Vihang Atharva
Deedo IDDP-THN-SYP8Completion was pushed back 4 months, to Apr 2030; no MahaRERA orders on record; 0% of its units are booked.
Ghodbunder, Thane 401107 · by Reyanshp Realty LLP
Buying a flat here?
See every deed registered on it.
Completion was pushed back 4 months, to Apr 2030
- This projectRegistered 3 Feb 2025, completion promised 31 Dec 2029, revised to 30 Apr 2030.
No extension certificate on record.
1 registration · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales first, then rentals and mortgages matched to this project · the free view shows a price band
4 buildings
Open a building to see every flat, floor by floor.
- Wing B2 floors · 12 units0% booked
- Wing C2 floors · 18 units0% booked
- Wing D24 floors · 184 units0% booked
- Wing F2 floors · 3 units0% booked
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrationP51700079063
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P51700079063 | 3 Feb 2025 | 31 Dec 2029 | 30 Apr 2030 | Reyanshp Realty LLP | Project page |
Documents106
1 document held by Deedo, 105 filings listed on MahaRERA's project page
Finance
- PAN CardREYANSHP REALTY LLP - PAN CARD.pdf · uploaded 27 Dec 2024Source
Legal
- Legal Title reportLEGAL TITLE REPORT - VIHANG ATHARVA DATE-08-01-2025_compressed - Copy_Part4.pdf · uploaded 9 Jan 2025Source
- Legal Title reportLEGAL TITLE REPORT - VIHANG ATHARVA DATE-08-01-2025_compressed - Copy_Part3.pdf · uploaded 9 Jan 2025Source
- Legal Title reportLEGAL TITLE REPORT - VIHANG ATHARVA DATE-08-01-2025_compressed - Copy_Part2.pdf · uploaded 9 Jan 2025Source
- Legal Title reportLEGAL TITLE REPORT - VIHANG ATHARVA DATE-08-01-2025_compressed - Copy_Part1.pdf · uploaded 9 Jan 2025Source
- Other – LegalPOA reg no 1996- dt- 5-2-2021 compressed MARTIN CORREA.pdf · uploaded 31 Jan 2025Source
- Other – LegalINDEX -2 WITH REGISTRATION RECEIPT - Martin Correa ANDatap Sarnaik TNN4-1995-2021 Date 05-02-2021 - Copy.pdf · uploaded 31 Jan 2025Source
Show all 106 documentsShow fewer documents
Legal
- Declaration Form BAFFIDAVIT CUM- DECLARATION FORM B.pdf · uploaded 31 Jan 2025Source
Migrated
- 1 PAN CardREYANSHP REALTY LLP - PAN CARD.pdf · uploaded 27 Dec 2024Source
- 1 Copy of the legal title reportLEGAL TITLE REPORT - VIHANG ATHARVA DATE-08-01-2025_compressed - Copy_Part1.pdf · uploaded 9 Jan 2025Source
- 2 Copy of the legal title reportLEGAL TITLE REPORT - VIHANG ATHARVA DATE-08-01-2025_compressed - Copy_Part2.pdf · uploaded 9 Jan 2025Source
- 3 Copy of the legal title reportLEGAL TITLE REPORT - VIHANG ATHARVA DATE-08-01-2025_compressed - Copy_Part3.pdf · uploaded 9 Jan 2025Source
- 4 Copy of the legal title reportLEGAL TITLE REPORT - VIHANG ATHARVA DATE-08-01-2025_compressed - Copy_Part4.pdf · uploaded 9 Jan 2025Source
- 1 Copy of Layout Approval (in case of layout)PLANS.pdf · uploaded 9 Jan 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)PERCENTAGE WORK COMPLETE CERTIFICATE.pdf · uploaded 9 Jan 2025Source
- 1 Building Plan Approval / NA Order for plotted developmentPLANS.pdf · uploaded 9 Jan 2025Source
- 1 Disclosure of Interest in Other Real Estate OrganizationsDISCLOSER OF INTERST PURVESH PRATAP SARNAIK.pdf · uploaded 15 Jan 2025Source
