Sadguru Darshan
Deedo IDDP-THN-H753Completion was pushed back 4 months, to Sep 2028; no MahaRERA orders on record; 0% of its units are booked.
Murbad, Thane 421401 · by Om Sadguru Realtors
Buying a flat here?
See every deed registered on it.
Completion was pushed back 4 months, to Sep 2028
- This projectRegistered 16 Jul 2018, completion promised 29 May 2028, revised to 29 Sep 2028.
No extension certificate on record.
1 registration · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales first, then rentals and mortgages matched to this project · the free view shows a price band
3 buildings
Open a building to see every flat, floor by floor.
- Building 16 floors · 34 units0% booked
- Building 26 floors · 43 units0% booked
- Building 36 floors · 40 units0% booked
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrationP51700017137
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P51700017137 | 16 Jul 2018 | 29 May 2028 | 29 Sep 2028 | Om Sadguru Realtors | Project page |
Documents257
1 document held by Deedo, 256 filings listed on MahaRERA's project page
Finance
- PAN CardFirm Pan Card.pdf · uploaded 9 Jul 2018Source
Legal
Migrated
- 1 PAN CardFirm Pan Card.pdf · uploaded 9 Jul 2018Source
- 1 Copy of the legal title reportTitle Certificate.pdf · uploaded 9 Jul 2018Source
- 1 Details of encumbrancesNo Encumbrance certificate.pdf · uploaded 9 Jul 2018Source
- 1 Copy of Layout Approval (in case of layout)Plan.pdf · uploaded 9 Jul 2018Source
Show all 257 documentsShow fewer documents
Migrated
- 1 Building Plan Approval (IOD)Approval _compressed.pdf · uploaded 9 Jul 2018Source
- 1 Commencement Certificates / NA Order for plotted developmentApproval _compressed.pdf · uploaded 9 Jul 2018Source
- 1 Declaration in FORM BForm B compressed.pdf · uploaded 9 Jul 2018Source
- 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect's Certificate-compressed.pdf · uploaded 9 Jul 2018Source
- 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Enginners Certificate.pdf · uploaded 9 Jul 2018Source
- 1 Proforma of Allotment letterProvisional Allotment of Flat.pdf · uploaded 9 Jul 2018Source
- 2 Proforma of Allotment letterDeclaration-Agreement for Sale.pdf · uploaded 9 Jul 2018Source
- 1 Certificates of CA (Form 3)CA CErtificate.pdf · uploaded 10 Jul 2018Source
- 2 Commencement Certificates / NA Order for plotted developmentCommencement Certificate_compressed.pdf · uploaded 13 Oct 2021Source
- 2 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect Certificate (Form 1)_compressed.pdf · uploaded 13 Oct 2021Source
- 2 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineers Certificate_compressed.pdf · uploaded 13 Oct 2021Source
- 2 Certificates of CA (Form 3)FORM-3_compressed.pdf · uploaded 2 Nov 2021Source
- 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1-30-09-2018.pdf · uploaded 19 Apr 2025Source
- 2 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1-31-12-2018.pdf · uploaded 19 Apr 2025Source
- 3 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1-31-03-2019.pdf · uploaded 19 Apr 2025Source
- 1 Certificates of CA (Form 3)Form 3 Sept 2018.pdf · uploaded 19 Apr 2025Source
