Arfa Garden
Deedo IDDP-THN-WA3ZCompletion was pushed back 4 months, to Apr 2027; no MahaRERA orders on record; 77% of its units are booked.
Bhiwandi (M Corp.), Thane 421302 · by Quba Homes Llp
Buying a flat here?
See every deed registered on it.
Completion was pushed back 4 months, to Apr 2027
- This projectRegistered 24 Jan 2023, completion promised 31 Dec 2026, revised to 30 Apr 2027.
No extension certificate on record.
1 registration · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales first, then rentals and mortgages matched to this project · the free view shows a price band
The building
Open a building to see every flat, floor by floor.
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrationP51700048960
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P51700048960 | 24 Jan 2023 | 31 Dec 2026 | 30 Apr 2027 | Quba Homes LLP | Project page |
Documents135
1 document held by Deedo, 134 filings listed on MahaRERA's project page
Finance
- PAN CardE-PAN_Quba Homes.pdf · uploaded 19 Dec 2022Source
Legal
Show all 135 documentsShow fewer documents
Migrated
- 1 a Details of encumbrances concerned to FinanceNo Encumbrance Certificate - Financial.pdf · uploaded 27 Dec 2022Source
- 2 a Details of encumbrances concerned to FinanceNo Encumbrance Certificate - Legal.pdf · uploaded 27 Dec 2022Source
- 1 b Details of encumbrances concerned to LegalNo Encumbrance Certificate - Financial.pdf · uploaded 27 Dec 2022Source
- 2 b Details of encumbrances concerned to LegalNo Encumbrance Certificate - Legal.pdf · uploaded 27 Dec 2022Source
- 1 Copy of Layout Approval (in case of layout)Homes 1C-6C-1_Site Plan.pdf · uploaded 27 Dec 2022Source
- 2 Copy of Layout Approval (in case of layout)Homes 1C-6C-2_Stilt.pdf · uploaded 27 Dec 2022Source
- 3 Copy of Layout Approval (in case of layout)Homes 1C-6C-3.pdf · uploaded 27 Dec 2022Source
- 1 Building Plan Approval / NA Order for plotted developmentHomes 1C-6C-4.pdf · uploaded 27 Dec 2022Source
- 2 Building Plan Approval / NA Order for plotted developmentHomes 1C-6C-5.pdf · uploaded 27 Dec 2022Source
- 1 Declaration in FORM BForm B Affidavit Cum Declaration.pdf · uploaded 27 Dec 2022Source
- 1 Proforma of Agreement for saleModel AFS - Arfa_Black.pdf · uploaded 27 Dec 2022Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFormat A.pdf · uploaded 27 Dec 2022Source
- 1 Deviation Report with respect to Allotment letterDeviation Report Allotment.pdf · uploaded 27 Dec 2022Source
- 1 CERSAI detailsCERSAI_Declaration.pdf · uploaded 28 Dec 2022Source
- 2 Copy of the legal title reportTitle Certificate_Homes.pdf · uploaded 30 Dec 2022Source
- 1 Declaration about Commencement CertificateFormat D Quba Homes.pdf · uploaded 30 Dec 2022Source
- 1 Disclosure of Interest in Other Real Estate OrganizationsAnnexure-A_Quba Homes.pdf · uploaded 30 Dec 2022Source
- 1 Deviation Report with respect to model copy of Agreement2_merged_compressed.pdf · uploaded 2 Jan 2023Source
- 1 Proforma of Allotment letterLetter of Allotment - Arfa Garden_New.pdf · uploaded 5 Jan 2023Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form-3 with proposed declaration.pdf · uploaded 13 Jan 2023Source
