploaded 27 Dec 2018Source
  • 2 Commencement Certificates / NA Order for plotted developmentP51700019178 · CC PLAN SHEET NO 01.pdf · uploaded 27 Dec 2018Source
  • 3 Commencement Certificates / NA Order for plotted developmentP51700019178 · SHEET NO 02.pdf · uploaded 27 Dec 2018Source
  • 4 Commencement Certificates / NA Order for plotted developmentP51700019178 · SHEET NO 03.pdf · uploaded 27 Dec 2018Source
  • 5 Commencement Certificates / NA Order for plotted developmentP51700019178 · SHEET NO 04.pdf · uploaded 27 Dec 2018Source
  • 6 Commencement Certificates / NA Order for plotted developmentP51700019178 · SHEET NO 05.pdf · uploaded 27 Dec 2018Source
  • 7 Commencement Certificates / NA Order for plotted developmentP51700019178 · SHEET NO 06.pdf · uploaded 27 Dec 2018Source
  • 8 Commencement Certificates / NA Order for plotted developmentP51700019178 · SHEET NO 07.pdf · uploaded 27 Dec 2018Source
  • 9 Commencement Certificates / NA Order for plotted developmentP51700019178 · SHEET NO 08.pdf · uploaded 27 Dec 2018Source
  • 10 Commencement Certificates / NA Order for plotted developmentP51700019178 · SHEET NO 09.pdf · uploaded 27 Dec 2018Source
  • 11 Commencement Certificates / NA Order for plotted developmentP51700019178 · SHEET NO 10.pdf · uploaded 27 Dec 2018Source
  • 12 Commencement Certificates / NA Order for plotted developmentP51700019178 · SHEET NO 11.pdf · uploaded 27 Dec 2018Source
  • 13 Commencement Certificates / NA Order for plotted developmentP51700019178 · SHEET NO 12.pdf · uploaded 27 Dec 2018Source
  • 14 Commencement Certificates / NA Order for plotted developmentP51700019178 · SHEET NO 13.pdf · uploaded 27 Dec 2018Source
  • 15 Commencement Certificates / NA Order for plotted developmentP51700019178 · SHEET NO 14.pdf · uploaded 27 Dec 2018Source
  • 16 Commencement Certificates / NA Order for plotted developmentP51700019178 · SHEET NO 15.pdf · uploaded 27 Dec 2018Source
  • 17 Commencement Certificates / NA Order for plotted developmentP51700019178 · SHEET NO 16.pdf · uploaded 27 Dec 2018Source
  • 18 Commencement Certificates / NA Order for plotted developmentP51700019178 · SHEET NO 17.pdf · uploaded 27 Dec 2018Source
  • 19 Commencement Certificates / NA Order for plotted developmentP51700019178 · SHEET NO 18.pdf · uploaded 27 Dec 2018Source
  • 20 Commencement Certificates / NA Order for plotted developmentP51700019178 · SHEET NO 19.pdf · uploaded 27 Dec 2018Source
  • 21 Commencement Certificates / NA Order for plotted developmentP51700019178 · SHEET NO 20.pdf · uploaded 27 Dec 2018Source
  • 22 Commencement Certificates / NA Order for plotted developmentP51700019178 · SHEET NO 21.pdf · uploaded 27 Dec 2018Source
  • 23 Commencement Certificates / NA Order for plotted developmentP51700019178 · SHEET NO 22.pdf · uploaded 27 Dec 2018Source
  • 24 Commencement Certificates / NA Order for plotted developmentP51700019178 · SHEET NO 23.pdf · uploaded 27 Dec 2018Source
  • 25 Commencement Certificates / NA Order for plotted developmentP51700019178 · SHEET NO 24.pdf · uploaded 27 Dec 2018Source
  • 26 Commencement Certificates / NA Order for plotted developmentP51700019178 · SHEET NO 25.pdf · uploaded 27 Dec 2018Source
  • 27 Commencement Certificates / NA Order for plotted developmentP51700019178 · SHEET NO 26.pdf · uploaded 27 Dec 2018Source
  • 28 Commencement Certificates / NA Order for plotted developmentP51700019178 · SHEET NO 27.pdf · uploaded 27 Dec 2018Source
  • 29 Commencement Certificates / NA Order for plotted developmentP51700019178 · SHEET NO 28.pdf · uploaded 27 Dec 2018Source
  • 30 Commencement Certificates / NA Order for plotted developmentP51700019178 · SHEET NO 29.pdf · uploaded 27 Dec 2018Source
  • 1 Declaration in FORM BP51700019178 · Form B- Century Estates final.pdf · uploaded 27 Dec 2018Source
  • 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)P51700019178 · Architect Certificate (compressed).pdf · uploaded 27 Dec 2018Source
  • 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)P51700019178 · Engineer Certificate (compressed).pdf · uploaded 27 Dec 2018Source
  • 1 Certificates of CA (Form 3)P51700019178 · CA Certificate.pdf · uploaded 27 Dec 2018Source
  • 1 Proforma of Allotment letterP51700019178 · Self Declaration for Allotment Letter - CTIL.pdf · uploaded 27 Dec 2018Source
  • 1 OtherP51700019178 · ELEVATION-A-.pdf · uploaded 3 Jan 2019Source
  • 2 OtherP51700019178 · MASTER PLAN WITH TYPICAL FLOOR.pdf · uploaded 3 Jan 2019Source
  • 3 OtherP51700019178 · MASTER PLAN WITH REFUGE FLOOR.pdf · uploaded 3 Jan 2019Source
  • 4 OtherP51700019178 · PODIUM- FIRST LEVEL.pdf · uploaded 3 Jan 2019Source
  • 5 OtherP51700019178 · PODIUM- SECOND LEVEL - compressed.pdf · uploaded 3 Jan 2019Source
  • 6 OtherP51700019178 · PODIUM- THIRD LEVEL - compressed.pdf · uploaded 3 Jan 2019Source
  • 7 OtherP51700019178 · PODIUM- FOURTH LEVEL - compressed.pdf · uploaded 3 Jan 2019Source
  • 8 OtherP51700019178 · PODIUM- FIFTHLEVEL.pdf · uploaded 3 Jan 2019Source
  • 9 OtherP51700019178 · PODIUM- SIXTH - LANDSCAPE EVEL.pdf · uploaded 3 Jan 2019Source
  • 10 OtherP51700019178 · PODIUM- STILT LEVEL.pdf · uploaded 3 Jan 2019Source
  • 11 OtherP51700019178 · TYPICAL FLOOR PLAN-Tower A.pdf · uploaded 3 Jan 2019Source
  • 12 OtherP51700019178 · TYPICAL FLOOR PLAN-Tower B.pdf · uploaded 3 Jan 2019Source
  • 13 OtherP51700019178 · TYPICAL FLOOR PLAN-Tower F.pdf · uploaded 3 Jan 2019Source
  • 14 OtherP51700019178 · TYPICAL FLOOR PLAN-Tower G.pdf · uploaded 3 Jan 2019Source
  • 15 OtherP51700019178 · TYPICAL REFUGE FLOOR PLAN-Tower A.pdf · uploaded 3 Jan 2019Source