- 2 Certificates of CA (Form 3)Form 3 Dec2018.pdf · uploaded 19 Apr 2025Source
- 3 Certificates of CA (Form 3)Form 3 March 2019.pdf · uploaded 19 Apr 2025Source
- 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 01-07-2018 to 30-09-2018.pdf · uploaded 19 Apr 2025Source
- 2 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 01-10-2018 to 31-12-2018.pdf · uploaded 19 Apr 2025Source
- 3 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 -01-01-2019 to 31-03-2019.pdf · uploaded 19 Apr 2025Source
- 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1June2019.pdf · uploaded 30 Apr 2025Source
- 2 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 Sept2019.pdf · uploaded 30 Apr 2025Source
- 3 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 Dec 2019.pdf · uploaded 30 Apr 2025Source
- 4 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 March2020.pdf · uploaded 30 Apr 2025Source
- 1 Certificates of CA (Form 3)Form 3 June 2019.pdf · uploaded 30 Apr 2025Source
- 2 Certificates of CA (Form 3)Form 3 Sept2019.pdf · uploaded 30 Apr 2025Source
- 3 Certificates of CA (Form 3)Form 3 Dec2018.pdf · uploaded 30 Apr 2025Source
- 4 Certificates of CA (Form 3)Form 3 March 2020.pdf · uploaded 30 Apr 2025Source
- 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)01-04-2019 to 30-06-2019.pdf · uploaded 30 Apr 2025Source
- 2 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Sept 2019 Final .pdf · uploaded 30 Apr 2025Source
- 3 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)01-10-2019 to 31-12-2019.pdf · uploaded 30 Apr 2025Source
- 4 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)01-01-2020 to 31-03-2020.pdf · uploaded 30 Apr 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)form 2A 2019-2020.pdf · uploaded 2 May 2025Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)Form 5-2018-19.pdf · uploaded 2 May 2025Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)Form5 2019-20.pdf · uploaded 2 May 2025Source
- 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1-30-06-2020.pdf · uploaded 4 May 2025Source
- 2 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1-Sept2020.pdf · uploaded 4 May 2025Source
- 3 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 Dec 2020.pdf · uploaded 4 May 2025Source
- 4 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 March 2021.pdf · uploaded 4 May 2025Source
- 1 Certificates of CA (Form 3)Form 3 June 2020.pdf · uploaded 4 May 2025Source
- 2 Certificates of CA (Form 3)Form 3 Sept 2020.pdf · uploaded 4 May 2025Source
- 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)01-04-2020 to 30-06-2020.pdf · uploaded 4 May 2025Source
- 2 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)01-07-2020 to 30-09-2020.pdf · uploaded 4 May 2025Source
- 3 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)01-10-2020 to 31-12-2020.pdf · uploaded 4 May 2025Source
- 4 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)01-01-2021 to 31-03- 2021.pdf · uploaded 4 May 2025Source
- 1 Certificates of CA (Form 3)Form 3 Dec2020.pdf · uploaded 5 May 2025Source
- 2 Certificates of CA (Form 3)Form 3 March 2021.pdf · uploaded 5 May 2025Source
- 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1-30-06-2021.pdf · uploaded 8 May 2025Source