- 1 Disclosure for secured/unsecured finance availed for the projectdisclouser for secured and unsecured finance.pdf · uploaded 15 Jan 2025Source
- 2 Disclosure of Interest in Other Real Estate OrganizationsDisclosure of interest Parisha Sarnaik.pdf · uploaded 18 Jan 2025Source
- 3 Disclosure of Interest in Other Real Estate OrganizationsDISCLOSER OF INTEREST- PRATAP SARNAIK.pdf · uploaded 18 Jan 2025Source
- 1 Declaration about all RERA Designated Bank Accounts (Format A)format a.pdf · uploaded 22 Jan 2025Source
- 1 Proforma of Allotment letterALLOTMENT LETTER -ATHARVA.pdf · uploaded 23 Jan 2025Source
- 1 Deviation Report with respect to Allotment letterDeviation Report for Vihang Atharva.pdf · uploaded 23 Jan 2025Source
- 1 a Details of encumbrances concerned to FinanceNON ENCUMBERANCE CERTIFICATE - FINANCE - 25-01-2025.pdf · uploaded 25 Jan 2025Source
- 1 CERSAI detailscersai UNDERTAKING - 25-01-2025.pdf · uploaded 25 Jan 2025Source
- 1 b Details of encumbrances concerned to LegalNON ENCUMBERANCE CERTIFICATE - FINANCE - 25-01-2025.pdf · uploaded 25 Jan 2025Source
- 1 Commencement Certificates / NA Order for plotted developmentCC WITH SHUDDHIPATRA.pdf · uploaded 27 Jan 2025Source
- 1 Other – TechnicalAnnexure A_Declarion-cum-Undertaking_Atharva_Signed.pdf · uploaded 27 Jan 2025Source
- 1 Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)01-Format 'B'-1.pdf · uploaded 27 Jan 2025Source
- 2 a Details of encumbrances concerned to FinanceAtharva NON ENCUMBERANCE CERTIFICATE LEGAL.pdf · uploaded 29 Jan 2025Source
- 2 b Details of encumbrances concerned to LegalAtharva NON ENCUMBERANCE CERTIFICATE LEGAL.pdf · uploaded 29 Jan 2025Source
- 1 Deviation Report with respect to model copy of Agreementdeviation report AFS-29-01-2025.pdf · uploaded 29 Jan 2025Source
- 1 Proforma of Agreement for saleAGREEMENT FOR SALE-VIHANG ATHARVA-29-01-2025.pdf · uploaded 29 Jan 2025Source
- 1 Declaration in FORM BAFFIDAVIT CUM- DECLARATION FORM B.pdf · uploaded 31 Jan 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Reyanshp Realty LLP_ATHARVA.pdf · uploaded 31 Jan 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)form -2 ENGR CERT FOR COST vihang atharva.pdf · uploaded 31 Jan 2025Source
- 1 Other – LegalINDEX -2 WITH REGISTRATION RECEIPT - Martin Correa ANDatap Sarnaik TNN4-1995-2021 Date 05-02-2021 - Copy.pdf · uploaded 31 Jan 2025Source
- 2 Other – LegalPOA reg no 1996- dt- 5-2-2021 compressed MARTIN CORREA.pdf · uploaded 31 Jan 2025Source
- 1 Declaration about Commencement Certificatedeclaration about commencement certificate FORMAT- D.pdf · uploaded 31 Jan 2025Source
- 2 Other – Technicaldeclaration FOR WING- G.pdf · uploaded 31 Jan 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)20250403 RERA ATHARVA ARCHITECT WORK PERCENTAGE COMPLETION CERTIFICATE_compressed.pdf · uploaded 3 Apr 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)20250403 RERA ATHARVA ENGINEER'S CERTIFICATE .pdf · uploaded 3 Apr 2025Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)20250401 ATHARVA FORM 2A QUALITY ASSURANCE CERTIFICATE.pdf · uploaded 4 Apr 2025Source
