Residential / Group Housing · 1 building · 103 unitsRERA P51700048960

Arfa Garden

Deedo IDDP-THN-WA3Z

Completion was pushed back 4 months, to Apr 2027; no MahaRERA orders on record; 77% of its units are booked.

Bhiwandi (M Corp.), Thane 421302 · by Quba Homes Llp

DeliveryExtended 4 moPromised Dec 2026 · now due Apr 2027RegulatoryNo ordersNot in any MahaRERA list or order Deedo has readSales77% booked79 of 103 units · as the promoter reported to MahaRERA

Buying a flat here?

See every deed registered on it.

Completion was pushed back 4 months, to Apr 2027

  • This projectRegistered 24 Jan 2023, completion promised 31 Dec 2026, revised to 30 Apr 2027.

No extension certificate on record.

1 registration · Source: MahaRERA registration and extension certificates

Latest registered deeds

Sales first, then rentals and mortgages matched to this project · the free view shows a price band

No registered deeds matched to this project yet
Sales, resales, rentals and mortgages appear here once registered documents are matched to it by evidence.

The building

Open a building to see every flat, floor by floor.

Floors and units from the registration certificate annexures and MahaRERA's project page.

Regulatory recordNone found

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

RERA registrationP51700048960
RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5170004896024 Jan 202331 Dec 202630 Apr 2027Quba Homes LLPProject page
Documents135

1 document held by Deedo, 134 filings listed on MahaRERA's project page

Registration certificate

Finance

  • PAN CardE-PAN_Quba Homes.pdf · uploaded 19 Dec 2022Source

Legal

  • Legal Title reportFormat - A_Arfa Garden.pdf · uploaded 27 Dec 2022Source
  • Declaration Form BForm B Affidavit Cum Declaration.pdf · uploaded 27 Dec 2022Source
  • Legal Title reportTitle Certificate_Homes.pdf · uploaded 30 Dec 2022Source

Migrated

  • 1 PAN CardE-PAN_Quba Homes.pdf · uploaded 19 Dec 2022Source
  • 1 Commencement Certificates / NA Order for plotted developmentHomes CC.pdf · uploaded 19 Dec 2022Source
  • 1 Copy of the legal title reportFormat - A_Arfa Garden.pdf · uploaded 27 Dec 2022Source
Show all 135 documentsShow fewer documents