- 2 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1- 30-09-2021.pdf · uploaded 8 May 2025Source
- 3 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1-31-12-2021.pdf · uploaded 8 May 2025Source
- 4 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form-1-31-03-2022.pdf · uploaded 8 May 2025Source
- 1 Certificates of CA (Form 3)Form 3 June 2021.pdf · uploaded 8 May 2025Source
- 2 Certificates of CA (Form 3)Form 3 Sept2021.pdf · uploaded 8 May 2025Source
- 3 Certificates of CA (Form 3)Form 3 Dec2021.pdf · uploaded 8 May 2025Source
- 4 Certificates of CA (Form 3)March 2022 FORM 3.pdf · uploaded 8 May 2025Source
- 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 1- 30-09-2021.pdf · uploaded 8 May 2025Source
- 2 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 June 2021.pdf · uploaded 8 May 2025Source
- 3 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2Sept2021.pdf · uploaded 8 May 2025Source
- 4 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2Dec2021.pdf · uploaded 8 May 2025Source
- 5 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 March 2022.pdf · uploaded 8 May 2025Source
- 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1-30-06-2022.pdf · uploaded 10 May 2025Source
- 2 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1- 30-09-2022.pdf · uploaded 10 May 2025Source
- 3 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1-31-12-2022.pdf · uploaded 10 May 2025Source
- 4 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1-31-03-2023.pdf · uploaded 10 May 2025Source
- 1 Certificates of CA (Form 3)Form 3JUNE22.pdf · uploaded 10 May 2025Source
- 2 Certificates of CA (Form 3)Form 3 Sept 22.pdf · uploaded 10 May 2025Source
- 3 Certificates of CA (Form 3)Form 3 Dec22.pdf · uploaded 10 May 2025Source
- 4 Certificates of CA (Form 3)Form 3 March23.pdf · uploaded 10 May 2025Source
- 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)01-04-22 to 30-06-22.pdf · uploaded 10 May 2025Source
- 2 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)01-07-22 to 30-09-22.pdf · uploaded 10 May 2025Source
- 3 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)01-10-22 to 31-12-22.pdf · uploaded 10 May 2025Source
- 4 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)01-01-23 to 31-03-23.pdf · uploaded 10 May 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)form 2A-2020-2021.pdf · uploaded 10 May 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)FORM 2A-2021-2022.pdf · uploaded 10 May 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)FORM 2A-2022-2023.pdf · uploaded 10 May 2025Source
- 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1-30-06-2023.pdf · uploaded 12 May 2025Source
- 2 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1-Dt-30-09-2023.pdf · uploaded 12 May 2025Source
- 3 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1- Dt-31-12-2023.pdf · uploaded 12 May 2025Source
- 4 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 -31-03-2024.pdf · uploaded 12 May 2025Source
- 1 Certificates of CA (Form 3)Form 3 June 2023.pdf · uploaded 12 May 2025Source
- 2 Certificates of CA (Form 3)Form 3 Sept23.pdf · uploaded 12 May 2025Source
