Others · 4 buildings · 186 unitsRERA P51700005934

Irasa Greens

Deedo IDDP-THN-KQXM

Completion was pushed back 4 months, to Apr 2028; no MahaRERA orders on record; 13% of its units are booked.

Dohole, Thane 421302 · by Suburban Spaces LLP

DeliveryExtended 4 moPromised Dec 2027 · now due Apr 2028RegulatoryNo ordersNot in any MahaRERA list or order Deedo has readSales13% booked25 of 186 units · as the promoter reported to MahaRERA

Buying a flat here?

See every deed registered on it.

Completion was pushed back 4 months, to Apr 2028

  • This projectRegistered 14 Aug 2017, completion promised 31 Dec 2027, revised to 30 Apr 2028.

No extension certificate on record.

1 registration · Source: MahaRERA registration and extension certificates

Latest registered deeds

Sales, rentals and mortgages matched to this project · the free view shows a price band

No registered deeds matched to this project yet
Sales, resales, rentals and mortgages appear here once registered documents are matched to it by evidence.

4 buildings

Open a building to see every flat, floor by floor.

Floors and units from the registration certificate annexures and MahaRERA's project page.

Regulatory recordNone found

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

RERA registrationP51700005934
RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5170000593414 Aug 201731 Dec 202730 Apr 2028Suburban Spaces LLPProject page
Documents161

1 document held by Deedo, 160 filings listed on MahaRERA's project page

Registration certificate

Finance

  • PAN CardSSLLP PAN.pdf · uploaded 29 Jul 2017Source

Legal

  • Legal Title reportSupplemental Memo.pdf · uploaded 29 Jul 2017Source
  • Declaration Form BSCAN PARVEZ ALAM.pdf · uploaded 29 Jul 2017Source
  • OtherEngg Certificate Irasa greens Pg1-4.pdf · uploaded 17 Oct 2017Source
  • Declaration Form BSCAN PARVEZ ALAM.pdf · uploaded 31 Mar 2018Source
  • Declaration Form BForm B.pdf · uploaded 13 Feb 2024Source

Migrated

  • 1 PAN CardSSLLP PAN.pdf · uploaded 29 Jul 2017Source
Show all 161 documentsShow fewer documents