- 3 Building Plan Approval / NA Order for plotted development1C-7C (Frontside) Homes_compressed_11zon.pdf · uploaded 5 May 2023Source
- 2 Commencement Certificates / NA Order for plotted developmentHomes CC (Front Side)_compressed.pdf · uploaded 5 May 2023Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)form 1 - Architect certificate - (25-11-2023) - Q4 2022-23 signed_compressed.pdf · uploaded 15 Jan 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form-1 Q1 Homes.pdf · uploaded 15 Jan 2024Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form-1 Q2 Homes.pdf · uploaded 15 Jan 2024Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form-1 Q2 Homes.pdf · uploaded 15 Jan 2024Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form-1 Q3 Homes.pdf · uploaded 15 Jan 2024Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 As on 31-3-23 (Q4 22-23).pdf · uploaded 15 Jan 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 As on 30-6-23 (Q1 23-24).pdf · uploaded 15 Jan 2024Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 As on 30-9-23 (Q2 23-24).pdf · uploaded 15 Jan 2024Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form_2_As_on_31-12-23_(Q3_23-24).pdf · uploaded 15 Jan 2024Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form-3 As on 31-12-23 (Q3 23-24)_Signed.pdf · uploaded 15 Jan 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form-3 As on 31-3-23 (Q4 22-23)_Signed.pdf · uploaded 15 Jan 2024Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form-3 As on 30-6-23 (Q1 23-24)_Signed.pdf · uploaded 15 Jan 2024Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form-3 As on 30-9-23 (Q2 23-24)_Signed.pdf · uploaded 15 Jan 2024Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form-3 As on 31-12-23 (Q3 23-24)_Signed.pdf · uploaded 5 Feb 2024Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form_2_As_on_31-12-23_(Q3_23-24).pdf · uploaded 13 Mar 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)FORM 5 22-23 Signed.pdf · uploaded 16 Mar 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form-1 Homes 31-03-2024.pdf · uploaded 13 May 2025Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form-1 Quba Homes.pdf · uploaded 13 May 2025Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form-1 Homes 30-09-2024.pdf · uploaded 13 May 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form-3 Homes 31-03-2024.pdf · uploaded 13 May 2025Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form-3 Quba Homes.pdf · uploaded 13 May 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form-2 Homes 31-03-2024.pdf · uploaded 13 May 2025Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form-2 Quba Homes.pdf · uploaded 13 May 2025Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form-2 Homes 30-09-2024.pdf · uploaded 13 May 2025Source
- Form 1Form-1 Homes 31-03-2024.pdf · uploaded 23 Jul 2025Source
- Form 2Form-2 Homes 31-03-2024.pdf · uploaded 23 Jul 2025Source
- Form 3Form-3 Homes 31-03-2024.pdf · uploaded 23 Jul 2025Source