- 3 Certificates of CA (Form 3)Form 3Dec 2023.pdf · uploaded 12 May 2025Source
- 4 Certificates of CA (Form 3)Form 3 Mar24.pdf · uploaded 12 May 2025Source
- 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)01-04-23 to 30-06-23.pdf · uploaded 12 May 2025Source
- 2 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)01-07-23 to 30-09-23.pdf · uploaded 12 May 2025Source
- 3 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)01-10-23 to 31-12-23.pdf · uploaded 12 May 2025Source
- 4 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)01-01-24 to 31-03-24.pdf · uploaded 12 May 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)FORM 2A 2023-2024.pdf · uploaded 12 May 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)FORM 2A 2023-2024.pdf · uploaded 12 May 2025Source
- Form 1Form 1-30-09-2018.pdf · uploaded 27 May 2025Source
- Form 1Form 1-31-12-2018.pdf · uploaded 27 May 2025Source
- Form 1Form 1-31-03-2019.pdf · uploaded 27 May 2025Source
- Form 1Form 1June2019.pdf · uploaded 27 May 2025Source
- Form 1Form 1 Sept2019.pdf · uploaded 27 May 2025Source
- Form 1Form 1 Dec 2019.pdf · uploaded 27 May 2025Source
- Form 1Form 1 March2020.pdf · uploaded 27 May 2025Source
- Form 1Form 1-30-06-2020.pdf · uploaded 27 May 2025Source
- Form 1Form 1-Sept2020.pdf · uploaded 27 May 2025Source
- Form 1Form 1 Dec 2020.pdf · uploaded 27 May 2025Source
- Form 1Form 1 March 2021.pdf · uploaded 27 May 2025Source
- Form 1Form 1-30-06-2021.pdf · uploaded 27 May 2025Source
- Form 1Form 1- 30-09-2021.pdf · uploaded 27 May 2025Source
- Form 1Form 1-31-12-2021.pdf · uploaded 27 May 2025Source
- Form 1Form-1-31-03-2022.pdf · uploaded 27 May 2025Source
- Form 1Form 1-30-06-2022.pdf · uploaded 27 May 2025Source
- Form 1Form 1- 30-09-2022.pdf · uploaded 27 May 2025Source
- Form 1Form 1-31-12-2022.pdf · uploaded 27 May 2025Source
- Form 1Form 1-31-03-2023.pdf · uploaded 27 May 2025Source
- Form 1Form 1-30-06-2023.pdf · uploaded 27 May 2025Source
- Form 1Form 1-Dt-30-09-2023.pdf · uploaded 27 May 2025Source
- Form 1Form 1- Dt-31-12-2023.pdf · uploaded 27 May 2025Source
- Form 1Form 1 -31-03-2024.pdf · uploaded 27 May 2025Source
- Form 201-07-2018 to 30-09-2018.pdf · uploaded 27 May 2025Source
- Form 2Form 2 01-10-2018 to 31-12-2018.pdf · uploaded 27 May 2025Source
- Form 2Form 2 -01-01-2019 to 31-03-2019.pdf · uploaded 27 May 2025Source
- Form 201-04-2019 to 30-06-2019.pdf · uploaded 27 May 2025Source
- Form 2Sept 2019 Final .pdf · uploaded 27 May 2025Source
- Form 201-10-2019 to 31-12-2019.pdf · uploaded 27 May 2025Source
- Form 201-01-2020 to 31-03-2020.pdf · uploaded 27 May 2025Source
- Form 201-04-2020 to 30-06-2020.pdf · uploaded 27 May 2025Source
- Form 201-07-2020 to 30-09-2020.pdf · uploaded 27 May 2025Source
- Form 201-10-2020 to 31-12-2020.pdf · uploaded 27 May 2025Source
- Form 201-01-2021 to 31-03- 2021.pdf · uploaded 27 May 2025Source
- Form 2Final June 2021.pdf · uploaded 27 May 2025Source
- Form 2Form 2Sept2021.pdf · uploaded 27 May 2025Source
- Form 2Form 2Dec2021.pdf · uploaded 27 May 2025Source
- Form 2Form 2 March 2022.pdf · uploaded 27 May 2025Source
