Residential / Group Housing · 2 buildings · 38 unitsRERA P51700000586

Salasar Greens

Deedo IDDP-THN-F95W

Completion was pushed back 4 years, to Dec 2026; no MahaRERA orders on record; 63% of its units are booked.

Bhayandar, Thane 401107 · by Salasar Estate Developers Llp

DeliveryExtended 4 yrsPromised Dec 2022 · now due Dec 2026RegulatoryNo ordersNot in any MahaRERA list or order Deedo has readSales63% booked24 of 38 units · as the promoter reported to MahaRERA

Buying a flat here?

See every deed registered on it.

Completion was pushed back 4 years, to Dec 2026

  • This projectRegistered 18 Jul 2017, completion promised 25 Dec 2022, revised to 31 Dec 2026.

1 extension certificate on record.

1 registration · Source: MahaRERA registration and extension certificates

Latest registered deeds

Sales first, then rentals and mortgages matched to this project · the free view shows a price band

No registered deeds matched to this project yet
Sales, resales, rentals and mortgages appear here once registered documents are matched to it by evidence.

2 buildings

Open a building to see every flat, floor by floor.

Floors and units from the registration certificate annexures and MahaRERA's project page.

Regulatory recordNone found

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

RERA registrationP51700000586
RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5170000058618 Jul 201725 Dec 202231 Dec 2026Salasar Estate Developers LLPProject page
Documents105

3 documents held by Deedo, 102 filings listed on MahaRERA's project page

Registration certificate

Extension certificate

Other

  • OtherDate not statedView

Finance

  • PAN CardPAN CARD.pdf · uploaded 21 Jun 2017Source

Legal

  • Legal Title reportLEGAL TITLE REPORT.pdf · uploaded 21 Jun 2017Source
  • Declaration Form BFROM 'B' (SALASAR GREENS).pdf · uploaded 8 Jul 2017Source
  • Declaration Form BFORM B.pdf · uploaded 28 Aug 2023Source

Migrated

  • 1 PAN CardPAN CARD.pdf · uploaded 21 Jun 2017Source
Show all 105 documentsShow fewer documents

