Residential / Group Housing · 26 buildings · 3,396 unitsRERA P51700003433

DB Ozone

Deedo IDDP-THN-VAPQ

Completion was pushed back 5 years to Dec 2024, and that date has passed too; no MahaRERA orders on record; 97% of its units are booked.

Mirabhayandar (M Corp.), Thane 400063 · by Neelkamal Realtors Suburban Private Limited, Neelkamal Realtors Suburban Private Limited

Delivery6 yrs 11 mo latePromised Dec 2019 · revised Dec 2024 · that date has passed tooRegulatoryNo ordersNot in any MahaRERA list or order Deedo has readSales97% booked3,282 of 3,396 units · as the promoter reported to MahaRERA

Buying a flat here?

See every deed registered on it.

Completion was pushed back 5 years to Dec 2024, and that date has passed too

  • This projectRegistered 5 Aug 2017, completion promised 31 Dec 2019, revised to 30 Dec 2024, and still not shown completed today.

1 extension certificate on record.

1 registration · Source: MahaRERA registration and extension certificates

Latest registered deeds

Sales, rentals and mortgages matched to this project · the free view shows a price band

No registered deeds matched to this project yet
Sales, resales, rentals and mortgages appear here once registered documents are matched to it by evidence.

26 buildings

Open a building to see every flat, floor by floor.

Show all 26 buildingsShow fewer buildings

Floors and units from the registration certificate annexures and MahaRERA's project page.

Regulatory recordNone found

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

RERA registrationP51700003433
RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P517000034335 Aug 201731 Dec 201930 Dec 2024Neelkamal Realtors Suburban Private LimitedProject page
Documents329

3 documents held by Deedo, 326 filings listed on MahaRERA's project page

Registration certificate

Extension certificate

Other

  • OtherDate not statedView

Finance

  • PAN CardPancard_NRSPL.pdf · uploaded 29 Jul 2017Source
  • PAN CardPancard_RA.pdf · uploaded 29 Jul 2017Source
  • PAN CardPancard_AB.pdf · uploaded 29 Jul 2017Source

Legal

  • Legal Title reportLegal Title Report (Pt1).pdf · uploaded 29 Jul 2017Source
  • Legal Title reportLegal Title Report (Pt2).pdf · uploaded 29 Jul 2017Source
Show all 329 documentsShow fewer documents

Legal

  • Legal Title reportLegal Title Report (Pt3).pdf · uploaded 29 Jul 2017Source
  • Legal Title reportLegal Title Report (Pt4).pdf · uploaded 29 Jul 2017Source
  • Legal Title reportLegal Title Report (Pt5).pdf · uploaded 29 Jul 2017Source
  • Declaration Form BDB Ozone (MBMC) form B.pdf · uploaded 29 Jul 2017Source

