Residential / Group Housing · 1 building · 65 unitsRERA P51700023391

Vardhaman Vatika

Deedo IDDP-THN-T5D3

Completion was pushed back 4 months, to Jul 2027; no MahaRERA orders on record; 63% of its units are booked.

Kamatghar, Thane 421302 · by Vardhaman Enterprises

DeliveryExtended 4 moPromised Mar 2027 · now due Jul 2027RegulatoryNo ordersNot in any MahaRERA list or order Deedo has readSales63% booked41 of 65 units · as the promoter reported to MahaRERA

Buying a flat here?

See every deed registered on it.

Completion was pushed back 4 months, to Jul 2027

  • This projectRegistered 12 Dec 2019, completion promised 31 Mar 2027, revised to 31 Jul 2027.

1 extension certificate on record.

1 registration · Source: MahaRERA registration and extension certificates

Latest registered deeds

Sales first, then rentals and mortgages matched to this project · the free view shows a price band

No registered deeds matched to this project yet
Sales, resales, rentals and mortgages appear here once registered documents are matched to it by evidence.

The building

Open a building to see every flat, floor by floor.

Floors and units from the registration certificate annexures and MahaRERA's project page.

Regulatory recordNone found

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

RERA registrationP51700023391
RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5170002339112 Dec 201931 Mar 202731 Jul 2027Vardhaman EnterprisesProject page
Documents140

2 documents held by Deedo, 138 filings listed on MahaRERA's project page

Extension certificate

Registration certificate

Finance

  • PAN CardVardhman Pan Card.pdf · uploaded 7 Dec 2019Source

Legal

  • Legal Title reportTitle Certificate Vardhaman-min.pdf · uploaded 7 Dec 2019Source
  • Declaration Form BBuilder Affidavit Vardhaman-min.pdf · uploaded 7 Dec 2019Source
  • Declaration Form Bform b landlord_11zon.pdf · uploaded 15 Feb 2025Source
  • Declaration Form Bform b promoter.pdf · uploaded 15 Feb 2025Source
  • Declaration Form BFORM B LANDLORD DATE CHANGED.pdf · uploaded 15 Feb 2025Source
Show all 140 documentsShow fewer documents

Legal

  • Declaration Form BFORM B PROMOTER DATE CHANGED.pdf · uploaded 15 Feb 2025Source
  • Declaration Form BVATIKA - KANDOWNER_0001.pdf · uploaded 24 Feb 2025Source
  • Declaration Form BVATIKA_0001- PROMOTER.pdf · uploaded 24 Feb 2025Source

