Deedo IDDP-THN-MS65Completion was pushed back 4 months, to Mar 2027; no MahaRERA orders on record; 47% of its units are booked.
Dombivli, Thane 421201 · by Sai Balaji Enterprises
Buying a flat here?
See every deed registered on it.
Completion was pushed back 4 months, to Mar 2027
- This projectRegistered 22 Dec 2021, completion promised 30 Nov 2026, revised to 30 Mar 2027.
No extension certificate on record.
1 registration · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales first, then rentals and mortgages matched to this project · the free view shows a price band
2 buildings
Open a building to see every flat, floor by floor.
- Balaji Govind-A wing17 floors · 127 units43% booked
- Balaji Govind -B wing16 floors · 98 units53% booked
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrationP51700032267
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P51700032267 | 22 Dec 2021 | 30 Nov 2026 | 30 Mar 2027 | Sai Balaji Enterprises | Project page |
Documents162
1 document held by Deedo, 161 filings listed on MahaRERA's project page
Finance
- PAN CardSBE Pan Card.pdf · uploaded 1 Dec 2021Source
Legal
Migrated
- 1 PAN CardSBE Pan Card.pdf · uploaded 1 Dec 2021Source
- 1 Copy of the legal title reportTitle - Balaji Govind.pdf · uploaded 1 Dec 2021Source
- 1 Details of encumbrancesSBE -Decleration of Non-Encumbarance (Balaji Govind).pdf · uploaded 1 Dec 2021Source
- 1 Copy of Layout Approval (in case of layout)Plane_1.pdf · uploaded 1 Dec 2021Source
Show all 162 documentsShow fewer documents
Migrated
- 2 Copy of Layout Approval (in case of layout)Plane_2.pdf · uploaded 1 Dec 2021Source
- 1 Building Plan Approval / NA Order for plotted developmentPlane_2.pdf · uploaded 1 Dec 2021Source
- 2 Building Plan Approval / NA Order for plotted developmentPlane_1.pdf · uploaded 1 Dec 2021Source
- 1 Declaration in FORM BBALAJI GOVIND -FORM B SANJAY R SINGH.pdf · uploaded 1 Dec 2021Source
- 1 Proforma of Allotment letterAgreement for Sale-BALAJI GOVIND-FINAL.pdf · uploaded 1 Dec 2021Source
- 2 Proforma of Allotment letterLETTER OF ALLOTMENT- BALAJI GOVIND.pdf · uploaded 1 Dec 2021Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)BAHAJI GOVIND Architect Certificate.pdf · uploaded 3 Dec 2021Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Balaji Govind Form Engineers Certificate.pdf · uploaded 3 Dec 2021Source
- 1 Commencement Certificates / NA Order for plotted developmentBALAJI GOVIND- CC.pdf · uploaded 4 Dec 2021Source
- 1 Declaration about Commencement CertificateSBE -Decleration of Commencement (Balaji Govind).pdf · uploaded 4 Dec 2021Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Balaji Govind.pdf · uploaded 7 Dec 2021Source
- 1 CERSAI detailsCERSAI REPORT.pdf · uploaded 17 Dec 2021Source
- 3 Copy of Layout Approval (in case of layout)Plan 1.pdf · uploaded 15 Sep 2022Source
- 4 Copy of Layout Approval (in case of layout)Plan 2.pdf · uploaded 15 Sep 2022Source
- 5 Copy of Layout Approval (in case of layout)PLan 3.pdf · uploaded 15 Sep 2022Source
- 2 Commencement Certificates / NA Order for plotted developmentCC.pdf · uploaded 15 Sep 2022Source
- 2 Declaration about Commencement CertificateDeclaration About commencement Certificate.pdf · uploaded 15 Sep 2022Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 6 Oct 2022Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 6 Oct 2022Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Balaji Govind - Form - 3 - 1.pdf · uploaded 6 Oct 2022Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Balaji Govind - Form - 3 - 2.pdf · uploaded 6 Oct 2022Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)BALAJI GOVIND FORM 1 Jun 22.pdf · uploaded 12 Dec 2022Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)BALAJI GOVIND FORM -1 Sep 22.pdf · uploaded 12 Dec 