- Form 201-04-22 to 30-06-22.pdf · uploaded 27 May 2025Source
- Form 201-07-22 to 30-09-22.pdf · uploaded 27 May 2025Source
- Form 201-10-22 to 31-12-22.pdf · uploaded 27 May 2025Source
- Form 201-01-23 to 31-03-23.pdf · uploaded 27 May 2025Source
- Form 201-04-23 to 30-06-23.pdf · uploaded 27 May 2025Source
- Form 201-07-23 to 30-09-23.pdf · uploaded 27 May 2025Source
- Form 201-10-23 to 31-12-23.pdf · uploaded 27 May 2025Source
- Form 201-01-24 to 31-03-24.pdf · uploaded 27 May 2025Source
- Form 3Form 3 Sept 2018.pdf · uploaded 27 May 2025Source
- Form 3Form 3 Dec2018.pdf · uploaded 27 May 2025Source
- Form 3Form 3 March 2019.pdf · uploaded 27 May 2025Source
- Form 3Form 3 June 2019.pdf · uploaded 27 May 2025Source
- Form 3Form 3 Sept2019.pdf · uploaded 27 May 2025Source
- Form 3Form 3 Dec2019.pdf · uploaded 27 May 2025Source
- Form 3Form 3 March 2020.pdf · uploaded 27 May 2025Source
- Form 3Form 3 June 2020.pdf · uploaded 27 May 2025Source
- Form 3Form 3 Sept 2020.pdf · uploaded 27 May 2025Source
- Form 3Form 3 Dec2020.pdf · uploaded 27 May 2025Source
- Form 3Form 3 March 2021.pdf · uploaded 27 May 2025Source
- Form 3Form 3 June 2021.pdf · uploaded 27 May 2025Source
- Form 3Form 3 Sept2021.pdf · uploaded 27 May 2025Source
- Form 3Form 3 Dec2021.pdf · uploaded 27 May 2025Source
- Form 3March 2022 FORM 3.pdf · uploaded 27 May 2025Source
- Form 3Form 3JUNE22.pdf · uploaded 27 May 2025Source
- Form 3Form 3 Sept 22.pdf · uploaded 27 May 2025Source
- Form 3Form 3 Dec22.pdf · uploaded 27 May 2025Source
- Form 3Form 3 March23.pdf · uploaded 27 May 2025Source
- Form 3Form 3 June 2023.pdf · uploaded 27 May 2025Source
- Form 3Form 3 Sept23.pdf · uploaded 27 May 2025Source
- Form 3Form 3Dec 2023.pdf · uploaded 27 May 2025Source
- Form 3Form 3 Mar24.pdf · uploaded 27 May 2025Source
- Form 5 (FY 2018-2019)Form 5-2018-19.pdf · uploaded 28 May 2025Source
- Form 5 (FY 2019-2020)Form5 2019-20.pdf · uploaded 28 May 2025Source
- Form 5 (FY 2020-2021)Form 5 20-21.pdf · uploaded 28 May 2025Source
- Form 5 (FY 2021-2022)Form 5 2021-22.pdf · uploaded 28 May 2025Source
- Form 5 (FY 2022-2023)Form 5 2022-23.pdf · uploaded 28 May 2025Source
- Form 5 (FY 2023-2024)Form 5 2023-24.pdf · uploaded 28 May 2025Source
- Form 1Form 1 June 2024.pdf · uploaded 2 Jun 2025Source
- Form 1Form 1 Sept 2024.pdf · uploaded 2 Jun 2025Source
- Form 1Form 1 Dec 2024.pdf · uploaded 2 Jun 2025Source
- Form 1Form 1 Mar2025.pdf · uploaded 2 Jun 2025Source
- Form 2Form 2 June 2024.pdf · uploaded 2 Jun 2025Source
- Form 2Form 2 Sept 2024.pdf · uploaded 2 Jun 2025Source
- Form 2Form 2 Dec2024.pdf · uploaded 2 Jun 2025Source
- Form 2Form 2 March 2025.pdf · uploaded 2 Jun 2025Source
- Form 3Final Form 3 June 2024.pdf · uploaded 2 Jun 2025Source
- Form 3Final Form 3 Sept 2024.pdf · uploaded 2 Jun 2025Source
- Form 3Final Form 3 Dec 2024.pdf · uploaded 2 Jun 2025Source
- Form 3Final Form 3 March 2025.pdf · uploaded 2 Jun 2025Source
- Withdrawal Update Form 1Form 1.pdf · uploaded 25 Aug 2025Source
- Withdrawal Update Form 2Form 2.pdf · uploaded 25 Aug 2025Source
- Withdrawal Update Form 3Form 3 June2025.pdf · uploaded 25 Aug 2025Source
- Withdrawal Update Form 1Form 1 Sept2025.pdf · uploaded 17 Mar 2026Source