Migrated

  • 1 Copy of the legal title reportLEGAL TITLE REPORT.pdf · uploaded 21 Jun 2017Source
  • 1 Details of encumbrancesINDEX II DEVELOPMENT AGREEMENT.pdf · uploaded 21 Jun 2017Source
  • 1 Copy of Layout Approval (in case of layout)salasar greens1.pdf · uploaded 21 Jun 2017Source
  • 1 Building Plan Approval (IOD)IOD.pdf · uploaded 21 Jun 2017Source
  • 1 Commencement Certificates / NA Order for plotted developmentCC.pdf · uploaded 21 Jun 2017Source
  • 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)Engineers Cert (SG)2.pdf · uploaded 6 Jul 2017Source
  • 1 Certificates of CA (Form 3)CA certificate SG2.pdf · uploaded 6 Jul 2017Source
  • 1 Declaration in FORM BFROM 'B' (SALASAR GREENS).pdf · uploaded 8 Jul 2017Source
  • 1 Proforma of Allotment letterPerforma of agreement.pdf · uploaded 17 Jul 2017Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)SED Salasar Greens MahaRERA Form 5 CA Certificate 29092018.PDF · uploaded 4 Dec 2019Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)SED Salasar Greens MahaRERA Form 5 CA Certificate 04112019.PDF · uploaded 4 Dec 2019Source
  • 1 Declaration about Commencement CertificateDECLARATION ABOUT CC-SALASAR GREENS.pdf · uploaded 4 Jun 2023Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1-SALASAR GREENS_MAR 23.pdf · uploaded 4 Jun 2023Source
  • 2 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)FORM 2-SALASAR GREENS_DEC 22.pdf · uploaded 4 Jun 2023Source
  • 3 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)FORM 2-SALASAR GREENS_MAR 23.pdf · uploaded 4 Jun 2023Source
  • 1 Disclosure of sold/ booked inventorySOLD BOOKED-SALASAR GREENS_MAR 23.pdf · uploaded 4 Jun 2023Source
  • 1 CERSAI detailsCERSAI-SALASAR GREENS.pdf · uploaded 4 Jun 2023Source
  • 2 Certificates of CA (Form 3)FORM 3-SALASAR GREENS_MAR 23_compressed.pdf · uploaded 4 Jun 2023Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)FORM 2A-SALASAR GREENS_MAR 23.pdf · uploaded 5 Jun 2023Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)FORM 2A-SALASAR GREENS_MAR 23.pdf · uploaded 5 Jun 2023Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)FORM 2A-SALASAR GREENS_MAR 23.pdf · uploaded 5 Jun 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)FORM 5 2019-2020.pdf · uploaded 6 Jun 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)FORM 5 2020-2021.pdf · uploaded 6 Jun 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)FORM 5 2021-2022.pdf · uploaded 6 Jun 2023Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1-SALASAR GREENS_JUN 23P.pdf · uploaded 17 Aug 2023Source
  • 4 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)FORM 2-SALASAR GREENS_JUN 23.pdf · uploaded 17 Aug 2023Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)FORM 2A-SALASAR GREENS_22 23.pdf · uploaded 17 Aug 2023Source
  • 2 Disclosure of sold/ booked inventorySOLD UNSOLD-SALASAR GREENS_JUN 23.pdf · uploaded 17 Aug 2023Source
  • 3 Certificates of CA (Form 3)FORM 3-SALASAR GREENS_JUN 23.pdf · uploaded 17 Aug 2023Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1-SALASAR GREENS_JUN 23P.pdf · uploaded 25 Aug 2023Source
  • 5 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)FORM 2-SALASAR GREENS_JUN 23.pdf · uploaded 25 Aug 2023Source
  • 2 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)FORM 2A-SALASAR GREENS_22 23.pdf · uploaded 25 Aug 2023Source
  • 3 Disclosure of sold/ booked inventorySOLD UNSOLD-SALASAR GREENS_JUN 23.pdf · uploaded 25 Aug 2023Source
  • 4 Certificates of CA (Form 3)FORM 3 GREENS.pdf · uploaded 25 Aug 2023Source
  • 2 Declaration in FORM BFORM B.pdf · uploaded 28 Aug 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)FORM 5-SALASAR GREENS_22-23.pdf · uploaded 4 Mar 2024Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)FORM 2A_ MARCH 20_ SALASAR GREENS.pdf · uploaded 12 May 2025Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)FORM 2A_ MARCH 21_ SALASAR GREENS.pdf · uploaded 12 May 2025Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)FORM 2A_ MARCH 22_ SALASAR GREENS.pdf · uploaded 12 May 2025Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)FORM 2A_ MARCH 23_ SALASAR GREENS.pdf · uploaded 12 May 2025Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)FORM 2A_ MARCH 24.pdf · uploaded 12 May 2025Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2024-25)FORM 5_ MARCH 24_SALASAR ESTATE DEVELOPERS LLP_SALASAR GREENS.pdf · uploaded 12 May 2025Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1_ DEC 23_ SALASAR GREENS.pdf · uploaded 13 May 2025Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1_ MARCH 24_ SALASAR GREENS.pdf · uploaded 13 May 2025Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1_ JUNE 24_ SALASAR GREENS.pdf · uploaded 13 May 2025Source
