Residential / Group Housing · 1 building · 323 unitsRERA P51700034145

Evana D-2

Deedo IDDP-THN-5GHT

Completion was pushed back 4 months, to Apr 2030; no MahaRERA orders on record; 84% of its units are booked.

Owale, Thane 400615 · by Vihang Infrastructure Pvt Ltd

DeliveryExtended 4 moPromised Dec 2029 · now due Apr 2030RegulatoryNo ordersNot in any MahaRERA list or order Deedo has readSales84% booked271 of 323 units · as the promoter reported to MahaRERA

Buying a flat here?

See every deed registered on it.

Completion was pushed back 4 months, to Apr 2030

  • This projectRegistered 24 Mar 2022, completion promised 31 Dec 2029, revised to 30 Apr 2030.

No extension certificate on record.

1 registration · Source: MahaRERA registration and extension certificates

Latest registered deeds

Sales first, then rentals and mortgages matched to this project · the free view shows a price band

No registered deeds matched to this project yet
Sales, resales, rentals and mortgages appear here once registered documents are matched to it by evidence.

The building

Open a building to see every flat, floor by floor.

Floors and units from the registration certificate annexures and MahaRERA's project page.

Regulatory recordNone found

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

RERA registrationP51700034145
RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5170003414524 Mar 202231 Dec 202930 Apr 2030Vihang Infrastructure Pvt LtdProject page
Documents118

1 document held by Deedo, 117 filings listed on MahaRERA's project page

Registration certificate

Finance

  • PAN CardPAN CARD VIHANG INFRA PVT LTD.pdf · uploaded 16 Mar 2022Source

Legal

  • Legal Title reportTitle Certificate valley D-2 - Date 07-03-2022_Part 1.pdf · uploaded 16 Mar 2022Source
  • Legal Title reportTitle Certificate valley D-2 - Date 07-03-2022_ Part2.pdf · uploaded 16 Mar 2022Source
  • Legal Title reportTitle Certificate valley D-2 - Date 07-03-2022__Part3.pdf · uploaded 16 Mar 2022Source
  • Legal Title reportTitle Certificate valley D-2 - Date 07-03-2022__Part4.pdf · uploaded 16 Mar 2022Source
  • Declaration Form BFORM- B - AFFIDAVIT CUM DECLARATION_compressed.pdf · uploaded 16 Mar 2022Source

Migrated

  • 1 PAN CardPAN CARD VIHANG INFRA PVT LTD.pdf · uploaded 16 Mar 2022Source
Show all 118 documentsShow fewer documents