Migrated

  • 1 a Details of encumbrances concerned to FinanceNo Encumbrance Certificate - Financial.pdf · uploaded 27 Dec 2022Source
  • 2 a Details of encumbrances concerned to FinanceNo Encumbrance Certificate - Legal.pdf · uploaded 27 Dec 2022Source
  • 1 b Details of encumbrances concerned to LegalNo Encumbrance Certificate - Financial.pdf · uploaded 27 Dec 2022Source
  • 2 b Details of encumbrances concerned to LegalNo Encumbrance Certificate - Legal.pdf · uploaded 27 Dec 2022Source
  • 1 Copy of Layout Approval (in case of layout)Homes 1C-6C-1_Site Plan.pdf · uploaded 27 Dec 2022Source
  • 2 Copy of Layout Approval (in case of layout)Homes 1C-6C-2_Stilt.pdf · uploaded 27 Dec 2022Source
  • 3 Copy of Layout Approval (in case of layout)Homes 1C-6C-3.pdf · uploaded 27 Dec 2022Source
  • 1 Building Plan Approval / NA Order for plotted developmentHomes 1C-6C-4.pdf · uploaded 27 Dec 2022Source
  • 2 Building Plan Approval / NA Order for plotted developmentHomes 1C-6C-5.pdf · uploaded 27 Dec 2022Source
  • 1 Declaration in FORM BForm B Affidavit Cum Declaration.pdf · uploaded 27 Dec 2022Source
  • 1 Proforma of Agreement for saleModel AFS - Arfa_Black.pdf · uploaded 27 Dec 2022Source
  • 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFormat A.pdf · uploaded 27 Dec 2022Source
  • 1 Deviation Report with respect to Allotment letterDeviation Report Allotment.pdf · uploaded 27 Dec 2022Source
  • 1 CERSAI detailsCERSAI_Declaration.pdf · uploaded 28 Dec 2022Source
  • 2 Copy of the legal title reportTitle Certificate_Homes.pdf · uploaded 30 Dec 2022Source
  • 1 Declaration about Commencement CertificateFormat D Quba Homes.pdf · uploaded 30 Dec 2022Source
  • 1 Disclosure of Interest in Other Real Estate OrganizationsAnnexure-A_Quba Homes.pdf · uploaded 30 Dec 2022Source
  • 1 Deviation Report with respect to model copy of Agreement2_merged_compressed.pdf · uploaded 2 Jan 2023Source
  • 1 Proforma of Allotment letterLetter of Allotment - Arfa Garden_New.pdf · uploaded 5 Jan 2023Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form-3 with proposed declaration.pdf · uploaded 13 Jan 2023Source
  • 3 Building Plan Approval / NA Order for plotted development1C-7C (Frontside) Homes_compressed_11zon.pdf · uploaded 5 May 2023Source
  • 2 Commencement Certificates / NA Order for plotted developmentHomes CC (Front Side)_compressed.pdf · uploaded 5 May 2023Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)form 1 - Architect certificate - (25-11-2023) - Q4 2022-23 signed_compressed.pdf · uploaded 15 Jan 2024Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form-1 Q1 Homes.pdf · uploaded 15 Jan 2024Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form-1 Q2 Homes.pdf · uploaded 15 Jan 2024Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form-1 Q2 Homes.pdf · uploaded 15 Jan 2024Source
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form-1 Q3 Homes.pdf · uploaded 15 Jan 2024Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 As on 31-3-23 (Q4 22-23).pdf · uploaded 15 Jan 2024Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 As on 30-6-23 (Q1 23-24).pdf · uploaded 15 Jan 2024Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 As on 30-9-23 (Q2 23-24).pdf · uploaded 15 Jan 2024Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form_2_As_on_31-12-23_(Q3_23-24).pdf · uploaded 15 Jan 2024Source