2022Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Balaji Govind - Form 2Mar 22.pdf · uploaded 12 Dec 2022Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Balaji Govind - Form 2 - Jun 22.pdf · uploaded 12 Dec 2022Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)Balaji Govind - Form 2 Sep 22.pdf · uploaded 12 Dec 2022Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM - 3 BALAJI GOVIND - 31-03-2022-1_compressed.pdf · uploaded 12 Dec 2022Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM - 3 BALAJI GOVIND - 31-03-2022 -2.pdf · uploaded 12 Dec 2022Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM - 3 BALAJI GOVIND - 30-06-22-1-6_compressed.pdf · uploaded 12 Dec 2022Source
- 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM - 3 BALAJI GOVIND - 30-06-22-7-13_compressed.pdf · uploaded 12 Dec 2022Source
- 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form -3 - 30-09-22-1-6_compressed.pdf · uploaded 12 Dec 2022Source
- 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form -3 - 30-09-22-7-12_compressed.pdf · uploaded 12 Dec 2022Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Balaji Govind -Form - 5 - 21-22_compressed.pdf · uploaded 28 Feb 2023Source
- 2 Details of encumbrancesDeclaration Of Financial.pdf · uploaded 11 Jul 2023Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFormat - A -Declaration About Separate Bank.pdf · uploaded 11 Jul 2023Source
- 3 Details of encumbrancesSBE DCB MORTGAGE INDEX 2.pdf · uploaded 28 Jul 2023Source
- 4 Details of encumbrancesEncumbrance Finance with Index II.pdf · uploaded 28 Jul 2023Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Balaji Govind - Form - 1 - 01012023_compressed.pdf · uploaded 22 Sep 2023Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)Foorm 2.pdf · uploaded 22 Sep 2023Source
- 10 CA Certificate on Project Cost & Fund withdrawal (Form 3)Balaji Govind Form 3- 31122022-1-6_compressed.pdf · uploaded 22 Sep 2023Source
- 11 CA Certificate on Project Cost & Fund withdrawal (Form 3)Balaji Govind Form 3- 31122022-7-12_compressed.pdf · uploaded 22 Sep 2023Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)Balaji Govind - Form - 1 - Dt - 01042023_compressed.pdf · uploaded 23 Sep 2023Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)Balaji Govind - Form 2 - 01042023_compressed.pdf · uploaded 23 Sep 2023Source
- 12 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Govind March 2023-1-6_compressed.pdf · uploaded 23 Sep 2023Source
- 13 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Govind March 2023-7-12_compressed.pdf · uploaded 23 Sep 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)SBE GOVIND FORM 2A MAR 22.pdf · uploaded 3 Oct 2023Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)SBE GOVIND FORM 2A MAR 23.pdf · uploaded 3 Oct 2023Source
- 14 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Balaji Govind June 2023 signed Copy_compressed-1-6.pdf · uploaded 9 Oct 2023Source
- 15 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Balaji Govind June 2023 signed Copy_compressed-7-12.pdf · uploaded 9 Oct 2023Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)Balaji Govind - Form - 1 - Dt - 01072023_compressed.pdf · uploaded 13 Oct 2023Source
- 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)Balaji Govind - Form 2- 01072023_compressed.pdf · uploaded 13 Oct 2023Source
- 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)Balaji Govind - Form 1 - 01102023_compressed.pdf · uploaded 10 Nov 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Form 5 Balaji govind 22 23.pdf · uploaded 10 Nov 2023Source
- 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 balaji Govind sept 2023.pdf · uploaded 22 Dec 2023Source
- 16 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Balaji Govind.pdf · uploaded 22 Dec 2023Source
