Skip to content
Others · 1 building · 380 unitsRERA P51700027251

Amber One

Deedo IDDP-THN-K6GB

Completion was pushed back 4 months, to Oct 2028; no MahaRERA orders on record; 30% of its units are booked.

Dombivli, Thane 421201 · by Amber Buildcon

DeliveryExtended 4 moPromised Jun 2028 · now due Oct 2028RegulatoryNo ordersNot in any MahaRERA list or order Deedo has readSales30% booked113 of 380 units · as the promoter reported to MahaRERA

Buying a flat here?

See every deed registered on it.

Completion was pushed back 4 months, to Oct 2028

  • This projectRegistered 26 Nov 2020, completion promised 30 Jun 2028, revised to 30 Oct 2028.

No extension certificate on record.

1 registration · Source: MahaRERA registration and extension certificates

Latest registered deeds

Sales first, then rentals and mortgages matched to this project · the free view shows a price band

No registered deeds matched to this project yet
Sales, resales, rentals and mortgages appear here once registered documents are matched to it by evidence.

The building

Open a building to see every flat, floor by floor.

Floors and units from the registration certificate annexures and MahaRERA's project page.

Regulatory recordNone found

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

RERA registrationP51700027251
RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5170002725126 Nov 202030 Jun 202830 Oct 2028Amber BuildconProject page
Documents165

1 document held by Deedo, 164 filings listed on MahaRERA's project page

Registration certificate

Finance

  • PAN CardPAN Amber Buildcon.pdf · uploaded 21 Nov 2020Source
  • Other – FinanceDevelopment Right Morge Deed Index2file.pdf · uploaded 29 May 2023Source

Legal

  • Legal Title reportTITLE CERTIFICATE.pdf · uploaded 21 Nov 2020Source
  • Declaration Form BFORM B -AMBER BUILDCON-.pdf · uploaded 21 Nov 2020Source
  • OtherRESOLUTION CONSENT FOR CORRECTION US 14(2).pdf · uploaded 4 May 2022Source

Migrated

  • 1 PAN CardPAN Amber Buildcon.pdf · uploaded 21 Nov 2020Source
  • 1 Copy of the legal title reportTITLE CERTIFICATE.pdf · uploaded 21 Nov 2020Source
Show all 165 documentsShow fewer documents