Migrated

  • 1 Copy of the legal title reportTitle Certificate valley D-2 - Date 07-03-2022_Part 1.pdf · uploaded 16 Mar 2022Source
  • 2 Copy of the legal title reportTitle Certificate valley D-2 - Date 07-03-2022_ Part2.pdf · uploaded 16 Mar 2022Source
  • 3 Copy of the legal title reportTitle Certificate valley D-2 - Date 07-03-2022__Part3.pdf · uploaded 16 Mar 2022Source
  • 4 Copy of the legal title reportTitle Certificate valley D-2 - Date 07-03-2022__Part4.pdf · uploaded 16 Mar 2022Source
  • 1 Details of encumbrancesNOC Encumberance Certificate.pdf · uploaded 16 Mar 2022Source
  • 1 Copy of Layout Approval (in case of layout)D 2 TYPICAL FLOORS.pdf · uploaded 16 Mar 2022Source
  • 1 Building Plan Approval / NA Order for plotted developmentD 2 GROUND AND BASEMENT.pdf · uploaded 16 Mar 2022Source
  • 1 Commencement Certificates / NA Order for plotted developmentCC Valley TDD-3962 Dated-11-2-2022 new_compressed.pdf · uploaded 16 Mar 2022Source
  • 1 Declaration about Commencement CertificateDeclaration About Commencement Certificate Format-D.pdf · uploaded 16 Mar 2022Source
  • 1 Declaration in FORM BFORM- B - AFFIDAVIT CUM DECLARATION_compressed.pdf · uploaded 16 Mar 2022Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)architect certficate- 10Folds.pdf · uploaded 16 Mar 2022Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineering certificate D2.pdf · uploaded 16 Mar 2022Source
  • 1 CERSAI detailsUndertaking CERSAI.pdf · uploaded 16 Mar 2022Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA CERTIFICATE.pdf · uploaded 16 Mar 2022Source
  • 1 Proforma of Allotment letterUNDERTAKEING for uploading PROFARMA OF ALLOTMENT LETTER and AGREEMENT.pdf · uploaded 16 Mar 2022Source
  • 1 Proforma of Agreement for saleDRAFT- FSA.pdf · uploaded 11 Apr 2023Source
  • 2 Commencement Certificates / NA Order for plotted developmentCOMMENCEMENT CERTIFICATE - VALLEY BUILDING D-2 DATE 20-10-2023 -.pdf · uploaded 25 Oct 2023Source
  • 1 Disclosure of sold/ booked inventorySold Unsold Units_16-11-2023.pdf · uploaded 16 Nov 2023Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)FROM 3 EVANA D2 16-11-2023.pdf · uploaded 16 Nov 2023Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 - Engineer certificate as on 31-12-2023.pdf · uploaded 21 Mar 2024Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 EVANA D2 31-12-2023_compressed.pdf · uploaded 21 Mar 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)FORM 5 EVANA D2 DATE 12 MAR 2023.pdf · uploaded 21 Mar 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)D2 Rera Annexure C Engineering.pdf · uploaded 6 Apr 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)D2 Rera Annexure C Engineering.pdf · uploaded 4 May 2024Source
  • 2 Disclosure of sold/ booked inventoryFORM 3 EVANA D2 31-12-2023_compressed.pdf · uploaded 4 May 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)FORM 5 EVANA D2 DATE 12 MAR 2023.pdf · uploaded 4 May 2024Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCHITECTS CERTIFICATE EVANA D2 FORM 1 - 31-12-2023.pdf · uploaded 9 May 2024Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCHITECTS CERTIFICATE FORM 1 - EVANA D2 - 341-03-2024.pdf · uploaded 9 May 2024Source
  • 2 Details of encumbrancesSBI Mortgage Index 2.pdf · uploaded 18 May 2024Source
  • 2 Proforma of Agreement for saleEVANA D2-404-revised as per sbi loan availed.pdf · uploaded 18 May 2024Source
  • 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFORMAT A Separate Bank Account 06-05-2024 EVANA D-2 -STATE BANK OF INDIA.pdf · uploaded 15 Jun 2024Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)form 2 - Evana D-2 -engineer certificate.pdf · uploaded 17 Jun 2024Source
  • 2 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 2A- Evana D-2.pdf · uploaded 17 Jun 2024Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 - EVANA D-2 Lilani AND co.pdf · uploaded 17 Jun 2024Source
  • 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 - EVANA D-2 Lilani co_compressed.pdf · uploaded 21 Jun 2024Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Evana Form 2 Jun 24_compressed.pdf · uploaded 17 Oct 2024Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Evana Form 3.pdf · uploaded 13 Nov 2024Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 JUNE 2024 EVANA D2.pdf · uploaded 23 Dec 2024Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 SEP 24 EVANA D2.pdf · uploaded 23 Dec 2024Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 SEP 24 EVANA D2.pdf · uploaded 23 Dec 2024Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)EVANA FORM 2 DEC 2024.pdf · uploaded 31 Jan 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)EVANA FORM 1 DEC 2024.pdf · uploaded 6 Feb 2025Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 SEPT 2024 EVANA D2.pdf · uploaded 6 Feb 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)EVANA FORM 3 DEC 24.pdf · uploaded 6 Feb 2025Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)EVANA FORM 5 23 24.pdf · uploaded 6 Feb 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM NO 1 EVANA MARCH 25.pdf · uploaded 12 Apr 2025Source