- 1 Disclosure of sold/ booked inventorySBE-GOVIND INSOLD UNSOLD INVENTORY TILL 30092023_compressed.pdf · uploaded 27 Dec 2023Source
- 2 Disclosure of sold/ booked inventoryDiclosure of Sold_Booked Inventory Dec 2023 - Balaji G.pdf · uploaded 22 Jan 2024Source
- 17 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 SBE Govind_compressed.pdf · uploaded 22 Jan 2024Source
- 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Balaji Govind Dec 23.pdf · uploaded 30 Jan 2024Source
- 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)Balaji Govind - Form 1 - Dt - 01012024.pdf · uploaded 1 Feb 2024Source
- 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form - 1 - Balaji Govind - Dt 01-04-2024.pdf · uploaded 22 May 2024Source
- 11 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Balaji Govind March 2024.pdf · uploaded 6 Jun 2024Source
- 3 Disclosure of sold/ booked inventoryDiclosure of Sold_Booked Inventory March 2024 - Balaji Govind_compressed.pdf · uploaded 6 Jun 2024Source
- 18 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Balaji Govind March 2024.pdf · uploaded 6 Jun 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)SBE GOVIND FORM 2A MAR 24.pdf · uploaded 18 Jun 2024Source
- 11 Architect’s Certificate of Percentage of Completion of Work (Form 1)Balaji Govind - Form 1 - Dt 01-07-2024.pdf · uploaded 30 Jul 2024Source
- 12 Engineer’s Certificate on Cost Incurred on Project (Form 2)Balaji Govind - Form 2 - Dt 26-07-2024.pdf · uploaded 30 Jul 2024Source
- 4 Disclosure of sold/ booked inventoryInventory Balaji Govind Jun 24_compressed.pdf · uploaded 30 Jul 2024Source
- 19 CA Certificate on Project Cost & Fund withdrawal (Form 3)Balaji Govind - Form 3 - Dt 30-06-2024_compressed.pdf · uploaded 30 Jul 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 29 Oct 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3_compressed.pdf · uploaded 29 Oct 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 29 Oct 2024Source
- 2 Disclosure of sold/ booked inventoryInventory disclosure Balaji Govind sept 2024.pdf · uploaded 29 Oct 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form 5 Govind 23 24.pdf · uploaded 8 Jan 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Balaji Govind - Form 1 - Dt 01-01-2025 .pdf · uploaded 24 Jan 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Govind Dec 2024_compressed.pdf · uploaded 29 Jan 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form - 2 - Balaji Govind - Dt 25 - 01 -2025 .pdf · uploaded 29 Jan 2025Source
- 1 Disclosure of sold/ booked inventoryInventory Govind Dec 2024_compressed.pdf · uploaded 29 Jan 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1- Balaji Govind - Dt 01-04-2025.pdf · uploaded 30 Apr 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Signed Form 3 Balaji Govind March 2025_compressed.pdf · uploaded 30 Apr 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form -2 - Balaji Govind -Dt - 17-04-2025.pdf · uploaded 30 Apr 2025Source
- 1 Disclosure of sold/ booked inventoryInventory_compressed.pdf · uploaded 30 Apr 2025Source
- Form 5 (FY 2024-2025)Balaji Govind - Form 5 - Dt 30-09-2025.pdf · uploaded 22 Dec 2025Source
- Form 1Balaji Govind - Form 1 - Dt 01-07-2025.pdf · uploaded 24 Dec 2025Source
- Form 2Form 2 Govind June 25.pdf · uploaded 24 Dec 2025Source
- Form 3Form 3 Balaji Govind June 2025_compressed.pdf · uploaded 24 Dec 2025Source
- Disclosure of Sold and Booked InventoryInventory Disclosure of Govind June 2025_compressed.pdf · uploaded 24 Dec 2025Source
- Form 1Balaji Govind - Form 1 - Dt 01-07-2024.pdf · uploaded 24 Dec 2025Source
- Form 2Balaji Govind - Form 2 - Dt 26-07-2024.pdf · uploaded 24 Dec 2025Source
- Form 3Balaji Govind - Form 3 - Dt 30-06-2024_compressed.pdf · uploaded 24 Dec 2025Source