Migrated

  • 1 PAN CardPancard_NRSPL.pdf · uploaded 29 Jul 2017Source
  • 2 PAN CardPancard_AB.pdf · uploaded 29 Jul 2017Source
  • 3 PAN CardPancard_RA.pdf · uploaded 29 Jul 2017Source
  • 1 Copy of the legal title reportLegal Title Report (Pt1).pdf · uploaded 29 Jul 2017Source
  • 2 Copy of the legal title reportLegal Title Report (Pt2).pdf · uploaded 29 Jul 2017Source
  • 3 Copy of the legal title reportLegal Title Report (Pt3).pdf · uploaded 29 Jul 2017Source
  • 4 Copy of the legal title reportLegal Title Report (Pt4).pdf · uploaded 29 Jul 2017Source
  • 5 Copy of the legal title reportLegal Title Report (Pt5).pdf · uploaded 29 Jul 2017Source
  • 1 Details of encumbrancesDetails of encumbrances.pdf · uploaded 29 Jul 2017Source
  • 1 Copy of Layout Approval (in case of layout)Layout Approval_pt1.pdf · uploaded 29 Jul 2017Source
  • 2 Copy of Layout Approval (in case of layout)Layout Approval_pt2.pdf · uploaded 29 Jul 2017Source
  • 1 Building Plan Approval (IOD)Building Plan Approval (IOD)-Pt(1).pdf · uploaded 29 Jul 2017Source
  • 2 Building Plan Approval (IOD)Building Plan Approval (IOD)-Pt(2).pdf · uploaded 29 Jul 2017Source
  • 1 Commencement Certificates / NA Order for plotted developmentCommencement Certificate-Pt(1).pdf · uploaded 29 Jul 2017Source
  • 2 Commencement Certificates / NA Order for plotted developmentCommencement Certificate-Pt(2).pdf · uploaded 29 Jul 2017Source
  • 1 Declaration in FORM BDB Ozone (MBMC) form B.pdf · uploaded 29 Jul 2017Source
  • 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 - Architect certificate (mbmc).pdf · uploaded 29 Jul 2017Source
  • 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form-2 Engineers Certificate.pdf · uploaded 29 Jul 2017Source
  • 1 Certificates of CA (Form 3)DB Ozone Form-3 CAs Certificate-Pt(1).pdf · uploaded 29 Jul 2017Source
  • 2 Certificates of CA (Form 3)DB Ozone Form-3 CAs Certificate-Pt(2).pdf · uploaded 29 Jul 2017Source
  • 3 Certificates of CA (Form 3)DB Ozone Form-3 CAs Certificate-Pt(3).pdf · uploaded 29 Jul 2017Source
  • 4 Certificates of CA (Form 3)DB Ozone Form-3 CAs Certificate-Pt(4).pdf · uploaded 29 Jul 2017Source
  • 5 Certificates of CA (Form 3)DB Ozone Form-3 CAs Certificate-Pt(6).pdf · uploaded 29 Jul 2017Source
  • 6 Certificates of CA (Form 3)DB Ozone Form-3 CAs Certificate-Pt(7).pdf · uploaded 29 Jul 2017Source
  • 7 Certificates of CA (Form 3)DB Ozone Form-3 CAs Certificate-Pt(6).pdf · uploaded 29 Jul 2017Source
  • 8 Certificates of CA (Form 3)DB Ozone Form-3 CAs Certificate-Pt(8).pdf · uploaded 29 Jul 2017Source
  • 9 Certificates of CA (Form 3)DB Ozone Form-3 CAs Certificate-Pt(9).pdf · uploaded 29 Jul 2017Source
  • 10 Certificates of CA (Form 3)DB Ozone Form-3 CAs Certificate-Pt(10).pdf · uploaded 29 Jul 2017Source
  • 1 Proforma of Allotment letterProforma of the Allotment Letter and agreement for sale.pdf · uploaded 29 Jul 2017Source
  • 2 Proforma of Allotment letterMira Rera AFS Annexure-1.pdf · uploaded 14 Dec 2017Source
  • 3 Proforma of Allotment letterMira Rera AFS Annexure-3 (prt 1 of 2).pdf · uploaded 14 Dec 2017Source
  • 4 Proforma of Allotment letterMira Rera AFS Annexure-4.pdf · uploaded 14 Dec 2017Source
  • 5 Proforma of Allotment letter20171214 Mira Side - RERA Agreement for Sales.pdf · uploaded 14 Dec 2017Source
  • 6 Proforma of Allotment letterMira Rera AFS Annexure-2.pdf · uploaded 14 Dec 2017Source
  • 7 Proforma of Allotment letter20171214 Mira Side - RERA Agreement for Sales.pdf · uploaded 14 Dec 2017Source
  • 8 Proforma of Allotment letterMira Rera AFS Annexure-1.pdf · uploaded 14 Dec 2017Source
  • 9 Proforma of Allotment letterMira Rera AFS Annexure-2.pdf · uploaded 14 Dec 2017Source
  • 10 Proforma of Allotment letterMira Rera AFS Annexure-3 (prt 1 of 2).pdf · uploaded 14 Dec 2017Source
  • 11 Proforma of Allotment letterMira Rera AFS Annexure-3 (prt 2 of 2).pdf · uploaded 14 Dec 2017Source
  • 12 Proforma of Allotment letterMira Rera AFS Annexure-4.pdf · uploaded 14 Dec 2017Source
  • 13 Proforma of Allotment letterMira Rera AFS Annexure-5.pdf · uploaded 14 Dec 2017Source
  • 14 Proforma of Allotment letterMira Rera AFS Annexure-6.pdf · uploaded 14 Dec 2017Source
  • 15 Proforma of Allotment letterMira Rera AFS Annexure-7 (prt 1 of 2).pdf · uploaded 14 Dec 2017Source
  • 16 Proforma of Allotment letterMira Rera AFS Annexure-7 (prt 2 of 2).pdf · uploaded 14 Dec 2017Source
  • 17 Proforma of Allotment letterMira Rera AFS Annexure-8.pdf · uploaded 14 Dec 2017Source
  • 18 Proforma of Allotment letterMira Rera AFS Annexure-9.pdf · uploaded 14 Dec 2017Source
  • 19 Proforma of Allotment letterMira Rera AFS Annexure-10.pdf · uploaded 14 Dec 2017Source
  • 2 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Q1 (Sep17) Form-1 Ozone MBMC s.pdf · uploaded 22 Feb 2018Source
  • 2 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Q1 (Sep17) Form 2 - DB Ozone MBMC s.pdf · uploaded 22 Feb 2018Source
  • 11 Certificates of CA (Form 3)Q1 (Sep17) Form 3 db ozone mbmc pt1 (1-5).pdf · uploaded 22 Feb 2018Source
  • 12 Certificates of CA (Form 3)Q1 (Sep17) Form 3 db ozone mbmc pt1 (6-11).pdf · uploaded 22 Feb 2018Source
  • 13 Certificates of CA (Form 3)Q1 (Sep17) Form 3 db ozone mbmc pt1 (12-16).pdf · uploaded 22 Feb 2018Source
  • 14 Certificates of CA (Form 3)Q1 (Sep17) Form 3 db ozone mbmc pt1 (17-21).pdf · uploaded 22 Feb 2018Source
  • 15 Certificates of CA (Form 3)Q1 (Sep17) Form 3 db ozone mbmc pt1 (22-25).pdf · uploaded 22 Feb 2018Source
  • 16 Certificates of CA (Form 3)Q1 (Sep17) Form 3 db ozone mbmc pt2 (26-31).pdf · uploaded 22 Feb 2018Source
  • 17 Certificates of CA (Form 3)Q1 (Sep17) Form 3 db ozone mbmc pt2 (32-37).pdf · uploaded 22 Feb 2018Source
  • 18 Certificates of CA (Form 3)Q1 (Sep17) Form 3 db ozone mbmc pt2 (38-43).pdf · uploaded 22 Feb 2018Source
  • 19 Certificates of CA (Form 3)Q1 (Sep17) Form 3 db ozone mbmc pt2 (44-49).pdf · uploaded 22 Feb 2018Source
  • 20 Certificates of CA (Form 3)Q1 (Sep17) Form 3 db ozone mbmc pt2 (50-55).pdf · uploaded 22 Feb 2018Source
  • 21 Certificates of CA (Form 3)Q1 (Sep17) Form 3 db ozone mbmc pt2 (56-59).pdf · uploaded 22 Feb 2018Source
  • 3 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Q2 Form 1 db ozone mbmc (1-4).pdf · uploaded 26 Mar 2018Source
  • 4 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Q2 Form 1 db ozone mbmc (5-7).pdf · uploaded 26 Mar 2018Source
  • 3 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Q2 Form 2 db ozone mbmc.pdf · uploaded 26 Mar 2018Source
  • 22 Certificates of CA (Form 3)Q2 Form 3 db ozone mbmc (pt1) - 1-5.pdf · uploaded 26 Mar 2018Source
  • 23 Certificates of CA (Form 3)Q2 Form 3 db ozone mbmc (pt2) - 6-8.pdf · uploaded 26 Mar 2018Source
  • 24 Certificates of CA (Form 3)Q2 Form 3 db ozone mbmc (pt3) - 9-12.pdf · uploaded 26 Mar 2018Source
  • 25 Certificates of CA (Form 3)Q2 Form 3 db ozone mbmc (pt4) - 13-16.pdf · uploaded 26 Mar 2018Source
  • 26 Certificates of CA (Form 3)Q2 Form 3 db ozone mbmc (pt5) - 17-20.pdf · uploaded 26 Mar 2018Source
  • 27 Certificates of CA (Form 3)Q2 Form 3 db ozone mbmc (pt6) - 21-24.pdf · uploaded 26 Mar 2018Source
  • 28 Certificates of CA (Form 3)Q2 Form 3 db ozone mbmc (pt7) - 25-28.pdf · uploaded 26 Mar 2018Source
  • 29 Certificates of CA (Form 3)Q2 Form 3 db ozone mbmc (pt8) - 29-30.pdf · uploaded 26 Mar 2018Source
  • 30 Certificates of CA (Form 3)Q2 Form 3 db ozone mbmc (pt9) - 31-34.pdf · uploaded 26 Mar 2018Source