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form-3 As on 31-12-23 (Q3 23-24)_Signed.pdf · uploaded 15 Jan 2024Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form-3 As on 31-3-23 (Q4 22-23)_Signed.pdf · uploaded 15 Jan 2024Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form-3 As on 30-6-23 (Q1 23-24)_Signed.pdf · uploaded 15 Jan 2024Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form-3 As on 30-9-23 (Q2 23-24)_Signed.pdf · uploaded 15 Jan 2024Source
  • 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form-3 As on 31-12-23 (Q3 23-24)_Signed.pdf · uploaded 5 Feb 2024Source
  • 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form_2_As_on_31-12-23_(Q3_23-24).pdf · uploaded 13 Mar 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)FORM 5 22-23 Signed.pdf · uploaded 16 Mar 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form-1 Homes 31-03-2024.pdf · uploaded 13 May 2025Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form-1 Quba Homes.pdf · uploaded 13 May 2025Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form-1 Homes 30-09-2024.pdf · uploaded 13 May 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form-3 Homes 31-03-2024.pdf · uploaded 13 May 2025Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form-3 Quba Homes.pdf · uploaded 13 May 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form-2 Homes 31-03-2024.pdf · uploaded 13 May 2025Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form-2 Quba Homes.pdf · uploaded 13 May 2025Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form-2 Homes 30-09-2024.pdf · uploaded 13 May 2025Source
  • Form 1Form-1 Homes 31-03-2024.pdf · uploaded 23 Jul 2025Source
  • Form 2Form-2 Homes 31-03-2024.pdf · uploaded 23 Jul 2025Source
  • Form 3Form-3 Homes 31-03-2024.pdf · uploaded 23 Jul 2025Source
  • Disclosure of Sold and Booked InventoryDISCOLURE OF SOLD AND UNSOLD.pdf · uploaded 23 Jul 2025Source
  • Form 1Form-1 Quba Homes.pdf · uploaded 23 Jul 2025Source
  • Form 2Form-2 Quba Homes.pdf · uploaded 23 Jul 2025Source
  • Form 3Form-3 Quba Homes.pdf · uploaded 23 Jul 2025Source
  • Disclosure of Sold and Booked InventoryDISCOLURE OF SOLD AND UNSOLD.pdf · uploaded 23 Jul 2025Source
  • Form 1Form-1 Homes 30-09-2024.pdf · uploaded 23 Jul 2025Source
  • Form 2Form-2 Homes 30-09-2024.pdf · uploaded 23 Jul 2025Source
  • Form 3Form-3 Homes 30-09-2024.pdf · uploaded 23 Jul 2025Source
  • Disclosure of Sold and Booked InventoryDISCOLURE OF SOLD AND UNSOLD.pdf · uploaded 23 Jul 2025Source
  • Form 1Form-1 Homes 31-12-24.pdf · uploaded 23 Jul 2025Source
  • Form 2Form-2 Homes 31-12-2024.pdf · uploaded 23 Jul 2025Source
  • Form 3Form-3 Quba Homes 31-12-2024.pdf · uploaded 23 Jul 2025Source
  • Disclosure of Sold and Booked InventoryDISCOLURE OF SOLD AND UNSOLD.pdf · uploaded 23 Jul 2025Source
  • Form 1Form-1 Homes 31-03-25.pdf · uploaded 23 Jul 2025Source
  • Form 2Form-2 Homes 31-03-25.pdf · uploaded 23 Jul 2025Source
  • Form 3FORM 3 QUBA HOMES 31-03-2025.pdf · uploaded 23 Jul 2025Source
  • Disclosure of Sold and Booked InventoryDISCOLURE OF SOLD AND UNSOLD.pdf · uploaded 23 Jul 2025Source
  • Withdrawal Update Form 1Form-1 Q3 Homes.pdf · uploaded 31 Jul 2025Source
  • Withdrawal Update Form 1Withdrawal Application Form1.pdf · uploaded 31 Jul 2025Source
  • Withdrawal Update Form 2Form_2_As_on_31-12-23_(Q3_23-24).pdf · uploaded 31 Jul 2025Source
  • Withdrawal Update Form 2Withdrawal Application Form2.pdf · uploaded 31 Jul 2025Source
  • Withdrawal Update Form 3Withdrawal Application Form3.pdf · uploaded 31 Jul 2025Source