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1_ SEP 24_ SALASAR GREENS.pdf · uploaded 13 May 2025Source
  • 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1_ DEC 24_ SALASAR GREENS.pdf · uploaded 13 May 2025Source
  • 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1_ MARCH 25_ SALASAR GREENS.pdf · uploaded 13 May 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1_ SEP 23_ SALASAR GREENS.pdf · uploaded 13 May 2025Source
  • 3 Certificates of CA (Form 3)FORM 3_ MARCH 24_ SALASAR GREENS_compressed.pdf · uploaded 13 May 2025Source
  • 7 Certificates of CA (Form 3)FORM 3_ MARCH 25_ SALASAR GREENS_compressed.pdf · uploaded 13 May 2025Source
  • 6 Certificates of CA (Form 3)FORM 3_ DEC 24_ SALASAR GREENS_compressed.pdf · uploaded 13 May 2025Source
  • 5 Certificates of CA (Form 3)FORM 3_ SEP 24_ SALASAR GREENS_compressed.pdf · uploaded 13 May 2025Source
  • 4 Certificates of CA (Form 3)FORM 3_ JUNE 24_ SALASAR GREENS_compressed.pdf · uploaded 13 May 2025Source
  • 2 Certificates of CA (Form 3)FORM 3_ DEC 23_ SALASAR GREENS.pdf · uploaded 13 May 2025Source
  • 1 Certificates of CA (Form 3)FORM 3_ SEP 23_ SALASAR GREENS.pdf · uploaded 13 May 2025Source
  • 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)FORM 2_ SEP 23_ SALASAR GREENS.pdf · uploaded 13 May 2025Source
  • 7 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)FORM 2_ MARCH 25_ SALASAR GREENS.pdf · uploaded 13 May 2025Source
  • 6 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)FORM 2_ DEC 24_ SALASAR GREENS.pdf · uploaded 13 May 2025Source
  • 5 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)FORM 2_ SEP 24_ SALASAR GREENS.pdf · uploaded 13 May 2025Source
  • 4 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)FORM 2_ JUNE 24_ SALASAR GREENS.pdf · uploaded 13 May 2025Source
  • 3 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)FORM 2_ MARCH 24.pdf · uploaded 13 May 2025Source
  • 2 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)FORM 2_ DEC 23_ SALASAR GREENS.pdf · uploaded 13 May 2025Source
  • 1 Disclosure of sold/ booked inventorySOLD UNSOLD_ SEP 23_ SALASAR GREENS.pdf · uploaded 13 May 2025Source
  • 2 Disclosure of sold/ booked inventorySOLD UNSOLD_ DEC 23_ SALASAR GREENS.pdf · uploaded 13 May 2025Source
  • 3 Disclosure of sold/ booked inventorySOLD UNSOLD_ MARCH 24_ SALASAR GREENS.pdf · uploaded 13 May 2025Source
  • 4 Disclosure of sold/ booked inventorySOLD UNSOLD_ JUNE 24_ SALASAR GREENS.pdf · uploaded 13 May 2025Source
  • 5 Disclosure of sold/ booked inventorySOLD UNSOLD_ SEP 24_ SALASAR GREENS.pdf · uploaded 13 May 2025Source
  • 6 Disclosure of sold/ booked inventorySOLD UNSOLD_ DEC 24_ SALASAR GREENS.pdf · uploaded 13 May 2025Source
  • 7 Disclosure of sold/ booked inventorySLD UNSOLD_ MARCH 25_ SALASAR GREENS.pdf · uploaded 13 May 2025Source
  • Form 2A (FY 2024-2025)FORM 2A_ MARCH 25_ SALASAR GREENS.pdf · uploaded 6 Oct 2025Source
  • Form 1FORM 1_ JUNE 25_ SALASAR GREENS.pdf · uploaded 11 Nov 2025Source
  • Form 2FORM 2_ JUNE 25_ SALASAR GREENS.pdf · uploaded 11 Nov 2025Source
  • Form 3FORM 3_ JUNE 25_ SALASAR GREENS_compressed.pdf · uploaded 11 Nov 2025Source
  • Disclosure of Sold and Booked InventorySOLD UNSOLD_ JUNE 25_ SALASAR GREENS.pdf · uploaded 11 Nov 2025View
  • Form 1FORM 1_ SEP 25_ SALASAR GREENS.pdf · uploaded 11 Nov 2025Source
  • Form 2FORM 2_ SEP 25_ SALASAR GREENS.pdf · uploaded 11 Nov 2025Source
  • Form 3FORM 3_ SEP 25_ SALASAR GREENS_compressed.pdf · uploaded 11 Nov 2025Source
  • Disclosure of Sold and Booked InventorySOLD UNSOLD_ SEP 25_ SALASAR GREENS.pdf · uploaded 11 Nov 2025View

