Residential / Group Housing · 4 buildings · 83 unitsRERA P51700010425

Palm Prism

Deedo IDDP-THN-71NB

Completion was pushed back 2 years and 5 months to Dec 2022, and that date has passed too; no MahaRERA orders on record; 67% of its units are booked.

Shahad, Thane 421103 · by P J Construction

Delivery6 yrs 4 mo latePromised Jul 2020 · revised Dec 2022 · that date has passed tooRegulatoryNo ordersNot in any MahaRERA list or order Deedo has readSales67% booked56 of 83 units · as the promoter reported to MahaRERA

Buying a flat here?

See every deed registered on it.

Completion was pushed back 2 years and 5 months to Dec 2022, and that date has passed too

  • This projectRegistered 24 Aug 2017, completion promised 31 Jul 2020, revised to 31 Dec 2022, and still not shown completed today.

1 extension certificate on record.

1 registration · Source: MahaRERA registration and extension certificates

Latest registered deeds

Sales, rentals and mortgages matched to this project · the free view shows a price band

No registered deeds matched to this project yet
Sales, resales, rentals and mortgages appear here once registered documents are matched to it by evidence.

4 buildings

Open a building to see every flat, floor by floor.

Floors and units from the registration certificate annexures and MahaRERA's project page.

Regulatory recordNone found

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

RERA registrationP51700010425
RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5170001042524 Aug 201731 Jul 202031 Dec 2022P J ConstructionProject page
Documents133

3 documents held by Deedo, 130 filings listed on MahaRERA's project page

Registration certificate

Extension certificate

Other

  • OtherDate not statedView

Finance

  • PAN CardP j construction pan.pdf · uploaded 29 Jul 2017Source

Legal

  • Legal Title reporttitle report P J Construction-min (2).pdf · uploaded 29 Jul 2017Source
  • Declaration Form Bf.pdf · uploaded 29 Jul 2017Source
  • Otherloi7662842017.pdf · uploaded 30 Jul 2017Source
  • OtherEcminutes.pdf · uploaded 30 Jul 2017Source
Show all 133 documentsShow fewer documents

Legal

  • OtherMseb noc.pdf · uploaded 30 Jul 2017Source
  • OtherStp Noc kdmc.pdf · uploaded 30 Jul 2017Source
  • Otherstability certificate_2.pdf · uploaded 30 Jul 2017Source
  • OtherNA_Order_shahad.pdf · uploaded 30 Jul 2017Source
  • Otherkdmc water noc.pdf · uploaded 30 Jul 2017Source
  • OtherNulla noc kdmc.pdf · uploaded 30 Jul 2017Source
  • Declaration Form Bauthority letter rera.pdf · uploaded 30 Jul 2017Source
  • OtherP_j_8_9_2011.pdf · uploaded 31 Jul 2017Source
  • Otherp_j_construction_partnership_deed (1).pdf · uploaded 31 Jul 2017Source
  • Legal Title reporttitle report P J Construction.pdf · uploaded 22 Dec 2017Source
  • Legal Title reportNEW TITLE CERTI 30-7-2021-compressed.pdf · uploaded 26 Sep 2021Source
  • Legal Title reportP j construction title certificate 06-08-2021-compressed_compressed.pdf · uploaded 26 Sep 2021Source
  • Legal Title reportp j construction Rera title certificate and flow of title_compressed.pdf · uploaded 20 Jul 2022Source
  • Legal Title reportPj new title 8-4-23_compressed.pdf · uploaded 22 Apr 2023Source
  • Declaration Form BAffidavit.pdf · uploaded 6 May 2023Source
  • Legal Title reportTitle 25-5-23_compressed.pdf · uploaded 30 May 2023Source
  • Legal Title reportTitle 25-5-23_compressed.pdf · uploaded 30 May 2023Source

