Skip to content
Residential / Group Housing · 3 buildings · 329 unitsRERA P51700010706

Amakin Mohammadiya Complex Phase III

Deedo IDDP-THN-EZ0Q

MahaRERA shows it completed; no MahaRERA orders on record; 39% of its units are booked.

Kachore, Thane 421304 · by Raj Corporation, Raj Corporation

DeliveryCompletedCompletion / occupancy certificate on MahaRERARegulatoryNo ordersNot in any MahaRERA list or order Deedo has readSales39% booked127 of 329 units · as the promoter reported to MahaRERA

Buying a flat here?

See every deed registered on it.

MahaRERA shows it completed

  • This projectRegistered 31 Aug 2017, completion promised 30 Dec 2024.

No extension certificate on record.

1 registration · Source: MahaRERA registration and extension certificates

Latest registered deeds

Sales first, then rentals and mortgages matched to this project · the free view shows a price band

No registered deeds matched to this project yet
Sales, resales, rentals and mortgages appear here once registered documents are matched to it by evidence.

3 buildings

Open a building to see every flat, floor by floor.

Floors and units from the registration certificate annexures and MahaRERA's project page.

Regulatory recordNone found

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

RERA registrationP51700010706
RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5170001070631 Aug 201730 Dec 202430 Dec 2024Raj CorporationProject page
Documents126

1 document held by Deedo, 125 filings listed on MahaRERA's project page

Registration certificate

Finance

  • PAN Cardpancard 2.pdf · uploaded 4 Aug 2017Source
  • PAN Cardpan card.pdf · uploaded 4 Aug 2017Source

Legal

  • Legal Title reportCopy of The Legal Title.pdf · uploaded 4 Aug 2017Source
  • Declaration Form BDeclaretion of FORM B (1).pdf · uploaded 4 Aug 2017Source
  • OtherAmakin_Declaration_Raj Application.pdf · uploaded 1 Oct 2018Source

Migrated

  • 1 PAN Cardpancard 2.pdf · uploaded 4 Aug 2017Source
  • 2 PAN Cardpan card.pdf · uploaded 4 Aug 2017Source
Show all 126 documentsShow fewer documents