- Disclosure of Sold and Booked InventoryDISCOLURE OF SOLD AND UNSOLD.pdf · uploaded 23 Jul 2025Source
- Form 1Form-1 Quba Homes.pdf · uploaded 23 Jul 2025Source
- Form 2Form-2 Quba Homes.pdf · uploaded 23 Jul 2025Source
- Form 3Form-3 Quba Homes.pdf · uploaded 23 Jul 2025Source
- Disclosure of Sold and Booked InventoryDISCOLURE OF SOLD AND UNSOLD.pdf · uploaded 23 Jul 2025Source
- Form 1Form-1 Homes 30-09-2024.pdf · uploaded 23 Jul 2025Source
- Form 2Form-2 Homes 30-09-2024.pdf · uploaded 23 Jul 2025Source
- Form 3Form-3 Homes 30-09-2024.pdf · uploaded 23 Jul 2025Source
- Disclosure of Sold and Booked InventoryDISCOLURE OF SOLD AND UNSOLD.pdf · uploaded 23 Jul 2025Source
- Form 1Form-1 Homes 31-12-24.pdf · uploaded 23 Jul 2025Source
- Form 2Form-2 Homes 31-12-2024.pdf · uploaded 23 Jul 2025Source
- Form 3Form-3 Quba Homes 31-12-2024.pdf · uploaded 23 Jul 2025Source
- Disclosure of Sold and Booked InventoryDISCOLURE OF SOLD AND UNSOLD.pdf · uploaded 23 Jul 2025Source
- Form 1Form-1 Homes 31-03-25.pdf · uploaded 23 Jul 2025Source
- Form 2Form-2 Homes 31-03-25.pdf · uploaded 23 Jul 2025Source
- Form 3FORM 3 QUBA HOMES 31-03-2025.pdf · uploaded 23 Jul 2025Source
- Disclosure of Sold and Booked InventoryDISCOLURE OF SOLD AND UNSOLD.pdf · uploaded 23 Jul 2025Source
- Withdrawal Update Form 1Form-1 Q3 Homes.pdf · uploaded 31 Jul 2025Source
- Withdrawal Update Form 1Withdrawal Application Form1.pdf · uploaded 31 Jul 2025Source
- Withdrawal Update Form 2Form_2_As_on_31-12-23_(Q3_23-24).pdf · uploaded 31 Jul 2025Source
- Withdrawal Update Form 2Withdrawal Application Form2.pdf · uploaded 31 Jul 2025Source
- Withdrawal Update Form 3Withdrawal Application Form3.pdf · uploaded 31 Jul 2025Source
- Withdrawal Update Form 3Withdrawal Application Form3.pdf · uploaded 31 Jul 2025Source
- Withdrawal Update Form 1Withdrawal Application Form1.pdf · uploaded 1 Aug 2025Source
- Withdrawal Update Form 1Withdrawal Application Form1.pdf · uploaded 1 Aug 2025Source
- Withdrawal Update Form 2Withdrawal Application Form2.pdf · uploaded 1 Aug 2025Source
- Withdrawal Update Form 2Withdrawal Application Form2.pdf · uploaded 1 Aug 2025Source
- Withdrawal Update Form 3Withdrawal Application Form3.pdf · uploaded 1 Aug 2025Source
- Withdrawal Update Form 3Withdrawal Application Form3.pdf · uploaded 1 Aug 2025Source
- Form 1Form-1 Q1 Homes.pdf · uploaded 22 Sep 2025Source
- Form 2Form 2 As on 31-3-23 (Q4 22-23).pdf · uploaded 22 Sep 2025Source
- Form 3Form-3 As on 31-3-23 (Q4 22-23)_Signed.pdf · uploaded 22 Sep 2025Source
- Disclosure of Sold and Booked InventoryDISCOLURE OF SOLD AND UNSOLD.pdf · uploaded 22 Sep 2025Source
- Form 1Form-1 Q1 Homes.pdf · uploaded 22 Sep 2025Source
- Form 2Form 2 As on 30-6-23 (Q1 23-24).pdf · uploaded 22 Sep 2025Source
- Form 3Form-3 As on 30-6-23 (Q1 23-24)_Signed.pdf · uploaded 22 Sep 2025Source
- Disclosure of Sold and Booked InventoryDISCOLURE OF SOLD AND UNSOLD.pdf · uploaded 22 Sep 2025Source
- Form 1Form-1 Q2 Homes.pdf · uploaded 22 Sep 2025Source
- Form 2Form 2 As on 30-9-23 (Q2 23-24).pdf · uploaded 22 Sep 2025Source
- Form 3Form-3 As on 30-9-23 (Q2 23-24)_Signed.pdf · uploaded 22 Sep 2025Source