  • 31 Certificates of CA (Form 3)Q2 Form 3 db ozone mbmc (pt10) - 35-38.pdf · uploaded 26 Mar 2018Source
  • 32 Certificates of CA (Form 3)Q2 Form 3 db ozone mbmc (pt11) - 39-43.pdf · uploaded 26 Mar 2018Source
  • 33 Certificates of CA (Form 3)Q2 Form 3 db ozone mbmc (pt12) - 44-47.pdf · uploaded 26 Mar 2018Source
  • 5 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Q3 (Mar 18) Form 1 DB Ozone MBMC.pdf · uploaded 26 Jul 2018Source
  • 4 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Q3 (Mar 18) Form 2 DB Ozone (MBMC).pdf · uploaded 26 Jul 2018Source
  • 34 Certificates of CA (Form 3)Q3 (Mar-18) Ozone - Form 3 PT-1.pdf · uploaded 26 Jul 2018Source
  • 35 Certificates of CA (Form 3)Q3 (Mar-18) Ozone - Form 3 PT-2.pdf · uploaded 26 Jul 2018Source
  • 36 Certificates of CA (Form 3)Q3 (Mar-18) Ozone - Form 3 PT-3.pdf · uploaded 26 Jul 2018Source
  • 37 Certificates of CA (Form 3)Q3 (Mar-18) Ozone - Form 3 PT-4.pdf · uploaded 26 Jul 2018Source
  • 38 Certificates of CA (Form 3)Q3 (Mar-18) Ozone - Form 3 PT-5.pdf · uploaded 26 Jul 2018Source
  • 39 Certificates of CA (Form 3)Q3 (Mar-18) Ozone - Form 3 PT-6.pdf · uploaded 26 Jul 2018Source
  • 40 Certificates of CA (Form 3)Q3 (Mar-18) Ozone - Form 3 PT-7.pdf · uploaded 26 Jul 2018Source
  • 41 Certificates of CA (Form 3)Q3 (Mar-18) Ozone - Form 3 PT-8.pdf · uploaded 26 Jul 2018Source
  • 42 Certificates of CA (Form 3)Q3 (Mar-18) Ozone - Form 3 PT-9.pdf · uploaded 26 Jul 2018Source
  • 1 Certificates of CA (Form 5)Form 5 (Aug17 - Mar18) DB Ozone (Mira).pdf · uploaded 30 Sep 2018Source
  • 6 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Q4 (Jun18) Form1 - DB Ozone Miras.pdf · uploaded 15 Oct 2018Source
  • 43 Certificates of CA (Form 3)Q4 (Jun18) Form 3 - DB Ozone (MBMC) - Pt1.pdf · uploaded 15 Oct 2018Source
  • 44 Certificates of CA (Form 3)Q4 (Jun18) Form 3 - DB Ozone (MBMC) - Pt2.pdf · uploaded 15 Oct 2018Source
  • 45 Certificates of CA (Form 3)Q4 (Jun18) Form 3 - DB Ozone (MBMC) - Pt3.pdf · uploaded 15 Oct 2018Source
  • 46 Certificates of CA (Form 3)Q4 (Jun18) Form 3 - DB Ozone (MBMC) - Pt4.pdf · uploaded 15 Oct 2018Source
  • 47 Certificates of CA (Form 3)Q4 (Jun18) Form 3 - DB Ozone (MBMC) - Pt5.pdf · uploaded 15 Oct 2018Source
  • 48 Certificates of CA (Form 3)Q4 (Jun18) Form 3 - DB Ozone (MBMC) - Pt6.pdf · uploaded 15 Oct 2018Source
  • 49 Certificates of CA (Form 3)Q4 (Jun18) Form 3 - DB Ozone (MBMC) - Pt7.pdf · uploaded 15 Oct 2018Source
  • 50 Certificates of CA (Form 3)Q4 (Jun18) Form 3 - DB Ozone (MBMC) - Pt8.pdf · uploaded 15 Oct 2018Source
  • 51 Certificates of CA (Form 3)Q4 (Jun18) Form 3 - DB Ozone (MBMC) - Pt9.pdf · uploaded 15 Oct 2018Source
  • 7 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Q5 (Sep18) Form 1 - DB Ozone MBMC.PDF · uploaded 2 Jan 2019Source
  • 5 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Q5 (Sep18) Form 2 - DB Ozone MBMC.pdf · uploaded 2 Jan 2019Source
  • 6 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Q4 (Jun18) Form2 - DB Ozone (mbmc).pdf · uploaded 2 Jan 2019Source
  • 52 Certificates of CA (Form 3)Q5 (Sep18) Form 3 - DB Ozone (MBMC) - Pt1.pdf · uploaded 2 Jan 2019Source
  • 53 Certificates of CA (Form 3)Q5 (Sep18) Form 3 - DB Ozone (MBMC) - Pt2.pdf · uploaded 2 Jan 2019Source
  • 54 Certificates of CA (Form 3)Q5 (Sep18) Form 3 - DB Ozone (MBMC) - Pt3.pdf · uploaded 2 Jan 2019Source
  • 55 Certificates of CA (Form 3)Q5 (Sep18) Form 3 - DB Ozone (MBMC) - Pt4.pdf · uploaded 2 Jan 2019Source
  • 56 Certificates of CA (Form 3)Q5 (Sep18) Form 3 - DB Ozone (MBMC) - Pt5.pdf · uploaded 2 Jan 2019Source
  • 57 Certificates of CA (Form 3)Q5 (Sep18) Form 3 - DB Ozone (MBMC) - Pt6.pdf · uploaded 2 Jan 2019Source
  • 58 Certificates of CA (Form 3)Q5 (Sep18) Form 3 - DB Ozone (MBMC) - Pt7.pdf · uploaded 2 Jan 2019Source
  • 59 Certificates of CA (Form 3)Q5 (Sep18) Form 3 - DB Ozone (MBMC) - Pt8.pdf · uploaded 2 Jan 2019Source
  • 60 Certificates of CA (Form 3)Q5 (Sep18) Form 3 - DB Ozone (MBMC) - Pt9.pdf · uploaded 2 Jan 2019Source
  • 61 Certificates of CA (Form 3)Q5 (Sep18) Form 3 - DB Ozone (MBMC) - Pt10.pdf · uploaded 2 Jan 2019Source
  • 8 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Q6 (Dec18) Form1 - DB Ozone (Mira).pdf · uploaded 4 Feb 2019Source
  • 7 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Q6 (Dec18) Form2 - DB Ozone-MBMC.pdf · uploaded 5 Apr 2019Source
  • 62 Certificates of CA (Form 3)Q6 (Dec18) Form3 - DB Ozone-MBMC pt1.pdf · uploaded 5 Apr 2019Source
  • 63 Certificates of CA (Form 3)Q6 (Dec18) Form3 - DB Ozone-MBMC pt2.pdf · uploaded 5 Apr 2019Source
  • 64 Certificates of CA (Form 3)Q6 (Dec18) Form3 - DB Ozone-MBMC pt3.pdf · uploaded 5 Apr 2019Source
  • 65 Certificates of CA (Form 3)Q6 (Dec18) Form3 - DB Ozone-MBMC pt4.pdf · uploaded 5 Apr 2019Source
  • 66 Certificates of CA (Form 3)Q6 (Dec18) Form3 - DB Ozone-MBMC pt5.pdf · uploaded 5 Apr 2019Source
  • 67 Certificates of CA (Form 3)Q6 (Dec18) Form3 - DB Ozone-MBMC pt6.pdf · uploaded 5 Apr 2019Source
  • 68 Certificates of CA (Form 3)Q6 (Dec18) Form3 - DB Ozone-MBMC pt7.pdf · uploaded 5 Apr 2019Source
  • 69 Certificates of CA (Form 3)Q6 (Dec18) Form3 - DB Ozone-MBMC pt8.pdf · uploaded 5 Apr 2019Source
  • 9 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1.pdf · uploaded 10 Jul 2019Source
  • 8 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engg Cert Form 2.pdf · uploaded 10 Jul 2019Source
  • 1 Form 2AEng Cert Form 2A.pdf · uploaded 10 Jul 2019Source
  • 70 Certificates of CA (Form 3)DB Ozone_Form-3 Mar,19 - pt1.pdf · uploaded 10 Jul 2019Source
  • 71 Certificates of CA (Form 3)DB Ozone_Form-3 Mar,19 - pt2.pdf · uploaded 10 Jul 2019Source
  • 72 Certificates of CA (Form 3)DB Ozone_Form-3 Mar,19 - pt3.pdf · uploaded 10 Jul 2019Source
  • 73 Certificates of CA (Form 3)DB Ozone_Form-3 Mar,19 - pt4.pdf · uploaded 10 Jul 2019Source
  • 74 Certificates of CA (Form 3)DB Ozone_Form-3 Mar,19 - pt5.pdf · uploaded 10 Jul 2019Source
  • 75 Certificates of CA (Form 3)DB Ozone_Form-3 Mar,19 - pt6.pdf · uploaded 10 Jul 2019Source
  • 76 Certificates of CA (Form 3)DB Ozone_Form-3 Mar,19 - pt7.pdf · uploaded 10 Jul 2019Source
  • 77 Certificates of CA (Form 3)DB Ozone_Form-3 Mar,19 - pt7.pdf · uploaded 10 Jul 2019Source
  • 78 Certificates of CA (Form 3)DB Ozone_Form-3 Mar,19 - pt8.pdf · uploaded 10 Jul 2019Source
  • 79 Certificates of CA (Form 3)DB Ozone_Form-3 Mar,19 - pt9.pdf · uploaded 10 Jul 2019Source
  • 80 Certificates of CA (Form 3)DB Ozone_Form-3 Mar,19 - pt1.pdf · uploaded 10 Jul 2019Source
  • 2 Certificates of CA (Form 5)DB ozone -mira.pdf · uploaded 30 Sep 2019Source
  • 3 Certificates of CA (Form 5)DB ozone -mira.pdf · uploaded 30 Sep 2019Source
  • 4 Certificates of CA (Form 5)DB ozone -mira.pdf · uploaded 30 Sep 2019Source
  • 9 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form - 2 Engineer's Certificate - DB Ozone (MBMC).pdf · uploaded 5 Oct 2019Source
  • 10 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1.pdf · uploaded 7 Oct 2019Source
  • 10 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engg Cert Form 2.pdf · uploaded 7 Oct 2019Source
  • 81 Certificates of CA (Form 3)BBA 1.pdf · uploaded 7 Oct 2019Source
  • 82 Certificates of CA (Form 3)BBA 1.pdf · uploaded 10 Oct 2019Source
  • 83 Certificates of CA (Form 3)1.pdf · uploaded 10 Oct 2019Source
  • 84 Certificates of CA (Form 3)2.pdf · uploaded 10 Oct 2019Source
  • 85 Certificates of CA (Form 3)3.pdf · uploaded 10 Oct 2019Source