Migrated

  • 1 Copy of the legal title reportSupplemental Memo.pdf · uploaded 29 Jul 2017Source
  • 1 Details of encumbrancesSupplemental Memo.pdf · uploaded 29 Jul 2017Source
  • 1 Copy of Layout Approval (in case of layout)GREENS LAYOUT.pdf · uploaded 29 Jul 2017Source
  • 1 Building Plan Approval (IOD)Dohole Building 3.pdf · uploaded 29 Jul 2017Source
  • 2 Building Plan Approval (IOD)Dohole Buildin 1.pdf · uploaded 29 Jul 2017Source
  • 3 Building Plan Approval (IOD)Dohole Buildin 2.pdf · uploaded 29 Jul 2017Source
  • 4 Building Plan Approval (IOD)Dohole Building 4.pdf · uploaded 29 Jul 2017Source
  • 1 Declaration in FORM BSCAN PARVEZ ALAM.pdf · uploaded 29 Jul 2017Source
  • 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)GREENS ARCH CERT1.pdf · uploaded 29 Jul 2017Source
  • 2 Certificates of Architect (Form 1)(Mandatory for only ongoing project)GREENS ARCH CERT2.pdf · uploaded 29 Jul 2017Source
  • 3 Certificates of Architect (Form 1)(Mandatory for only ongoing project)GREENS ARCH CERT3.pdf · uploaded 29 Jul 2017Source
  • 4 Certificates of Architect (Form 1)(Mandatory for only ongoing project)GREENS ARCH CERT4.pdf · uploaded 29 Jul 2017Source
  • 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)GREENS ENGG CERT1.pdf · uploaded 29 Jul 2017Source
  • 2 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)GREENS ENGG CERT2.pdf · uploaded 29 Jul 2017Source
  • 1 Certificates of CA (Form 3)GREENS CA CERT3.pdf · uploaded 29 Jul 2017Source
  • 2 Certificates of CA (Form 3)GREENS CA CERT1.pdf · uploaded 29 Jul 2017Source
  • 1 Proforma of Allotment letterAgreement for Sale and Allotment Letter - Dohole.pdf · uploaded 29 Jul 2017Source
  • 5 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Irasa Greens Architect Certificate pg1-10.pdf · uploaded 17 Oct 2017Source
  • 2 Proforma of Allotment letterAllotment Letter to Tamanna.pdf · uploaded 17 Oct 2017Source
  • 1 OtherEngg Certificate Irasa greens Pg1-4.pdf · uploaded 17 Oct 2017Source
  • 3 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Irasa Greens Architect Certificate pg1-10.pdf · uploaded 16 Dec 2017Source
  • 4 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineers_certificate_IRASA_GREENS_Rera_2cmp.pdf · uploaded 16 Dec 2017Source
  • 1 Certificates of CA (Form 5)CA_certificate_IRASA_GREENS_Rera_2cmp.pdf · uploaded 16 Dec 2017Source
  • 1 Commencement Certificates / NA Order for plotted developmentgreen1.pdf · uploaded 23 Mar 2018Source
  • 2 Commencement Certificates / NA Order for plotted developmentgreen2.pdf · uploaded 23 Mar 2018Source
  • 3 Commencement Certificates / NA Order for plotted developmentgreen3.pdf · uploaded 23 Mar 2018Source
  • 4 Commencement Certificates / NA Order for plotted developmentgreen4.pdf · uploaded 23 Mar 2018Source
  • 5 Commencement Certificates / NA Order for plotted developmentgreen5.pdf · uploaded 23 Mar 2018Source
  • 6 Commencement Certificates / NA Order for plotted developmentgreen6.pdf · uploaded 23 Mar 2018Source
  • 7 Commencement Certificates / NA Order for plotted developmentgreen7.pdf · uploaded 23 Mar 2018Source
  • 5 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)New Doc 2018-03-24.pdf · uploaded 24 Mar 2018Source
  • 6 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Arch-Rera3.pdf · uploaded 26 Mar 2018Source
  • 2 Certificates of CA (Form 5)CACERTIFICATE.pdf · uploaded 29 Mar 2018Source
  • 2 Details of encumbrancesSCAN PARVEZ ALAM.pdf · uploaded 31 Mar 2018Source
  • 3 Details of encumbrancesdownload (1).pdf · uploaded 31 Mar 2018Source
  • 2 Declaration in FORM BSCAN PARVEZ ALAM.pdf · uploaded 31 Mar 2018Source
  • 1 Status of Formation of Legal Entity (Society/Co Op etc.)Dohole Devlopment Agreement.pdf · uploaded 31 Mar 2018Source
  • 1 Status of ConveyanceDohole Devlopment Agreement.pdf · uploaded 31 Mar 2018Source
  • 7 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect Certificate IRASA GREENS2-28_06_2018.pdf · uploaded 28 Jun 2018Source
  • 6 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)For.pdf · uploaded 28 Jun 2018Source
  • 3 Certificates of CA (Form 3)CA.pdf · uploaded 29 Jun 2018Source
  • 8 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect Cirtificate.pdf · uploaded 29 Sep 2018Source
  • 7 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineer Certificate.pdf · uploaded 29 Sep 2018Source
  • 4 Certificates of CA (Form 3)CA.pdf · uploaded 29 Sep 2018Source
  • 9 Certificates of Architect (Form 1)(Mandatory for only ongoing project)architect certificate.pdf · uploaded 29 Dec 2018Source
  • 8 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)engineer certificate.pdf · uploaded 29 Dec 2018Source
  • 5 Certificates of CA (Form 3)ca certificate.pdf · uploaded 29 Dec 2018Source