  • 16 OtherP51700019178 · TYPICAL REFUGE FLOOR PLAN-Tower B.pdf · uploaded 3 Jan 2019Source
  • 17 OtherP51700019178 · TYPICAL REFUGE FLOOR PLAN-Tower F.pdf · uploaded 3 Jan 2019Source
  • 18 OtherP51700019178 · TYPICAL REFUGE FLOOR PLAN-Tower G.pdf · uploaded 3 Jan 2019Source
  • 19 OtherP51700019178 · TYPICAL SECTION-Model.pdf · uploaded 3 Jan 2019Source
  • 20 OtherP51700019178 · Name Change- BE to CE 211218.pdf · uploaded 3 Jan 2019Source
  • 2 Details of encumbrancesP51700019178 · Self Declaration CTIL.pdf · uploaded 4 Apr 2019Source
  • 2 Declaration in FORM BP51700019178 · affidavit bepl.pdf · uploaded 4 Apr 2019Source
  • 3 Declaration in FORM BP51700019178 · Affidavit CTIL -_compressed.pdf · uploaded 4 Apr 2019Source
  • 2 Proforma of Allotment letterP51700019178 · App Form_Latest - 04-04-2019 - FINAL.pdf · uploaded 4 Apr 2019Source
  • 3 Proforma of Allotment letterP51700019178 · Allotment Letter - 01-04-2019 (clean).pdf · uploaded 4 Apr 2019Source
  • 4 Proforma of Allotment letterP51700019178 · Draft AFS - Shahad 04-04-2019 - FINAL.pdf · uploaded 4 Apr 2019Source
  • 21 OtherP51700019178 · BEPL - PROPOSED PLAN.pdf · uploaded 4 Apr 2019Source
  • 22 OtherP51700019178 · ELEVATION-A.pdf · uploaded 4 Apr 2019Source
  • 23 OtherP51700019178 · MASTER PLAN WITH TYPICAL.pdf · uploaded 4 Apr 2019Source
  • 24 OtherP51700019178 · Podium- Level 1.pdf · uploaded 4 Apr 2019Source
  • 25 OtherP51700019178 · Podium- Level 2.pdf · uploaded 4 Apr 2019Source
  • 26 OtherP51700019178 · Podium- Level 3.pdf · uploaded 4 Apr 2019Source
  • 27 OtherP51700019178 · Podium- Level 4.pdf · uploaded 4 Apr 2019Source
  • 28 OtherP51700019178 · Podium- Level 5.pdf · uploaded 4 Apr 2019Source
  • 29 OtherP51700019178 · Podium- Level 6-Landscape Level.pdf · uploaded 4 Apr 2019Source
  • 30 OtherP51700019178 · Podium- Stilt Level.pdf · uploaded 4 Apr 2019Source
  • 31 OtherP51700019178 · Tower A- Refuge Floor.pdf · uploaded 4 Apr 2019Source
  • 32 OtherP51700019178 · Tower A- Typical Floor.pdf · uploaded 4 Apr 2019Source
  • 33 OtherP51700019178 · Tower B- Refuge Floor.pdf · uploaded 4 Apr 2019Source
  • 34 OtherP51700019178 · Tower B- Typical Floor.pdf · uploaded 4 Apr 2019Source
  • 35 OtherP51700019178 · Tower F- Refuge Floor.pdf · uploaded 4 Apr 2019Source
  • 36 OtherP51700019178 · Tower F- Typical Floor.pdf · uploaded 4 Apr 2019Source
  • 37 OtherP51700019178 · Tower G- Refuge Floor.pdf · uploaded 4 Apr 2019Source
  • 38 OtherP51700019178 · Tower G- Typical Floor.pdf · uploaded 4 Apr 2019Source
  • 39 OtherP51700019178 · Typical Section.pdf · uploaded 4 Apr 2019Source
  • 5 Proforma of Allotment letterP51700019178 · Declaration for Uploading Allotment Letter.pdf · uploaded 11 Apr 2019Source
  • 2 Copy of the legal title reportP51700019178 · Supplement Title Certificate.pdf · uploaded 15 Jul 2019Source
  • 2 Certificates of Architect (Form 1)(Mandatory for only ongoing project)P51700019178 · Architect Certificate.pdf · uploaded 15 Jul 2019Source
  • 2 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)P51700019178 · Engineers Certificate.pdf · uploaded 15 Jul 2019Source
  • 1 Form 2AP51700019178 · Form 2A RERA Engineer Certificate.pdf · uploaded 15 Jul 2019Source
  • 2 Certificates of CA (Form 3)P51700019178 · CA Certificate_merged_compressed.pdf · uploaded 15 Jul 2019Source
  • 3 Certificates of Architect (Form 1)(Mandatory for only ongoing project)P51700019178 · Form 1 - Compressed.pdf · uploaded 26 Jul 2019Source
  • 3 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)P51700019178 · FORM 2 - Q1 - 2019 - 2020.pdf · uploaded 26 Jul 2019Source
  • 3 Certificates of CA (Form 3)P51700019178 · CA Certificate_merged_compressed.pdf · uploaded 26 Jul 2019Source
  • 4 Certificates of CA (Form 3)P51700019178 · Form 3 - CA Certificate compressed.pdf · uploaded 26 Jul 2019Source
  • 6 Proforma of Allotment letterP51700019178 · Draft AFS - Shahad.pdf · uploaded 7 Aug 2019Source
  • 1 Annual Audit Report of Statutory CA (Form 5)P51700019178 · FORM 5- 30092019-1.pdf · uploaded 30 Sep 2019Source
  • 4 Certificates of Architect (Form 1)(Mandatory for only ongoing project)P51700019178 · Progress Report -3- Architect Certificate- Form 1_compressed.pdf · uploaded 16 Oct 2019Source
  • 4 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)P51700019178 · FORM 2 - Q2 - 2019 - 2020- Engineer Certificate.pdf · uploaded 16 Oct 2019Source
  • 2 Form 2AP51700019178 · RERA Engineer Certificate for Quality Assurance (Form 2A).pdf · uploaded 16 Oct 2019Source
  • 5 Certificates of CA (Form 3)P51700019178 · Form 3 - compressed.pdf · uploaded 16 Oct 2019Source
  • 40 OtherP51700019178 · Writ Petition Letter.pdf · uploaded 12 Nov 2019Source
  • 1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentP51700019178 · Completion Certificate - substructure (A B F G).pdf · uploaded 19 Nov 2019Source
  • 3 Copy of the legal title reportP51700019178 · Second Supplemental Certificate dated 26 November 2019.pdf · uploaded 27 Nov 2019Source
  • 7 Proforma of Allotment letterP51700019178 · FINAL Draft AFS - Shahad 02 08 2019 (clean) - POA ref added_Clean (27 11 2019) Uploaded on MAHARERA.pdf · uploaded 12 Dec 2019Source
  • 8 Proforma of Allotment letterP51700019178 · Vanya Allotment- 311219 (uploaded on maharera website).pdf · uploaded 7 Jan 2020Source
  • 3 Form 2AP51700019178 · Site engineer certificate – Form 2A Oct 2019 to Dec 2019.pdf · uploaded 27 Jan 2020Source
  • 6 Certificates of CA (Form 3)P51700019178 · Form 3 Dec-19.pdf · uploaded 27 Jan 2020Source