Migrated

  • 1 PAN CardP j construction pan.pdf · uploaded 29 Jul 2017Source
  • 1 Copy of the legal title reporttitle report P J Construction-min (2).pdf · uploaded 29 Jul 2017Source
  • 1 Copy of Layout Approval (in case of layout)kdmc layout.pdf · uploaded 29 Jul 2017Source
  • 1 Building Plan Approval (IOD)Iod Shahad 3032007 1_39.pdf · uploaded 29 Jul 2017Source
  • 2 Building Plan Approval (IOD)Iod Shahad 3032007_69.pdf · uploaded 29 Jul 2017Source
  • 1 Commencement Certificates / NA Order for plotted developmentC C 2013.pdf · uploaded 29 Jul 2017Source
  • 2 Commencement Certificates / NA Order for plotted developmentc c 2012-12-359-46.pdf · uploaded 29 Jul 2017Source
  • 1 Declaration in FORM Bf.pdf · uploaded 29 Jul 2017Source
  • 1 Proforma of Allotment letterS909 P J CONSTRUCTION RERA.pdf · uploaded 29 Jul 2017Source
  • 2 Proforma of Allotment letterAllotment letter (1).pdf · uploaded 29 Jul 2017Source
  • 1 Details of encumbrancesadv kadam to kdmc.pdf · uploaded 30 Jul 2017Source
  • 2 Details of encumbrancesadv hemanth.pdf · uploaded 30 Jul 2017Source
  • 2 Copy of Layout Approval (in case of layout)PalmprismB1.pdf · uploaded 30 Jul 2017Source
  • 3 Copy of Layout Approval (in case of layout)PalmprismB1a.pdf · uploaded 30 Jul 2017Source
  • 4 Copy of Layout Approval (in case of layout)PalmprismB1b.pdf · uploaded 30 Jul 2017Source
  • 5 Copy of Layout Approval (in case of layout)ParkingplanB1.pdf · uploaded 30 Jul 2017Source
  • 6 Copy of Layout Approval (in case of layout)Podiumparkingplan.pdf · uploaded 30 Jul 2017Source
  • 2 Declaration in FORM Bauthority letter rera.pdf · uploaded 30 Jul 2017Source
  • 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Final_RERA_Engineer_Certificate_-PDF.pdf · uploaded 30 Jul 2017Source
  • 1 OtherNA_Order_shahad.pdf · uploaded 30 Jul 2017Source
  • 2 OtherNulla noc kdmc.pdf · uploaded 30 Jul 2017Source
  • 3 Otherkdmc water noc.pdf · uploaded 30 Jul 2017Source
  • 4 OtherMseb noc.pdf · uploaded 30 Jul 2017Source
  • 5 Otherstability certificate_2.pdf · uploaded 30 Jul 2017Source
  • 6 OtherStp Noc kdmc.pdf · uploaded 30 Jul 2017Source
  • 7 OtherEcminutes.pdf · uploaded 30 Jul 2017Source
  • 8 Otherloi7662842017.pdf · uploaded 30 Jul 2017Source
  • 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)architect rera certificate.pdf · uploaded 31 Jul 2017Source
  • 1 Certificates of CA (Form 3)CA certificate rera (1).pdf · uploaded 31 Jul 2017Source
  • 9 OtherP_j_8_9_2011.pdf · uploaded 31 Jul 2017Source
  • 10 Otherp_j_construction_partnership_deed (1).pdf · uploaded 31 Jul 2017Source
  • 3 Details of encumbrancesadv Hemant Patil cetf.pdf · uploaded 2 Dec 2017Source
  • 4 Details of encumbrancesashok kadam kdmc letter.pdf · uploaded 2 Dec 2017Source
  • 3 Commencement Certificates / NA Order for plotted developmentc c .pdf · uploaded 2 Dec 2017Source
  • 2 Copy of the legal title reporttitle report P J Construction.pdf · uploaded 22 Dec 2017Source
  • 7 Copy of Layout Approval (in case of layout)CC_KDMC_REVISED_map.pdf · uploaded 22 May 2019Source
  • 4 Commencement Certificates / NA Order for plotted developmentCC_KDMC_REVISED_2019.pdf · uploaded 22 May 2019Source
  • 2 Certificates of Architect (Form 1)(Mandatory for only ongoing project)architect_rera_certificate.pdf · uploaded 22 May 2019Source
  • 2 Certificates of CA (Form 3)CA_CERTIFICATE_RERA.pdf · uploaded 22 May 2019Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)CA1718_20200118180449.pdf · uploaded 18 Jan 2020Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)CA1819_20200118180531.pdf · uploaded 18 Jan 2020Source
  • 3 Copy of the legal title reportNEW TITLE CERTI 30-7-2021-compressed.pdf · uploaded 26 Sep 2021Source
  • 4 Copy of the legal title reportP j construction title certificate 06-08-2021-compressed_compressed.pdf · uploaded 26 Sep 2021Source
  • 8 Copy of Layout Approval (in case of layout)scan2204-converted-compressed.pdf · uploaded 26 Sep 2021Source
  • 9 Copy of Layout Approval (in case of layout)scan2202-converted-compressed.pdf · uploaded 26 Sep 2021Source
  • 5 Commencement Certificates / NA Order for plotted developmentNEW CC COPY-compressed.pdf · uploaded 26 Sep 2021Source
  • 3 Certificates of Architect (Form 1)(Mandatory for only ongoing project)ARCTEC- 13-1-2021.pdf · uploaded 26 Sep 2021Source
  • 4 Certificates of Architect (Form 1)(Mandatory for only ongoing project)ARCHTEC-12-8-2021.pdf · uploaded 26 Sep 2021Source