Technical

  • Documentsalasar greens1.pdf · uploaded 21 Jun 2017Source
  • DocumentIOD.pdf · uploaded 21 Jun 2017Source

Technical (Architect)

  • DocumentFORM 1-SALASAR GREENS_JUN 23P.pdf · uploaded 25 Aug 2023Source
  • DocumentFORM 1_ SEP 23_ SALASAR GREENS.pdf · uploaded 13 May 2025Source
  • DocumentFORM 1_ DEC 23_ SALASAR GREENS.pdf · uploaded 13 May 2025Source
  • DocumentFORM 1_ MARCH 24_ SALASAR GREENS.pdf · uploaded 13 May 2025Source
  • DocumentFORM 1_ JUNE 24_ SALASAR GREENS.pdf · uploaded 13 May 2025Source
  • DocumentFORM 1_ SEP 24_ SALASAR GREENS.pdf · uploaded 13 May 2025Source
  • DocumentFORM 1_ DEC 24_ SALASAR GREENS.pdf · uploaded 13 May 2025Source
  • DocumentFORM 1_ MARCH 25_ SALASAR GREENS.pdf · uploaded 13 May 2025Source

Technical (Engineer)

  • DocumentFORM 2-SALASAR GREENS_JUN 23.pdf · uploaded 25 Aug 2023Source
  • DocumentFORM 2_ SEP 23_ SALASAR GREENS.pdf · uploaded 13 May 2025Source
  • DocumentFORM 2_ DEC 23_ SALASAR GREENS.pdf · uploaded 13 May 2025Source
  • DocumentFORM 2_ MARCH 24.pdf · uploaded 13 May 2025Source
  • DocumentFORM 2_ JUNE 24_ SALASAR GREENS.pdf · uploaded 13 May 2025Source
  • DocumentFORM 2_ SEP 24_ SALASAR GREENS.pdf · uploaded 13 May 2025Source
  • DocumentFORM 2_ DEC 24_ SALASAR GREENS.pdf · uploaded 13 May 2025Source
  • DocumentFORM 2_ MARCH 25_ SALASAR GREENS.pdf · uploaded 13 May 2025Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Land & approvalsLand parcel OLD 299 NEW 180 H.NO 4

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Certificate Signed
Unit types
1BHK, 2BHK, Shop38 units in all
Address
Old 299 New 180 H.no 4, Kanakia Road, Mira Road EastPIN 401107
Village
Bhayandar, Thane taluka
Land area for this project
7,850 sq m (84,497 sq ft)
Permissible built-up area
1,557 sq m (16,764 sq ft)
Sanctioned built-up area
1,557 sq m (16,764 sq ft)
Recreational open space
2,422 sq m (26,073 sq ft)
Designated bank account
19
Developed in phases
No

Survey, CTS, gat or plot numbers

OLD 299 NEW 180 H.NO 4

Land as published on MahaRERA's project page

OLD 299 NEW 180 H.NO 4

Boundaries

North
SURVEY NO 250-Old 46-New
South
SURVEY NO 302-Old 181-New
East
SURVEY NO 297-Old 57-New
West
SURVEY NO 300-Old 45-New

Source: registration certificates and MahaRERA's project page, as stated there.

Units & parking38 units

24 of 38 units booked (63%), as the promoter reported to MahaRERA

1BHK · 16 units2BHK · 19 unitsShop · 3 units
TypeCarpet areaUnitsBooked
1BHK35.09 sq m · 378 sq ft1513
1BHK39.46 sq m · 425 sq ft11
2BHK48.32 sq m · 520 sq ft198
Shop22.34 sq m · 240 sq ft21
Shop27.87 sq m · 300 sq ft11

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Professionals5

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectAnish & Associates—
Chartered accountantCa Sanjay Sharma—
Chartered accountantCa Vivek Thar—
EngineerPremnath Chougule—
EngineerProtech Consultants—

Source: MahaRERA project page. Contact details are not shown.

Other projects in Bhayandar

All 118 projects in Bhayandar · Compare Salasar Greens with another project

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Report a problemMethodology