- Withdrawal Update Form 2Form 2Sept25.pdf · uploaded 17 Mar 2026Source
- Withdrawal Update Form 3Form 3 Sept 2025.pdf · uploaded 17 Mar 2026Source
- Withdrawal Update Form 1Form 1 Dec2025.pdf · uploaded 18 Mar 2026Source
- Withdrawal Update Form 2Form 2Dec2025.pdf · uploaded 18 Mar 2026Source
- Withdrawal Update Form 3Form 3Dec25.pdf · uploaded 18 Mar 2026Source
- Form 5 (FY 2024-2025)Form 5 March 25.pdf · uploaded 4 Jun 2026Source
- Form 2A (FY 2018-2019)Form 2A 18-19.pdf · uploaded 12 Jun 2026Source
- Form 2A (FY 2019-2020)Form 2A 19-20.pdf · uploaded 12 Jun 2026Source
- Form 2A (FY 2020-2021)Form 2A 20-21.pdf · uploaded 12 Jun 2026Source
- Form 2A (FY 2021-2022)Form 2A 21-22.pdf · uploaded 12 Jun 2026Source
- Form 2A (FY 2022-2023)Form 2A 22-23.pdf · uploaded 12 Jun 2026Source
- Form 2A (FY 2023-2024)Form 2A 23-24.pdf · uploaded 12 Jun 2026Source
- Form 2A (FY 2024-2025)Form 2A 24-25.pdf · uploaded 12 Jun 2026Source
- Form 2A (FY 2025-2026)Form 2A 25-26.pdf · uploaded 17 Jun 2026Source
- Withdrawal Update Form 1Form 1 March 2026.pdf · uploaded 19 Jun 2026Source
- Withdrawal Update Form 2Form 2 March 26.pdf · uploaded 19 Jun 2026Source
- Withdrawal Update Form 3Form 3 March 2026.pdf · uploaded 19 Jun 2026Source
Technical
Technical (Architect)
- DocumentForm 1-30-09-2018.pdf · uploaded 19 Apr 2025Source
- DocumentForm 1-31-12-2018.pdf · uploaded 19 Apr 2025Source
- DocumentForm 1-31-03-2019.pdf · uploaded 19 Apr 2025Source
- DocumentForm 1June2019.pdf · uploaded 30 Apr 2025Source
- DocumentForm 1 Sept2019.pdf · uploaded 30 Apr 2025Source
- DocumentForm 1 Dec 2019.pdf · uploaded 30 Apr 2025Source
- DocumentForm 1 March2020.pdf · uploaded 30 Apr 2025Source
- DocumentForm 1-30-06-2020.pdf · uploaded 4 May 2025Source
- DocumentForm 1-Sept2020.pdf · uploaded 4 May 2025Source
- DocumentForm 1 Dec 2020.pdf · uploaded 4 May 2025Source
- DocumentForm 1 March 2021.pdf · uploaded 4 May 2025Source
- DocumentForm 1-30-06-2021.pdf · uploaded 8 May 2025Source
- DocumentForm 1- 30-09-2021.pdf · uploaded 8 May 2025Source
- DocumentForm 1-31-12-2021.pdf · uploaded 8 May 2025Source
- DocumentForm-1-31-03-2022.pdf · uploaded 8 May 2025Source
- DocumentForm 1-30-06-2022.pdf · uploaded 10 May 2025Source
- DocumentForm 1- 30-09-2022.pdf · uploaded 10 May 2025Source
- DocumentForm 1-31-12-2022.pdf · uploaded 10 May 2025Source
- DocumentForm 1-31-03-2023.pdf · uploaded 10 May 2025Source
- DocumentForm 1-30-06-2023.pdf · uploaded 12 May 2025Source
- DocumentForm 1-Dt-30-09-2023.pdf · uploaded 12 May 2025Source
- DocumentForm 1- Dt-31-12-2023.pdf · uploaded 12 May 2025Source
- DocumentForm 1 -31-03-2024.pdf · uploaded 12 May 2025Source
- DocumentForm 1 March 2026.pdf · uploaded 18 Jun 2026Source
Technical (Engineer)
- DocumentForm 2 01-07-2018 to 30-09-2018.pdf · uploaded 19 Apr 2025Source
- DocumentForm 2 01-10-2018 to 31-12-2018.pdf · uploaded 19 Apr 2025Source
- DocumentForm 2 -01-01-2019 to 31-03-2019.pdf · uploaded 19 Apr 2025Source
- Document01-04-2019 to 30-06-2019.pdf · uploaded 30 Apr 2025Source
- DocumentSept 2019 Final .pdf · uploaded 30 Apr 2025Source
- Document01-10-2019 to 31-12-2019.pdf · uploaded 30 Apr 2025Source