  • 5 Certificates of Architect (Form 1)(Mandatory for only ongoing project)P51700019178 · Form 1.pdf · uploaded 30 Jan 2020Source
  • 5 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)P51700019178 · Form 2 - Engineer Certificate.pdf · uploaded 30 Jan 2020Source
  • 6 Certificates of Architect (Form 1)(Mandatory for only ongoing project)P51700019178 · From 1 Birla Vanya Progress Report - 5-min (1).pdf · uploaded 5 Jul 2020Source
  • 4 Form 2AP51700019178 · From 2 A Rera Quality 5 Birla Vanya-min.pdf · uploaded 5 Jul 2020Source
  • 7 Certificates of CA (Form 3)P51700019178 · Form 3- Signed RERA Certificate - March 20-min (1) (1) (1) (1)-min (1)-compressed_reduce (1).pdf · uploaded 5 Jul 2020Source
  • 6 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)P51700019178 · FORM 2- Q4 - 2019-2020.pdf · uploaded 16 Jul 2020Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)P51700019178 · Birla Vanya Form 5.pdf · uploaded 1 Oct 2020Source
  • 7 Certificates of Architect (Form 1)(Mandatory for only ongoing project)P51700019178 · Birla Estate- RERA Sept 2020 - FORM 1.pdf · uploaded 14 Oct 2020Source
  • 5 Form 2AP51700019178 · TPMI-ECQA-006 RERA Engineer's Certificate for quality assurance as on 30 09 2020.pdf · uploaded 14 Oct 2020Source
  • 7 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)P51700019178 · FORM 2- July 20 to Sept 20.pdf · uploaded 25 Jan 2021Source
  • 6 Form 2AP51700019178 · Form 2A - Oct -Dec 2020.pdf · uploaded 12 Feb 2021Source
  • 8 Certificates of Architect (Form 1)(Mandatory for only ongoing project)P51700019178 · Form 1 - Architect Certificate.pdf · uploaded 18 Feb 2021Source
  • 7 Form 2AP51700019178 · Form 2A - Oct -Dec 2020.pdf · uploaded 18 Feb 2021Source
  • 8 Certificates of CA (Form 3)P51700019178 · Form 3- Dec 20- Compress.pdf · uploaded 18 Feb 2021Source
  • 8 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)P51700019178 · FORM 2- Q3 - 2020-2021.pdf · uploaded 22 Feb 2021Source
  • 9 Certificates of Architect (Form 1)(Mandatory for only ongoing project)P51700019178 · Form 1- RERA Progress Report MAR 2021.pdf · uploaded 7 May 2021Source
  • 9 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)P51700019178 · FORM 2- Q4 - March 2021.pdf · uploaded 7 May 2021Source
  • 8 Form 2AP51700019178 · Form 2A- March 2021.pdf · uploaded 7 May 2021Source
  • 1 Disclosure of sold/ booked inventoryP51700019178 · Disclosure -Booked Inventory Birla Vanya 1.pdf · uploaded 7 May 2021View
  • 9 Certificates of CA (Form 3)P51700019178 · Form 3 - Compressed - March 21.pdf · uploaded 7 May 2021Source
  • 1 PAN CardP51700029755 · CTIL PAN CARD.pdf · uploaded 17 Jun 2021Source
  • 2 PAN CardP51700029755 · BEPL-PANCARD.pdf · uploaded 17 Jun 2021Source
  • 1 Details of encumbrancesP51700029755 · Details of encumbrance- CE.pdf · uploaded 17 Jun 2021Source
  • 2 Details of encumbrancesP51700029755 · Details of encumbrance- BEPL.pdf · uploaded 17 Jun 2021Source
  • 1 Declaration in FORM BP51700029755 · Declaration- Form B - CE.pdf · uploaded 17 Jun 2021Source
  • 2 Declaration in FORM BP51700029755 · Declaration- Form B - BEPL.pdf · uploaded 17 Jun 2021Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51700029755 · Architect Cert Form A - Vanya2.pdf · uploaded 17 Jun 2021Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51700029755 · Form 3_Vanya 2_CA Certificate.pdf · uploaded 17 Jun 2021Source
  • 1 Proforma of Allotment letterP51700029755 · Expression of Interest - Phase 2.pdf · uploaded 17 Jun 2021Source
  • 2 Proforma of Allotment letterP51700029755 · Application Form - Phase 2.pdf · uploaded 17 Jun 2021Source
  • 3 Proforma of Allotment letterP51700029755 · Allotment Letter - Vanya 2.pdf · uploaded 17 Jun 2021Source
  • 1 Copy of Layout Approval (in case of layout)P51700029755 · Birla Vanya 2 CC Site Layout.pdf · uploaded 18 Jun 2021Source
  • 1 Building Plan Approval / NA Order for plotted developmentP51700029755 · Birla Vanya 2 1st Podium Plan.pdf · uploaded 18 Jun 2021Source
  • 2 Building Plan Approval / NA Order for plotted developmentP51700029755 · Birla Vanya 2 2nd Podium Plan.pdf · uploaded 18 Jun 2021Source
  • 3 Building Plan Approval / NA Order for plotted developmentP51700029755 · Birla Vanya 2 3rd Podium Plan.pdf · uploaded 18 Jun 2021Source
  • 4 Building Plan Approval / NA Order for plotted developmentP51700029755 · Birla Vanya 2 4th Podium Plan.pdf · uploaded 18 Jun 2021Source
  • 5 Building Plan Approval / NA Order for plotted developmentP51700029755 · Birla Vanya 2 5th Podium Plan.pdf · uploaded 18 Jun 2021Source
  • 6 Building Plan Approval / NA Order for plotted developmentP51700029755 · Birla Vanya 2 6th Podium Plan.pdf · uploaded 18 Jun 2021Source
  • 7 Building Plan Approval / NA Order for plotted developmentP51700029755 · Birla Vanya 2 Bldg C Floor Plan.pdf · uploaded 18 Jun 2021Source
  • 8 Building Plan Approval / NA Order for plotted developmentP51700029755 · Birla Vanya 2 Bldg C Podium Flr Plan.pdf · uploaded 18 Jun 2021Source
  • 9 Building Plan Approval / NA Order for plotted developmentP51700029755 · Birla Vanya 2 Bldg D Floor Plan.pdf · uploaded 18 Jun 2021Source
  • 10 Building Plan Approval / NA Order for plotted developmentP51700029755 · Birla Vanya 2 Bldg D Podium Flr Plan.pdf · uploaded 18 Jun 2021Source
  • 11 Building Plan Approval / NA Order for plotted developmentP51700029755 · Birla Vanya 2 Bldg E Floor Plan.pdf · uploaded 18 Jun 2021Source
  • 12 Building Plan Approval / NA Order for plotted developmentP51700029755 · Birla Vanya 2 Bldg E Podium Flr Plan.pdf · uploaded 18 Jun 2021Source