  • 5 Certificates of Architect (Form 1)(Mandatory for only ongoing project)ARCHTEC- 19-8-2021.pdf · uploaded 26 Sep 2021Source
  • 2 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)RCC ATUL-22-5-2019-compressed.pdf · uploaded 26 Sep 2021Source
  • 3 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)RCC ATUL-12-8-2021-compressed.pdf · uploaded 26 Sep 2021Source
  • 4 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)RCC ATUL 13-01-2021-compressed.pdf · uploaded 26 Sep 2021Source
  • 5 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)RCC ATUL -19-8-2021.pdf · uploaded 26 Sep 2021Source
  • 3 Certificates of CA (Form 3)LALIT SHARMA CERT 2 NEW-compressed.pdf · uploaded 26 Sep 2021Source
  • 4 Certificates of CA (Form 3)LALIT SHARMA NEW CERT-compressed.pdf · uploaded 26 Sep 2021Source
  • 2 Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)LALIT SHARMA FORM 5 NEW.pdf · uploaded 26 Sep 2021Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)LALIT SHARMA FORM 5 NEW.pdf · uploaded 26 Sep 2021Source
  • 5 Copy of the legal title reportp j construction Rera title certificate and flow of title_compressed.pdf · uploaded 20 Jul 2022Source
  • 1 Disclosure of sold/ booked inventorysold flat list.pdf · uploaded 20 Jul 2022Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)Rera form 5 ca Lalit.pdf · uploaded 20 Jul 2022Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)Engineer cert 1.pdf · uploaded 24 Jul 2022Source
  • 2 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)Engineer cer 2.pdf · uploaded 24 Jul 2022Source
  • 3 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)engineer cert 3.pdf · uploaded 24 Jul 2022Source
  • 4 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)engineer cert 4.pdf · uploaded 24 Jul 2022Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)engineer cert 5.pdf · uploaded 24 Jul 2022Source
  • 2 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)engineer cert 6.pdf · uploaded 24 Jul 2022Source
  • 3 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)engineer cer 7.pdf · uploaded 24 Jul 2022Source
  • 4 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)engineer cer 8.pdf · uploaded 24 Jul 2022Source
  • 1 Declaration about Commencement CertificateRera cc declaration.pdf · uploaded 27 Jul 2022Source
  • 5 Certificates of CA (Form 3)CA LALIT FORM 3 29-7-2022-compressed_compressed (1) (1).pdf · uploaded 29 Jul 2022Source
  • 10 Copy of Layout Approval (in case of layout)scan4060_compressed.pdf · uploaded 29 Dec 2022Source
  • 11 Copy of Layout Approval (in case of layout)scan4061_compressed.pdf · uploaded 29 Dec 2022Source
  • 12 Copy of Layout Approval (in case of layout)scan4062_compressed.pdf · uploaded 29 Dec 2022Source
  • 13 Copy of Layout Approval (in case of layout)scan4063_compressed.pdf · uploaded 29 Dec 2022Source
  • 14 Copy of Layout Approval (in case of layout)scan4064_compressed.pdf · uploaded 29 Dec 2022Source
  • 15 Copy of Layout Approval (in case of layout)scan4065_compressed.pdf · uploaded 29 Dec 2022Source
  • 6 Commencement Certificates / NA Order for plotted developmentSKM_C364e22122912570_compressed.pdf · uploaded 29 Dec 2022Source
  • 1 Status of Formation of Legal Entity (Society/Co Op etc.)palm Prism coop housing society ltd.pdf · uploaded 22 Feb 2023Source
  • 2 Status of Formation of Legal Entity (Society/Co Op etc.)palm Prism coop housing society ltd.pdf · uploaded 22 Feb 2023Source
  • 6 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architecture rera certi 24-2-23 (1).pdf · uploaded 24 Feb 2023Source
  • 6 Copy of the legal title reportPj new title 8-4-23_compressed.pdf · uploaded 22 Apr 2023Source
  • 2 Declaration about Commencement CertificateRera commencement certificate.pdf · uploaded 6 May 2023Source
  • 3 Declaration in FORM BAffidavit.pdf · uploaded 6 May 2023Source
  • 6 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)ATUL SIR RCC CERT 9-7-2022.pdf · uploaded 6 May 2023Source
  • 2 Disclosure of sold/ booked inventorySold unsold flats_compressed.pdf · uploaded 6 May 2023View
  • 2 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)Ca FORM 5 2021-22.pdf · uploaded 6 May 2023Source
  • 7 Copy of the legal title reportTitle 25-5-23_compressed.pdf · uploaded 30 May 2023Source
  • 8 Copy of the legal title reportTitle 25-5-23_compressed.pdf · uploaded 30 May 2023Source
  • 7 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)P J Construction.pdf · uploaded 12 Jun 2024Source