  • 10 Certificates of Architect (Form 1)(Mandatory for only ongoing project)architect certificate.pdf · uploaded 30 Mar 2019Source
  • 9 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)engineer certificate.pdf · uploaded 30 Mar 2019Source
  • 6 Certificates of CA (Form 3)ca certificate.pdf · uploaded 30 Mar 2019Source
  • 11 Certificates of Architect (Form 1)(Mandatory for only ongoing project)architect certificate.pdf · uploaded 29 Jun 2019Source
  • 10 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)engineer certificate.pdf · uploaded 29 Jun 2019Source
  • 7 Certificates of CA (Form 3)ca certificate.pdf · uploaded 29 Jun 2019Source
  • 12 Certificates of Architect (Form 1)(Mandatory for only ongoing project)architect certificate.pdf · uploaded 30 Sep 2019Source
  • 11 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)engineer certificate Irasa green-min.pdf · uploaded 30 Sep 2019Source
  • 8 Certificates of CA (Form 3)CA CERTIFICATE IRASA GREEN.pdf · uploaded 30 Sep 2019Source
  • 13 Certificates of Architect (Form 1)(Mandatory for only ongoing project)architect certificate.pdf · uploaded 31 Dec 2019Source
  • 12 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)engineer certificate.pdf · uploaded 31 Dec 2019Source
  • 9 Certificates of CA (Form 3)ca certificate.pdf · uploaded 31 Dec 2019Source
  • 14 Certificates of Architect (Form 1)(Mandatory for only ongoing project)architect certificate-min.pdf · uploaded 31 Mar 2021Source
  • 13 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)engineer certificate-min.pdf · uploaded 31 Mar 2021Source
  • 3 Certificates of CA (Form 5)Phase-3.pdf · uploaded 31 Mar 2021Source
  • 15 Certificates of Architect (Form 1)(Mandatory for only ongoing project)ARCHITECT CERTIFICATE FOR IRASA GREEN.pdf · uploaded 30 Jun 2021Source
  • 16 Certificates of Architect (Form 1)(Mandatory for only ongoing project)ARCHITECT CERTIFICATE FOR IRASA PARK PHASE 2.pdf · uploaded 30 Jun 2021Source
  • 14 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)ENGINEER CERTIFICATE FOR IRASA GREEN_compressed.pdf · uploaded 30 Jun 2021Source
  • 15 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)ENGINEER CERTIFICATE FOR IRASA PARK PHASE 2-compressed.pdf · uploaded 30 Jun 2021Source
  • 10 Certificates of CA (Form 3)C ACERTIFICATE FOR IRASA GREEN.pdf · uploaded 5 Jul 2021Source
  • 17 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Architect Certificate IRASA GREENS.pdf · uploaded 30 Sep 2021Source
  • 16 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineer certificate for irasa green .pdf · uploaded 30 Sep 2021Source
  • 11 Certificates of CA (Form 3)c a certificate irasa green.pdf · uploaded 30 Sep 2021Source
  • 17 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)irasa green (3).pdf · uploaded 31 Dec 2021Source
  • 18 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)irasa green engineer certificate 28 March 2022_compressed.pdf · uploaded 22 May 2022Source
  • 4 Certificates of CA (Form 5)irasa green.pdf · uploaded 22 May 2022Source
  • 18 Certificates of Architect (Form 1)(Mandatory for only ongoing project)architect certificate irasa greens.pdf · uploaded 31 Dec 2022Source
  • 19 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)IRASA GREENS ENGINEER CERTIFICATE_compressed.pdf · uploaded 31 Dec 2022Source
  • 12 Certificates of CA (Form 3)Chartered Accountants_ Suburban Spaces LLP irasa greens.pdf · uploaded 31 Dec 2022Source
  • 19 Certificates of Architect (Form 1)(Mandatory for only ongoing project)ARCHITECH CERTIFICATE DOHLE 03-04-2023_compressed.pdf · uploaded 13 Apr 2023Source
  • 20 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineer Certificate irasa green 24-03-2023_compressed.pdf · uploaded 13 Apr 2023Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)QUALITY ENGINEER CERTIFICATE FORM 2A.pdf · uploaded 13 Apr 2023Source
  • 13 Certificates of CA (Form 3)Form-3-IRASA Greens 15-03-2023_compressed.pdf · uploaded 13 Apr 2023Source
  • 4 a Details of encumbrances concerned to FinanceNo Encumbrances Certificate.pdf · uploaded 13 Feb 2024Source
  • 1 b Details of encumbrances concerned to LegalNo Encumbrances Certificate.pdf · uploaded 13 Feb 2024Source
  • 1 Declaration about Commencement CertificateDeclaration about CC.pdf · uploaded 13 Feb 2024Source
  • 3 Declaration in FORM BForm B.pdf · uploaded 13 Feb 2024Source
  • 21 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 Jun 2023.pdf · uploaded 13 Feb 2024Source
  • 22 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 Sept 2023.pdf · uploaded 13 Feb 2024Source
  • 23 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 Jan 2024.pdf · uploaded 13 Feb 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form 2A Jun 2023.pdf · uploaded 13 Feb 2024Source