  • Withdrawal Update Form 3Withdrawal Application Form3.pdf · uploaded 31 Jul 2025Source
  • Withdrawal Update Form 1Withdrawal Application Form1.pdf · uploaded 1 Aug 2025Source
  • Withdrawal Update Form 1Withdrawal Application Form1.pdf · uploaded 1 Aug 2025Source
  • Withdrawal Update Form 2Withdrawal Application Form2.pdf · uploaded 1 Aug 2025Source
  • Withdrawal Update Form 2Withdrawal Application Form2.pdf · uploaded 1 Aug 2025Source
  • Withdrawal Update Form 3Withdrawal Application Form3.pdf · uploaded 1 Aug 2025Source
  • Withdrawal Update Form 3Withdrawal Application Form3.pdf · uploaded 1 Aug 2025Source
  • Form 1Form-1 Q1 Homes.pdf · uploaded 22 Sep 2025Source
  • Form 2Form 2 As on 31-3-23 (Q4 22-23).pdf · uploaded 22 Sep 2025Source
  • Form 3Form-3 As on 31-3-23 (Q4 22-23)_Signed.pdf · uploaded 22 Sep 2025Source
  • Disclosure of Sold and Booked InventoryDISCOLURE OF SOLD AND UNSOLD.pdf · uploaded 22 Sep 2025Source
  • Form 1Form-1 Q1 Homes.pdf · uploaded 22 Sep 2025Source
  • Form 2Form 2 As on 30-6-23 (Q1 23-24).pdf · uploaded 22 Sep 2025Source
  • Form 3Form-3 As on 30-6-23 (Q1 23-24)_Signed.pdf · uploaded 22 Sep 2025Source
  • Disclosure of Sold and Booked InventoryDISCOLURE OF SOLD AND UNSOLD.pdf · uploaded 22 Sep 2025Source
  • Form 1Form-1 Q2 Homes.pdf · uploaded 22 Sep 2025Source
  • Form 2Form 2 As on 30-9-23 (Q2 23-24).pdf · uploaded 22 Sep 2025Source
  • Form 3Form-3 As on 30-9-23 (Q2 23-24)_Signed.pdf · uploaded 22 Sep 2025Source
  • Disclosure of Sold and Booked InventoryDISCOLURE OF SOLD AND UNSOLD.pdf · uploaded 22 Sep 2025Source
  • Form 1Form-1 Q3 Homes.pdf · uploaded 22 Sep 2025Source
  • Form 2Form_2_As_on_31-12-23_(Q3_23-24).pdf · uploaded 22 Sep 2025Source
  • Form 3Form-3 As on 31-12-23 (Q3 23-24)_Signed.pdf · uploaded 22 Sep 2025Source
  • Disclosure of Sold and Booked InventoryDISCOLURE OF SOLD AND UNSOLD.pdf · uploaded 22 Sep 2025Source
  • Withdrawal Update Form 1Form-1 Homes 30-09-25.pdf · uploaded 28 Nov 2025Source
  • Withdrawal Update Form 2Form-2 Homes 30-09-25.pdf · uploaded 28 Nov 2025Source
  • Withdrawal Update Form 3Withdrawal Application Form3.pdf · uploaded 28 Nov 2025Source
  • Form 5 (FY 2022-2023)FORM 5 22-23 Signed.pdf · uploaded 6 Jan 2026Source
  • Form 5 (FY 2024-2025)Form-5 24-25.pdf · uploaded 7 Jan 2026Source
  • Form 2A (FY 2022-2023)Form 2A 22-23.pdf · uploaded 15 Jan 2026Source
  • Form 2A (FY 2023-2024)Form 2A 23-24.pdf · uploaded 2 Feb 2026Source
  • Form 2A (FY 2024-2025)Form 2A 24-25.pdf · uploaded 2 Feb 2026Source
  • Withdrawal Update Form 1Form-1 Quba Homes LLP 31-12-2025.pdf · uploaded 6 Feb 2026Source
  • Withdrawal Update Form 2Form-2 Quba Homes LLP 31-12-2025.pdf · uploaded 6 Feb 2026Source
  • Withdrawal Update Form 3Form-3 Quba Homes LLP 31-12-2025.pdf · uploaded 6 Feb 2026Source
  • Withdrawal Update Form 1Form-1 Quba Homes LLP 31-03-2026.pdf · uploaded 12 May 2026Source
  • Withdrawal Update Form 2Form-2 Quba Homes LLP 31-03-2026.pdf · uploaded 12 May 2026Source
  • Withdrawal Update Form 3Form-3 Quba Homes LLP 31-03-2026.pdf · uploaded 12 May 2026Source
  • Withdrawal Update Form 1Form-1 Quba Homes LLP 30-06-2026.pdf · uploaded 4 Aug 2026Source
  • Withdrawal Update Form 2Form-2 Quba Homes LLP 30-06-2026.pdf · uploaded 4 Aug 2026Source
  • Withdrawal Update Form 3Form-3 Quba Homes LLP 30-06-2026.pdf · uploaded 4 Aug 2026Source
  • Form 5 (FY 2023-2024)Form-5 Quba Homes 23-24.pdf · uploaded 6 Aug 2026Source
  • Form 2A (FY 2025-2026)Form 2A Arfa Garden FY 25-26.pdf · uploaded 24 Aug 2026Source