Migrated

  • 1 PAN CardVardhman Pan Card.pdf · uploaded 7 Dec 2019Source
  • 1 Copy of the legal title reportTitle Certificate Vardhaman-min.pdf · uploaded 7 Dec 2019Source
  • 1 Details of encumbrancesNo Encumbrance Certificate.pdf · uploaded 7 Dec 2019Source
  • 1 Copy of Layout Approval (in case of layout)Plan Vardhaman Vatika-min (1).pdf · uploaded 7 Dec 2019Source
  • 1 Building Plan Approval / NA Order for plotted developmentPlan Vardhaman Vatika-min (1).pdf · uploaded 7 Dec 2019Source
  • 1 Commencement Certificates / NA Order for plotted developmentPermission Vardhaman-min.pdf · uploaded 7 Dec 2019Source
  • 1 Declaration in FORM BBuilder Affidavit Vardhaman-min.pdf · uploaded 7 Dec 2019Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)FROM NO 1.pdf · uploaded 7 Dec 2019Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)FROM 2.pdf · uploaded 7 Dec 2019Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)compresspdf_shIgdVor.pdf · uploaded 7 Dec 2019Source
  • 1 Proforma of Allotment letterAllotment Letter Vardhaman.pdf · uploaded 7 Dec 2019Source
  • 2 Proforma of Allotment letterFlat-Draft-Rera.pdf · uploaded 7 Dec 2019Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)FROM 1 VE MARCH 20_3_11zon.pdf · uploaded 3 May 2023Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)FROM 1 VE MARCH 22_4_11zon.pdf · uploaded 3 May 2023Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)FROM 1 VE JUNE 22_2_11zon.pdf · uploaded 3 May 2023Source
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)FROM 1 VE SEPT 22_5_11zon.pdf · uploaded 3 May 2023Source
  • 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)FROM 1 VE DEC 22_1_11zon.pdf · uploaded 3 May 2023Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)FROM 2 VE DEC 19_1_11zon.pdf · uploaded 3 May 2023Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)FROM 2 VE MARCH 20_8_11zon.pdf · uploaded 3 May 2023Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)FROM 2 VE JUNE 20_6_11zon.pdf · uploaded 3 May 2023Source
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)FROM 2 VE SEPT 20_11_11zon.pdf · uploaded 3 May 2023Source
  • 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)FROM 2 VE DEC 20_2_11zon.pdf · uploaded 3 May 2023Source
  • 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)FROM 2 VE MARCH 21_9_11zon.pdf · uploaded 3 May 2023Source
  • 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)FROM 2 VE JUNE 21_5_11zon.pdf · uploaded 3 May 2023Source
  • 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)FROM 2 VE SEPT 21_12_11zon.pdf · uploaded 3 May 2023Source
  • 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)FROM 2 VE DEC 21_3_11zon.pdf · uploaded 3 May 2023Source
  • 11 Engineer’s Certificate on Cost Incurred on Project (Form 2)FROM 2 VE MARCH 22_10_11zon.pdf · uploaded 3 May 2023Source
  • 12 Engineer’s Certificate on Cost Incurred on Project (Form 2)FROM 2 VE JUNE 22_7_11zon.pdf · uploaded 3 May 2023Source
  • 13 Engineer’s Certificate on Cost Incurred on Project (Form 2)FROM 2 VE SEPT 22_13_11zon.pdf · uploaded 3 May 2023Source
  • 14 Engineer’s Certificate on Cost Incurred on Project (Form 2)FROM 2 VE DEC 22_4_11zon.pdf · uploaded 3 May 2023Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)FORM 2A MARCH 20_1_11zon.pdf · uploaded 3 May 2023Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)FROM 2A MARCH 21_2_11zon.pdf · uploaded 3 May 2023Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 VE DEC 19.pdf · uploaded 3 May 2023Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 VE MARCH 20.pdf · uploaded 3 May 2023Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 VE JUNE 20.pdf · uploaded 3 May 2023Source
  • 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 VE SEPT 20.pdf · uploaded 3 May 2023Source
  • 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 VE DECEMBER 20.pdf · uploaded 3 May 2023Source
  • 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 VE MARCH 21.pdf · uploaded 3 May 2023Source