  • 1 CERSAI detailsDecalaration about CERSAI.pdf · uploaded 13 Feb 2024Source
  • 1 Disclosure of sold/ booked inventoryDisclosure of Sold, Unsold Jan 2024.pdf · uploaded 13 Feb 2024Source
  • 5 Certificates of CA (Form 5)Form 5 FY 2021-22.pdf · uploaded 13 Feb 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Form 5 FY 2021-22.pdf · uploaded 13 Feb 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Form 5 FY 2022-23.pdf · uploaded 13 Feb 2024Source
  • 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameSeperate bank Acc Details.pdf · uploaded 13 Feb 2024Source
  • 20 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 Jan.pdf · uploaded 14 Feb 2024Source
  • 21 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 June.pdf · uploaded 14 Feb 2024Source
  • 22 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 Sept.pdf · uploaded 14 Feb 2024Source
  • 14 Certificates of CA (Form 3)Form 3_Dec_compressed.pdf · uploaded 14 Feb 2024Source
  • 15 Certificates of CA (Form 3)Form 3_June_compressed.pdf · uploaded 14 Feb 2024Source
  • 16 Certificates of CA (Form 3)Form 3_Sept_compressed.pdf · uploaded 14 Feb 2024Source
  • 1 Disclosure of Interest in Other Real Estate OrganizationsDisclosure of Interest Arbar Ahmed.pdf · uploaded 20 Feb 2024Source
  • 2 Disclosure of Interest in Other Real Estate OrganizationsDisclosure of Interest murlidharan.pdf · uploaded 20 Feb 2024Source
  • 3 Disclosure of Interest in Other Real Estate OrganizationsDisclosure of Interest Shafique Ahmed.pdf · uploaded 20 Feb 2024Source
  • 4 Disclosure of Interest in Other Real Estate OrganizationsDisclosure of Interest Parvez Alam.pdf · uploaded 20 Feb 2024Source
  • 17 Certificates of CA (Form 3)form 3_Dec Latest Compressed.pdf · uploaded 1 Mar 2024Source
  • 2 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 Irasa Green March 24.pdf · uploaded 20 Dec 2024Source
  • 3 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 Irasa Green June 24.pdf · uploaded 20 Dec 2024Source
  • 4 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 Irasa Green September 24.pdf · uploaded 20 Dec 2024Source
  • 3 Certificates of CA (Form 3)Irasa Green- Form 3 June 24.pdf · uploaded 20 Dec 2024Source
  • 4 Certificates of CA (Form 3)Irasa Green- Form 3 Sept 24.pdf · uploaded 20 Dec 2024Source
  • 2 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 Irasa Green March 24.pdf · uploaded 20 Dec 2024Source
  • 3 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 Irasa Green June 24.pdf · uploaded 20 Dec 2024Source
  • 4 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 Irasa Green Septmeber 24.pdf · uploaded 20 Dec 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 2A Irasa Green 2024.pdf · uploaded 20 Dec 2024Source
  • 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1 - Dec 24.pdf · uploaded 7 Feb 2025Source
  • 1 Certificates of CA (Form 3)Form 3 - Sep 24_compressed.pdf · uploaded 7 Feb 2025Source
  • 2 Certificates of CA (Form 3)Form 3 - Dec 24_compressed.pdf · uploaded 7 Feb 2025Source
  • 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2 - Dec 24.pdf · uploaded 7 Feb 2025Source
  • 1 Disclosure of sold/ booked inventorySold Booked - Sep 24.pdf · uploaded 7 Feb 2025Source
  • 2 Disclosure of sold/ booked inventorySold Booked - Dec 24.pdf · uploaded 7 Feb 2025Source
  • 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)Form 1.pdf · uploaded 26 Apr 2025Source
  • 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Form 2.pdf · uploaded 26 Apr 2025Source
  • Form 1form 1 irasa green june 2025.pdf · uploaded 10 Feb 2026Source
  • Form 1IRASA GREENS FORM 1 ARCHITECT CERTIFICATE SEPTEMBER 2025.pdf · uploaded 10 Feb 2026Source
  • Form 2form 2 june 25 final_11zon.pdf · uploaded 10 Feb 2026Source
  • Form 2IRASA GREENS FORM 2 ENGENEER CERTIFICATE SEPTEMBER 2025.pdf · uploaded 10 Feb 2026Source
  • Form 3IRASA GREENS FORM 3 CA CERTIFICATE JUNE 2025 (1)_11zon.pdf · uploaded 10 Feb 2026Source
  • Form 3IRASA GREENS FORM 3 CA CERTIFICATE SEPTEMBER 2025_11zon (1).pdf · uploaded 10 Feb 2026Source
  • Disclosure of Sold and Booked InventorySold Unsold Irasa Greens.pdf · uploaded 10 Feb 2026Source
  • Disclosure of Sold and Booked InventoryIRASA GREENS SOLD UNSOLD SEPTEMBER 2025.pdf · uploaded 10 Feb 2026Source
  • Withdrawal Update Form 1FORM 1 ARCHITECT CERTIFICATE IRASA GREENS DECEMBER 2025.pdf · uploaded 24 Apr 2026Source
  • Withdrawal Update Form 2Form 2 Q-3.pdf · uploaded 24 Apr 2026Source
  • Withdrawal Update Form 3Form 3 Q - 3.pdf · uploaded 24 Apr 2026Source
  • Withdrawal Update Form 1IRASA GREENS FORM 1 MARCH 2026.pdf · uploaded 28 May 2026Source
  • Withdrawal Update Form 2IRASA GREENS FORM 2 MARCH 2026.pdf · uploaded 28 May 2026Source
  • Withdrawal Update Form 3IRASA GREENS FORM 3 MARCH 2026.pdf · uploaded 28 May 2026Source