- Form 1MArch 2025 RERA ATHARVA ARCHITECT WORK PERCENTAGE COMPLETION CERTIFICATE.pdf · uploaded 6 Oct 2025Source
- Form 220250403 RERA ATHARVA ENGINEER'S CERTIFICATE .pdf · uploaded 6 Oct 2025Source
- Form 3Form 3 as on 31 March Atharva Project.pdf · uploaded 6 Oct 2025Source
- Disclosure of Sold and Booked InventoryForm 3 as on 31 March Atharva Project.pdf · uploaded 6 Oct 2025Source
- Self-declaration of Quarterly ProgressMArch 2025 ATHARVA FORM 2A QUALITY ASSURANCE CERTIFICATE.pdf · uploaded 6 Oct 2025Source
- Withdrawal Update Form 120250707 ATHARVA RERA ARCHITECT WORK PERCENTAGE COMPLETION CERTIFICATE.pdf · uploaded 6 Oct 2025Source
- Withdrawal Update Form 120250707 ATHARVA RERA ARCHITECT WORK PERCENTAGE COMPLETION CERTIFICATE.pdf · uploaded 6 Oct 2025Source
- Withdrawal Update Form 120250707 ATHARVA RERA ARCHITECT WORK PERCENTAGE COMPLETION CERTIFICATE.pdf · uploaded 6 Oct 2025Source
- Withdrawal Update Form 120250707 ATHARVA RERA ARCHITECT WORK PERCENTAGE COMPLETION CERTIFICATE.pdf · uploaded 6 Oct 2025Source
- Withdrawal Update Form 2form -2 ENGR CERT FOR COST vihang atharva.pdf · uploaded 6 Oct 2025Source
- Withdrawal Update Form 2form -2 ENGR CERT FOR COST vihang atharva.pdf · uploaded 6 Oct 2025Source
- Withdrawal Update Form 2form -2 ENGR CERT FOR COST vihang atharva.pdf · uploaded 6 Oct 2025Source
- Withdrawal Update Form 220250903 atharva ENGINEERS CERTIFICATE.pdf · uploaded 6 Oct 2025Source
- Withdrawal Update Form 3Form 3 as on 31.03.25 Atharva Project (3).pdf · uploaded 6 Oct 2025Source
- Withdrawal Update Form 3Form 3 as on 31.03.25 Atharva Project (3).pdf · uploaded 6 Oct 2025Source
- Withdrawal Update Form 3Form 3 as on 31.03.25 Atharva Project (3).pdf · uploaded 6 Oct 2025Source
- Withdrawal Update Form 32025-Jun 25 Form 3 Vihang Atharva_compressed.pdf · uploaded 6 Oct 2025Source
- Withdrawal Update Form 120260106 ATHARVA WORK PERCENTAGE COMPLETION CERTIFICATE AS ON DATE 30-09-2025.pdf · uploaded 23 Feb 2026Source
- Withdrawal Update Form 120260106 ATHARVA WORK PERCENTAGE COMPLETION CERTIFICATE AS ON DATE 30-09-2025.pdf · uploaded 23 Feb 2026Source
- Withdrawal Update Form 220260210 Atharva form 2 July Sept 2025 (1).pdf · uploaded 23 Feb 2026Source
- Withdrawal Update Form 220260210 Atharva form 2 July Sept 2025 (1).pdf · uploaded 23 Feb 2026Source
- Withdrawal Update Form 3Final Form 3 for Vihang Atharva as on 300925 (2)_compressed.pdf · uploaded 23 Feb 2026Source
- Withdrawal Update Form 3Final Form 3 for Vihang Atharva as on 300925 (2)_compressed.pdf · uploaded 23 Feb 2026Source
- Withdrawal Update Form 1VIHANG ATHARVA FORM 1 OCT to DEC 2025.pdf · uploaded 6 Jun 2026Source
- Withdrawal Update Form 1VIHANG ATHARVA FORM 1 OCT to DEC 2025.pdf · uploaded 6 Jun 2026Source
- Withdrawal Update Form 2Application Form2 atharva - as per changes on 1-4-2026 (1).pdf · uploaded 6 Jun 2026Source
- Withdrawal Update Form 2Application Form2 atharva - as per changes on 1-4-2026 (1).pdf · uploaded 6 Jun 2026Source
- Withdrawal Update Form 3Form 3 _ Atharva _OCT - DEC 2025.pdf · uploaded 6 Jun 2026Source
- Withdrawal Update Form 3Form 3 _ Atharva _OCT - DEC 2025.pdf · uploaded 6 Jun 2026Source