- Disclosure of Sold and Booked InventoryDISCOLURE OF SOLD AND UNSOLD.pdf · uploaded 22 Sep 2025Source
- Form 1Form-1 Q3 Homes.pdf · uploaded 22 Sep 2025Source
- Form 2Form_2_As_on_31-12-23_(Q3_23-24).pdf · uploaded 22 Sep 2025Source
- Form 3Form-3 As on 31-12-23 (Q3 23-24)_Signed.pdf · uploaded 22 Sep 2025Source
- Disclosure of Sold and Booked InventoryDISCOLURE OF SOLD AND UNSOLD.pdf · uploaded 22 Sep 2025Source
- Withdrawal Update Form 1Form-1 Homes 30-09-25.pdf · uploaded 28 Nov 2025Source
- Withdrawal Update Form 2Form-2 Homes 30-09-25.pdf · uploaded 28 Nov 2025Source
- Withdrawal Update Form 3Withdrawal Application Form3.pdf · uploaded 28 Nov 2025Source
- Form 5 (FY 2022-2023)FORM 5 22-23 Signed.pdf · uploaded 6 Jan 2026Source
- Form 5 (FY 2024-2025)Form-5 24-25.pdf · uploaded 7 Jan 2026Source
- Form 2A (FY 2022-2023)Form 2A 22-23.pdf · uploaded 15 Jan 2026Source
- Form 2A (FY 2023-2024)Form 2A 23-24.pdf · uploaded 2 Feb 2026Source
- Form 2A (FY 2024-2025)Form 2A 24-25.pdf · uploaded 2 Feb 2026Source
- Withdrawal Update Form 1Form-1 Quba Homes LLP 31-12-2025.pdf · uploaded 6 Feb 2026Source
- Withdrawal Update Form 2Form-2 Quba Homes LLP 31-12-2025.pdf · uploaded 6 Feb 2026Source
- Withdrawal Update Form 3Form-3 Quba Homes LLP 31-12-2025.pdf · uploaded 6 Feb 2026Source
- Withdrawal Update Form 1Form-1 Quba Homes LLP 31-03-2026.pdf · uploaded 12 May 2026Source
- Withdrawal Update Form 2Form-2 Quba Homes LLP 31-03-2026.pdf · uploaded 12 May 2026Source
- Withdrawal Update Form 3Form-3 Quba Homes LLP 31-03-2026.pdf · uploaded 12 May 2026Source
- Withdrawal Update Form 1Form-1 Quba Homes LLP 30-06-2026.pdf · uploaded 4 Aug 2026Source
- Withdrawal Update Form 2Form-2 Quba Homes LLP 30-06-2026.pdf · uploaded 4 Aug 2026Source
- Withdrawal Update Form 3Form-3 Quba Homes LLP 30-06-2026.pdf · uploaded 4 Aug 2026Source
- Form 5 (FY 2023-2024)Form-5 Quba Homes 23-24.pdf · uploaded 6 Aug 2026Source
- Form 2A (FY 2025-2026)Form 2A Arfa Garden FY 25-26.pdf · uploaded 24 Aug 2026Source
Technical
- DocumentHomes 1C-6C-1_Site Plan.pdf · uploaded 27 Dec 2022Source
- DocumentHomes 1C-6C-2_Stilt.pdf · uploaded 27 Dec 2022Source
- DocumentHomes 1C-6C-3.pdf · uploaded 27 Dec 2022Source
- DocumentHomes 1C-6C-4.pdf · uploaded 27 Dec 2022Source
- DocumentHomes 1C-6C-5.pdf · uploaded 27 Dec 2022Source
- Document1C-7C (Frontside) Homes_compressed_11zon.pdf · uploaded 5 May 2023Source
Technical (Architect)
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvalsLand parcel S No 65/2/1, S No 92/3/2/2
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Certificate Signed
- Unit types
- 1BHK, 2BHK, 3BHK, Bungalow, Office space, Shop103 units in all
- Address
- S No 65/2/1 and S No 92/3/2/2, Chavindra, ChavindraPIN 421302
- Village
- Bhiwandi (M Corp.), Bhiwandi taluka
- Location
- 19.31469, 73.07504
- Land area for this project
- 4,800 sq m (51,667 sq ft)
- Permissible built-up area
- 21,158 sq m (2,27,746 sq ft)
- Sanctioned built-up area
- 4,973 sq m (53,533 sq ft)
- Designated bank account
- 88
- Developed in phases
- No