- Document01-01-2020 to 31-03-2020.pdf · uploaded 30 Apr 2025Source
- Document01-04-2020 to 30-06-2020.pdf · uploaded 4 May 2025Source
- Document01-07-2020 to 30-09-2020.pdf · uploaded 4 May 2025Source
- Document01-10-2020 to 31-12-2020.pdf · uploaded 4 May 2025Source
- Document01-01-2021 to 31-03- 2021.pdf · uploaded 4 May 2025Source
- DocumentForm 1- 30-09-2021.pdf · uploaded 8 May 2025Source
- DocumentForm 2 June 2021.pdf · uploaded 8 May 2025Source
- DocumentForm 2Sept2021.pdf · uploaded 8 May 2025Source
- DocumentForm 2Dec2021.pdf · uploaded 8 May 2025Source
- DocumentForm 2 March 2022.pdf · uploaded 8 May 2025Source
- Document01-04-22 to 30-06-22.pdf · uploaded 10 May 2025Source
- Document01-07-22 to 30-09-22.pdf · uploaded 10 May 2025Source
- Document01-10-22 to 31-12-22.pdf · uploaded 10 May 2025Source
- Document01-01-23 to 31-03-23.pdf · uploaded 10 May 2025Source
- Document01-04-23 to 30-06-23.pdf · uploaded 12 May 2025Source
- Document01-07-23 to 30-09-23.pdf · uploaded 12 May 2025Source
- Document01-10-23 to 31-12-23.pdf · uploaded 12 May 2025Source
- Document01-01-24 to 31-03-24.pdf · uploaded 12 May 2025Source
- DocumentForm 2 March 26.pdf · uploaded 19 Jun 2026Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvalsLand parcel 3A, S. No. 27 H. No. 2B
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Certificate Signed
- Unit types
- 1 BHK, 1BHK, 1 RK, 2 BHK117 units in all
- Address
- S. No. 27 H. No. 2B and 3A, Murbad, MurbadPIN 421401
- Village
- Murbad, Murbad taluka
- Location
- 19.26116, 73.38887
- Land area for this project
- 4,340 sq m (46,715 sq ft)
- Permissible built-up area
- 4,683 sq m (50,412 sq ft)
- Sanctioned built-up area
- 4,683 sq m (50,412 sq ft)
- Recreational open space
- 551 sq m (5,936 sq ft)
- Designated bank account
- 220
- Developed in phases
- Yes
Survey, CTS, gat or plot numbers
Land as published on MahaRERA's project page
S. No. 27 H. No. 2B and 3A
Boundaries
- North
- S No 29
- South
- S No 5
- East
- H No 3B
- West
- H No 2A
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking117 units
0 of 117 units booked (0%), as the promoter reported to MahaRERA
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| Building 1 | 1 BHK | 29.7 sq m · 320 sq ft | 2 | 0 |
| Building 1 | 1 BHK | 30.21 sq m · 325 sq ft | 1 | 0 |
| Building 1 | 1 BHK | 30.63 sq m · 330 sq ft | 2 | 0 |
| Building 1 | 1 BHK | 30.99 sq m · 334 sq ft | 2 | 0 |
| Building 1 | 1 BHK | 31.39 sq m · 338 sq ft | 1 | 0 |
| Building 1 | 1 BHK | 31.88 sq m · 343 sq ft | 4 | 0 |
| Building 1 | 1 BHK | 31.89 sq m · 343 sq ft | 1 | 0 |
| Building 1 | 1 BHK | 33.34 sq m · 359 sq ft | 2 | 0 |
Show all 60 unit rowsShow fewer unit rows
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| Building 1 | 1 BHK | 33.98 sq m · 366 sq ft | 2 | 0 |
| Building 1 | 1 BHK | 34.48 sq m · 371 sq ft | 4 | 0 |
| Building 1 | 1 BHK | 34.83 sq m · 375 sq ft | 2 | 0 |
| Building 1 | 1BHK | 35.47 sq m · 382 sq ft | 2 | 0 |
| Building 1 | 1 RK | 20.29 sq m · 218 sq ft | 1 | 0 |
| Building 1 | 2 BHK | 37.94 sq m · 408 sq ft | 2 | 0 |
| Building 1 | 2 BHK | 38.61 sq m · 416 sq ft | 2 | 0 |