Technical

  • DocumentGREENS LAYOUT.pdf · uploaded 29 Jul 2017Source
  • DocumentDohole Building 3.pdf · uploaded 29 Jul 2017Source
  • DocumentDohole Buildin 1.pdf · uploaded 29 Jul 2017Source
  • DocumentDohole Buildin 2.pdf · uploaded 29 Jul 2017Source
  • DocumentDohole Building 4.pdf · uploaded 29 Jul 2017Source

Technical (Architect)

  • DocumentForm 1 Irasa Green March 24.pdf · uploaded 20 Dec 2024Source
  • DocumentForm 1 Irasa Green June 24.pdf · uploaded 20 Dec 2024Source
  • DocumentForm 1 Irasa Green September 24.pdf · uploaded 20 Dec 2024Source
  • DocumentForm 1 - Dec 24.pdf · uploaded 7 Feb 2025Source
  • DocumentForm 1.pdf · uploaded 26 Apr 2025Source
  • DocumentIRASA GREENS FORM 1 MARCH 2026.pdf · uploaded 30 Jun 2026Source

Technical (Engineer)

  • DocumentForm 2 Irasa Green March 24.pdf · uploaded 20 Dec 2024Source
  • DocumentForm 2 Irasa Green June 24.pdf · uploaded 20 Dec 2024Source
  • DocumentForm 2 Irasa Green Septmeber 24.pdf · uploaded 20 Dec 2024Source
  • DocumentForm 2 - Dec 24.pdf · uploaded 7 Feb 2025Source
  • DocumentForm 2.pdf · uploaded 26 Apr 2025Source
  • DocumentIRASA GREENS FORM 2 MARCH 2026.pdf · uploaded 28 May 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Land & approvalsLand parcel Survey No 124 Hissa No 3A Survey No 124 Hissa No 3B Survey No 125 Hissa No 1P

As registered with MahaRERA and published on its project page

Project type
Others
Status on MahaRERA
Certificate Signed
Unit types
—187 units in all
Address
Survey No 124 Hissa No 3A Survey No 124 Hissa No 3B Survey No 125 Hissa No 1P, Bhokari Road, Village DoholePIN 421302
Village
Dohole, Bhiwandi taluka
Land area for this project
9,300 sq m (1,00,104 sq ft)
Permissible built-up area
6,979 sq m (75,123 sq ft)
Sanctioned built-up area
6,979 sq m (75,123 sq ft)
Recreational open space
1,069 sq m (11,506 sq ft)
Designated bank account
82
Developed in phases
Yes

Survey, CTS, gat or plot numbers

Survey No 124 Hissa No 3A Survey No 124 Hissa No 3B Survey No 125 Hissa No 1P

Land as published on MahaRERA's project page

Survey No 124 Hissa No 3A Survey No 124 Hissa No 3B Survey No 125 Hissa No 1P

Boundaries

North
Survey No 158 and Road to Bhokari village
South
Survey No 56
East
Survey No 166 and Canal
West
Survey No 124 Hissa No 2

Source: registration certificates and MahaRERA's project page, as stated there.

Units & parking187 units

187 units registered

— · 187 units
BuildingTypeCarpet areaUnits
1——40
2——40
3——60
4——47

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Report a problemMethodology