- Withdrawal Update Form 1VIHANG ATHARVA FORM 1 AS ON DATE 31-03-2026 - SIGNED.pdf · uploaded 4 Aug 2026Source
- Withdrawal Update Form 1VIHANG ATHARVA FORM 1 AS ON DATE 31-03-2026 - SIGNED.pdf · uploaded 4 Aug 2026Source
- Withdrawal Update Form 1VIHANG ATHARVA FORM 1 AS ON DATE 31-03-2026 - SIGNED.pdf · uploaded 4 Aug 2026Source
- Withdrawal Update Form 1VIHANG ATHARVA FORM 1 AS ON DATE 31-03-2026 - SIGNED.pdf · uploaded 4 Aug 2026Source
- Withdrawal Update Form 1VIHANG ATHARVA FORM 1 AS ON DATE 31-03-2026 - SIGNED.pdf · uploaded 4 Aug 2026Source
- Withdrawal Update Form 2VIHANG ATHARVA FORM 2 AS ON DATE 31-03-2026 - SIGNED.pdf · uploaded 4 Aug 2026Source
- Withdrawal Update Form 2VIHANG ATHARVA FORM 2 AS ON DATE 31-03-2026 - SIGNED.pdf · uploaded 4 Aug 2026Source
- Withdrawal Update Form 2VIHANG ATHARVA FORM 2 AS ON DATE 31-03-2026 - SIGNED.pdf · uploaded 4 Aug 2026Source
- Withdrawal Update Form 2VIHANG ATHARVA FORM 2 AS ON DATE 31-03-2026 - SIGNED.pdf · uploaded 4 Aug 2026Source
- Withdrawal Update Form 2VIHANG ATHARVA FORM 2 AS ON DATE 31-03-2026 - SIGNED.pdf · uploaded 4 Aug 2026Source
- Withdrawal Update Form 3Final CA Atharva Form 3_31032026-compressed.pdf · uploaded 4 Aug 2026Source
- Withdrawal Update Form 3Final CA Atharva Form 3_31032026-compressed.pdf · uploaded 4 Aug 2026Source
- Withdrawal Update Form 3Final CA Atharva Form 3_31032026-compressed.pdf · uploaded 4 Aug 2026Source
- Withdrawal Update Form 3Final CA Atharva Form 3_31032026-compressed.pdf · uploaded 4 Aug 2026Source
- Withdrawal Update Form 3Final CA Atharva Form 3_31032026-compressed.pdf · uploaded 4 Aug 2026Source
- Form 2A (FY 2024-2025)20260831 VIHANG ATHARVA FORM 02A - 2024-25.pdf · uploaded 31 Aug 2026Source
- Form 2A (FY 2025-2026)20260831 VIHANG ATHARVA FORM 02A - 2025-26.pdf · uploaded 31 Aug 2026Source
- Withdrawal Update Form 1Atharva _form 1 _quater 1 - SIGNED.pdf · uploaded 11 Sep 2026Source
- Withdrawal Update Form 1Atharva _form 1 _quater 1 - SIGNED.pdf · uploaded 11 Sep 2026Source
- Withdrawal Update Form 2ATHARVA_ FORM 02 - Q1 _April -June 2026_SIGNED.pdf · uploaded 11 Sep 2026Source
- Withdrawal Update Form 2ATHARVA_ FORM 02 - Q1 _April -June 2026_SIGNED.pdf · uploaded 11 Sep 2026Source
- Withdrawal Update Form 3Final CA Sign_Vihang Atharva Form 3_Q-1 April - June 2026-compressed.pdf · uploaded 11 Sep 2026Source
- Withdrawal Update Form 3Final CA Sign_Vihang Atharva Form 3_Q-1 April - June 2026-compressed.pdf · uploaded 11 Sep 2026Source
- Form 5 (FY 2024-2025)Form 5-ATHARVA_2024-25 R C JAIN SIGNED.pdf · uploaded 16 Sep 2026Source
- Form 5 (FY 2025-2026)CA Certified_Reyanshp_Atharva_Form-5_FY 25-26.pdf · uploaded 30 Sep 2026Source
Technical
Technical (Architect)
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvalsLand parcel 193/1A, 193/1B 193/2
As registered with MahaRERA and published on its project page
- Project type
- Others
- Status on MahaRERA
- Certificate Signed
- Unit types
- 1BHK, 2BHK, Shop, Office space217 units in all
- Address
- 193/1a, 193/1b 193/2, 193/3, 193/7, 193/9, Ghodbunder Road, GhodbunderPIN 401107
- Village
- Mira-Bhayandar (M Corp.), Thane taluka
- Location
- 19.28195, 72.89000
- Land area for this project