  • 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 VE JUNE 21.pdf · uploaded 3 May 2023Source
  • 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 VE JUNE 21.pdf · uploaded 3 May 2023Source
  • 10 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 VE SEPT 21.pdf · uploaded 3 May 2023Source
  • 11 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 VE DEC21.pdf · uploaded 3 May 2023Source
  • 12 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 VE MARCH 22.pdf · uploaded 3 May 2023Source
  • 13 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 VE JUNE 22.pdf · uploaded 3 May 2023Source
  • 14 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 VE SEPT22.pdf · uploaded 3 May 2023Source
  • 15 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 VE DECEMBER 22.pdf · uploaded 3 May 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)FORM 5 VE 2019-2020.pdf · uploaded 3 May 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)FORM 5 VE 2020-2021.pdf · uploaded 3 May 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)FORM 5 VE 2021-2022.pdf · uploaded 3 May 2023Source
  • 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)VARDHAMAN ENTERPRISES FORM 1 MARCH 23.pdf · uploaded 23 Dec 2023Source
  • 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)VARDHAMAN ENTERPRISES FORM 1 JUNE 23.pdf · uploaded 23 Dec 2023Source
  • 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)VARDHAMAN ENTERPRISES FORM 1 SEPT 23.pdf · uploaded 23 Dec 2023Source
  • 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)VARDHAMAN ENTERPRISES FORM 1 19 DEC 23.pdf · uploaded 23 Dec 2023Source
  • 15 Engineer’s Certificate on Cost Incurred on Project (Form 2)VARDHAMAN ENTERPRISES FORM 2 MARCH 23.pdf · uploaded 23 Dec 2023Source
  • 16 Engineer’s Certificate on Cost Incurred on Project (Form 2)VARDHAMAN ENTERPRISES FORM 2 JUNE 23.pdf · uploaded 23 Dec 2023Source
  • 17 Engineer’s Certificate on Cost Incurred on Project (Form 2)VARDHAMAN ENTERPRISES FORM 2 SEPT 23.pdf · uploaded 23 Dec 2023Source
  • 18 Engineer’s Certificate on Cost Incurred on Project (Form 2)VARDHAMAN ENTERPRISES FORM 2 19 DECEMBER 2023.pdf · uploaded 23 Dec 2023Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)VARDHAMAN ENTERPRISES_ FORM 2A MARCH 23.pdf · uploaded 23 Dec 2023Source
  • 16 CA Certificate on Project Cost & Fund withdrawal (Form 3)VARDHAMAN ENTERPRISES_ FORM 3 MARCH 23_11zon.pdf · uploaded 23 Dec 2023Source
  • 17 CA Certificate on Project Cost & Fund withdrawal (Form 3)VARDHAMAN ENTERPRISES FORM 3 JUNE 23_11zon.pdf · uploaded 23 Dec 2023Source
  • 18 CA Certificate on Project Cost & Fund withdrawal (Form 3)VARDHAMAN ENTERPRISES FORM3 SEPT 23_11zon.pdf · uploaded 23 Dec 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)VARDHAMAN ENTERPRISES FORM 5 MARCH 23.pdf · uploaded 23 Dec 2023Source
  • 2 Building Plan Approval / NA Order for plotted developmentnew plan copy_11zon.pdf · uploaded 25 Dec 2023Source
  • 2 Commencement Certificates / NA Order for plotted developmentnew cc.pdf · uploaded 25 Dec 2023Source
  • 1 Declaration about Commencement CertificateFORMAT D NEW.pdf · uploaded 25 Dec 2023Source
  • 1 Disclosure of sold/ booked inventorySOLD UNSOLD DECLARATION.pdf · uploaded 25 Dec 2023Source
  • 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameformat a vardhaman_1.pdf · uploaded 25 Dec 2023Source
  • 19 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3.pdf · uploaded 25 Jan 2024Source
  • 20 CA Certificate on Project Cost & Fund withdrawal (Form 3)VARDHAMAN FORM 3 REVISED NEWS.pdf · uploaded 1 Apr 2024Source
  • 3 Building Plan Approval / NA Order for plotted developmentnew plan copy MARKED.pdf · uploaded 17 Apr 2024Source
  • 21 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 VARDHAMAN VATIKA FINAL 17042024.pdf · uploaded 17 Apr 2024Source
  • 3 Commencement Certificates / NA Order for plotted developmentnew cc MARKED.pdf · uploaded 23 Apr 2024Source
  • 11 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 VARDHAMAN ENTERPRISES MARCH 24.pdf · uploaded 12 Jul 2024Source