Migrated

  • 1 Details of encumbrancesEncumbrances Letter.pdf · uploaded 21 Nov 2020Source
  • 1 Copy of Layout Approval (in case of layout)LAYOUT PLAN-min.pdf · uploaded 21 Nov 2020Source
  • 1 Building Plan Approval / NA Order for plotted developmentBASEMENT GROUND AND FIRST.pdf · uploaded 21 Nov 2020Source
  • 2 Building Plan Approval / NA Order for plotted development2ND AND 3RD.pdf · uploaded 21 Nov 2020Source
  • 3 Building Plan Approval / NA Order for plotted development4TH TO 28TH.pdf · uploaded 21 Nov 2020Source
  • 1 Commencement Certificates / NA Order for plotted developmentCommencement Certificate.pdf · uploaded 21 Nov 2020Source
  • 1 Declaration in FORM BFORM B -AMBER BUILDCON-.pdf · uploaded 21 Nov 2020Source
  • 1 Proforma of Allotment letterDEAFT AGREEMENT And ALLOTMENT LETTER.pdf · uploaded 21 Nov 2020Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)RCC CERTIFICATE.pdf · uploaded 23 Nov 2020Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)form 3 Chartered Accountants.pdf · uploaded 24 Nov 2020Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)ENGINEER CERTIFICAT FORM 2 MARCH-21.pdf · uploaded 19 May 2021Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)CARTERED ACCOUNTANT CERTIFICAT-FORM 3 MARCH-21.pdf · uploaded 19 May 2021Source
  • 1 Disclosure of sold/ booked inventorySOLD INVENTORY.pdf · uploaded 20 May 2021Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate Form-1.pdf · uploaded 28 May 2021Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)QUALITY CERTIFICATE 2020-2021.pdf · uploaded 3 Jun 2021Source
  • 1 Declaration about Commencement CertificatePROMOTER - DECLARATION ABOUT COMMENCEMNT CERTIFICATE.pdf · uploaded 16 Sep 2021Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCHITECT CERTIFICATE FORM 1 June-21.pdf · uploaded 16 Sep 2021Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)ENGINEER CERTIFICATE FORM 2 June-21.pdf · uploaded 16 Sep 2021Source
  • 2 Disclosure of sold/ booked inventorySOLD AND UNSOLD INVENTORY June-21.pdf · uploaded 16 Sep 2021Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)C A CERTIFICATE FORM 3 June-21.pdf · uploaded 16 Sep 2021Source
  • 2 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)QUALITY CERTIFICATE JUNE 2021.pdf · uploaded 18 Sep 2021Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA CERTIFICATE Fome-3 Sept-21.pdf · uploaded 7 Oct 2021Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCHITECT CERTIFICATE-FORM 1 Sept-21.pdf · uploaded 8 Oct 2021Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)ENGINEER CERTIFICATE-FORM 2 Sep-21.pdf · uploaded 8 Oct 2021Source
  • 3 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)QUALITY CERTIFICATE Sept-21.pdf · uploaded 8 Oct 2021Source
  • 3 Disclosure of sold/ booked inventoryPROMOTER SOLD UNSOLD AMBER ONE Sept-21.pdf · uploaded 8 Oct 2021Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)Form 5 Rera CA Certificat 2020-21.pdf · uploaded 16 Oct 2021Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form-1 ARCHITECT CERTIFICATE For Dec-21.pdf · uploaded 20 Jan 2022Source
  • 4 Disclosure of sold/ booked inventoryPROMOTER SOLD UNSOLD AMBER ONE Dec-21.pdf · uploaded 20 Jan 2022Source
  • 1 CERSAI detailsCERSAI_Search_Report Dec-21.pdf · uploaded 20 Jan 2022Source
  • 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form-3 Chartered Certificat for Dec-21.pdf · uploaded 20 Jan 2022Source
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)Fome -2 Engineer Certificate Dec-21.pdf · uploaded 27 Jan 2022Source
  • 4 Building Plan Approval / NA Order for plotted developmentRewise PLAN 25-02-2022.PDF · uploaded 23 Apr 2022Source
  • 2 Commencement Certificates / NA Order for plotted developmentRewise Commence Certificat 25-02-2022.pdf · uploaded 23 Apr 2022Source