  • 13 Building Plan Approval / NA Order for plotted developmentP51700029755 · Birla Vanya 2 Club House.pdf · uploaded 18 Jun 2021Source
  • 14 Building Plan Approval / NA Order for plotted developmentP51700029755 · Birla Vanya 2 Section and Elev.pdf · uploaded 18 Jun 2021Source
  • 15 Building Plan Approval / NA Order for plotted developmentP51700029755 · Birla Vanya 2 Stilt Level Plan.pdf · uploaded 18 Jun 2021Source
  • 1 Commencement Certificates / NA Order for plotted developmentP51700029755 · Birla Vanya Revised CC Letter.pdf · uploaded 18 Jun 2021Source
  • 1 Declaration about Commencement CertificateP51700029755 · Final Format D - Dec of CC.pdf · uploaded 18 Jun 2021Source
  • 4 Proforma of Allotment letterP51700029755 · Draft Agm For Sale- Birla Vanya 2.pdf · uploaded 18 Jun 2021Source
  • 1 OtherP51700029755 · Proposed Master Plan.pdf · uploaded 18 Jun 2021Source
  • 2 OtherP51700029755 · Proposed Elevation.pdf · uploaded 18 Jun 2021Source
  • 3 OtherP51700029755 · Tower C- Proposed Refuge.pdf · uploaded 18 Jun 2021Source
  • 4 OtherP51700029755 · Tower C- Proposed Typical.pdf · uploaded 18 Jun 2021Source
  • 5 OtherP51700029755 · Tower D- Proposed Refuge.pdf · uploaded 18 Jun 2021Source
  • 6 OtherP51700029755 · Tower D- Proposed Typical.pdf · uploaded 18 Jun 2021Source
  • 7 OtherP51700029755 · Tower E- Proposed Refuge.pdf · uploaded 18 Jun 2021Source
  • 8 OtherP51700029755 · Tower E- Proposed Typical.pdf · uploaded 18 Jun 2021Source
  • 9 OtherP51700029755 · TYPICAL SECTION.PDF · uploaded 18 Jun 2021Source
  • 1 Copy of the legal title reportP51700029755 · Legal Title Report - Century Estates - 250621.pdf · uploaded 25 Jun 2021Source
  • 10 Certificates of Architect (Form 1)(Mandatory for only ongoing project)P51700019178 · RERA Progress Report - Form 1.pdf · uploaded 19 Jul 2021Source
  • 9 Form 2AP51700019178 · For 2A- Apr to Jun 2021.pdf · uploaded 19 Jul 2021Source
  • 10 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)P51700019178 · FORM 2-jUNE 2021.pdf · uploaded 26 Jul 2021Source
  • 10 Certificates of CA (Form 3)P51700019178 · Form 3_June 21.pdf · uploaded 26 Jul 2021Source
  • 2 Disclosure of sold/ booked inventoryP51700019178 · DISCLOSURE of Sold Units - June 21- Compressed.pdf · uploaded 28 Sep 2021Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)P51700019178 · Form 5- 31 March 2021.pdf · uploaded 30 Sep 2021Source
  • 4 Copy of the legal title reportP51700019178 · Legal Title Report - Century Estates - 250621.pdf · uploaded 7 Dec 2021Source
  • 1 Declaration about Commencement CertificateP51700019178 · Birla Vanya Phase 1 Format D.pdf · uploaded 10 Jan 2022Source
  • 11 Certificates of Architect (Form 1)(Mandatory for only ongoing project)P51700019178 · 202109_Ar_Ph1.pdf · uploaded 10 Jan 2022Source
  • 11 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)P51700019178 · 202109_Er_ph1.pdf · uploaded 10 Jan 2022Source
  • 10 Form 2AP51700019178 · Form 2A- Vanya Phase 1.pdf · uploaded 10 Jan 2022Source
  • 11 Certificates of CA (Form 3)P51700019178 · 202109_CA_Ph1.pdf · uploaded 10 Jan 2022Source
  • 3 Disclosure of sold/ booked inventoryP51700019178 · BV_P-1 INVENTORY SOLD DATA.pdf · uploaded 3 May 2022Source
  • 12 Certificates of Architect (Form 1)(Mandatory for only ongoing project)P51700019178 · BV_P1_202203_Ar.pdf · uploaded 11 May 2022Source
  • 12 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)P51700019178 · BV_P1_202203_Er.pdf · uploaded 11 May 2022Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)P51700019178 · BV_P1_2020-21_Form 2A.pdf · uploaded 11 May 2022Source
  • 1 CERSAI detailsP51700019178 · Birla Vanya Phase-I Cersai declaration.pdf · uploaded 11 May 2022Source
  • 4 Disclosure of sold/ booked inventoryP51700019178 · BV_P1_202203_Sold Inventory.pdf · uploaded 11 May 2022Source
  • 2 CERSAI detailsP51700019178 · Birla Vanya Phase-I Cersai declaration.pdf · uploaded 18 May 2022Source
  • 2 Copy of Layout Approval (in case of layout)P51700019178 · Revised CC Vanya Cover Letter_compressed.pdf · uploaded 27 Jun 2022Source
  • 3 Copy of Layout Approval (in case of layout)P51700019178 · Revised Layout_compressed.pdf · uploaded 27 Jun 2022Source
  • 9 Proforma of Allotment letterP51700019178 · Agreement for Sale - Vanya Phase 1.pdf · uploaded 27 Jun 2022Source
  • 2 Copy of Layout Approval (in case of layout)P51700029755 · Revised CC Vanya Cover Letter_compressed.pdf · uploaded 27 Jun 2022Source
  • 3 Copy of Layout Approval (in case of layout)P51700029755 · Revised Layout_compressed.pdf · uploaded 27 Jun 2022Source
  • 5 Proforma of Allotment letterP51700029755 · Agreement for Sale - Vanya Phase 2 (2).pdf · uploaded 27 Jun 2022Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51700029755 · BV_P2_202203_Ar.pdf · uploaded 4 Nov 2022Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51700029755 · 202109_Ar_Ph2.pdf · uploaded 4 Nov 2022Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51700029755 · BV_P2_202203_Er.pdf · uploaded 4 Nov 2022Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51700029755 · BV_P2_202206_Er.pdf · uploaded 4 Nov 2022Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)P51700029755 · BV_P2_Form 2A_2020-21.pdf · uploaded 4 Nov 2022Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)P51700029755 · BV_P2_Form 2A_2021-22.pdf · uploaded 4 Nov 2022Source
  • 1 Disclosure of sold/ booked inventoryP51700029755 · BV_P2_202203_Sold Inventory.pdf · uploaded 4 Nov 2022View