  • 86 Certificates of CA (Form 3)4.pdf · uploaded 10 Oct 2019Source
  • 87 Certificates of CA (Form 3)5.pdf · uploaded 10 Oct 2019Source
  • 88 Certificates of CA (Form 3)6.pdf · uploaded 10 Oct 2019Source
  • 89 Certificates of CA (Form 3)7.pdf · uploaded 10 Oct 2019Source
  • 90 Certificates of CA (Form 3)8.pdf · uploaded 10 Oct 2019Source
  • 11 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 DB Ozone (MBMC).pdf · uploaded 11 Dec 2019Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)Audit Report 1.pdf · uploaded 30 Dec 2019Source
  • 2 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)Audit Report 2.pdf · uploaded 30 Dec 2019Source
  • 3 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)Audit Report 3.pdf · uploaded 30 Dec 2019Source
  • 4 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)Audit Report 4.pdf · uploaded 30 Dec 2019Source
  • 5 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)Audit Report 5.pdf · uploaded 30 Dec 2019Source
  • 11 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form-1 Architect's Certificate NRSPL.pdf · uploaded 31 Aug 2020Source
  • 91 Certificates of CA (Form 3)Form-3 - DB Ozone-1-8.pdf · uploaded 31 Aug 2020Source
  • 92 Certificates of CA (Form 3)Form-3 - DB Ozone-9-13.pdf · uploaded 31 Aug 2020Source
  • 93 Certificates of CA (Form 3)Form-3 - DB Ozone-14-19_compressed (1).pdf · uploaded 31 Aug 2020Source
  • 94 Certificates of CA (Form 3)Form-3 - DB Ozone-20-24.pdf · uploaded 31 Aug 2020Source
  • 95 Certificates of CA (Form 3)Form-3 - DB Ozone-25-29.pdf · uploaded 31 Aug 2020Source
  • 96 Certificates of CA (Form 3)Form-3 - DB Ozone-30-34.pdf · uploaded 31 Aug 2020Source
  • 97 Certificates of CA (Form 3)Form-3 - DB Ozone-35-39.pdf · uploaded 31 Aug 2020Source
  • 98 Certificates of CA (Form 3)Form-3 - DB Ozone-39-44.pdf · uploaded 31 Aug 2020Source
  • 12 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 NRSPL June Qtr.pdf · uploaded 2 Sep 2020Source
  • 12 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 NRSPL.pdf · uploaded 2 Sep 2020Source
  • 5 Certificates of CA (Form 5)NRSPL From RERA 5.pdf · uploaded 30 Sep 2020Source
  • 13 Certificates of Architect (Form 1)(Mandatory for only ongoing project)20210404 FORM 1.pdf · uploaded 16 Jul 2021Source
  • 99 Certificates of CA (Form 3)20210722 FORM 3_organized (1)-1-5.pdf · uploaded 26 Jul 2021Source
  • 100 Certificates of CA (Form 3)20210722 FORM 3_organized (1)-6-10.pdf · uploaded 26 Jul 2021Source
  • 101 Certificates of CA (Form 3)20210722 FORM 3_organized (1)-11-15.pdf · uploaded 26 Jul 2021Source
  • 102 Certificates of CA (Form 3)20210722 FORM 3_organized (1)-16-20.pdf · uploaded 26 Jul 2021Source
  • 103 Certificates of CA (Form 3)20210722 FORM 3_organized (1)-21-25.pdf · uploaded 26 Jul 2021Source
  • 104 Certificates of CA (Form 3)20210722 FORM 3_organized (1)-26-30.pdf · uploaded 26 Jul 2021Source
  • 105 Certificates of CA (Form 3)20210722 FORM 3_organized (1)-31-35.pdf · uploaded 26 Jul 2021Source
  • 106 Certificates of CA (Form 3)20210722 FORM 3_organized (1)-36-41.pdf · uploaded 26 Jul 2021Source
  • 107 Certificates of CA (Form 3)20210722 FORM 3_organized (1)-42-47.pdf · uploaded 26 Jul 2021Source
  • 1 Disclosure of sold/ booked inventoryBldg No 1.pdf · uploaded 27 Jul 2021Source
  • 2 Disclosure of sold/ booked inventoryBldg No 2.pdf · uploaded 27 Jul 2021Source
  • 3 Disclosure of sold/ booked inventoryBldg No 3.pdf · uploaded 27 Jul 2021Source
  • 4 Disclosure of sold/ booked inventoryBldg No 4.pdf · uploaded 27 Jul 2021Source
  • 5 Disclosure of sold/ booked inventoryBldg No 6.pdf · uploaded 27 Jul 2021Source
  • 6 Disclosure of sold/ booked inventoryBldg No 7.pdf · uploaded 27 Jul 2021Source
  • 7 Disclosure of sold/ booked inventoryBldg No 8.pdf · uploaded 27 Jul 2021Source
  • 8 Disclosure of sold/ booked inventoryBldg No 9.pdf · uploaded 27 Jul 2021Source
  • 9 Disclosure of sold/ booked inventoryBldg No 10.pdf · uploaded 27 Jul 2021Source
  • 10 Disclosure of sold/ booked inventoryBldg No 11.pdf · uploaded 27 Jul 2021Source
  • 11 Disclosure of sold/ booked inventoryBldg No 12.pdf · uploaded 27 Jul 2021Source
  • 12 Disclosure of sold/ booked inventoryBldg No 14.pdf · uploaded 27 Jul 2021Source
  • 13 Disclosure of sold/ booked inventoryBldg No 15.pdf · uploaded 27 Jul 2021Source
  • 14 Disclosure of sold/ booked inventoryBldg No 16.pdf · uploaded 27 Jul 2021Source
  • 15 Disclosure of sold/ booked inventoryBldg No 17.pdf · uploaded 27 Jul 2021Source
  • 16 Disclosure of sold/ booked inventoryBldg No 18.pdf · uploaded 27 Jul 2021Source
  • 17 Disclosure of sold/ booked inventoryBldg No 20.pdf · uploaded 27 Jul 2021Source
  • 18 Disclosure of sold/ booked inventoryBldg No 21.pdf · uploaded 27 Jul 2021Source
  • 19 Disclosure of sold/ booked inventoryBldg No 22.pdf · uploaded 27 Jul 2021Source
  • 20 Disclosure of sold/ booked inventoryBldg No 23.pdf · uploaded 27 Jul 2021Source
  • 21 Disclosure of sold/ booked inventoryBldg No 24.pdf · uploaded 27 Jul 2021Source
  • 22 Disclosure of sold/ booked inventoryBldg No 27.pdf · uploaded 27 Jul 2021Source
  • 23 Disclosure of sold/ booked inventoryBldg No 28.pdf · uploaded 27 Jul 2021Source
  • 24 Disclosure of sold/ booked inventoryBldg No 29.pdf · uploaded 27 Jul 2021Source
  • 25 Disclosure of sold/ booked inventoryBldg No 30.pdf · uploaded 27 Jul 2021View
  • 1 Declaration about Commencement Certificate20210809 Declaration of CC.PDF · uploaded 12 Aug 2021Source
  • 13 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)20210805 FORM 2.pdf · uploaded 12 Aug 2021Source
  • 6 Certificates of CA (Form 5)FORM-5_DB_Ozone-MBMC_Mar_21.pdf · uploaded 30 Sep 2021Source
  • 14 Certificates of Architect (Form 1)(Mandatory for only ongoing project)20210702 FORM 1 _compressed.pdf · uploaded 11 May 2022Source
  • 15 Certificates of Architect (Form 1)(Mandatory for only ongoing project)20211004 FORM 1 _compressed.pdf · uploaded 11 May 2022Source
  • 16 Certificates of Architect (Form 1)(Mandatory for only ongoing project)20220117 FORM 1_compressed.pdf · uploaded 11 May 2022Source
  • 14 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)20210805 FORM 2-II.pdf · uploaded 11 May 2022Source
  • 15 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)20211004 FORM 2.pdf · uploaded 11 May 2022Source
  • 16 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)20220117 FORM 2.pdf · uploaded 11 May 2022Source
  • 108 Certificates of CA (Form 3)20220207 Form 3-1-6.pdf · uploaded 11 May 2022Source
  • 109 Certificates of CA (Form 3)20220207 Form 3-7-12.pdf · uploaded 11 May 2022Source
  • 110 Certificates of CA (Form 3)20220207 Form 3-13-18.pdf · uploaded 11 May 2022Source
  • 111 Certificates of CA (Form 3)20220207 Form 3-19-24.pdf · uploaded 11 May 2022Source
  • 112 Certificates of CA (Form 3)20220207 Form 3-25-30.pdf · uploaded 11 May 2022Source
  • 113 Certificates of CA (Form 3)20220207 Form 3-31-35.pdf · uploaded 11 May 2022Source
  • 114 Certificates of CA (Form 3)20220207 Form 3-36-40.pdf · uploaded 11 May 2022Source
  • 115 Certificates of CA (Form 3)20220207 Form 3-41-46.pdf · uploaded 11 May 2022Source
  • 116 Certificates of CA (Form 3)20220207 Form 3-47-52.pdf · uploaded 11 May 2022Source
  • 117 Certificates of CA (Form 3)20220315 FORM 3-1-7.pdf · uploaded 11 May 2022Source
  • 118 Certificates of CA (Form 3)20220315 FORM 3-8-13.pdf · uploaded 11 May 2022Source