  • 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)ENGINEER rewise form-2 Certificate.pdf · uploaded 23 Apr 2022Source
  • 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA rewise form-3 CERTIFICATE.pdf · uploaded 23 Apr 2022Source
  • 2 Proforma of Allotment letterRera Flat Sale-Amber One-DRAFT.pdf · uploaded 23 Apr 2022Source
  • 2 Declaration about Commencement CertificatePROMOTER - DECLARATION ABOUT COMMENCEMNT CERTIFICATE.pdf · uploaded 4 May 2022Source
  • 1 OtherRESOLUTION CONSENT FOR CORRECTION US 14(2).pdf · uploaded 4 May 2022Source
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCHITECT CERTIFICATE FORM 1.pdf · uploaded 5 May 2022Source
  • 5 Disclosure of sold/ booked inventorySOLD UNSOLD INVENTORY - PROMOTER.pdf · uploaded 5 May 2022Source
  • 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate Form 1.pdf · uploaded 23 Jul 2022Source
  • 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate Form 2.pdf · uploaded 23 Jul 2022Source
  • 6 Disclosure of sold/ booked inventoryPromoter sold unsold inventory.pdf · uploaded 23 Jul 2022Source
  • 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate Form 3.pdf · uploaded 23 Jul 2022Source
  • 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate Form 1.pdf · uploaded 4 Oct 2022Source
  • 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate Form 2.pdf · uploaded 4 Oct 2022Source
  • 7 Disclosure of sold/ booked inventoryPromoter sold unsold inventory.pdf · uploaded 4 Oct 2022Source
  • 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate Form 3.pdf · uploaded 18 Oct 2022Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Form-5 Amber Buidcon 2021-22.pdf · uploaded 18 Oct 2022Source
  • 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)A-ONE Engineer Certificate Form 2.pdf · uploaded 18 Jan 2023Source
  • 8 Disclosure of sold/ booked inventoryPromoter sold unsold inventory-31-12-22.pdf · uploaded 18 Jan 2023Source
  • 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameA ONE - DECLARATION ABOUT SEPARATE BANK ACCOUNT.pdf · uploaded 18 Jan 2023Source
  • 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate Form 1.pdf · uploaded 24 Jan 2023Source
  • 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate Form 3.pdf · uploaded 24 Jan 2023Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Engineer Quality Assurance Certificate Fome 2A F A 2021-22.pdf · uploaded 31 Jan 2023Source
  • 1 Proforma of Agreement for salePerfoma Of Agreement for Sale-Amber One.pdf · uploaded 31 Jan 2023Source
  • 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer cost Incurred Cetificat Form-2 31-03-23.pdf · uploaded 14 Apr 2023Source
  • 9 Disclosure of sold/ booked inventoryPromoter sold unsold inventory-31-03-2023.pdf · uploaded 14 Apr 2023Source
  • 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect work Complition Certificate Form -1.pdf · uploaded 21 Apr 2023Source
  • 10 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate Form 3.pdf · uploaded 21 Apr 2023Source
  • 1 Other – FinanceDevelopment Right Morge Deed Index2file.pdf · uploaded 29 May 2023Source
  • 2 Details of encumbrancesDetails of Encumbrance concerned to finance.pdf · uploaded 2 Jun 2023Source
  • 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)ONE ARCHITECT CERTIFICATE FORM 1.pdf · uploaded 8 Jul 2023Source
  • 11 Engineer’s Certificate on Cost Incurred on Project (Form 2)ONE ENGINEER CERTIFICATE FORM 2.pdf · uploaded 8 Jul 2023Source
  • 10 Disclosure of sold/ booked inventoryPROMOTER SOLD UNSOLD INVENTORY.pdf · uploaded 8 Jul 2023Source
  • 11 CA Certificate on Project Cost & Fund withdrawal (Form 3)ONE CA CERTIFICATE FORM 3.pdf · uploaded 8 Jul 2023Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Engineer QUALITY CERTIFICATE 2022-23.pdf · uploaded 11 Jul 2023Source