  • 2 Disclosure of sold/ booked inventoryP51700029755 · BV_P2_202206_Sold Inventory.pdf · uploaded 4 Nov 2022Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51700029755 · BV_P2_202203_CA.pdf · uploaded 4 Nov 2022Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51700029755 · 202109_CA_Ph2.pdf · uploaded 4 Nov 2022Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51700029755 · BV_P2_202206_CA.pdf · uploaded 4 Nov 2022Source
  • 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51700029755 · BV_P2_202209_CA.pdf · uploaded 4 Nov 2022Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)P51700029755 · Birla Vanya- Phase 2-Form 5.pdf · uploaded 4 Nov 2022Source
  • 1 Proforma of Agreement for saleP51700029755 · BV_P2_AfS.pdf · uploaded 4 Nov 2022Source
  • 13 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)P51700019178 · BV_P1_202206_Er.pdf · uploaded 7 Nov 2022Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)P51700019178 · BV_P1_Form 2A_2021-22.pdf · uploaded 7 Nov 2022Source
  • 5 Disclosure of sold/ booked inventoryP51700019178 · BV_P1_202206_Sold Inventory.pdf · uploaded 7 Nov 2022Source
  • 12 Certificates of CA (Form 3)P51700019178 · BV_P1_202203_CA.pdf · uploaded 7 Nov 2022Source
  • 13 Certificates of CA (Form 3)P51700019178 · BV_P1_202206_CA.pdf · uploaded 7 Nov 2022Source
  • 14 Certificates of CA (Form 3)P51700019178 · BV_P1_202209_CA.pdf · uploaded 7 Nov 2022Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)P51700019178 · Birla Vanya- Phase 1-Form 5.pdf · uploaded 7 Nov 2022Source
  • 13 Certificates of Architect (Form 1)(Mandatory for only ongoing project)P51700019178 · BV_P1_202206_Ar.pdf · uploaded 28 Nov 2022Source
  • 14 Certificates of Architect (Form 1)(Mandatory for only ongoing project)P51700019178 · BV_P1_202209_Ar.pdf · uploaded 28 Nov 2022Source
  • 14 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)P51700019178 · BV_P1_202209_Er.pdf · uploaded 28 Nov 2022Source
  • 6 Disclosure of sold/ booked inventoryP51700019178 · BV_P1_202209_Sold.pdf · uploaded 28 Nov 2022Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51700029755 · BV_P2_202203_Ar.pdf · uploaded 28 Nov 2022Source
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51700029755 · BV_P2_202206_Ar.pdf · uploaded 28 Nov 2022Source
  • 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51700029755 · BV_P2_202209_Ar.pdf · uploaded 28 Nov 2022Source
  • 3 Disclosure of sold/ booked inventoryP51700029755 · BV_P2_202209_Sold.pdf · uploaded 28 Nov 2022Source
  • 15 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)P51700019178 · BV_P1_202209_Er.pdf · uploaded 29 Dec 2022Source
  • 15 Certificates of CA (Form 3)P51700019178 · BV_P1_202209_CA-1.pdf · uploaded 29 Dec 2022Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51700029755 · BV_P2_202209_Er.pdf · uploaded 29 Dec 2022Source
  • 15 Certificates of Architect (Form 1)(Mandatory for only ongoing project)P51700019178 · BV_P1_202212_Ar.pdf · uploaded 19 Jan 2023Source
  • 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51700029755 · BV_P2_202212_Ar.pdf · uploaded 19 Jan 2023Source
  • 16 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)P51700019178 · BV_P1_202212_Er.pdf · uploaded 1 Feb 2023Source
  • 7 Disclosure of sold/ booked inventoryP51700019178 · BV_P1_202212_Sold.pdf · uploaded 1 Feb 2023Source
  • 16 Certificates of CA (Form 3)P51700019178 · BV_P1_202212_CA.pdf · uploaded 1 Feb 2023Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51700029755 · BV_P2_202212_Er.pdf · uploaded 1 Feb 2023Source
  • 4 Disclosure of sold/ booked inventoryP51700029755 · BV_P2_202212_Sold.pdf · uploaded 1 Feb 2023Source
  • 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51700029755 · BV_P2_202212_CA.pdf · uploaded 1 Feb 2023Source
  • 17 Certificates of CA (Form 3)P51700019178 · 202006_BV_P1_CA_1.pdf · uploaded 3 Feb 2023Source
  • 18 Certificates of CA (Form 3)P51700019178 · 202006_BV_P1_CA_2.pdf · uploaded 3 Feb 2023Source
  • 19 Certificates of CA (Form 3)P51700019178 · 202009_BV_P1_CA_1.pdf · uploaded 3 Feb 2023Source
  • 20 Certificates of CA (Form 3)P51700019178 · 202009_BV_P1_CA_2.pdf · uploaded 3 Feb 2023Source
  • 21 Certificates of CA (Form 3)P51700019178 · 202112_BV_P1_CA.pdf · uploaded 3 Feb 2023Source
  • 16 Certificates of Architect (Form 1)(Mandatory for only ongoing project)P51700019178 · 202112_BV_P1_Ar.pdf · uploaded 10 Feb 2023Source
  • 17 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)P51700019178 · 202112_BV_P1_Er.pdf · uploaded 10 Feb 2023Source
  • 11 Form 2AP51700019178 · 202112_BV_P1_Form-2A.pdf · uploaded 10 Feb 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)P51700019178 · Form-5_2018-19.pdf · uploaded 10 Feb 2023Source
  • 1 Other – TechnicalP51700029755 · 202112_BV_P2_Form-2A.pdf · uploaded 10 Feb 2023Source
  • 3 a Details of encumbrances concerned to FinanceP51700019178 · Legal Encumbrance.pdf · uploaded 9 Mar 2023Source
  • 1 b Details of encumbrances concerned to LegalP51700019178 · Legal Encumbrance.pdf · uploaded 9 Mar 2023Source
  • 1 Disclosure of Interest in Other Real Estate OrganizationsP51700019178 · Disclosure of interest KTJ.pdf · uploaded 9 Mar 2023Source
  • 2 Disclosure of Interest in Other Real Estate OrganizationsP51700019178 · Disclosure of interest NCJ.pdf · uploaded 9 Mar 2023Source
  • 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameP51700019178 · Bank Account Declaration.pdf · uploaded 9 Mar 2023Source
  • 3 a Details of encumbrances concerned to FinanceP51700029755 · Legal Encumbrance.pdf · uploaded 9 Mar 2023Source
  • 1 b Details of encumbrances concerned to LegalP51700029755 · Legal Encumbrance.pdf · uploaded 9 Mar 2023Source
  • 1 Disclosure of Interest in Other Real Estate OrganizationsP51700029755 · Disclosure of interest KTJ.pdf · uploaded 9 Mar 2023Source