  • 119 Certificates of CA (Form 3)20220315 FORM 3-14-19.pdf · uploaded 11 May 2022Source
  • 120 Certificates of CA (Form 3)20220315 FORM 3-20-25.pdf · uploaded 11 May 2022Source
  • 121 Certificates of CA (Form 3)20220315 FORM 3-26-31.pdf · uploaded 11 May 2022Source
  • 122 Certificates of CA (Form 3)20220315 FORM 3-32-39.pdf · uploaded 11 May 2022Source
  • 123 Certificates of CA (Form 3)20220315 FORM 3-40-47.pdf · uploaded 11 May 2022Source
  • 124 Certificates of CA (Form 3)20220404 FORM 3-1-7.pdf · uploaded 11 May 2022Source
  • 125 Certificates of CA (Form 3)20220404 FORM 3-8-13.pdf · uploaded 11 May 2022Source
  • 126 Certificates of CA (Form 3)20220404 FORM 3-14-18.pdf · uploaded 11 May 2022Source
  • 127 Certificates of CA (Form 3)20220404 FORM 3-19-24.pdf · uploaded 11 May 2022Source
  • 128 Certificates of CA (Form 3)20220404 FORM 3-25-30.pdf · uploaded 11 May 2022Source
  • 129 Certificates of CA (Form 3)20220404 FORM 3-31-38.pdf · uploaded 11 May 2022Source
  • 130 Certificates of CA (Form 3)20220404 FORM 3-39-47.pdf · uploaded 11 May 2022Source
  • 2 Form 2A202203 Quality Assurance Certtificate.pdf · uploaded 20 May 2022Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)20200929 FORM 5.pdf · uploaded 3 Jun 2022Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)20210907 FORM 5.pdf · uploaded 3 Jun 2022Source
  • 17 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form No 2 DB Ozone March 2022.pdf · uploaded 12 Sep 2022Source
  • 18 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form No 2 DB Ozone June 2022.pdf · uploaded 12 Sep 2022Source
  • 131 Certificates of CA (Form 3)1.pdf · uploaded 12 Sep 2022Source
  • 132 Certificates of CA (Form 3)2.pdf · uploaded 12 Sep 2022Source
  • 133 Certificates of CA (Form 3)3.pdf · uploaded 12 Sep 2022Source
  • 134 Certificates of CA (Form 3)4.pdf · uploaded 12 Sep 2022Source
  • 135 Certificates of CA (Form 3)5.pdf · uploaded 12 Sep 2022Source
  • 136 Certificates of CA (Form 3)6.pdf · uploaded 12 Sep 2022Source
  • 137 Certificates of CA (Form 3)7.pdf · uploaded 12 Sep 2022Source
  • 138 Certificates of CA (Form 3)8.pdf · uploaded 12 Sep 2022Source
  • 139 Certificates of CA (Form 3)9.pdf · uploaded 12 Sep 2022Source
  • 140 Certificates of CA (Form 3)10.pdf · uploaded 12 Sep 2022Source
  • 141 Certificates of CA (Form 3)11.pdf · uploaded 12 Sep 2022Source
  • 142 Certificates of CA (Form 3)12.pdf · uploaded 12 Sep 2022Source
  • 143 Certificates of CA (Form 3)1.pdf · uploaded 12 Sep 2022Source
  • 144 Certificates of CA (Form 3)2.pdf · uploaded 12 Sep 2022Source
  • 145 Certificates of CA (Form 3)3.pdf · uploaded 12 Sep 2022Source
  • 146 Certificates of CA (Form 3)4.pdf · uploaded 12 Sep 2022Source
  • 147 Certificates of CA (Form 3)5.pdf · uploaded 12 Sep 2022Source
  • 148 Certificates of CA (Form 3)6.pdf · uploaded 12 Sep 2022Source
  • 149 Certificates of CA (Form 3)7.pdf · uploaded 12 Sep 2022Source
  • 150 Certificates of CA (Form 3)8.pdf · uploaded 12 Sep 2022Source
  • 151 Certificates of CA (Form 3)9.pdf · uploaded 12 Sep 2022Source
  • 152 Certificates of CA (Form 3)10.pdf · uploaded 12 Sep 2022Source
  • 153 Certificates of CA (Form 3)11.pdf · uploaded 12 Sep 2022Source
  • 17 Certificates of Architect (Form 1)(Mandatory for only ongoing project)01.pdf · uploaded 13 Sep 2022Source
  • 18 Certificates of Architect (Form 1)(Mandatory for only ongoing project)02.pdf · uploaded 13 Sep 2022Source
  • 19 Certificates of Architect (Form 1)(Mandatory for only ongoing project)03.pdf · uploaded 13 Sep 2022Source
  • 20 Certificates of Architect (Form 1)(Mandatory for only ongoing project)01.pdf · uploaded 13 Sep 2022Source
  • 21 Certificates of Architect (Form 1)(Mandatory for only ongoing project)02.pdf · uploaded 13 Sep 2022Source
  • 22 Certificates of Architect (Form 1)(Mandatory for only ongoing project)03.pdf · uploaded 13 Sep 2022Source
  • 23 Certificates of Architect (Form 1)(Mandatory for only ongoing project)20220930 FORM 1.pdf · uploaded 1 Feb 2023Source
  • 24 Certificates of Architect (Form 1)(Mandatory for only ongoing project)20221231 FORM 1.pdf · uploaded 1 Feb 2023Source
  • 19 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)20220930 FORM 2.pdf · uploaded 1 Feb 2023Source
  • 20 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)20221231 FORM 2.pdf · uploaded 1 Feb 2023Source
  • 154 Certificates of CA (Form 3)01.pdf · uploaded 1 Feb 2023Source
  • 155 Certificates of CA (Form 3)02.pdf · uploaded 1 Feb 2023Source
  • 156 Certificates of CA (Form 3)03.pdf · uploaded 1 Feb 2023Source
  • 157 Certificates of CA (Form 3)04.pdf · uploaded 1 Feb 2023Source
  • 158 Certificates of CA (Form 3)05.pdf · uploaded 1 Feb 2023Source
  • 159 Certificates of CA (Form 3)06.pdf · uploaded 1 Feb 2023Source
  • 160 Certificates of CA (Form 3)07.pdf · uploaded 1 Feb 2023Source
  • 161 Certificates of CA (Form 3)08.pdf · uploaded 1 Feb 2023Source
  • 162 Certificates of CA (Form 3)09.pdf · uploaded 1 Feb 2023Source
  • 163 Certificates of CA (Form 3)10.pdf · uploaded 1 Feb 2023Source
  • 164 Certificates of CA (Form 3)11.pdf · uploaded 1 Feb 2023Source
  • 165 Certificates of CA (Form 3)12.pdf · uploaded 1 Feb 2023Source
  • 166 Certificates of CA (Form 3)13.pdf · uploaded 1 Feb 2023Source
  • 167 Certificates of CA (Form 3)14.pdf · uploaded 1 Feb 2023Source
  • 168 Certificates of CA (Form 3)01.pdf · uploaded 1 Feb 2023Source
  • 169 Certificates of CA (Form 3)02.pdf · uploaded 1 Feb 2023Source
  • 170 Certificates of CA (Form 3)03.pdf · uploaded 1 Feb 2023Source
  • 171 Certificates of CA (Form 3)04.pdf · uploaded 1 Feb 2023Source
  • 172 Certificates of CA (Form 3)05.pdf · uploaded 1 Feb 2023Source
  • 173 Certificates of CA (Form 3)06.pdf · uploaded 1 Feb 2023Source
  • 174 Certificates of CA (Form 3)07.pdf · uploaded 1 Feb 2023Source
  • 175 Certificates of CA (Form 3)08.pdf · uploaded 1 Feb 2023Source
  • 176 Certificates of CA (Form 3)09.pdf · uploaded 1 Feb 2023Source
  • 177 Certificates of CA (Form 3)10.pdf · uploaded 1 Feb 2023Source
  • 178 Certificates of CA (Form 3)11.pdf · uploaded 1 Feb 2023Source
  • 179 Certificates of CA (Form 3)12.pdf · uploaded 1 Feb 2023Source
  • 180 Certificates of CA (Form 3)13.pdf · uploaded 1 Feb 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)20220930 FORM 5.pdf · uploaded 1 Feb 2023Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)202203 Quality Assurance Certtificate.pdf · uploaded 16 Mar 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)20240330 March 2023 Form 5.pdf · uploaded 21 May 2024Source
  • 1 Certificates of CA (Form 3)DB Ozone RERA Form 3 - March 2023-1-18.pdf · uploaded 21 May 2025Source
  • 2 Certificates of CA (Form 3)DB Ozone RERA Form 3 - March 2023-19-38-1-10.pdf · uploaded 21 May 2025Source
  • 3 Certificates of CA (Form 3)DB Ozone RERA Form 3 - March 2023-19-38-11-20.pdf · uploaded 21 May 2025Source
  • 4 Certificates of CA (Form 3)DB Ozone RERA Form 3 - March 2023-39-54.pdf · uploaded 21 May 2025Source
  • 5 Certificates of CA (Form 3)DB Ozone RERA Form 3 - June 2023_compressed-1-15.pdf · uploaded 21 May 2025Source
  • 6 Certificates of CA (Form 3)DB Ozone RERA Form 3 - June 2023_compressed-16-30.pdf · uploaded 21 May 2025Source
  • 7 Certificates of CA (Form 3)DB Ozone RERA Form 3 - June 2023_compressed-31-45.pdf · uploaded 21 May 2025Source
  • 8 Certificates of CA (Form 3)DB Ozone RERA Form 3 - June 2023_compressed-46-60.pdf · uploaded 21 May 2025Source