Technical

  • DocumentIod Shahad 3032007 1_39.pdf · uploaded 29 Jul 2017Source
  • DocumentIod Shahad 3032007_69.pdf · uploaded 29 Jul 2017Source
  • Documentkdmc layout.pdf · uploaded 29 Jul 2017Source
  • DocumentPodiumparkingplan.pdf · uploaded 30 Jul 2017Source
  • DocumentPalmprismB1b.pdf · uploaded 30 Jul 2017Source
  • DocumentParkingplanB1.pdf · uploaded 30 Jul 2017Source
  • DocumentPalmprismB1.pdf · uploaded 30 Jul 2017Source
  • DocumentPalmprismB1a.pdf · uploaded 30 Jul 2017Source
  • DocumentCC_KDMC_REVISED_map.pdf · uploaded 22 May 2019Source
  • Documentscan2204-converted-compressed.pdf · uploaded 26 Sep 2021Source
  • Documentscan2202-converted-compressed.pdf · uploaded 26 Sep 2021Source
  • Documentscan4060_compressed.pdf · uploaded 29 Dec 2022Source
  • Documentscan4061_compressed.pdf · uploaded 29 Dec 2022Source
  • Documentscan4062_compressed.pdf · uploaded 29 Dec 2022Source
  • Documentscan4063_compressed.pdf · uploaded 29 Dec 2022Source
  • Documentscan4064_compressed.pdf · uploaded 29 Dec 2022Source
  • Documentscan4065_compressed.pdf · uploaded 29 Dec 2022Source

Technical (Architect)

  • DocumentArchitecture rera certi 24-2-23 (1).pdf · uploaded 24 Feb 2023Source

Technical (Engineer)

  • DocumentP J Construction.pdf · uploaded 12 Jun 2024Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Land & approvalsLand parcel 16/2, 16/2

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Certificate Signed
Unit types
1 BHK, 2 BHK83 units in all
Address
Survey No-22/1, 22/3, 16/2, 23/11, 23/13, Shahad Mohana Road, ShahadPIN 421103
Village
Kalyan-Dombivali (M Corp.), Kalyan taluka
Land area for this project
2,471 sq m (26,593 sq ft)
Permissible built-up area
4,122 sq m (44,373 sq ft)
Sanctioned built-up area
2,019 sq m (21,735 sq ft)
Recreational open space
366 sq m (3,937 sq ft)
Designated bank account
89
Developed in phases
No

Survey, CTS, gat or plot numbers

16/216/222/322/323/1123/1123/1323/13Survey No22/1Survey No22/1

Land as published on MahaRERA's project page

Survey No-22/1,22/3,16/2,23/11,23/13

Boundaries

North
S No 21P and 28P
South
S No 23P
East
30mt DP Road
West
S No 16P

Source: registration certificates and MahaRERA's project page, as stated there.

Units & parking83 units

56 of 83 units booked (67%), as the promoter reported to MahaRERA

1 BHK · 15 units2 BHK · 68 units
TypeCarpet areaUnitsBooked
1 BHK48.29 sq m · 520 sq ft1511
2 BHK52.03 sq m · 560 sq ft3421
2 BHK52.24 sq m · 562 sq ft3424

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Professionals6

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectSatish Kanade—
EngineerAtul Kudtarkar—
OtherAvkash Kumar—
OtherBalchandra Soman—
OtherHanuman Desai—
OtherNadeem Beg—

Source: MahaRERA project page. Contact details are not shown.

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Report a problemMethodology