| Building 1 | 2 BHK | 41.88 sq m · 451 sq ft | 2 | 0 |
| Building 1 | 2 BHK | 42.28 sq m · 455 sq ft | 2 | 0 |
| Building 2 | 1 BHK | 28.41 sq m · 306 sq ft | 2 | 0 |
| Building 2 | 1 BHK | 28.61 sq m · 308 sq ft | 1 | 0 |
| Building 2 | 1 BHK | 29.76 sq m · 320 sq ft | 2 | 0 |
| Building 2 | 1 BHK | 30.79 sq m · 331 sq ft | 2 | 0 |
| Building 2 | 1 BHK | 30.98 sq m · 333 sq ft | 2 | 0 |
| Building 2 | 1 BHK | 31.11 sq m · 335 sq ft | 2 | 0 |
| Building 2 | 1 BHK | 31.25 sq m · 336 sq ft | 2 | 0 |
| Building 2 | 1 BHK | 31.28 sq m · 337 sq ft | 2 | 0 |
| Building 2 | 1 BHK | 31.32 sq m · 337 sq ft | 2 | 0 |
| Building 2 | 1 BHK | 31.88 sq m · 343 sq ft | 4 | 0 |
| Building 2 | 1 BHK | 32.36 sq m · 348 sq ft | 2 | 0 |
| Building 2 | 1 BHK | 32.39 sq m · 349 sq ft | 2 | 0 |
| Building 2 | 1 BHK | 33.92 sq m · 365 sq ft | 4 | 0 |
| Building 2 | 1 BHK | 33.94 sq m · 365 sq ft | 1 | 0 |
| Building 2 | 1 RK | 19.49 sq m · 210 sq ft | 1 | 0 |
| Building 2 | 2 BHK | 37.37 sq m · 402 sq ft | 2 | 0 |
| Building 2 | 2 BHK | 39.39 sq m · 424 sq ft | 2 | 0 |
| Building 2 | 2 BHK | 41.06 sq m · 442 sq ft | 2 | 0 |
| Building 2 | 2 BHK | 41.76 sq m · 450 sq ft | 2 | 0 |
| Building 2 | 2 BHK | 42.9 sq m · 462 sq ft | 2 | 0 |
| Building 2 | 2 BHK | 42.91 sq m · 462 sq ft | 2 | 0 |
| Building 3 | 1 BHK | 27.85 sq m · 300 sq ft | 1 | 0 |
| Building 3 | 1 BHK | 29.83 sq m · 321 sq ft | 1 | 0 |
| Building 3 | 1 BHK | 30 sq m · 323 sq ft | 1 | 0 |
| Building 3 | 1 BHK | 30.04 sq m · 323 sq ft | 1 | 0 |
| Building 3 | 1 BHK | 30.5 sq m · 328 sq ft | 1 | 0 |
| Building 3 | 1 BHK | 30.76 sq m · 331 sq ft | 1 | 0 |
| Building 3 | 1 BHK | 31.25 sq m · 336 sq ft | 2 | 0 |
| Building 3 | 1 BHK | 32.14 sq m · 346 sq ft | 2 | 0 |
| Building 3 | 1 BHK | 32.47 sq m · 350 sq ft | 2 | 0 |
| Building 3 | 1 BHK | 32.82 sq m · 353 sq ft | 2 | 0 |
| Building 3 | 1 BHK | 32.94 sq m · 355 sq ft | 2 | 0 |
| Building 3 | 1 BHK | 33.1 sq m · 356 sq ft | 2 | 0 |
| Building 3 | 1 BHK | 33.19 sq m · 357 sq ft | 2 | 0 |
| Building 3 | 1 BHK | 33.23 sq m · 358 sq ft | 2 | 0 |
| Building 3 | 1 BHK | 33.75 sq m · 363 sq ft | 2 | 0 |
| Building 3 | 1 BHK | 33.98 sq m · 366 sq ft | 1 | 0 |
| Building 3 | 1 BHK | 34.66 sq m · 373 sq ft | 4 | 0 |
| Building 3 | 1BHK | 27.13 sq m · 292 sq ft | 2 | 0 |
| Building 3 | 1BHK | 30.99 sq m · 334 sq ft | 1 | 0 |
| Building 3 | 1BHK | 31.88 sq m · 343 sq ft | 4 | 0 |
| Building 3 | 2 BHK | 39.47 sq m · 425 sq ft | 2 | 0 |
| Building 3 | 2 BHK | 39.78 sq m · 428 sq ft | 2 | 0 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Professionals2
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Mahesh Jagtap Jagtap | — |
| Chartered accountant | Anil Paryaldas Dhanwani | — |
Source: MahaRERA project page. Contact details are not shown.
Other projects in Murbad
- Sai Siddhi ParkRERA PR1330002602321
- Sujata HeightsRERA PM1330002602319
- Om Sai Krupa ApartmentRERA PR1330002502446
- Suparshavanath RealityRERA PR1330002501844
- Shree Ganesh ApartmentRERA P51700080980
- Shree Darshan HeightsRERA P51700080082
- Skyrise VillaRERA P51700079708
- Vishwa ComplexRERA P51700079701
All 33 projects in Murbad · Compare Sadguru Darshan with another project