  • 2 Disclosure of Interest in Other Real Estate OrganizationsP51700029755 · Disclosure of interest NCJ.pdf · uploaded 9 Mar 2023Source
  • 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameP51700029755 · Bank Account Declaration.pdf · uploaded 9 Mar 2023Source
  • 17 Certificates of Architect (Form 1)(Mandatory for only ongoing project)P51700019178 · BV_P1_202303_Ar.pdf · uploaded 1 May 2023Source
  • 18 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)P51700019178 · BV_P1_202303_Er.pdf · uploaded 1 May 2023Source
  • 8 Disclosure of sold/ booked inventoryP51700019178 · BV_P1_202303_Sold.pdf · uploaded 1 May 2023Source
  • 22 Certificates of CA (Form 3)P51700019178 · BV_P1_202303_CA.pdf · uploaded 1 May 2023Source
  • 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51700029755 · BV_P2_202303_Ar.pdf · uploaded 1 May 2023Source
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51700029755 · BV_P2_202303_Er.pdf · uploaded 1 May 2023Source
  • 5 Disclosure of sold/ booked inventoryP51700029755 · BV_P2_202303_Sold.pdf · uploaded 1 May 2023Source
  • 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51700029755 · BV_P2_202303_CA.pdf · uploaded 1 May 2023Source
  • 4 a Details of encumbrances concerned to FinanceP51700019178 · 202306_Encumbrance Declartion Phase 1.pdf · uploaded 16 Jun 2023Source
  • 2 b Details of encumbrances concerned to LegalP51700019178 · 202306_Encumbrance Declartion Phase 1.pdf · uploaded 16 Jun 2023Source
  • 4 a Details of encumbrances concerned to FinanceP51700029755 · 202306_Encumbrance Declaration Phase 2.pdf · uploaded 16 Jun 2023Source
  • 2 b Details of encumbrances concerned to LegalP51700029755 · 202306_Encumbrance Declaration Phase 2.pdf · uploaded 16 Jun 2023Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)P51700019178 · BV_P1_Form 2A_2022-23.pdf · uploaded 6 Jul 2023Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)P51700029755 · BV_P2_Form 2A_2022-23.pdf · uploaded 6 Jul 2023Source
  • 18 Certificates of Architect (Form 1)(Mandatory for only ongoing project)P51700019178 · BV_P1_202306_Ar.pdf · uploaded 19 Jul 2023Source
  • 19 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)P51700019178 · BV_P1_202306_Er.pdf · uploaded 19 Jul 2023Source
  • 23 Certificates of CA (Form 3)P51700019178 · BV_P1_202306_CA.pdf · uploaded 19 Jul 2023Source
  • 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51700029755 · BV_P2_202306_Ar.pdf · uploaded 19 Jul 2023Source
  • 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51700029755 · BV_P2_202306_Er.pdf · uploaded 25 Jul 2023Source
  • 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51700029755 · BV_P2_202306_CA.pdf · uploaded 25 Jul 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)P51700019178 · Final Form -5-Birla Vanya Phase-1.pdf · uploaded 29 Sep 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)P51700029755 · Final Form -5-Birla Vanya Phase-2.pdf · uploaded 29 Sep 2023Source
  • 9 Disclosure of sold/ booked inventoryP51700019178 · BV-P1_202306_Sold.pdf · uploaded 5 Oct 2023Source
  • 6 Disclosure of sold/ booked inventoryP51700029755 · BV-P2_202306_Sold.pdf · uploaded 5 Oct 2023Source
  • 20 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)P51700019178 · BV_P1_202309_Er.pdf · uploaded 20 Oct 2023Source
  • 24 Certificates of CA (Form 3)P51700019178 · BV_P1_202309_CA.pdf · uploaded 20 Oct 2023Source
  • 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51700029755 · BV_P2_202309_Er.pdf · uploaded 20 Oct 2023Source
  • 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51700029755 · BV_P2_202309_CA.pdf · uploaded 20 Oct 2023Source
  • 19 Certificates of Architect (Form 1)(Mandatory for only ongoing project)P51700019178 · BV_P1_202309_Ar.pdf · uploaded 3 Nov 2023Source
  • 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51700029755 · BV_P2_202309_Ar-II.pdf · uploaded 3 Nov 2023Source
  • 20 Certificates of Architect (Form 1)(Mandatory for only ongoing project)P51700019178 · BV_P1_202312_Ar.pdf · uploaded 14 Mar 2024Source
  • 21 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)P51700019178 · BV_P1_202312_Er.pdf · uploaded 14 Mar 2024Source
  • 25 Certificates of CA (Form 3)P51700019178 · BV_P1_202312_CA.pdf · uploaded 14 Mar 2024Source
  • 11 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51700029755 · BV_P2_202312_Ar.PDF · uploaded 14 Mar 2024Source
  • 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51700029755 · BV_P2_202312_Er.pdf · uploaded 14 Mar 2024Source
  • 10 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51700029755 · BV_P2_202312_CA.pdf · uploaded 14 Mar 2024Source
  • 22 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)P51700019178 · BV_P1_202403_Er.pdf · uploaded 21 Apr 2024Source
  • 26 Certificates of CA (Form 3)P51700019178 · BV_P1_202403_CA.pdf · uploaded 21 Apr 2024Source
  • 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51700029755 · BV_P2_202403_Er.pdf · uploaded 21 Apr 2024Source
  • 11 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51700029755 · BV_P2_202403_CA.pdf · uploaded 21 Apr 2024Source
  • 10 Disclosure of sold/ booked inventoryP51700019178 · BV_P1_202309_Sold.pdf · uploaded 19 Jun 2024Source
  • 11 Disclosure of sold/ booked inventoryP51700019178 · BV_P1_202312_Sold.pdf · uploaded 19 Jun 2024Source
  • 12 Disclosure of sold/ booked inventoryP51700019178 · BV_P1_202403_Sold.pdf · uploaded 19 Jun 2024Source
  • 7 Disclosure of sold/ booked inventoryP51700029755 · BV_P2_202309_Sold.pdf · uploaded 19 Jun 2024Source