Technical

  • DocumentBuilding Plan Approval (IOD)-Pt(1).pdf · uploaded 29 Jul 2017Source
  • DocumentBuilding Plan Approval (IOD)-Pt(2).pdf · uploaded 29 Jul 2017Source
  • DocumentLayout Approval_pt1.pdf · uploaded 29 Jul 2017Source
  • DocumentLayout Approval_pt2.pdf · uploaded 29 Jul 2017Source

Technical (Architect)

  • Document20221231 FORM 1.pdf · uploaded 1 Feb 2023Source

Technical (Engineer)

  • Document20221231 FORM 2.pdf · uploaded 1 Feb 2023Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Land & approvalsLand parcel 4509 4513, 4517

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Certificate Signed
Unit types
B1 X01 EVEN 1.5BHK, B1 X01 ODD 1.5BHK, B1 X02 EVEN 2BHK, B1 X02 ODD 2BHK, B1 X03 EVEN 1BHK, B1 X03 ODD 1BHK, B10 X01 EVEN 1.5BHK, B10 X01 ODD 1.5BHK, B10 X02 EVEN 2BHK, B10 X02 ODD 2BHK, B10 X03 EVEN 1BHK, B10 X03 ODD 1BHK, B11 X01 EVEN 2BHK, B11 X01 ODD 2BHK, B11 X02 EVEN 1BHK, B11 X02 ODD 1BHK, B12 X01 EVEN 1BHK, B12 X01 ODD 1BHK, B12 X02 EVEN 1BHK, B12 X02 ODD 1BHK, B12 X03 EVEN 2BHK, B12 X03 ODD 2BHK, B14 X01 EVEN 1BHK, B14 X01 ODD 1BHK, B14 X02 EVEN 2BHK, B14 X02 ODD 1BHK, B14 X03 ODD 2BHK, B15 X01 EVEN 1BHK, B15 X01 ODD 1BHK, B15 X02 EVEN 1BHK, B15 X02 ODD 1BHK, B16 X01 EVEN 1BHK, B16 X01 ODD 1BHK, B16 X02 EVEN 2BHK, B16 X02 ODD 2BHK, B17 X01 EVEN 1BHK, B17 X01 ODD 1BHK, B17 X02 EVEN 2BHK, B17 X02 ODD 1BHK, B17 X03 ODD 2BHK, B18 X01 EVEN 1BHK, B18 X01 ODD 1BHK, B18 X02 EVEN 2BHK, B18 X02 ODD 2BHK, B18 X03 EVEN 2BHK, B18 X03 ODD 2BHK, B18 X04 EVEN 2BHK, B18 X04 ODD 2BHK, B2 X01 ODD 1.5BHK, B2 X02 EVEN 2BHK, B2 X02 ODD 2BHK, B2 X03 EVEN 1BHK, B2 X03 ODD 1BHK, B X01 EVEN 1.5BHK, B20 X01 EVEN 1.5BHK, B20 X01 ODD 1.5BHK, B20 X02 EVEN 2BHK, B20 X02 ODD 2BHK, B20 X03 EVEN 1BHK, B20 X03 ODD 1BHK, B21 X01 EVEN 1.5BHK, B21 X01 ODD 1.5BHK, B21 X02 EVEN 2BHK, B21 X02 ODD 2BHK, B21 X03 EVEN 1BHK, B21 X03 ODD 1BHK, B 22 X01 EVEN 1 BHK, B 22 X01 ODD 1 BHK, B 22 X02 EVEN 2 BHK, B 22 X02 ODD 2 BHK, 23 X01 EVEN 1.5BHK, 23 X01 ODD 1.5BHK, 23 X02 EVEN 2BHK, 23 X02 ODD 2BHK, 23 X03 EVEN 1BHK, 23 X03 ODD 1BHK, 24 X01 EVEN 2BHK, 24 X01 ODD 2BHK, 24 X02 EVEN 1BHK, 24 X02 ODD 1BHK, 27 X01 EVEN 2BHK, 27 X01 ODD 2BHK, 27 X02 EVEN 2BHK, 27 X02 ODD 2BHK, 27 X03 EVEN 2BHK, 27 X03 ODD 2BHK, B28 X01 EVEN 1.5BHK, B28 X01 ODD 1.5BHK, B28 X02 EVEN 2BHK, B28 X02 ODD 2BHK, B28 X03 EVEN 1BHK, B28 X03 ODD 1BHK, B28 X04 EVEN 2BHK, B28 X04 ODD 2BHK, 29 X01 EVEN 1.5BHK, 29 X01 ODD 1.5BHK, 29 X02 EVEN 2BHK, 29 X02 ODD 2BHK, 29 X03 EVEN 1BHK, 29 X03 ODD 1BHK, B3 X01 EVEN 1.5BHK, B3 X01 ODD 1.5BHK, B3 X02 EVEN 2BHK, B3 X02 ODD 2BHK, B3 X03 EVEN 1BHK, B3 X03 ODD 1BHK, 30 X01 EVEN 2BHK, 30 X01 ODD 2BHK, 30 X02 EVEN 1.5BHK, 30 X02 ODD 1.5BHK, 30 X03 EVEN 2BHK, 30 X03 ODD 2BHK, 30 X04 EVEN 2BHK, 30 X04 ODD 2BHK, B4 X01 EVEN 1.5BHK, B4 X01 ODD 1.5BHK, B4 X02 EVEN 2BHK, B4 X02 ODD 2BHK, B4 X03 EVEN 1BHK, B4 X03 ODD 1BHK, B6 X01 EVEN 2BHK, B6 X01 ODD 2BHK, B6 X02 EVEN 1.5BHK, B6 X02 ODD 1.5BHK, B6 X03 EVEN 2BHK, B6 X03 ODD 2BHK, B6 X04 EVEN 2BHK, B6 X04 ODD 2BHK, B7 X01 EVEN 1.5BHK, B7 X01 ODD 1.5BHK, B7 X02 EVEN 2BHK, B7 X03 EVEN 1BHK, B7 X03 ODD 1BHK, B7 XO2 ODD 2BHK, B8 X01 EVEN 1.5BHK, B8 X01 ODD 1.5BHK, B8 X02 EVEN 2BHK, B8 X02 ODD 2BHK, B8 X03 EVEN 1BHK, B8 X03 ODD 1BHK, B9 X01 EVEN 1.5BHK, B9 X01 ODD 1.5BHK, B9 X02 EVEN 2BHK, B9 X02 ODD 2BHK, B9 X03 EVEN 1BHK, B9 XO3 ODD 1BHK3,396 units in all
Address
4509 - 4513, 4517, 4547, 4548, 4572-4575, 4604, 4609-4611, 4652, 4691, 4692, 4702, 4710-4721, 4724-4732, General A K Vaidya Marg, Goregaon EastPIN 400063
Village
Mira-Bhayandar (M Corp.), Thane taluka
Land area for this project
38,401 sq m (4,13,340 sq ft)
Permissible built-up area
1,65,138 sq m (17,77,529 sq ft)
Sanctioned built-up area
1,61,994 sq m (17,43,687 sq ft)
Recreational open space
4,740 sq m (51,017 sq ft)
Designated bank account
76
Developed in phases
Yes

Survey, CTS, gat or plot numbers

4509 45134517454745484572457546044609 461146524691469247024710472147244732

Land as published on MahaRERA's project page

4509 - 4513,4517,4547,4548,4572-4575,4604,4609-4611,4652,4691,4692,4702,4710-4721, 4724-4732

Boundaries

North
Thakur Mall and International school
South
Dahisar Boundary CTS No 3113D
East
Sanjay Gandhi National Park
West
National Highway No 8

Source: registration certificates and MahaRERA's project page, as stated there.