- Disclosure of Sold and Booked InventoryInventory Balaji Govind Jun 24_compressed.pdf · uploaded 24 Dec 2025Source
- Form 1Form 1.pdf · uploaded 24 Dec 2025Source
- Form 2Form 2.pdf · uploaded 24 Dec 2025Source
- Form 3Form 3_compressed.pdf · uploaded 24 Dec 2025Source
- Disclosure of Sold and Booked InventoryInventory disclosure Balaji Govind sept 2024.pdf · uploaded 24 Dec 2025Source
- Form 1Balaji Govind - Form 1 - Dt 01-01-2025 .pdf · uploaded 24 Dec 2025Source
- Form 2Form - 2 - Balaji Govind - Dt 25 - 01 -2025 .pdf · uploaded 24 Dec 2025Source
- Form 3Form 3 Govind Dec 2024_compressed.pdf · uploaded 24 Dec 2025Source
- Disclosure of Sold and Booked InventoryInventory Govind Dec 2024_compressed.pdf · uploaded 24 Dec 2025Source
- Form 1Form 1- Balaji Govind - Dt 01-04-2025.pdf · uploaded 24 Dec 2025Source
- Form 2Form -2 - Balaji Govind -Dt - 17-04-2025.pdf · uploaded 24 Dec 2025Source
- Form 3Signed Form 3 Balaji Govind March 2025_compressed.pdf · uploaded 24 Dec 2025Source
- Disclosure of Sold and Booked InventoryInventory_compressed.pdf · uploaded 24 Dec 2025Source
- Form 1Balaji Govind - Form 1 - 01102023.pdf · uploaded 24 Dec 2025Source
- Form 2Form 2 balaji Govind sept 2023.pdf · uploaded 24 Dec 2025Source
- Form 3Form 3 Balaji Govind.pdf · uploaded 24 Dec 2025Source
- Disclosure of Sold and Booked InventorySBE-GOVIND INSOLD UNSOLD INVENTORY TILL 30092023_compressed.pdf · uploaded 24 Dec 2025Source
- Form 1Balaji Govind - Form 1 - Dt - 01012024.pdf · uploaded 24 Dec 2025Source
- Form 2Form 2 Balaji Govind Dec 23.pdf · uploaded 24 Dec 2025Source
- Form 3Form 3 SBE Govind_compressed.pdf · uploaded 24 Dec 2025Source
- Disclosure of Sold and Booked InventoryDiclosure of Sold_Booked Inventory Dec 2023 - Balaji G.pdf · uploaded 24 Dec 2025Source
- Form 1Form - 1 - Balaji Govind - Dt 01-04-2024.pdf · uploaded 24 Dec 2025Source
- Form 2Form 2 Balaji Govind March 2024.pdf · uploaded 24 Dec 2025Source
- Form 3Form 3 Balaji Govind March 2024.pdf · uploaded 24 Dec 2025Source
- Disclosure of Sold and Booked InventoryDiclosure of Sold_Booked Inventory March 2024 - Balaji Govind_compressed.pdf · uploaded 24 Dec 2025Source
- Form 1Balaji Govind Form 1 - Dt 01102025.pdf · uploaded 24 Dec 2025Source
- Form 2From 2 Balaji Govind Sept 25.pdf · uploaded 24 Dec 2025Source
- Form 3SBE-GOVIND FORM 3 SEP 25_compressed.pdf · uploaded 24 Dec 2025Source
- Disclosure of Sold and Booked InventoryBalaji Govind - Sold and Unsold Inventory Dt 30092025.pdf · uploaded 24 Dec 2025Source
- Form 2A (FY 2021-2022)SBE GOVIND FORM 2A MAR 22.pdf · uploaded 25 Dec 2025Source
- Form 2A (FY 2022-2023)SBE GOVIND FORM 2A MAR 23.pdf · uploaded 25 Dec 2025Source
- Form 2A (FY 2023-2024)SBE GOVIND FORM 2A MAR 24.pdf · uploaded 26 Dec 2025Source
- Form 2A (FY 2024-2025)Form 2A Balaji Govind March 25.pdf · uploaded 26 Dec 2025Source
- Form 5 (FY 2021-2022)Balaji Govind -Form - 5 - 21-22.pdf · uploaded 26 Dec 2025Source
- Form 5 (FY 2023-2024)Form 5 Govind 23 24.pdf · uploaded 26 Dec 2025Source
- Withdrawal Update Form 1Balaji Govind -Form 1 - Dt 01-01-2026.pdf · uploaded 4 Feb 2026Source
- Withdrawal Update Form 2Form 2- Balaji Govind - Dt 28-01-2026.pdf · uploaded 4 Feb 2026Source
- Withdrawal Update Form 3Form 3 Balaji Govind Dec 25_compressed.pdf · uploaded 4 Feb 2026Source
- Withdrawal Update Form 1Balaji Govind - Form 1 - Dt 01-04-2026.pdf · uploaded 6 Oct 2026Source
- Withdrawal Update Form 1Balaji Govind - Form 1 - Dt 01-04-2026.pdf · uploaded 6 Oct 2026Source
- Withdrawal Update Form 2Balaji Govind - Form 2 - Dt 22-04-2026.pdf · uploaded 6 Oct 2026Source
- Withdrawal Update Form 2Balaji Govind - Form 2 - Dt 22-04-2026.pdf · uploaded 6 Oct 2026Source
- Withdrawal Update Form 3Form 3- Balaji Govind_ March 26.pdf · uploaded 6 Oct 2026Source
- Withdrawal Update Form 3Form 3- Balaji Govind_ March 26.pdf · uploaded 6 Oct 2026Source