  • 11 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCHITECT CERTIFICATE FORM 1 30-09-2023.pdf · uploaded 17 Oct 2023Source
  • 12 Engineer’s Certificate on Cost Incurred on Project (Form 2)ENGINEER CERTIFICATE FORM 2 30-09-2023.pdf · uploaded 17 Oct 2023Source
  • 11 Disclosure of sold/ booked inventoryPROMOTER SOLD UNSOLD INVENTORY.pdf · uploaded 17 Oct 2023Source
  • 12 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA CERTIFICATE FORM 3 Sept-23.pdf · uploaded 17 Oct 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)CA REPORT FORM 5 2022-23.pdf · uploaded 17 Oct 2023Source
  • 12 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCHITECT CERTIFICATE FORM 1 DEC 23.pdf · uploaded 16 Jan 2024Source
  • 13 Engineer’s Certificate on Cost Incurred on Project (Form 2)ENGINEER CERTIFICATE FORM 2 DEC 23.pdf · uploaded 16 Jan 2024Source
  • 12 Disclosure of sold/ booked inventoryPROMOTER SOLD UNSOLD INVENTORY DEC 23.pdf · uploaded 16 Jan 2024Source
  • 13 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA CERTIFICATE FORM-3 DEC 23.pdf · uploaded 16 Jan 2024Source
  • 13 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCHITECT CERTIFICATE FORM 1 MARCH 24.pdf · uploaded 13 Apr 2024Source
  • 14 Engineer’s Certificate on Cost Incurred on Project (Form 2)ENGINEER CERTIFICATE FORM 2 MARCH 24.pdf · uploaded 13 Apr 2024Source
  • 13 Disclosure of sold/ booked inventoryPROMOTER SOLD UNSOLD MARCH 24 - MARCH 24.pdf · uploaded 13 Apr 2024Source
  • 14 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA CERTIFICATE FORM-3 MARCH 24.pdf · uploaded 16 Apr 2024Source
  • 14 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCHITECT CERTIFICATE FORM 1 JUNE 24.pdf · uploaded 15 Jul 2024Source
  • 4 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)ENGINEER CERTIFICATE FORM 2 JUNE 24.pdf · uploaded 15 Jul 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)FORM 2A - QUALITY CERTIFICAATE.pdf · uploaded 15 Jul 2024Source
  • 14 Disclosure of sold/ booked inventoryPROMOTER SOLD UNSOLD JUNE 24.pdf · uploaded 15 Jul 2024Source
  • 15 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA CERTIFICATE FORM-3 JUNE 24.pdf · uploaded 15 Jul 2024Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCHITECT CERTIFICATE FORM 1 SEPT 24.pdf · uploaded 26 Oct 2024Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA CERTIFICATE FORM-3 SEPT 24.pdf · uploaded 26 Oct 2024Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)ENGINEER CERTIFICATE FORM 2 SEPT 24.pdf · uploaded 26 Oct 2024Source
  • 2 Disclosure of sold/ booked inventoryBUILDCON PROMOTER SOLD UNSOLD.pdf · uploaded 26 Oct 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)CA FORM 5 SEPT 24.pdf · uploaded 26 Oct 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCHITECT CERTIFICATE FORM 1 DEC 24.pdf · uploaded 23 Jan 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA CERTIFICATE FORM 3 DEC 2024.pdf · uploaded 23 Jan 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)ENGINEER CERTIFICATE FORM 2 DEC 24.pdf · uploaded 23 Jan 2025Source
  • 1 Disclosure of sold/ booked inventoryPROMOTER SOLD UNSOLD - ONE.pdf · uploaded 23 Jan 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCHITECT CERTIFICATE FORM 1 MARCH 2025.pdf · uploaded 14 Apr 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA CERTIFICATE FORM 3 MARCH 2025.pdf · uploaded 14 Apr 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)ENGINEER CERTIFICATE Form 2 MARCH 2025.pdf · uploaded 14 Apr 2025Source
  • 1 Disclosure of sold/ booked inventoryPROMOTER SOLD UNSOLD - ELITE.pdf · uploaded 14 Apr 2025Source
  • Form 1ARCHITECT CERTIFICATE FORM 1 MARCH 25.pdf · uploaded 21 Jul 2025Source
  • Form 2ENGINEER CERTIFICATE FORM 2 MARCH 25.pdf · uploaded 21 Jul 2025Source