Units & parking3,396 units

3,282 of 3,396 units booked (97%), as the promoter reported to MahaRERA

B1 X01 EVEN 1.5BHK · 9 unitsB1 X01 ODD 1.5BHK · 10 unitsB1 X02 EVEN 2BHK · 27 unitsB1 X02 ODD 2BHK · 30 unitsB1 X03 EVEN 1BHK · 30 unitsB1 X03 ODD 1BHK · 40 unitsB10 X01 EVEN 1.5BHK · 9 unitsB10 X01 ODD 1.5BHK · 10 unitsB10 X02 EVEN 2BHK · 27 unitsB10 X02 ODD 2BHK · 30 unitsB10 X03 EVEN 1BHK · 30 unitsB10 X03 ODD 1BHK · 40 unitsB11 X01 EVEN 2BHK · 40 unitsB11 X01 ODD 2BHK · 44 unitsB11 X02 EVEN 1BHK · 16 unitsB11 X02 ODD 1BHK · 22 unitsB12 X01 EVEN 1BHK · 20 unitsB12 X01 ODD 1BHK · 22 unitsB12 X02 EVEN 1BHK · 16 unitsB12 X02 ODD 1BHK · 22 unitsB12 X03 EVEN 2BHK · 20 unitsB12 X03 ODD 2BHK · 22 unitsB14 X01 EVEN 1BHK · 48 unitsB14 X01 ODD 1BHK · 20 unitsB14 X02 EVEN 2BHK · 18 unitsB14 X02 ODD 1BHK · 40 unitsB14 X03 ODD 2BHK · 20 unitsB15 X01 EVEN 1BHK · 20 unitsB15 X01 ODD 1BHK · 22 unitsB15 X02 EVEN 1BHK · 36 unitsB15 X02 ODD 1BHK · 44 unitsB16 X01 EVEN 1BHK · 36 unitsB16 X01 ODD 1BHK · 40 unitsB16 X02 EVEN 2BHK · 20 unitsB16 X02 ODD 2BHK · 20 unitsB17 X01 EVEN 1BHK · 48 unitsB17 X01 ODD 1BHK · 20 unitsB17 X02 EVEN 2BHK · 18 unitsB17 X02 ODD 1BHK · 40 unitsB17 X03 ODD 2BHK · 20 unitsB18 X01 EVEN 1BHK · 20 unitsB18 X01 ODD 1BHK · 22 unitsB18 X02 EVEN 2BHK · 20 unitsB18 X02 ODD 2BHK · 22 unitsB18 X03 EVEN 2BHK · 20 unitsB18 X03 ODD 2BHK · 22 unitsB18 X04 EVEN 2BHK · 8 unitsB18 X04 ODD 2BHK · 11 unitsB2 X01 ODD 1.5BHK · 10 unitsB2 X02 EVEN 2BHK · 27 unitsB2 X02 ODD 2BHK · 30 unitsB2 X03 EVEN 1BHK · 30 unitsB2 X03 ODD 1BHK · 40 unitsB X01 EVEN 1.5BHK · 9 unitsB20 X01 EVEN 1.5BHK · 9 unitsB20 X01 ODD 1.5BHK · 10 unitsB20 X02 EVEN 2BHK · 27 unitsB20 X02 ODD 2BHK · 30 unitsB20 X03 EVEN 1BHK · 30 unitsB20 X03 ODD 1BHK · 40 unitsB21 X01 EVEN 1.5BHK · 10 unitsB21 X01 ODD 1.5BHK · 10 unitsB21 X02 EVEN 2BHK · 10 unitsB21 X02 ODD 2BHK · 10 unitsB21 X03 EVEN 1BHK · 36 unitsB21 X03 ODD 1BHK · 40 unitsB 22 X01 EVEN 1 BHK · 36 unitsB 22 X01 ODD 1 BHK · 40 unitsB 22 X02 EVEN 2 BHK · 20 unitsB 22 X02 ODD 2 BHK · 20 units23 X01 EVEN 1.5BHK · 9 units23 X01 ODD 1.5BHK · 10 units23 X02 EVEN 2BHK · 27 units23 X02 ODD 2BHK · 30 units23 X03 EVEN 1BHK · 30 units23 X03 ODD 1BHK · 40 units24 X01 EVEN 2BHK · 40 units24 X01 ODD 2BHK · 44 units24 X02 EVEN 1BHK · 16 units24 X02 ODD 1BHK · 22 units27 X01 EVEN 2BHK · 8 units27 X01 ODD 2BHK · 11 units27 X02 EVEN 2BHK · 20 units27 X02 ODD 2BHK · 22 units27 X03 EVEN 2BHK · 20 units27 X03 ODD 2BHK · 22 unitsB28 X01 EVEN 1.5BHK · 10 unitsB28 X01 ODD 1.5BHK · 10 unitsB28 X02 EVEN 2BHK · 30 unitsB28 X02 ODD 2BHK · 30 unitsB28 X03 EVEN 1BHK · 16 unitsB28 X03 ODD 1BHK · 20 unitsB28 X04 EVEN 2BHK · 18 unitsB28 X04 ODD 2BHK · 20 units29 X01 EVEN 1.5BHK · 9 units29 X01 ODD 1.5BHK · 10 units29 X02 EVEN 2BHK · 27 units29 X02 ODD 2BHK · 30 units29 X03 EVEN 1BHK · 30 units29 X03 ODD 1BHK · 40 unitsB3 X01 EVEN 1.5BHK · 9 unitsB3 X01 ODD 1.5BHK · 10 unitsB3 X02 EVEN 2BHK · 27 unitsB3 X02 ODD 2BHK · 30 unitsB3 X03 EVEN 1BHK · 30 unitsB3 X03 ODD 1BHK · 40 units30 X01 EVEN 2BHK · 30 units30 X01 ODD 2BHK · 33 units30 X02 EVEN 1.5BHK · 10 units30 X02 ODD 1.5BHK · 11 units30 X03 EVEN 2BHK · 20 units30 X03 ODD 2BHK · 22 units30 X04 EVEN 2BHK · 8 units30 X04 ODD 2BHK · 11 unitsB4 X01 EVEN 1.5BHK · 9 unitsB4 X01 ODD 1.5BHK · 10 unitsB4 X02 EVEN 2BHK · 27 unitsB4 X02 ODD 2BHK · 30 unitsB4 X03 EVEN 1BHK · 30 unitsB4 X03 ODD 1BHK · 40 unitsB6 X01 EVEN 2BHK · 30 unitsB6 X01 ODD 2BHK · 33 unitsB6 X02 EVEN 1.5BHK · 10 unitsB6 X02 ODD 1.5BHK · 11 unitsB6 X03 EVEN 2BHK · 20 unitsB6 X03 ODD 2BHK · 22 unitsB6 X04 EVEN 2BHK · 8 unitsB6 X04 ODD 2BHK · 11 unitsB7 X01 EVEN 1.5BHK · 9 unitsB7 X01 ODD 1.5BHK · 10 unitsB7 X02 EVEN 2BHK · 27 unitsB7 X03 EVEN 1BHK · 30 unitsB7 X03 ODD 1BHK · 40 unitsB7 XO2 ODD 2BHK · 30 unitsB8 X01 EVEN 1.5BHK · 10 unitsB8 X01 ODD 1.5BHK · 10 unitsB8 X02 EVEN 2BHK · 10 unitsB8 X02 ODD 2BHK · 10 unitsB8 X03 EVEN 1BHK · 36 unitsB8 X03 ODD 1BHK · 40 unitsB9 X01 EVEN 1.5BHK · 9 unitsB9 X01 ODD 1.5BHK · 10 unitsB9 X02 EVEN 2BHK · 27 unitsB9 X02 ODD 2BHK · 30 unitsB9 X03 EVEN 1BHK · 30 unitsB9 XO3 ODD 1BHK · 40 units
BuildingTypeCarpet areaUnitsBooked
Building No 1B1 X01 EVEN 1.5BHK45.38 sq m · 488 sq ft99
Building No 1B1 X01 ODD 1.5BHK45.23 sq m · 487 sq ft1010
Building No 1B1 X02 EVEN 2BHK51.74 sq m · 557 sq ft2727
Building No 1B1 X02 ODD 2BHK52.06 sq m · 560 sq ft3030
Building No 1B1 X03 EVEN 1BHK33.59 sq m · 362 sq ft3030
Building No 1B1 X03 ODD 1BHK33.41 sq m · 360 sq ft4040
Building No 10B10 X01 EVEN 1.5BHK45.38 sq m · 488 sq ft99
Building No 10B10 X01 ODD 1.5BHK45.23 sq m · 487 sq ft109
Show all 146 unit rowsShow fewer unit rows
BuildingTypeCarpet areaUnitsBooked
Building No 10B10 X02 EVEN 2BHK51.74 sq m · 557 sq ft2727
Building No 10B10 X02 ODD 2BHK52.06 sq m · 560 sq ft3030
Building No 10B10 X03 EVEN 1BHK33.59 sq m · 362 sq ft3030
Building No 10B10 X03 ODD 1BHK33.41 sq m · 360 sq ft4040
Building No 11B11 X01 EVEN 2BHK50.85 sq m · 547 sq ft4036
Building No 11B11 X01 ODD 2BHK51.33 sq m · 553 sq ft4440
Building No 11B11 X02 EVEN 1BHK33.67 sq m · 362 sq ft1614
Building No 11B11 X02 ODD 1BHK33.26 sq m · 358 sq ft2220
Building No 12B12 X01 EVEN 1BHK34.3 sq m · 369 sq ft2020
Building No 12B12 X01 ODD 1BHK34.11 sq m · 367 sq ft2220
Building No 12B12 X02 EVEN 1BHK33.41 sq m · 360 sq ft1615
Building No 12B12 X02 ODD 1BHK33.41 sq m · 360 sq ft2220
Building No 12B12 X03 EVEN 2BHK51.82 sq m · 558 sq ft2019
Building No 12B12 X03 ODD 2BHK52.15 sq m · 561 sq ft2220
Building No 14B14 X01 EVEN 1BHK33.67 sq m · 362 sq ft4845
Building No 14B14 X01 ODD 1BHK33.94 sq m · 365 sq ft2020
Building No 14B14 X02 EVEN 2BHK51.49 sq m · 554 sq ft1818
Building No 14B14 X02 ODD 1BHK33.41 sq m · 360 sq ft4040
Building No 14B14 X03 ODD 2BHK51.99 sq m · 560 sq ft2018
Building No 15B15 X01 EVEN 1BHK33.24 sq m · 358 sq ft2020
Building No 15B15 X01 ODD 1BHK33.08 sq m · 356 sq ft2220
Building No 15B15 X02 EVEN 1BHK33.81 sq m · 364 sq ft3636
Building No 15B15 X02 ODD 1BHK33.41 sq m · 360 sq ft4439
Building No 16B16 X01 EVEN 1BHK33.41 sq m · 360 sq ft3635
Building No 16B16 X01 ODD 1BHK33.4 sq m · 360 sq ft4040
Building No 16B16 X02 EVEN 2BHK51.96 sq m · 559 sq ft2018
Building No 16B16 X02 ODD 2BHK51.72 sq m · 557 sq ft2020
Building No 17B17 X01 EVEN 1BHK33.67 sq m · 362 sq ft4848
Building No 17B17 X01 ODD 1BHK33.94 sq m · 365 sq ft2020
Building No 17B17 X02 EVEN 2BHK51.49 sq m · 554 sq ft1818
Building No 17B17 X02 ODD 1BHK33.41 sq m · 360 sq ft4037