  • 1 Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)format b.pdf · uploaded 24 Apr 2025Source
  • Withdrawal Update Form 1ARCHITECTS CERTIFICATE FORM 1 - EVANA D2 - 341-03-2024.pdf · uploaded 4 Nov 2025Source
  • Withdrawal Update Form 2D2 Engineering certificate.pdf · uploaded 4 Nov 2025Source
  • Withdrawal Update Form 3FORM 3 - EVANA D-2 Lilani co_compressed.pdf · uploaded 4 Nov 2025Source
  • Withdrawal Update Form 1ARCHITECTS CERTIFICATE FORM 1 - EVANA D2 - 341-03-2024.pdf · uploaded 10 Nov 2025Source
  • Withdrawal Update Form 2D2 Engineering certificate.pdf · uploaded 10 Nov 2025Source
  • Withdrawal Update Form 3FORM 3 - EVANA D-2 Lilani co_compressed.pdf · uploaded 10 Nov 2025Source
  • Withdrawal Update Form 1ARCHITECTS CERTIFICATE FORM 1 - EVANA D2 - 341-03-2024.pdf · uploaded 17 Nov 2025Source
  • Withdrawal Update Form 1ARCHITECTS CERTIFICATE FORM 1 - EVANA D2 - 341-03-2024.pdf · uploaded 17 Nov 2025Source
  • Withdrawal Update Form 2D2 Engineering certificate.pdf · uploaded 17 Nov 2025Source
  • Withdrawal Update Form 2D2 Engineering certificate.pdf · uploaded 17 Nov 2025Source
  • Withdrawal Update Form 3FORM 3 - EVANA D-2 Lilani co_compressed.pdf · uploaded 17 Nov 2025Source
  • Withdrawal Update Form 3FORM 3 - EVANA D-2 Lilani co_compressed.pdf · uploaded 17 Nov 2025Source
  • Withdrawal Update Form 1ARCHITECTS CERTIFICATE FORM 1 - EVANA D2 - 341-03-2024.pdf · uploaded 17 Dec 2025Source
  • Withdrawal Update Form 2D2 Engineering certificate.pdf · uploaded 17 Dec 2025Source
  • Withdrawal Update Form 3FORM 3 - EVANA D-2 Lilani co_compressed.pdf · uploaded 17 Dec 2025Source
  • Withdrawal Update Form 1form 1 dec 2025.pdf · uploaded 10 Feb 2026Source
  • Withdrawal Update Form 1form 1 dec 2025.pdf · uploaded 10 Feb 2026Source
  • Withdrawal Update Form 2D2 Engineering certificate.pdf · uploaded 10 Feb 2026Source
  • Withdrawal Update Form 2D2 Engineering certificate.pdf · uploaded 10 Feb 2026Source
  • Withdrawal Update Form 3FORM 3 - EVANA D-2 Lilani co_compressed.pdf · uploaded 10 Feb 2026Source
  • Withdrawal Update Form 3FORM 3 - EVANA D-2 Lilani co_compressed.pdf · uploaded 10 Feb 2026Source
  • Withdrawal Update Form 1form 1 dec 2025.pdf · uploaded 20 Jul 2026Source
  • Withdrawal Update Form 2D2 Engineering certificate.pdf · uploaded 20 Jul 2026Source
  • Withdrawal Update Form 3FORM 3 Evana D2 DEC 25.pdf · uploaded 20 Jul 2026Source
  • Form 1FORM NO 1 EVANA MARCH 25.pdf · uploaded 7 Aug 2026Source
  • Form 1EVANA FORM 1 DEC 2024.pdf · uploaded 7 Aug 2026Source
  • Form 1FORM 1 SEPT 2024 EVANA D2.pdf · uploaded 7 Aug 2026Source
  • Form 2FORM 2 EVANA MARCH 25.pdf · uploaded 7 Aug 2026Source
  • Form 2EVANA FORM 2 DEC 2024.pdf · uploaded 7 Aug 2026Source
  • Form 2FORM 2 SEP 24 EVANA D2.pdf · uploaded 7 Aug 2026Source
  • Form 3Form 3 EvanaD2- Q1 FY 25-26.pdf · uploaded 7 Aug 2026Source
  • Form 3EVANA FORM 3 DEC 24.pdf · uploaded 7 Aug 2026Source
  • Form 3FORM 3 SEP 24 EVANA D2.pdf · uploaded 7 Aug 2026Source
  • Disclosure of Sold and Booked InventoryForm 3 EvanaD2- Q1 FY 25-26.pdf · uploaded 7 Aug 2026Source
  • Disclosure of Sold and Booked InventoryEVANA FORM 3 DEC 24.pdf · uploaded 7 Aug 2026Source
  • Disclosure of Sold and Booked InventoryFORM 3 SEP 24 EVANA D2.pdf · uploaded 7 Aug 2026Source
  • Withdrawal Update Form 1D2 EVANA Architect Form 1 march 2026.pdf · uploaded 18 Aug 2026Source
  • Withdrawal Update Form 2D2 Engineering certificate.pdf · uploaded 18 Aug 2026Source
  • Withdrawal Update Form 3form 3 evana march 2026.pdf · uploaded 18 Aug 2026Source
  • Withdrawal Update Form 1D2 EVANA Architect Form 1 march 2026.pdf · uploaded 2 Sep 2026Source
  • Withdrawal Update Form 2FORM 2 D2 -30-03-26.pdf · uploaded 2 Sep 2026Source
  • Withdrawal Update Form 3form 3 evana march 2026.pdf · uploaded 2 Sep 2026Source
  • Form 5 (FY 2021-2022)form 5 22-23 evana.pdf · uploaded 1 Oct 2026Source
  • Form 5 (FY 2022-2023)form 5 22-23 evana.pdf · uploaded 1 Oct 2026Source
  • Form 5 (FY 2023-2024)EVANA FORM 5 23 24.pdf · uploaded 1 Oct 2026Source
  • Form 5 (FY 2024-2025)form 5 24-25 evana.pdf · uploaded 1 Oct 2026Source