  • Form 3CA CERTIFICATE FORM 3 MARCH 25.pdf · uploaded 21 Jul 2025Source
  • Disclosure of Sold and Booked InventoryPROMOTER SOLD UNSOLD - ONE.pdf · uploaded 21 Jul 2025Source
  • Withdrawal Update Form 1ARCHITECT CERTIFICATE FORM 1 SEPTEMBER 2025.pdf · uploaded 1 Nov 2025Source
  • Withdrawal Update Form 1ARCHITECT CERTIFICATE FORM 1 SEPTEMBER 2025.pdf · uploaded 1 Nov 2025Source
  • Withdrawal Update Form 2ENGINEER CERTIFICATE FORM 2 MARCH 24.pdf · uploaded 1 Nov 2025Source
  • Withdrawal Update Form 2ENGINEER CERTIFICATE FORM 2 MARCH 24.pdf · uploaded 1 Nov 2025Source
  • Withdrawal Update Form 3CA CERTIFICATE FORM 3 SEPTEMBER 2025.pdf · uploaded 1 Nov 2025Source
  • Withdrawal Update Form 3CA CERTIFICATE FORM 3 SEPTEMBER 2025.pdf · uploaded 1 Nov 2025Source
  • Form 2A (FY 2020-2021)QUALITY CERTIFICATE 2020-2021.pdf · uploaded 1 Nov 2025Source
  • Form 2A (FY 2021-2022)QUALITY CERTIFICATE JUNE 2021.pdf · uploaded 1 Nov 2025Source
  • Form 2A (FY 2022-2023)Quality Certificate.pdf · uploaded 1 Nov 2025Source
  • Form 2A (FY 2023-2024)FORM 2A - QUALITY CERTIFICAATE.pdf · uploaded 1 Nov 2025Source
  • Form 2A (FY 2024-2025)FORM 2A - QUALITY CERTIFICATE MARCH 25.pdf · uploaded 1 Nov 2025Source
  • Form 5 (FY 2022-2023)CA REPORT FORM 5 2022-23.pdf · uploaded 1 Nov 2025Source
  • Form 5 (FY 2023-2024)CA FORM 5 SEPT 24.pdf · uploaded 1 Nov 2025Source
  • Form 5 (FY 2024-2025)FORM 5 - A ONE.pdf · uploaded 1 Nov 2025Source
  • Form 1ARCHITECT CERTIFICATE FORM 1 SEPTEMBER 2025.pdf · uploaded 7 Nov 2025Source
  • Form 2ENGINEER CERTIFICATE FORM 2 SEPTEMBER 2025.pdf · uploaded 7 Nov 2025Source
  • Form 3CA CERTIFICATE FORM 3 SEPTEMBER 2025.pdf · uploaded 7 Nov 2025Source
  • Disclosure of Sold and Booked InventoryONE - PROMOTER SOLD UNSOLD.pdf · uploaded 7 Nov 2025Source
  • Form 1ARCHITECT CERTIFICATE FORM 1.pdf · uploaded 17 Jan 2026Source
  • Form 2ENGINEER CERTIFICATE FORM 2_compressed.pdf · uploaded 17 Jan 2026Source
  • Form 3CA CERTIFICATE FORM 3.pdf · uploaded 17 Jan 2026Source
  • Disclosure of Sold and Booked InventoryPROMOTER Dicloser Sold UNsold FLAT.pdf · uploaded 17 Jan 2026Source
  • Form 1ARCHITECT CERTIFICATE FORM 1.pdf · uploaded 18 Apr 2026Source
  • Form 2ENGINEER CERTIFICATE FORM 2.pdf · uploaded 18 Apr 2026Source
  • Form 3CA CERTIFICATE FORM 3.pdf · uploaded 18 Apr 2026Source
  • Disclosure of Sold and Booked InventoryPROMOTER CERTIFICAT SOLD UNSOLD.pdf · uploaded 18 Apr 2026Source
  • Withdrawal Update Form 1ARCHITECT CERTIFICATE FORM 1.pdf · uploaded 24 Apr 2026Source
  • Withdrawal Update Form 2ENGINEER CERTIFICATE FORM 2.pdf · uploaded 24 Apr 2026Source
  • Withdrawal Update Form 3CA CERTIFICATE FORM 3.pdf · uploaded 24 Apr 2026Source
  • Withdrawal Update Form 1ARCHITECT CERTIFICATE FORM 1 June-26.pdf · uploaded 13 Jul 2026Source
  • Withdrawal Update Form 2ENGINEER CERTIFICATE FORM 2 June-26.pdf · uploaded 13 Jul 2026Source
  • Withdrawal Update Form 3CA CERTIFICATE FORM 3.pdf · uploaded 13 Jul 2026Source
  • Withdrawal Update Form 1ARCHITECT CERTIFICATE FORM 1 SEPT 2026.pdf · uploaded 12 Oct 2026Source
  • Withdrawal Update Form 1ARCHITECT CERTIFICATE FORM 1 SEPT 2026.pdf · uploaded 12 Oct 2026Source
  • Withdrawal Update Form 1ARCHITECT CERTIFICATE FORM 1 SEPT 2026.pdf · uploaded 12 Oct 2026Source
  • Withdrawal Update Form 2ENGINEER CERTIFICATE FORM 2 SEPT 2026.pdf · uploaded 12 Oct 2026Source
  • Withdrawal Update Form 2ENGINEER CERTIFICATE FORM 2 SEPT 2026.pdf · uploaded 12 Oct 2026Source
  • Withdrawal Update Form 2ENGINEER CERTIFICATE FORM 2 SEPT 2026.pdf · uploaded 12 Oct 2026Source
  • Withdrawal Update Form 3CA CERTIFICATE FORM 3.pdf · uploaded 12 Oct 2026Source
  • Withdrawal Update Form 3CA CERTIFICATE FORM 3.pdf · uploaded 12 Oct 2026Source
  • Withdrawal Update Form 3CA CERTIFICATE FORM 3.pdf · uploaded 12 Oct 2026Source