Building No 17B17 X03 ODD 2BHK51.99 sq m · 560 sq ft2020
Building No 18B18 X01 EVEN 1BHK32.77 sq m · 353 sq ft2020
Building No 18B18 X01 ODD 1BHK32.97 sq m · 355 sq ft2220
Building No 18B18 X02 EVEN 2BHK48.92 sq m · 527 sq ft2020
Building No 18B18 X02 ODD 2BHK49.58 sq m · 534 sq ft2220
Building No 18B18 X03 EVEN 2BHK51.3 sq m · 552 sq ft2020
Building No 18B18 X03 ODD 2BHK51.47 sq m · 554 sq ft2220
Building No 18B18 X04 EVEN 2BHK48.88 sq m · 526 sq ft87
Building No 18B18 X04 ODD 2BHK48.45 sq m · 522 sq ft1110
Building No 2B2 X01 ODD 1.5BHK45.23 sq m · 487 sq ft109
Building No 2B2 X02 EVEN 2BHK51.74 sq m · 557 sq ft2727
Building No 2B2 X02 ODD 2BHK52.06 sq m · 560 sq ft3030
Building No 2B2 X03 EVEN 1BHK33.59 sq m · 362 sq ft3030
Building No 2B2 X03 ODD 1BHK33.41 sq m · 360 sq ft4040
Building No 2B X01 EVEN 1.5BHK45.38 sq m · 488 sq ft99
Building No 20B20 X01 EVEN 1.5BHK45.38 sq m · 488 sq ft99
Building No 20B20 X01 ODD 1.5BHK45.23 sq m · 487 sq ft109
Building No 20B20 X02 EVEN 2BHK51.74 sq m · 557 sq ft2727
Building No 20B20 X02 ODD 2BHK52.06 sq m · 560 sq ft3030
Building No 20B20 X03 EVEN 1BHK33.59 sq m · 362 sq ft3029
Building No 20B20 X03 ODD 1BHK33.41 sq m · 360 sq ft4040
Building No 21B21 X01 EVEN 1.5BHK45.45 sq m · 489 sq ft109
Building No 21B21 X01 ODD 1.5BHK45.45 sq m · 489 sq ft1010
Building No 21B21 X02 EVEN 2BHK51.85 sq m · 558 sq ft109
Building No 21B21 X02 ODD 2BHK51.85 sq m · 558 sq ft1010
Building No 21B21 X03 EVEN 1BHK33.68 sq m · 363 sq ft3632
Building No 21B21 X03 ODD 1BHK33.41 sq m · 360 sq ft4038
Building No 22B 22 X01 EVEN 1 BHK33.41 sq m · 360 sq ft3635
Building No 22B 22 X01 ODD 1 BHK33.4 sq m · 360 sq ft4040
Building No 22B 22 X02 EVEN 2 BHK51.96 sq m · 559 sq ft2018
Building No 22B 22 X02 ODD 2 BHK51.72 sq m · 557 sq ft2020
Building No 2323 X01 EVEN 1.5BHK45.38 sq m · 488 sq ft99
Building No 2323 X01 ODD 1.5BHK45.23 sq m · 487 sq ft1010
Building No 2323 X02 EVEN 2BHK51.74 sq m · 557 sq ft2726
Building No 2323 X02 ODD 2BHK52.06 sq m · 560 sq ft3028
Building No 2323 X03 EVEN 1BHK33.59 sq m · 362 sq ft3030
Building No 2323 X03 ODD 1BHK33.41 sq m · 360 sq ft4040
Building No 2424 X01 EVEN 2BHK50.85 sq m · 547 sq ft4036
Building No 2424 X01 ODD 2BHK51.33 sq m · 553 sq ft4439
Building No 2424 X02 EVEN 1BHK33.67 sq m · 362 sq ft1614
Building No 2424 X02 ODD 1BHK33.26 sq m · 358 sq ft2220
Building No 2727 X01 EVEN 2BHK48.07 sq m · 517 sq ft87
Building No 2727 X01 ODD 2BHK51.63 sq m · 556 sq ft1110
Building No 2727 X02 EVEN 2BHK51.62 sq m · 556 sq ft2019
Building No 2727 X02 ODD 2BHK51.02 sq m · 549 sq ft2220
Building No 2727 X03 EVEN 2BHK49.56 sq m · 533 sq ft2020
Building No 2727 X03 ODD 2BHK49.42 sq m · 532 sq ft2220
Building No 28B28 X01 EVEN 1.5BHK45.27 sq m · 487 sq ft109
Building No 28B28 X01 ODD 1.5BHK44.53 sq m · 479 sq ft109
Building No 28B28 X02 EVEN 2BHK51.47 sq m · 554 sq ft3028
Building No 28B28 X02 ODD 2BHK51.25 sq m · 552 sq ft3028
Building No 28B28 X03 EVEN 1BHK33.41 sq m · 360 sq ft1614
Building No 28B28 X03 ODD 1BHK33.67 sq m · 362 sq ft2017
Building No 28B28 X04 EVEN 2BHK49.61 sq m · 534 sq ft1817
Building No 28B28 X04 ODD 2BHK50.13 sq m · 540 sq ft2020
Building No 2929 X01 EVEN 1.5BHK45.38 sq m · 488 sq ft99
Building No 2929 X01 ODD 1.5BHK45.23 sq m · 487 sq ft109
Building No 2929 X02 EVEN 2BHK51.74 sq m · 557 sq ft2727
Building No 2929 X02 ODD 2BHK52.06 sq m · 560 sq ft3029
Building No 2929 X03 EVEN 1BHK33.59 sq m · 362 sq ft3030
Building No 2929 X03 ODD 1BHK33.41 sq m · 360 sq ft4040
Building No 3B3 X01 EVEN 1.5BHK45.38 sq m · 488 sq ft99
Building No 3B3 X01 ODD 1.5BHK45.23 sq m · 487 sq ft109
Building No 3B3 X02 EVEN 2BHK51.74 sq m · 557 sq ft2727
Building No 3B3 X02 ODD 2BHK52.06 sq m · 560 sq ft3030
Building No 3B3 X03 EVEN 1BHK33.59 sq m · 362 sq ft3030
Building No 3B3 X03 ODD 1BHK33.41 sq m · 360 sq ft4040
Building No 3030 X01 EVEN 2BHK51.51 sq m · 554 sq ft3030
Building No 3030 X01 ODD 2BHK51.62 sq m · 556 sq ft3330
Building No 3030 X02 EVEN 1.5BHK45.13 sq m · 486 sq ft109
Building No 3030 X02 ODD 1.5BHK44.63 sq m · 480 sq ft1110
Building No 3030 X03 EVEN 2BHK48.9 sq m · 526 sq ft2020
Building No 3030 X03 ODD 2BHK49.3 sq m · 531 sq ft2220
Building No 3030 X04 EVEN 2BHK45.96 sq m · 495 sq ft88
Building No 3030 X04 ODD 2BHK46.35 sq m · 499 sq ft1110
Building No 4B4 X01 EVEN 1.5BHK45.38 sq m · 488 sq ft99
Building No 4B4 X01 ODD 1.5BHK45.23 sq m · 487 sq ft1010
Building No 4B4 X02 EVEN 2BHK51.74 sq m · 557 sq ft2727
Building No 4B4 X02 ODD 2BHK52.06 sq m · 560 sq ft3030
Building No 4B4 X03 EVEN 1BHK33.59 sq m · 362 sq ft3030
Building No 4B4 X03 ODD 1BHK33.41 sq m · 360 sq ft4040
Building No 6B6 X01 EVEN 2BHK51.51 sq m · 554 sq ft3030
Building No 6B6 X01 ODD 2BHK51.62 sq m · 556 sq ft3331
Building No 6B6 X02 EVEN 1.5BHK45.13 sq m · 486 sq ft1010
Building No 6B6 X02 ODD 1.5BHK44.63 sq m · 480 sq ft1111
Building No 6B6 X03 EVEN 2BHK48.9 sq m · 526 sq ft2020
Building No 6B6 X03 ODD 2BHK49.3 sq m · 531 sq ft2220
Building No 6B6 X04 EVEN 2BHK45.96 sq m · 495 sq ft88
Building No 6B6 X04 ODD 2BHK46.35 sq m · 499 sq ft1110
Building No 7B7 X01 EVEN 1.5BHK45.38 sq m · 488 sq ft99
Building No 7B7 X01 ODD 1.5BHK45.23 sq m · 487 sq ft109
Building No 7B7 X02 EVEN 2BHK51.74 sq m · 557 sq ft2727
Building No 7B7 X03 EVEN 1BHK33.59 sq m · 362 sq ft3030
Building No 7B7 X03 ODD 1BHK33.41 sq m · 360 sq ft4040
Building No 7B7 XO2 ODD 2BHK52.06 sq m · 560 sq ft3030
Building No 8B8 X01 EVEN 1.5BHK45.45 sq m · 489 sq ft109
Building No 8B8 X01 ODD 1.5BHK45.45 sq m · 489 sq ft1010
Building No 8B8 X02 EVEN 2BHK51.85 sq m · 558 sq ft1010
Building No 8B8 X02 ODD 2BHK51.85 sq m · 558 sq ft1010
Building No 8B8 X03 EVEN 1BHK33.68 sq m · 363 sq ft3636
Building No 8B8 X03 ODD 1BHK33.41 sq m · 360 sq ft4040
Building No 9B9 X01 EVEN 1.5BHK45.38 sq m · 488 sq ft99
Building No 9B9 X01 ODD 1.5BHK45.23 sq m · 487 sq ft1010
Building No 9B9 X02 EVEN 2BHK51.74 sq m · 557 sq ft2727
Building No 9B9 X02 ODD 2BHK52.06 sq m · 560 sq ft3030
Building No 9B9 X03 EVEN 1BHK33.59 sq m · 362 sq ft3030
Building No 9B9 XO3 ODD 1BHK33.41 sq m · 360 sq ft4040

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Professionals3

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectAvinash Mhatre & Associates—
ArchitectBK Engineers & Consultant—
EngineerJw Consultants LLP—

Source: MahaRERA project page. Contact details are not shown.

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Report a problemMethodology