Migrated

  • 1 Copy of the legal title reportCopy of The Legal Title.pdf · uploaded 4 Aug 2017Source
  • 1 Details of encumbrances1.pdf · uploaded 4 Aug 2017Source
  • 2 Details of encumbrances2.pdf · uploaded 4 Aug 2017Source
  • 1 Copy of Layout Approval (in case of layout)CC LAY OUT.pdf · uploaded 4 Aug 2017Source
  • 1 Building Plan Approval (IOD)IOD 1.pdf · uploaded 4 Aug 2017Source
  • 2 Building Plan Approval (IOD)IOD 2.pdf · uploaded 4 Aug 2017Source
  • 1 Commencement Certificates / NA Order for plotted developmentCommencement Certificate.pdf · uploaded 4 Aug 2017Source
  • 1 Declaration in FORM BDeclaretion of FORM B (1).pdf · uploaded 4 Aug 2017Source
  • 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Certificate of Architect FORM 1.pdf · uploaded 4 Aug 2017Source
  • 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Certificate of Engineer FORM 2.pdf · uploaded 4 Aug 2017Source
  • 1 Certificates of CA (Form 3)CERTIFICATE OF CA FORM 3 (2).pdf · uploaded 4 Aug 2017Source
  • 1 Proforma of Allotment letterAllotment Letter.pdf · uploaded 4 Aug 2017Source
  • 2 Proforma of Allotment letterSALE AGREEMENT-RERA.pdf · uploaded 4 Aug 2017Source
  • 3 Details of encumbrancesENCUMBREANCE 01.pdf · uploaded 30 Mar 2018Source
  • 4 Details of encumbrancesENCUMBREANCE 02.pdf · uploaded 30 Mar 2018Source
  • 5 Details of encumbrancesENCUMBREANCE 03.pdf · uploaded 30 Mar 2018Source
  • 2 Copy of Layout Approval (in case of layout)LAYOUT PLAN.pdf · uploaded 30 Mar 2018Source
  • 3 Copy of Layout Approval (in case of layout)LAYOUT PLAN.pdf · uploaded 30 Mar 2018Source
  • 3 Building Plan Approval (IOD)CC PLAN 3 OF 8.pdf · uploaded 30 Mar 2018Source
  • 4 Building Plan Approval (IOD)CC PLAN 2 OF 8.pdf · uploaded 30 Mar 2018Source
  • 5 Building Plan Approval (IOD)CC PLAN 4 OF 8.pdf · uploaded 30 Mar 2018Source
  • 6 Building Plan Approval (IOD)CC PLAN 5 OF 8.pdf · uploaded 30 Mar 2018Source
  • 7 Building Plan Approval (IOD)cc plan 6 of 8.pdf · uploaded 30 Mar 2018Source
  • 8 Building Plan Approval (IOD)cc plan 7 of 8.pdf · uploaded 30 Mar 2018Source
  • 9 Building Plan Approval (IOD)cc plan 8 of 8.pdf · uploaded 30 Mar 2018Source
  • 10 Building Plan Approval (IOD)cc plan 9 of 10.pdf · uploaded 30 Mar 2018Source
  • 11 Building Plan Approval (IOD)cc plan 10 of 10.pdf · uploaded 30 Mar 2018Source
  • 12 Building Plan Approval (IOD)LAYOUT PLAN.pdf · uploaded 30 Mar 2018Source
  • 2 Commencement Certificates / NA Order for plotted developmentCC COPY 2017.pdf · uploaded 31 Mar 2018Source
  • 1 OtherAmakin_Declaration_Raj Application.pdf · uploaded 1 Oct 2018Source
  • 2 Certificates of CA (Form 3)jpg-to-pdf (1).pdf · uploaded 25 Oct 2018Source
  • 3 Certificates of CA (Form 3)jpg-to-pdf.pdf · uploaded 25 Oct 2018Source
  • 4 Certificates of CA (Form 3)jpg-to-pdf (2).pdf · uploaded 25 Oct 2018Source
  • 5 Certificates of CA (Form 3)jpg-to-pdf (3).pdf · uploaded 25 Oct 2018Source
  • 6 Certificates of CA (Form 3)jpg-to-pdf (4).pdf · uploaded 25 Oct 2018Source
  • 7 Certificates of CA (Form 3)jpg-to-pdf (5).pdf · uploaded 25 Oct 2018Source
  • 8 Certificates of CA (Form 3)CA CERTIFICATE DT SEP 2018 (2).pdf · uploaded 25 Oct 2018Source
  • 1 Certificates of CA (Form 5)Certificates of CA (Form 5).pdf · uploaded 30 Oct 2018Source
  • 2 Certificates of Architect (Form 1)(Mandatory for only ongoing project)CERTIFICATE OF ARCHITECTS.pdf · uploaded 2 Feb 2019Source
  • 2 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)ENGINEER CERTIFICATE.pdf · uploaded 2 Feb 2019Source
  • 9 Certificates of CA (Form 3)CERTIFICATE OF CA FORM 3.pdf · uploaded 2 Feb 2019Source
  • 3 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)ENGINEER CERTIFICATE.pdf · uploaded 20 May 2019Source
  • 10 Certificates of CA (Form 3)CA CERTIFICATE FORM 3.pdf · uploaded 20 May 2019Source
  • 1 Certificates of Architect (Form 4)Architec Certificate FORM 4.pdf · uploaded 20 May 2019Source
  • 3 Certificates of Architect (Form 1)(Mandatory for only ongoing project)ARCHITECTS CERTIFICATE.pdf · uploaded 17 Jun 2019Source
  • 4 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)ENGINEER CERTIFICATE.pdf · uploaded 17 Jun 2019Source
  • 11 Certificates of CA (Form 3)CA CERTIFICATE Form 3.pdf · uploaded 17 Jun 2019Source