Survey, CTS, gat or plot numbers
Land as published on MahaRERA's project page
S No 65/2/1 and S No 92/3/2/2
Boundaries
- North
- property bearing s no 92 1 part
- South
- 12 mtr wide DP road
- East
- property bearing s no 65 2 1 part
- West
- 30 mtr wide DP road
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking103 units
79 of 103 units booked (77%), as the promoter reported to MahaRERA
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| 1BHK | 39.02 sq m · 420 sq ft | 4 | 4 |
| 1BHK | 41.94 sq m · 451 sq ft | 4 | 4 |
| 2BHK | 54.23 sq m · 584 sq ft | 8 | 8 |
| 3BHK | 59.39 sq m · 639 sq ft | 1 | 1 |
| 3BHK | 77.23 sq m · 831 sq ft | 7 | 7 |
| Bungalow | 130.8 sq m · 1,408 sq ft | 2 | 2 |
| Bungalow | 133.37 sq m · 1,436 sq ft | 15 | 15 |
| Bungalow | 160.42 sq m · 1,727 sq ft | 1 | 1 |
Show all 38 unit rowsShow fewer unit rows
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| Office space | 13.35 sq m · 144 sq ft | 2 | 1 |
| Office space | 13.46 sq m · 145 sq ft | 2 | 0 |
| Office space | 16.11 sq m · 173 sq ft | 4 | 2 |
| Office space | 16.24 sq m · 175 sq ft | 2 | 0 |
| Office space | 16.5 sq m · 178 sq ft | 2 | 1 |
| Office space | 16.63 sq m · 179 sq ft | 4 | 1 |
| Office space | 17.29 sq m · 186 sq ft | 2 | 0 |
| Office space | 17.32 sq m · 186 sq ft | 2 | 0 |
| Office space | 18.07 sq m · 195 sq ft | 4 | 2 |
| Office space | 18.22 sq m · 196 sq ft | 4 | 1 |
| Office space | 18.39 sq m · 198 sq ft | 2 | 1 |
| Office space | 18.54 sq m · 200 sq ft | 2 | 1 |
| Office space | 22.49 sq m · 242 sq ft | 2 | 1 |
| Office space | 22.71 sq m · 244 sq ft | 2 | 1 |
| Office space | 23.56 sq m · 254 sq ft | 2 | 2 |
| Office space | 23.76 sq m · 256 sq ft | 2 | 2 |
| Shop | 14.38 sq m · 155 sq ft | 2 | 2 |
| Shop | 18.3 sq m · 197 sq ft | 1 | 1 |
| Shop | 18.84 sq m · 203 sq ft | 1 | 1 |
| Shop | 28.3 sq m · 305 sq ft | 1 | 1 |
| Shop | 28.57 sq m · 308 sq ft | 1 | 1 |
| Shop | 33.37 sq m · 359 sq ft | 2 | 2 |
| Shop | 34.81 sq m · 375 sq ft | 2 | 2 |
| Shop | 35.3 sq m · 380 sq ft | 2 | 2 |
| Shop | 37.84 sq m · 407 sq ft | 2 | 2 |
| Shop | 38.17 sq m · 411 sq ft | 1 | 1 |
| Shop | 38.5 sq m · 414 sq ft | 1 | 1 |
| Shop | 38.67 sq m · 416 sq ft | 2 | 2 |
| Shop | 48 sq m · 517 sq ft | 1 | 1 |
| Shop | 50.42 sq m · 543 sq ft | 2 | 2 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Professionals4
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Hk Design & Consultants | — |
| Chartered accountant | BM CHAUHAN & Co | — |
| Engineer | Momin Shuraem Saud Ahmad | — |
| Engineer | Yusuf Nasir Husain Momin | — |
Source: MahaRERA project page. Contact details are not shown.
Other projects in Bhiwandi (M Corp.)
- Golden ParadiseRERA PM1330002602419
- Shree Siddhivinayak BuildconRERA PM1330002602247
- Pearl AvenueRERA PM1330002601973
- Jai Malhar ResidencyRERA PR1331012601865
- Afra HeightRERA PM1330002601698
- Everest HeightsRERA PR1330002601147
- Harsha Apartment Co-Operative Housing Society LimitedRERA PR1330002600865
- Samata HeightsRERA PM1330002600726
All 153 projects in Bhiwandi (M Corp.) · Compare Arfa Garden with another project