- Form 2A (FY 2025-2026)Form -2A - Balaji Govind.pdf · uploaded 6 Oct 2026Source
- Withdrawal Update Form 1Balaji Govind - Form 1 - Dt 01-04-2026.pdf · uploaded 8 Oct 2026Source
- Withdrawal Update Form 2Balaji Govind - Form 2 - Dt 22-04-2026.pdf · uploaded 8 Oct 2026Source
- Withdrawal Update Form 3Form 3- Balaji Govind_ March 26.pdf · uploaded 8 Oct 2026Source
- Form 5 (FY 2025-2026)Form 5 Balaji Govind FY 25 26.pdf · uploaded 8 Oct 2026Source
Technical
- DocumentPlane_1.pdf · uploaded 1 Dec 2021Source
- DocumentPlane_2.pdf · uploaded 1 Dec 2021Source
- DocumentPlane_2.pdf · uploaded 1 Dec 2021Source
- DocumentPlane_1.pdf · uploaded 1 Dec 2021Source
- DocumentPlan 1.pdf · uploaded 15 Sep 2022Source
- DocumentPlan 2.pdf · uploaded 15 Sep 2022Source
- DocumentPLan 3.pdf · uploaded 15 Sep 2022Source
Technical (Architect)
Technical (Engineer)
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvalsLand parcel 30/3A, 30/3B
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Certificate Signed
- Unit types
- 1BHK, 2BHK, Shop225 units in all
- Address
- Survey No 30/2A PART, 30/3A, 30/3B, 30/4, 30/5, 30/6, Kanchangaon, KanchangaonPIN 421201
- Village
- Dombivli, Kalyan taluka
- Land area for this project
- 3,080 sq m (33,153 sq ft)
- Permissible built-up area
- 12,271 sq m (1,32,081 sq ft)
- Sanctioned built-up area
- 8,956 sq m (96,405 sq ft)
- Recreational open space
- 0 sq m (0 sq ft)
- Designated bank account
- 51
- Developed in phases
- Yes
Survey, CTS, gat or plot numbers
Land as published on MahaRERA's project page
Survey No 30/2A PART,30/3A,30/3B,30/4,30/5,30/6
Boundaries
- North
- Survey No 30 by 1 part
- South
- Survey No 30 by 1 part
- East
- Survey No 30 by 1 part
- West
- Survey No 30 by 7
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking225 units
106 of 225 units booked (47%), as the promoter reported to MahaRERA
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| Balaji Govind-A wing | 1BHK | 34.6 sq m · 372 sq ft | 14 | 13 |
| Balaji Govind-A wing | 1BHK | 34.64 sq m · 373 sq ft | 1 | 0 |
| Balaji Govind-A wing | 1BHK | 35.06 sq m · 377 sq ft | 1 | 0 |
| Balaji Govind-A wing | 1BHK | 35.1 sq m · 378 sq ft | 14 | 11 |
| Balaji Govind-A wing | 2BHK | 46.55 sq m · 501 sq ft | 4 | 1 |
| Balaji Govind-A wing | 2BHK | 46.6 sq m · 502 sq ft | 70 | 13 |
| Balaji Govind-A wing | 2BHK | 46.7 sq m · 503 sq ft | 14 | 10 |
| Balaji Govind-A wing | 2BHK | 60.58 sq m · 652 sq ft | 1 | 1 |
Show all 16 unit rowsShow fewer unit rows
| Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|
| Balaji Govind-A wing | 2BHK | 83.1 sq m · 894 sq ft | 1 | 1 |
| Balaji Govind-A wing | Shop | 16.08 sq m · 173 sq ft | 2 | 1 |
| Balaji Govind-A wing | Shop | 18.64 sq m · 201 sq ft | 1 | 1 |
| Balaji Govind-A wing | Shop | 18.67 sq m · 201 sq ft | 2 | 1 |
| Balaji Govind-A wing | Shop | 18.83 sq m · 203 sq ft | 1 | 0 |
| Balaji Govind-A wing | Shop | 21.03 sq m · 226 sq ft | 1 | 1 |
| Balaji Govind -B wing | 1BHK | 35.06 sq m · 377 sq ft | 84 | 48 |
| Balaji Govind -B wing | 2BHK | 46.55 sq m · 501 sq ft | 14 | 4 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Professionals4
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Sthapatya Nirmaan | — |
| Chartered accountant | Kapure & Kapure | — |
| Engineer | Rijo Kinaruvila | — |
| Engineer | SHANTI cONSULTANTS | — |
Source: MahaRERA project page. Contact details are not shown.
Other projects in Dombivli
- Mali ShivalayaRERA PM1330002602683
- Shiv SadanRERA PR1330002602567
- Bhargav Co-Op Housing Society LimitedRERA PM1330002602519
- The MeadowsRERA PR1330002601825
- Om Ganesh PujaRERA PR1330002601796
- Payal Business ParkRERA PC1330002600694
- VedvikaRERA PR1330002600676
- YashrajRERA PM1330002600521
All 445 projects in Dombivli · Compare Balaji Govind with another project