Technical

  • DocumentLAYOUT PLAN-min.pdf · uploaded 21 Nov 2020Source
  • DocumentBASEMENT GROUND AND FIRST.pdf · uploaded 21 Nov 2020Source
  • Document2ND AND 3RD.pdf · uploaded 21 Nov 2020Source
  • Document4TH TO 28TH.pdf · uploaded 21 Nov 2020Source
  • DocumentRewise PLAN 25-02-2022.PDF · uploaded 23 Apr 2022Source

Technical (Architect)

  • DocumentARCHITECT CERTIFICATE FORM 1 SEPT 24.pdf · uploaded 26 Oct 2024Source
  • DocumentARCHITECT CERTIFICATE FORM 1 DEC 24.pdf · uploaded 23 Jan 2025Source
  • DocumentARCHITECT CERTIFICATE FORM 1 MARCH 2025.pdf · uploaded 14 Apr 2025Source
  • DocumentARCHITECT CERTIFICATE FORM 1 SEPT 2026.pdf · uploaded 12 Oct 2026Source

Technical (Engineer)

  • DocumentENGINEER CERTIFICATE FORM 2 SEPT 24.pdf · uploaded 26 Oct 2024Source
  • DocumentENGINEER CERTIFICATE FORM 2 DEC 24.pdf · uploaded 23 Jan 2025Source
  • DocumentENGINEER CERTIFICATE Form 2 MARCH 2025.pdf · uploaded 14 Apr 2025Source
  • DocumentENGINEER CERTIFICATE FORM 2 SEPT 2026.pdf · uploaded 12 Oct 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Land & approvalsLand parcel Old S No 74 New S No 102 Hissa no 1C 2A 2B 2C

As registered with MahaRERA and published on its project page

Project type
Others
Status on MahaRERA
Certificate Signed
Unit types
1BHK, 2BHK, Office space, Shop380 units in all
Address
Old S No 74 New S No 102 Hissa no 1C 2A 2B 2C, Thakurli Kalyan Road, kanchangoanPIN 421201
Village
Kalyan-Dombivali (M Corp.), Kalyan taluka
Land area for this project
3,629 sq m (39,057 sq ft)
Permissible built-up area
22,900 sq m (2,46,488 sq ft)
Sanctioned built-up area
22,900 sq m (2,46,488 sq ft)
Recreational open space
237 sq m (2,555 sq ft)
Designated bank account
76
Developed in phases
No

Survey, CTS, gat or plot numbers

Old S No 74 New S No 102 Hissa no 1C 2A 2B 2C

Land as published on MahaRERA's project page

Old S No 74 New S No 102 Hissa no 1C 2A 2B 2C

Boundaries

North
24 Meter Road
South
K D M C Reseve Garden plot
East
18 Meter Road
West
Mahalaxmi Ashish Building

Source: registration certificates and MahaRERA's project page, as stated there.

Units & parking380 units

113 of 380 units booked (30%), as the promoter reported to MahaRERA

1BHK · 138 units2BHK · 163 unitsOffice space · 56 unitsShop · 23 units
TypeCarpet areaUnitsBooked
1BHK39.4 sq m · 424 sq ft10
1BHK39.78 sq m · 428 sq ft357
1BHK40.11 sq m · 432 sq ft345
1BHK40.43 sq m · 435 sq ft3411
1BHK40.65 sq m · 438 sq ft11
1BHK40.66 sq m · 438 sq ft335
2BHK54.4 sq m · 586 sq ft20
2BHK54.85 sq m · 590 sq ft345
Show all 33 unit rowsShow fewer unit rows
TypeCarpet areaUnitsBooked
2BHK54.87 sq m · 591 sq ft343
2BHK56.14 sq m · 604 sq ft3413
2BHK56.65 sq m · 610 sq ft257
2BHK57.52 sq m · 619 sq ft1710
2BHK58.96 sq m · 635 sq ft175
Office space14.3 sq m · 154 sq ft21
Office space14.64 sq m · 158 sq ft31
Office space15.78 sq m · 170 sq ft11
Office space16.86 sq m · 181 sq ft20
Office space20.83 sq m · 224 sq ft21
Office space21.33 sq m · 230 sq ft3222
Office space22.26 sq m · 240 sq ft42
Office space28.44 sq m · 306 sq ft20
Office space29.37 sq m · 316 sq ft20
Office space30.96 sq m · 333 sq ft22
Office space32.15 sq m · 346 sq ft20
Office space33.26 sq m · 358 sq ft20
Shop18.89 sq m · 203 sq ft10
Shop19.34 sq m · 208 sq ft10
Shop27.7 sq m · 298 sq ft10
Shop28.45 sq m · 306 sq ft1610
Shop34.19 sq m · 368 sq ft10
Shop34.26 sq m · 369 sq ft10
Shop39.23 sq m · 422 sq ft11
Shop39.46 sq m · 425 sq ft10

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Professionals6

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectShirish G Nachane—
Chartered accountantDinesh Kanji Patel—
Chartered accountantNilesh S Patil—
Chartered accountantUrvi Devansh Rangani—
EngineerDinanath Balmkund Jha—
EngineerTechline Consulting Engineer—

Source: MahaRERA project page. Contact details are not shown.

Other projects in Dombivli

All 445 projects in Dombivli · Compare Amber One with another project

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Report a problemMethodology