  • 8 Disclosure of sold/ booked inventoryP51700029755 · BV_P2_202312_Sold.pdf · uploaded 19 Jun 2024Source
  • 9 Disclosure of sold/ booked inventoryP51700029755 · BV_P2_202403_Sold.pdf · uploaded 19 Jun 2024Source
  • 2 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentP51700019178 · BV_P-I_OC.pdf · uploaded 28 Jun 2024Source
  • 27 Certificates of CA (Form 3)P51700019178 · BV_P1_202406_CA.pdf · uploaded 20 Jul 2024Source
  • 12 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51700029755 · BV_P2_202406_CA.pdf · uploaded 20 Jul 2024Source
  • 23 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)P51700019178 · Vanya - Form 2 -Ph1.pdf · uploaded 20 Aug 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)P51700019178 · Vanya - Form 2A-Ph1.pdf · uploaded 20 Aug 2024Source
  • 1 Home Buyer /Allottee Grievance Redressal CellP51700019178 · Vanya phase 1 Grievance redressal officer.pdf · uploaded 20 Aug 2024Source
  • 12 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51700029755 · Vanya - Form 1 - Ph2.pdf · uploaded 20 Aug 2024Source
  • 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51700029755 · Vanya - Form 2 - Ph2.pdf · uploaded 20 Aug 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)P51700029755 · Vanya Form 2A-Ph2.pdf · uploaded 20 Aug 2024Source
  • 1 Home Buyer /Allottee Grievance Redressal CellP51700029755 · Vanya phase 2 -Grievance redressal officer.pdf · uploaded 20 Aug 2024Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51700029755 · CTIL_V2_Sep_24_Form-1.pdf · uploaded 8 Nov 2024Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51700029755 · CTIL_V2_Sep_24_Form-3.pdf · uploaded 8 Nov 2024Source
  • 1 Disclosure of sold/ booked inventoryP51700029755 · CTIL_V2_Sep_24_Sold.pdf · uploaded 8 Nov 2024View
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51700029755 · CTIL_V2_Sep_24_Form-2.pdf · uploaded 11 Nov 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)P51700029755 · Birla Vanya Phase2 F5.pdf · uploaded 20 Jan 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51700029755 · VANYA FORM 2 311224.pdf · uploaded 24 Jan 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51700029755 · Architect Certifcate Q3 2.pdf · uploaded 6 Feb 2025Source
  • 1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentP51700019178 · 2 Occupancy Certificate_ Completion Certificate_ Architect's certificate of completion for plotted development (17).pdf · uploaded 18 Mar 2025Source
  • 1 Declaration in FORM BP51700029755 · Affidavit cum Declaration (6).pdf · uploaded 20 Mar 2025Source
  • 2 Declaration in FORM BP51700029755 · Affidavit cum Declaration (6)_organized.pdf · uploaded 20 Mar 2025Source
  • 3 Declaration in FORM BP51700029755 · Affidavit cum Declaration (6) (1).pdf · uploaded 20 Mar 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51700029755 · Form 1 -Architect Certificate Q3 FY 25.pdf · uploaded 20 Mar 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51700029755 · Form 3 Vanya Ph2 Signed Certificate_11zon (1).pdf · uploaded 20 Mar 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51700029755 · VANYA-FORM 2 - Q3 FY 25_11zon.pdf · uploaded 20 Mar 2025Source
  • 1 Disclosure of sold/ booked inventoryP51700029755 · Disclousre of Sold Booked Inventory Phase 2 (1).pdf · uploaded 20 Mar 2025View
  • 2 Disclosure of sold/ booked inventoryP51700029755 · Disclosure of SoldBooked Inventry Phase 2_11zon.pdf · uploaded 20 Mar 2025Source
  • 1 CERSAI detailsP51700029755 · Cersai Declaration (2).pdf · uploaded 20 Mar 2025Source
  • 1 Other – TechnicalP51700029755 · PERT Chart (6).pdf · uploaded 20 Mar 2025Source
  • 1 Disclosure of Interest in Other Real Estate OrganizationsP51700029755 · Disclosure of Interest in other real estate organizations.pdf · uploaded 20 Mar 2025Source
  • 2 Other – TechnicalP51700029755 · Tower C OC (1).pdf · uploaded 21 Mar 2025Source
  • 3 Other – TechnicalP51700029755 · Tower D OC (1).pdf · uploaded 21 Mar 2025Source
  • 4 Other – TechnicalP51700029755 · Tower E part OC.pdf · uploaded 21 Mar 2025Source
  • 5 Other – TechnicalP51700029755 · 2 Other – Technical.pdf · uploaded 21 Mar 2025Source
  • 1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentP51700019178 · ilovepdf_merged (54)-compressed (1).pdf · uploaded 11 Apr 2025Source
  • 1 Disclosure of sold/ booked inventoryP51700019178 · Disclosure of Sold Booked inventory phase 1.pdf · uploaded 19 Apr 2025View
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51700029755 · 1_202503_Ar.pdf · uploaded 20 Apr 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51700029755 · 4_202503_CA.pdf · uploaded 20 Apr 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51700029755 · 2_202503_ER.pdf · uploaded 20 Apr 2025Source
  • 1 Disclosure of sold/ booked inventoryP51700029755 · 3_202503_Sold.pdf · uploaded 20 Apr 2025View
  • 1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentP51700029755 · organized (26).pdf · uploaded 2 Jul 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51700029755 · Vanya ph 12Form 2 Jun 25.pdf · uploaded 19 Jul 2025Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)P51700029755 · Vanya Ph 2 Form-1 Jun 25.pdf · uploaded 19 Jul 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)P51700029755 · Form 3 - Birla Vanya - Phase 2 - Certificate - June 25 - Signed.pdf · uploaded 19 Jul 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)P51700029755 · Form-2 Vanya qtr1-2025.pdf · uploaded 19 Jul 2025Source
  • 1 Disclosure of sold/ booked inventoryP51700029755 · Sold-Booked Inventary Vanya Phase 2.pdf · uploaded 19 Jul 2025View