  • 19 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 VARDHAMAN ENTERPRISES MARCH 24.pdf · uploaded 12 Jul 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)FORM 2A VARDHAMAN ENTERPRISES MARCH 24.pdf · uploaded 12 Jul 2024Source
  • 2 Disclosure of sold/ booked inventorydisclosure of sold unsold merged.pdf · uploaded 12 Jul 2024Source
  • 3 Disclosure of sold/ booked inventorydisclosure of sold unsold merged.pdf · uploaded 12 Jul 2024Source
  • 22 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 VARDHAMAN ENTER MARCH 24.pdf · uploaded 12 Jul 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)FORM 5 VE 2024.pdf · uploaded 12 Aug 2024Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 VE JUNE 24.pdf · uploaded 14 Nov 2024Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1 JUNE 24 GSA.pdf · uploaded 14 Nov 2024Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 GANDHI SAMANI AND ENTERPRISES JUNE 24_11zon.pdf · uploaded 14 Nov 2024Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 VARDHAMAN ENTERPRISES JUNE 24.pdf · uploaded 14 Nov 2024Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 JUNE GSA.pdf · uploaded 14 Nov 2024Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2 VE JUNE 24.pdf · uploaded 14 Nov 2024Source
  • 2 Declaration in FORM Bform b promoter.pdf · uploaded 15 Feb 2025Source
  • 3 Declaration in FORM BFORM B LANDLORD DATE CHANGED.pdf · uploaded 15 Feb 2025Source
  • 4 Declaration in FORM BFORM B PROMOTER DATE CHANGED.pdf · uploaded 15 Feb 2025Source
  • 1 Declaration in FORM Bform b landlord_11zon.pdf · uploaded 15 Feb 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)KK ARCHITACT CERTIFICATE VE form 1 dec 24 (1).pdf · uploaded 15 Feb 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)form 3 vardhamn enterprises sept 24 signed by promoter.pdf · uploaded 15 Feb 2025Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3 VARDHAMAN DECEMBER 2024.pdf · uploaded 15 Feb 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)KK ARCHITACT CERTIFICATE VE form 2 dec 24.pdf · uploaded 15 Feb 2025Source
  • 1 Disclosure of sold/ booked inventorysold unsold.pdf · uploaded 15 Feb 2025Source
  • 5 Declaration in FORM BVATIKA - KANDOWNER_0001.pdf · uploaded 24 Feb 2025Source
  • 6 Declaration in FORM BVATIKA_0001- PROMOTER.pdf · uploaded 24 Feb 2025Source
  • Form 1FORM-1 VE MAR-25.pdf · uploaded 19 Jul 2025Source
  • Form 2FORM-2 VE MAR-25.pdf · uploaded 19 Jul 2025Source
  • Form 3form 3 vardhaman enterprises MARCH 25.pdf · uploaded 19 Jul 2025Source
  • Disclosure of Sold and Booked Inventorysold unsold disclsoure march 25.pdf · uploaded 19 Jul 2025Source
  • Withdrawal Update Form 1FORM-1 VE JUNE-25.pdf · uploaded 5 Aug 2025Source
  • Withdrawal Update Form 2FORM-2 VE JUNE-25.pdf · uploaded 5 Aug 2025Source
  • Withdrawal Update Form 3FORM-3 NITIN DHAVAN UDIN AND SIGNED.pdf · uploaded 5 Aug 2025Source
  • Withdrawal Update Form 1ARCHITECH KK SEP-25.pdf · uploaded 17 Dec 2025Source
  • Withdrawal Update Form 2ENGINEERS KK SEP-25.pdf · uploaded 17 Dec 2025Source
  • Withdrawal Update Form 3FORM 3 VARDHAMAN VATIKA.pdf · uploaded 17 Dec 2025Source
  • Withdrawal Update Form 1form 1 vardhaman dec 25.pdf · uploaded 14 Feb 2026Source
  • Withdrawal Update Form 2form 2 vardhaman dec 25.pdf · uploaded 14 Feb 2026Source
  • Withdrawal Update Form 3FORM-3 NITIN DHAVAN VE.pdf · uploaded 14 Feb 2026Source
  • Withdrawal Update Form 1FORM-1 VE (1).pdf · uploaded 23 Jun 2026Source
  • Withdrawal Update Form 2FORM-2 VE (1).pdf · uploaded 23 Jun 2026Source
  • Withdrawal Update Form 3form 3 march 26..pdf · uploaded 23 Jun 2026Source
  • Form 2A (FY 2025-2026)FORM-2A VE (1).pdf · uploaded 7 Jul 2026Source
  • Form 5 (FY 2025-2026)FORM-5 YEAR 2025-26.pdf · uploaded 17 Jul 2026Source
  • Withdrawal Update Form 1FORM-1 VE 1-7-26.pdf · uploaded 21 Jul 2026Source
  • Withdrawal Update Form 2FORM-2 VE 1-7-26.pdf · uploaded 21 Jul 2026Source
  • Withdrawal Update Form 3vardhamanvatika june 2026 form 3....pdf · uploaded 21 Jul 2026Source