- 7,557 sq m (81,343 sq ft)
- Permissible built-up area
- 12,865 sq m (1,38,479 sq ft)
- Sanctioned built-up area
- 11,382 sq m (1,22,511 sq ft)
- Recreational open space
- 762 sq m (8,197 sq ft)
- Designated bank account
- 76
- Developed in phases
- Yes
Survey, CTS, gat or plot numbers
Land as published on MahaRERA's project page
193/1A, 193/1B 193/2, 193/3, 193/7, 193/9
Boundaries
- North
- Forest Office
- South
- Sahil Enterprises Industries
- East
- Survey 193 Hissa 4 5 8 10 46
- West
- 18 M Wide Road
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking217 units
0 of 217 units booked (0%), as the promoter reported to MahaRERA
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| Wing B | 1BHK | 31.91 sq m · 343 sq ft | 4 | 0 |
| Wing B | 2BHK | 52.11 sq m · 561 sq ft | 2 | 0 |
| Wing B | Shop | 12.81 sq m · 138 sq ft | 1 | 0 |
| Wing B | Shop | 16.68 sq m · 180 sq ft | 1 | 0 |
| Wing B | Shop | 27.24 sq m · 293 sq ft | 2 | 0 |
| Wing B | Shop | 35.49 sq m · 382 sq ft | 2 | 0 |
| Wing C | 1BHK | 31.91 sq m · 343 sq ft | 3 | 0 |
| Wing C | 2BHK | 52.11 sq m · 561 sq ft | 1 | 0 |
Show all 29 unit rowsShow fewer unit rows
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| Wing C | Shop | 13.84 sq m · 149 sq ft | 1 | 0 |
| Wing C | Shop | 17.49 sq m · 188 sq ft | 2 | 0 |
| Wing C | Shop | 18.62 sq m · 200 sq ft | 1 | 0 |
| Wing C | Shop | 23.85 sq m · 257 sq ft | 1 | 0 |
| Wing C | Shop | 24.81 sq m · 267 sq ft | 1 | 0 |
| Wing C | Shop | 25.74 sq m · 277 sq ft | 2 | 0 |
| Wing C | Shop | 26.96 sq m · 290 sq ft | 1 | 0 |
| Wing C | Shop | 27.68 sq m · 298 sq ft | 1 | 0 |
| Wing C | Shop | 31.1 sq m · 335 sq ft | 1 | 0 |
| Wing C | Shop | 33.39 sq m · 359 sq ft | 1 | 0 |
| Wing C | Shop | 36.28 sq m · 391 sq ft | 1 | 0 |
| Wing C | Shop | 37.25 sq m · 401 sq ft | 1 | 0 |
| Wing D | 1BHK | 29.65 sq m · 319 sq ft | 2 | 0 |
| Wing D | 1BHK | 31.91 sq m · 343 sq ft | 130 | 0 |
| Wing D | 2BHK | 52.11 sq m · 561 sq ft | 46 | 0 |
| Wing D | Shop | 12.81 sq m · 138 sq ft | 1 | 0 |
| Wing D | Shop | 16.68 sq m · 180 sq ft | 1 | 0 |
| Wing D | Shop | 27.24 sq m · 293 sq ft | 2 | 0 |
| Wing D | Shop | 35.49 sq m · 382 sq ft | 2 | 0 |
| Wing F | Office space | 84.44 sq m · 909 sq ft | 2 | 0 |
| Wing F | Office space | 85.51 sq m · 920 sq ft | 1 | 0 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Professionals6
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Anish & Associates Mr Anil P Motiramani | — |
| Chartered accountant | Lilani & Co | — |
| Chartered accountant | R C Jain & Associates LLP | — |
| Chartered accountant | Vinod Kumar Jain | — |
| Engineer | Epicons Consultants Pvt Ltd | — |
| Engineer | Gaurav Mishra | — |
Source: MahaRERA project page. Contact details are not shown.
Other projects in Ghodbunder
- Prestige PointRERA PM1330002602626
- Casa Supremo RetailRERA PC1330002601882
- OctaveRERA PM1331012601797
- Shree Nidhi HeavenRERA PM1330002601562
- RD RoyaltonRERA PR1330002601453
- Codename EndgameRERA PM1330002600898
- Atmaram HeightsRERA PM1330002600698
- Vihang AvaanaRERA PM1330002500856
All 14 projects in Ghodbunder · Compare Vihang Atharva with another project