Technical

  • DocumentP51700019178 · CC PLAN SHEET NO 01.pdf · uploaded 27 Dec 2018Source
  • DocumentP51700019178 · CC Copy.pdf · uploaded 27 Dec 2018Source
  • DocumentP51700029755 · Birla Vanya 2 Bldg D Podium Flr Plan.pdf · uploaded 18 Jun 2021Source
  • DocumentP51700029755 · Birla Vanya 2 Bldg E Floor Plan.pdf · uploaded 18 Jun 2021Source
  • DocumentP51700029755 · Birla Vanya 2 Bldg E Podium Flr Plan.pdf · uploaded 18 Jun 2021Source
  • DocumentP51700029755 · Birla Vanya 2 Club House.pdf · uploaded 18 Jun 2021Source
  • DocumentP51700029755 · Birla Vanya 2 Section and Elev.pdf · uploaded 18 Jun 2021Source
  • DocumentP51700029755 · Birla Vanya 2 Stilt Level Plan.pdf · uploaded 18 Jun 2021Source
  • DocumentP51700029755 · Birla Vanya 2 CC Site Layout.pdf · uploaded 18 Jun 2021Source
  • DocumentP51700029755 · Birla Vanya 2 1st Podium Plan.pdf · uploaded 18 Jun 2021Source
  • DocumentP51700029755 · Birla Vanya 2 2nd Podium Plan.pdf · uploaded 18 Jun 2021Source
  • DocumentP51700029755 · Birla Vanya 2 3rd Podium Plan.pdf · uploaded 18 Jun 2021Source
  • DocumentP51700029755 · Birla Vanya 2 4th Podium Plan.pdf · uploaded 18 Jun 2021Source
  • DocumentP51700029755 · Birla Vanya 2 5th Podium Plan.pdf · uploaded 18 Jun 2021Source
  • DocumentP51700029755 · Birla Vanya 2 6th Podium Plan.pdf · uploaded 18 Jun 2021Source
  • DocumentP51700029755 · Birla Vanya 2 Bldg C Floor Plan.pdf · uploaded 18 Jun 2021Source
  • DocumentP51700029755 · Birla Vanya 2 Bldg C Podium Flr Plan.pdf · uploaded 18 Jun 2021Source
  • DocumentP51700029755 · Birla Vanya 2 Bldg D Floor Plan.pdf · uploaded 18 Jun 2021Source
  • DocumentP51700019178 · Revised CC Vanya Cover Letter_compressed.pdf · uploaded 27 Jun 2022Source
  • DocumentP51700019178 · Revised Layout_compressed.pdf · uploaded 27 Jun 2022Source
  • DocumentP51700029755 · Revised CC Vanya Cover Letter_compressed.pdf · uploaded 27 Jun 2022Source
  • DocumentP51700029755 · Revised Layout_compressed.pdf · uploaded 27 Jun 2022Source
  • Other – TechnicalP51700029755 · 202112_BV_P2_Form-2A.pdf · uploaded 10 Feb 2023Source
  • Other – TechnicalP51700029755 · PERT Chart (6).pdf · uploaded 20 Mar 2025Source
  • Other – TechnicalP51700029755 · Tower C OC (1).pdf · uploaded 21 Mar 2025Source
  • Other – TechnicalP51700029755 · Tower D OC (1).pdf · uploaded 21 Mar 2025Source
  • Other – TechnicalP51700029755 · Tower E part OC.pdf · uploaded 21 Mar 2025Source
  • Other – TechnicalP51700029755 · 2 Other – Technical.pdf · uploaded 21 Mar 2025Source

Technical (Architect)

  • DocumentP51700019178 · BV_P1_202312_Ar.pdf · uploaded 14 Mar 2024Source
  • DocumentP51700029755 · Vanya - Form 1 - Ph2.pdf · uploaded 20 Aug 2024Source
  • DocumentP51700029755 · CTIL_V2_Sep_24_Form-1.pdf · uploaded 8 Nov 2024Source
  • DocumentP51700029755 · Architect Certifcate Q3 2.pdf · uploaded 6 Feb 2025Source
  • DocumentP51700029755 · Form 1 -Architect Certificate Q3 FY 25.pdf · uploaded 20 Mar 2025Source
  • DocumentP51700029755 · 1_202503_Ar.pdf · uploaded 20 Apr 2025Source
  • DocumentP51700029755 · Vanya ph 12Form 2 Jun 25.pdf · uploaded 19 Jul 2025Source
  • DocumentP51700029755 · Vanya Ph 2 Form-1 Jun 25.pdf · uploaded 19 Jul 2025Source

Technical (Engineer)

  • DocumentP51700019178 · Vanya - Form 2 -Ph1.pdf · uploaded 20 Aug 2024Source
  • DocumentP51700029755 · Vanya - Form 2 - Ph2.pdf · uploaded 20 Aug 2024Source
  • DocumentP51700029755 · CTIL_V2_Sep_24_Form-2.pdf · uploaded 11 Nov 2024Source
  • DocumentP51700029755 · VANYA FORM 2 311224.pdf · uploaded 24 Jan 2025Source
  • DocumentP51700029755 · VANYA-FORM 2 - Q3 FY 25_11zon.pdf · uploaded 20 Mar 2025Source
  • DocumentP51700029755 · 2_202503_ER.pdf · uploaded 20 Apr 2025Source
  • DocumentP51700029755 · Form-2 Vanya qtr1-2025.pdf · uploaded 19 Jul 2025Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Land & approvalsLand parcel 1550 B, 1550 B

As registered with MahaRERA and published on its project page

Project type
Mixed
Status on MahaRERA
Certificate Signed
Phases
2
Address
CTS 1653, 1550/B, 1550/D, Survey No. 17, 18 and 218, Kalyan Murbad Road, ShahadPIN 421103
Village
Kalyan-Dombivali (M Corp.), Kalyan taluka
Land area for this project
85,220 sq m (9,17,300 sq ft)
Permissible built-up area
53,468 sq m (5,75,528 sq ft)
Sanctioned built-up area
37,783 sq m (4,06,690 sq ft)
Recreational open space
30,958 sq m (3,33,229 sq ft)
Designated bank account
76
Developed in phases
Yes
Also registered as
Birla Vanya - Phase 1, Birla Vanya Phase 2

Survey, CTS, gat or plot numbers

1550 B1550 B1550/B1550 D1550 D1550/D1818218218CTS 1653CTS No 1653CTS No 1653Survey No. 17Survey No. 17

Land as published on MahaRERA's project page

CTS 1653, 1550/B, 1550/D, Survey No. 17, 18 and 218

Boundaries

North
S No 19
South
Shahad Murbad Road and CTS No 1551 and 1550C
East
S No 16 Hissa No 2 S No 23 and Sai Nirvana
West
Waldhuni River

Source: registration certificates and MahaRERA's project page, as stated there.