Technical

  • DocumentD 2 TYPICAL FLOORS.pdf · uploaded 16 Mar 2022Source
  • DocumentD 2 GROUND AND BASEMENT.pdf · uploaded 16 Mar 2022Source
  • DocumentLAYOUT.pdf · uploaded 2 Feb 2026Source
  • DocumentD2 REFUGE RECRIATIONAL TERRACE.pdf · uploaded 23 Feb 2026Source
  • DocumentD2 SECTION.pdf · uploaded 23 Feb 2026Source
  • DocumentD2 P2 TYPICAL.pdf · uploaded 23 Feb 2026Source
  • DocumentD2 B1GROUND P1.pdf · uploaded 23 Feb 2026Source
  • Documentlayout 23042025.pdf · uploaded 9 Mar 2026Source

Technical (Architect)

  • DocumentFORM 1 JUNE 2024 EVANA D2.pdf · uploaded 23 Dec 2024Source
  • DocumentEVANA FORM 1 DEC 2024.pdf · uploaded 6 Feb 2025Source
  • DocumentFORM 1 SEPT 2024 EVANA D2.pdf · uploaded 6 Feb 2025Source
  • DocumentFORM NO 1 EVANA MARCH 25.pdf · uploaded 12 Apr 2025Source
  • DocumentD2 EVANA Architect Form 1 march 2026.pdf · uploaded 12 Aug 2026Source

Technical (Engineer)

  • DocumentEvana Form 2 Jun 24_compressed.pdf · uploaded 17 Oct 2024Source
  • DocumentFORM 2 SEP 24 EVANA D2.pdf · uploaded 23 Dec 2024Source
  • DocumentEVANA FORM 2 DEC 2024.pdf · uploaded 31 Jan 2025Source
  • DocumentFORM 2 D2 -30-03-26.pdf · uploaded 2 Sep 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Land & approvalsLand parcel 1/2, 1/2B