Technical

  • DocumentPlan Vardhaman Vatika-min (1).pdf · uploaded 7 Dec 2019Source
  • DocumentPlan Vardhaman Vatika-min (1).pdf · uploaded 7 Dec 2019Source
  • Documentnew plan copy_11zon.pdf · uploaded 25 Dec 2023Source
  • Documentnew plan copy MARKED.pdf · uploaded 17 Apr 2024Source

Technical (Architect)

  • DocumentFORM 1 JUNE 24 GSA.pdf · uploaded 14 Nov 2024Source
  • DocumentFORM 1 VE JUNE 24.pdf · uploaded 14 Nov 2024Source
  • DocumentKK ARCHITACT CERTIFICATE VE form 1 dec 24 (1).pdf · uploaded 15 Feb 2025Source
  • DocumentFORM-1 VE 1-7-26.pdf · uploaded 21 Jul 2026Source

Technical (Engineer)

  • DocumentFORM 2 JUNE GSA.pdf · uploaded 14 Nov 2024Source
  • DocumentFORM 2 VE JUNE 24.pdf · uploaded 14 Nov 2024Source
  • DocumentKK ARCHITACT CERTIFICATE VE form 2 dec 24.pdf · uploaded 15 Feb 2025Source
  • DocumentFORM-2 VE 1-7-26.pdf · uploaded 21 Jul 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Land & approvalsLand parcel 2, SNO 123 HISSA NO 1 SNO127 HISSA NO 1

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Certificate Signed
Unit types
1BHK, 1BHK LANDLORD, 2BHK, 2BHK LANDLORD65 units in all
Address
Sno 123 Hissa No 1 Sno127 Hissa No 1 And 2, Narpoli, KamatgharPIN 421302
Village
Bhiwandi (M Corp.), Bhiwandi taluka
Land area for this project
1,242 sq m (13,365 sq ft)
Permissible built-up area
3,951 sq m (42,530 sq ft)
Sanctioned built-up area
3,949 sq m (42,506 sq ft)
Recreational open space
212 sq m (2,282 sq ft)
Designated bank account
82
Developed in phases
No

Survey, CTS, gat or plot numbers

2SNO 123 HISSA NO 1 SNO127 HISSA NO 1

Land as published on MahaRERA's project page

SNO 123 HISSA NO 1 SNO127 HISSA NO 1 AND 2

Boundaries

North
Sno 128
South
Sno 127
East
Sno 123
West
Sno 126

Source: registration certificates and MahaRERA's project page, as stated there.

Units & parking65 units

41 of 65 units booked (63%), as the promoter reported to MahaRERA

1BHK · 37 units1BHK LANDLORD · 17 units2BHK · 6 units2BHK LANDLORD · 5 units
TypeCarpet areaUnitsBooked
1BHK30.46 sq m · 328 sq ft99
1BHK30.48 sq m · 328 sq ft44
1BHK32.78 sq m · 353 sq ft109
1BHK34.51 sq m · 371 sq ft99
1BHK40.65 sq m · 438 sq ft54
1BHK LANDLORD30.46 sq m · 328 sq ft20
1BHK LANDLORD30.48 sq m · 328 sq ft60
1BHK LANDLORD32.78 sq m · 353 sq ft10
Show all 12 unit rowsShow fewer unit rows
TypeCarpet areaUnitsBooked
1BHK LANDLORD34.51 sq m · 371 sq ft20
1BHK LANDLORD40.65 sq m · 438 sq ft60
2BHK41.2 sq m · 443 sq ft66
2BHK LANDLORD41.2 sq m · 443 sq ft50

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Professionals6

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectKk And Associates—
Chartered accountantDushyant Patel—
Chartered accountantNitin Balaji Dhavan For Form Three—
EngineerKk And Associates—
OtherBhavani Enterprises—
OtherNitin B Dhavan Form Three—

Source: MahaRERA project page. Contact details are not shown.

Other projects in Kamatghar

All 22 projects in Kamatghar · Compare Vardhaman Vatika with another project

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Report a problemMethodology