Technical

  • DocumentHomes 1C-6C-1_Site Plan.pdf · uploaded 27 Dec 2022Source
  • DocumentHomes 1C-6C-2_Stilt.pdf · uploaded 27 Dec 2022Source
  • DocumentHomes 1C-6C-3.pdf · uploaded 27 Dec 2022Source
  • DocumentHomes 1C-6C-4.pdf · uploaded 27 Dec 2022Source
  • DocumentHomes 1C-6C-5.pdf · uploaded 27 Dec 2022Source
  • Document1C-7C (Frontside) Homes_compressed_11zon.pdf · uploaded 5 May 2023Source

Technical (Architect)

  • DocumentForm-1 Homes 31-03-2024.pdf · uploaded 13 May 2025Source
  • DocumentForm-1 Quba Homes.pdf · uploaded 13 May 2025Source
  • DocumentForm-1 Homes 30-09-2024.pdf · uploaded 13 May 2025Source
  • DocumentForm-1 Quba Homes LLP 30-06-2026.pdf · uploaded 4 Aug 2026Source

Technical (Engineer)

  • DocumentForm-2 Homes 31-03-2024.pdf · uploaded 13 May 2025Source
  • DocumentForm-2 Quba Homes.pdf · uploaded 13 May 2025Source
  • DocumentForm-2 Homes 30-09-2024.pdf · uploaded 13 May 2025Source
  • DocumentForm-2 Quba Homes LLP 30-06-2026.pdf · uploaded 4 Aug 2026Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Land & approvalsLand parcel S No 65/2/1, S No 92/3/2/2

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Certificate Signed
Unit types
1BHK, 2BHK, 3BHK, Bungalow, Office space, Shop103 units in all
Address
S No 65/2/1 and S No 92/3/2/2, Chavindra, ChavindraPIN 421302
Village
Bhiwandi (M Corp.), Bhiwandi taluka
Land area for this project
4,800 sq m (51,667 sq ft)
Permissible built-up area
21,158 sq m (2,27,746 sq ft)
Sanctioned built-up area
4,973 sq m (53,533 sq ft)
Designated bank account
88
Developed in phases
No

Survey, CTS, gat or plot numbers

S No 65/2/1S No 92/3/2/2

Land as published on MahaRERA's project page

S No 65/2/1 and S No 92/3/2/2

Boundaries

North
property bearing s no 92 1 part
South
12 mtr wide DP road
East
property bearing s no 65 2 1 part
West
30 mtr wide DP road

Source: registration certificates and MahaRERA's project page, as stated there.

Units & parking103 units

79 of 103 units booked (77%), as the promoter reported to MahaRERA

1BHK · 8 units2BHK · 8 units3BHK · 8 unitsBungalow · 18 unitsOffice space · 40 unitsShop · 21 units
TypeCarpet areaUnitsBooked
1BHK39.02 sq m · 420 sq ft44
1BHK41.94 sq m · 451 sq ft44
2BHK54.23 sq m · 584 sq ft88
3BHK59.39 sq m · 639 sq ft11
3BHK77.23 sq m · 831 sq ft77
Bungalow130.8 sq m · 1,408 sq ft22
Bungalow133.37 sq m · 1,436 sq ft1515
Bungalow160.42 sq m · 1,727 sq ft11
Show all 38 unit rowsShow fewer unit rows
TypeCarpet areaUnitsBooked
Office space13.35 sq m · 144 sq ft21
Office space13.46 sq m · 145 sq ft20
Office space16.11 sq m · 173 sq ft42
Office space16.24 sq m · 175 sq ft20
Office space16.5 sq m · 178 sq ft21
Office space16.63 sq m · 179 sq ft41
Office space17.29 sq m · 186 sq ft20
Office space17.32 sq m · 186 sq ft20
Office space18.07 sq m · 195 sq ft42
Office space18.22 sq m · 196 sq ft41
Office space18.39 sq m · 198 sq ft21
Office space18.54 sq m · 200 sq ft21
Office space22.49 sq m · 242 sq ft21
Office space22.71 sq m · 244 sq ft21
Office space23.56 sq m · 254 sq ft22
Office space23.76 sq m · 256 sq ft22
Shop14.38 sq m · 155 sq ft22
Shop18.3 sq m · 197 sq ft11
Shop18.84 sq m · 203 sq ft11
Shop28.3 sq m · 305 sq ft11
Shop28.57 sq m · 308 sq ft11
Shop33.37 sq m · 359 sq ft22
Shop34.81 sq m · 375 sq ft22
Shop35.3 sq m · 380 sq ft22
Shop37.84 sq m · 407 sq ft22
Shop38.17 sq m · 411 sq ft11
Shop38.5 sq m · 414 sq ft11
Shop38.67 sq m · 416 sq ft22
Shop48 sq m · 517 sq ft11
Shop50.42 sq m · 543 sq ft22

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Professionals4

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectHk Design & Consultants—
Chartered accountantBM CHAUHAN & Co—
EngineerMomin Shuraem Saud Ahmad—
EngineerYusuf Nasir Husain Momin—

Source: MahaRERA project page. Contact details are not shown.

Other projects in Bhiwandi (M Corp.)

All 153 projects in Bhiwandi (M Corp.) · Compare Arfa Garden with another project

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Report a problemMethodology