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Certificate Signed
Unit types
1BHK, 2BHK, Shop323 units in all
Address
69/1/1, 1/2, 3/A/1, 3/A/2, 4, 5/1, 5/2, 6 72/4/B, 4/C, 4/D, 4/E, 74/1/1b, 1/2b, 74/1/2a, 1/3a, 1/3b, 3/1, 3/2, 5, 2b, 2a/1, 2a/2, 4, 75/1/A, 1/B, 2/B, 2/C, 77/2, 3, 1/2, 1/3, 78/3/B/1, 3/B/2, 3/B/3, 4/A, 4/B, 3/A/A, 3/A/2, 1/B, 78/1/D, 78/1/E, Gb Cross Road Thane, ThanePIN 400615
Village
Owale, Thane taluka
Land area for this project
5,425 sq m (58,391 sq ft)
Approved layout area
33,849 sq m (3,64,342 sq ft)
Permissible built-up area
21,726 sq m (2,33,862 sq ft)
Sanctioned built-up area
21,726 sq m (2,33,862 sq ft)
Recreational open space
8,718 sq m (93,836 sq ft)
Designated bank account
109
Developed in phases
No

Survey, CTS, gat or plot numbers

1/21/2B1/31/3A1/3B1/B2A/12A/22/B2B2/C33/13/23/A/13/A/23/B/23/B/344/A4/B4/C4/D4/E55/15/2669/1/172/4/A72/4/B74/1/1B74/1/2A75/1/A77/278/1/D78/1/E78/3/B/1

Land as published on MahaRERA's project page

69/1/1, 1/2, 3/A/1, 3/A/2, 4,5/1, 5/2, 6, 72/4/A, 72/4/B, 4/C, 4/D, 4/E, 74/1/1B, 1/2B, 74/1/2A, 1/3A, 1/3B, 3/1, 3/2, 5, 2B, 2A/1, 2A/2, 4, 75/1/A, 1/B,2/B, 2/C, 77/2, 3, 1/2, 1/3, 78/3/B/1, 3/B/2, 3/B/3, 4/A, 4/B, 3/A/1, 3/A/1, 3/A/2, 1/B, 78/1/D, 78/1/E

Boundaries

North
N 19 16 07
South
N 19 16 07
East
1n 19 16 04
West
1n 191 16 07

Source: registration certificates and MahaRERA's project page, as stated there.

Units & parking323 units

271 of 323 units booked (84%), as the promoter reported to MahaRERA

1BHK · 232 units2BHK · 82 unitsShop · 9 units
TypeCarpet areaUnitsBooked
1BHK39.56 sq m · 426 sq ft8064
1BHK39.59 sq m · 426 sq ft9076
1BHK40 sq m · 431 sq ft6258
2BHK57.93 sq m · 624 sq ft8264
Shop13.18 sq m · 142 sq ft11
Shop18.33 sq m · 197 sq ft11
Shop19.29 sq m · 208 sq ft11
Shop19.49 sq m · 210 sq ft11
Show all 13 unit rowsShow fewer unit rows
TypeCarpet areaUnitsBooked
Shop22.84 sq m · 246 sq ft11
Shop41.68 sq m · 449 sq ft11
Shop46.74 sq m · 503 sq ft11
Shop47.48 sq m · 511 sq ft11
Shop61.74 sq m · 665 sq ft11

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Professionals4

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectAbhijeet Jagtap—
ArchitectAjay Ramesh Mane—
Chartered accountantVinod Kumar Jain—
EngineerTukaram Hamraskar—

Source: MahaRERA project page. Contact details are not shown.

Other projects in Owale

All 28 projects in Owale · Compare Evana D-2 with another project

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Report a problemMethodology