  • 12 Certificates of CA (Form 3)CA Certificate Form 3.pdf · uploaded 20 Aug 2019Source
  • 1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentA5 HUSAMI OCCUPANCY CERTIFICATE.pdf · uploaded 20 Aug 2019Source
  • 4 Certificates of Architect (Form 1)(Mandatory for only ongoing project)CERTIFICATE OF ARCHITECT.pdf · uploaded 9 Feb 2020Source
  • 5 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)CERTIFICATE OF ENGINEER.pdf · uploaded 9 Feb 2020Source
  • 13 Certificates of CA (Form 3)CA CERTIFICATE.pdf · uploaded 9 Feb 2020Source
  • 1 Status of Formation of Legal Entity (Society/Co Op etc.)Husami Society Registration Certificate.pdf · uploaded 12 Oct 2020Source
  • 5 Certificates of Architect (Form 1)(Mandatory for only ongoing project)ARCHITECTURAL FORM 1.pdf · uploaded 31 Oct 2020Source
  • 6 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)ENGINEER CERTIFICATE FORM 2.pdf · uploaded 31 Oct 2020Source
  • 14 Certificates of CA (Form 3)Certificates of CA (Form 3).pdf · uploaded 2 Nov 2020Source
  • 6 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect Certificate Form 1.pdf · uploaded 26 May 2021Source
  • 7 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineer Certificate.pdf · uploaded 26 May 2021Source
  • 15 Certificates of CA (Form 3)CA CERTIFICATE FORM 3.pdf · uploaded 26 May 2021Source
  • 7 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect Certificate (Form1).pdf · uploaded 1 Sep 2021Source
  • 8 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineers certificate (Form 2).pdf · uploaded 1 Sep 2021Source
  • 16 Certificates of CA (Form 3)CA Certificate (Form 3).pdf · uploaded 1 Sep 2021Source
  • 8 Certificates of Architect (Form 1)(Mandatory for only ongoing project)ARC CERTIFICATE.pdf · uploaded 15 Mar 2022Source
  • 9 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)GNR CINSULTANT.pdf · uploaded 15 Mar 2022Source
  • 17 Certificates of CA (Form 3)CA CERTIFICATE.pdf · uploaded 15 Mar 2022Source
  • 9 Certificates of Architect (Form 1)(Mandatory for only ongoing project)ARCHITECT CERTIFICTE.pdf · uploaded 5 Jul 2022Source
  • 10 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)ENGINEER CERTIFICATE.pdf · uploaded 5 Jul 2022Source
  • 4 Copy of Layout Approval (in case of layout)OC COPY.pdf · uploaded 16 Jul 2022Source
  • 5 Copy of Layout Approval (in case of layout)OC PLAN 01.pdf · uploaded 16 Jul 2022Source
  • 6 Copy of Layout Approval (in case of layout)OC PLAN 02.pdf · uploaded 16 Jul 2022Source
  • 7 Copy of Layout Approval (in case of layout)OC PLAN 03.pdf · uploaded 16 Jul 2022Source
  • 8 Copy of Layout Approval (in case of layout)OC PLAN 04.pdf · uploaded 16 Jul 2022Source
  • 9 Copy of Layout Approval (in case of layout)OC COPY 1ST TO 14TH FLOOR.pdf · uploaded 16 Jul 2022Source
  • 10 Copy of Layout Approval (in case of layout)OC PLAN-001 GR TO 14TH FLOOR.pdf · uploaded 16 Jul 2022Source
  • 11 Copy of Layout Approval (in case of layout)OC PLAN-002 GR TO 14TH FLOOR.pdf · uploaded 16 Jul 2022Source
  • 12 Copy of Layout Approval (in case of layout)OC PLAN-003 GR TO 14TH FLOOR.pdf · uploaded 16 Jul 2022Source
  • 13 Copy of Layout Approval (in case of layout)OC PLAN-004 GR TO 14TH FLOOR.pdf · uploaded 16 Jul 2022Source
  • 18 Certificates of CA (Form 3)Form 3_compressed_compressed.pdf · uploaded 16 Jul 2022Source
  • 2 Certificates of CA (Form 5)CA CERTIFICATE (FORM 5).pdf · uploaded 1 Nov 2022Source
  • 2 Status of Formation of Legal Entity (Society/Co Op etc.)Noorani Society Registration Number.pdf · uploaded 4 Jan 2023Source
  • 14 Copy of Layout Approval (in case of layout)OC LAYOUT PLAN01.PDF · uploaded 6 Apr 2023Source
  • 15 Copy of Layout Approval (in case of layout)OC LAYOUT PLAN02.PDF · uploaded 6 Apr 2023Source
  • 16 Copy of Layout Approval (in case of layout)OC LAYOUT PLAN03.PDF · uploaded 6 Apr 2023Source
  • 17 Copy of Layout Approval (in case of layout)OC LAYOUT PLAN04.pdf · uploaded 6 Apr 2023Source
  • 10 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Certificates of Architect (Form 1).pdf · uploaded 6 Apr 2023Source
  • 2 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentOccupancy Certificate.pdf · uploaded 6 Apr 2023Source
  • 3 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentOccupancy Certificate.pdf · uploaded 6 Apr 2023Source

Technical

  • DocumentCC LAY OUT.pdf · uploaded 4 Aug 2017Source
  • DocumentIOD 1.pdf · uploaded 4 Aug 2017Source
  • DocumentIOD 2.pdf · uploaded 4 Aug 2017Source
  • DocumentLAYOUT PLAN.pdf · uploaded 30 Mar 2018Source
  • DocumentCC PLAN 3 OF 8.pdf · uploaded 30 Mar 2018Source
  • DocumentCC PLAN 2 OF 8.pdf · uploaded 30 Mar 2018Source
  • DocumentCC PLAN 4 OF 8.pdf · uploaded 30 Mar 2018Source
  • DocumentCC PLAN 5 OF 8.pdf · uploaded 30 Mar 2018Source
  • Documentcc plan 6 of 8.pdf · uploaded 30 Mar 2018Source
  • Documentcc plan 7 of 8.pdf · uploaded 30 Mar 2018Source
  • Documentcc plan 8 of 8.pdf · uploaded 30 Mar 2018Source
  • Documentcc plan 9 of 10.pdf · uploaded 30 Mar 2018Source
  • Documentcc plan 10 of 10.pdf · uploaded 30 Mar 2018Source
  • DocumentLAYOUT PLAN.pdf · uploaded 30 Mar 2018Source
  • DocumentLAYOUT PLAN.pdf · uploaded 30 Mar 2018Source
  • DocumentOC COPY.pdf · uploaded 16 Jul 2022Source
  • DocumentOC PLAN 01.pdf · uploaded 16 Jul 2022Source
  • DocumentOC PLAN 02.pdf · uploaded 16 Jul 2022Source
  • DocumentOC PLAN 03.pdf · uploaded 16 Jul 2022Source
  • DocumentOC PLAN 04.pdf · uploaded 16 Jul 2022Source
  • DocumentOC COPY 1ST TO 14TH FLOOR.pdf · uploaded 16 Jul 2022Source
  • DocumentOC PLAN-001 GR TO 14TH FLOOR.pdf · uploaded 16 Jul 2022Source
  • DocumentOC PLAN-002 GR TO 14TH FLOOR.pdf · uploaded 16 Jul 2022Source
  • DocumentOC PLAN-003 GR TO 14TH FLOOR.pdf · uploaded 16 Jul 2022Source
  • DocumentOC PLAN-004 GR TO 14TH FLOOR.pdf · uploaded 16 Jul 2022Source
  • DocumentOC LAYOUT PLAN01.PDF · uploaded 6 Apr 2023Source
  • DocumentOC LAYOUT PLAN02.PDF · uploaded 6 Apr 2023Source
  • DocumentOC LAYOUT PLAN03.PDF · uploaded 6 Apr 2023Source
  • DocumentOC LAYOUT PLAN04.pdf · uploaded 6 Apr 2023Source

Technical (Architect)

  • DocumentCertificates of Architect (Form 1).pdf · uploaded 6 Apr 2023Source

Technical (Engineer)

  • DocumentENGINEER CERTIFICATE.pdf · uploaded 5 Jul 2022Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Land & approvals

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Certificate Signed
Unit types
2BHK, 1BHK329 units in all
Address
31/6, 31/7, Vikas Naka, Kachore VillagePIN 421304
Village
Kachore, Kalyan taluka
Land area for this project
19,711 sq m (2,12,165 sq ft)
Permissible built-up area
62,042 sq m (6,67,812 sq ft)
Sanctioned built-up area
19,568 sq m (2,10,624 sq ft)
Recreational open space
3,950 sq m (42,512 sq ft)
Designated bank account
21
Developed in phases
Yes

Land as published on MahaRERA's project page

31/6,31/7

Boundaries

North
502 Hdh Reservation
South
30 Meter Widh Road
East
12 Meter Widh Doad
West
Dp Road 45 Meter Widh

Source: registration certificates and MahaRERA's project page, as stated there.

Units & parking329 units

127 of 329 units booked (39%), as the promoter reported to MahaRERA

2BHK · 109 units1BHK · 220 units
BuildingTypeCarpet areaUnitsBooked
A5 Husami B2BHK54.97 sq m · 592 sq ft3824
A5 Husami B2BHK55.27 sq m · 595 sq ft3313
A5 Husami B2BHK56.92 sq m · 613 sq ft3819
B3 Noorani A1BHK32.59 sq m · 351 sq ft199
B3 Noorani A1BHK32.9 sq m · 354 sq ft198
B3 Noorani A1BHK32.91 sq m · 354 sq ft7217
B4 Noorani B1BHK32.59 sq m · 351 sq ft195
B4 Noorani B1BHK32.9 sq m · 354 sq ft194
B4 Noorani B1BHK32.91 sq m · 354 sq ft7228

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Professionals4

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectAr. Uday r Satavalekar—
EngineerMadhav chikodi and asso—
OtherHaresh K Patel—
OtherPravin Patel—

Source: MahaRERA project page. Contact details are not shown.

Other projects in Kachore

All 5 projects in Kachore · Compare Amakin Mohammadiya Complex Phase III with another project

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Report a problemMethodology