Skip to content
Residential / Group Housing · 2 buildings · 280 unitsRERA P51700024335

Anjani Pride

Deedo IDDP-THN-6DDG

MahaRERA shows it completed; no MahaRERA orders on record; 64% of its units are booked.

Bhayandar, Thane 401107 · by Geeta Developers · 75% of its projects kept the RERA date

DeliveryCompletedCompletion / occupancy certificate on MahaRERARegulatoryNo ordersNot in any MahaRERA list or order Deedo has readSales64% booked180 of 280 units · as the promoter reported to MahaRERA

Buying a flat here?

See every deed registered on it.

MahaRERA shows it completed

  • This projectRegistered 5 Feb 2020, completion promised 31 Dec 2025.

No extension certificate on record.

1 registration · Source: MahaRERA registration and extension certificates

Latest registered deeds

Sales first, then rentals and mortgages matched to this project · the free view shows a price band

No registered deeds matched to this project yet
Sales, resales, rentals and mortgages appear here once registered documents are matched to it by evidence.

2 buildings

Open a building to see every flat, floor by floor.

Floors and units from the registration certificate annexures and MahaRERA's project page.

Regulatory recordNone found

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

RERA registrationP51700024335
RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P517000243355 Feb 202031 Dec 202531 Dec 2025Geeta DevelopersProject page
Documents150

1 document held by Deedo, 149 filings listed on MahaRERA's project page

Registration certificate

Finance

  • PAN CardPAN.pdf · uploaded 9 Jan 2020Source

Legal

  • Declaration Form BForm B.pdf · uploaded 10 Jan 2020Source
  • Legal Title reportTittle Certificate.pdf · uploaded 11 Jan 2020Source

Migrated

  • 1 PAN CardPAN.pdf · uploaded 9 Jan 2020Source
  • 1 Copy of Layout Approval (in case of layout)plan -I.pdf · uploaded 9 Jan 2020Source
  • 1 Building Plan Approval / NA Order for plotted developmentplan-II 2.pdf · uploaded 9 Jan 2020Source
  • 2 Building Plan Approval / NA Order for plotted developmentplan1-III.pdf · uploaded 9 Jan 2020Source
Show all 150 documentsShow fewer documents

Migrated

  • 1 Commencement Certificates / NA Order for plotted developmentCC.pdf · uploaded 9 Jan 2020Source
  • 1 Details of encumbrancesDeclaration for Non Encumbrance.pdf · uploaded 10 Jan 2020Source
  • 1 Declaration in FORM BForm B.pdf · uploaded 10 Jan 2020Source
  • 1 Copy of the legal title reportTittle Certificate.pdf · uploaded 11 Jan 2020Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate.pdf · uploaded 11 Jan 2020Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architect Certificate.pdf · uploaded 16 Jan 2020Source
  • 1 Proforma of Allotment letterDraft Allotment Letter.pdf · uploaded 16 Jan 2020Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)CA Certificate.pdf · uploaded 18 Jan 2020Source
  • 2 Proforma of Allotment letterUnderaking.pdf · uploaded 25 Jan 2020Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)Form 2 A.pdf · uploaded 3 Oct 2020Source
  • 2 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)Form 2 A.pdf · uploaded 3 Oct 2020Source
  • 3 Proforma of Allotment letterDraft Agreement for Sale.pdf · uploaded 3 Nov 2020Source
  • 3 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)Form 2A of Pride.pdf · uploaded 18 Feb 2021Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)Form 5 Pride 19-20.pdf · uploaded 23 Feb 2021Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Form 2A.pdf · uploaded 28 May 2021Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 12 Aug 2021Source
  • 2 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)Form 2A.pdf · uploaded 12 Aug 2021Source
  • 1 Disclosure of sold/ booked inventorySold and Booked Inventory.pdf · uploaded 12 Aug 2021Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3.pdf · uploaded 12 Aug 2021Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 14 Aug 2021Source
  • 1 Declaration about Commencement CertificateDeclaration About Commencement Certificate.pdf · uploaded 18 Aug 2021Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)Form 5.pdf · uploaded 29 Sep 2021Source
  • 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 13 Oct 2021Source
  • 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 13 Oct 2021Source
  • 3 Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)FORM-2A.pdf · uploaded 13 Oct 2021Source
  • 2 Disclosure of sold/ booked inventoryDisclosure of Sold Inventory.pdf · uploaded 13 Oct 2021Source
  • 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3.pdf · uploaded 13 Oct 2021Source
  • 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificates.pdf · uploaded 7 Jan 2022Source
  • 3 Disclosure of sold/ booked inventoryDIsclosure of Sold Inventory.pdf · uploaded 7 Jan 2022Source
  • 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 17 Jan 2022Source
  • 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3.pdf · uploaded 17 Jan 2022Source
  • 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Anjani Pride_compressed.pdf · uploaded 11 Apr 2022Source
  • 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 Anjani Pride_compressed.pdf · uploaded 11 Apr 2022Source
  • 4 Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)Form 2A Anjani Pride.pdf · uploaded 11 Apr 2022Source
  • 4 Disclosure of sold/ booked inventoryDisclosure of Sold or Booked Inventory Anjani Pride.pdf · uploaded 11 Apr 2022Source
  • 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3.pdf · uploaded 11 Apr 2022Source
  • 5 Disclosure of sold/ booked inventoryDisclosure of Sold or Booked Inventory.pdf · uploaded 2 Aug 2022Source
  • 2 Commencement Certificates / NA Order for plotted developmentCC of Anjani Pride.pdf · uploaded 13 Aug 2022Source
  • 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 13 Aug 2022Source
  • 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 13 Aug 2022Source
  • 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3.pdf · uploaded 13 Aug 2022Source
  • 2 Copy of Layout Approval (in case of layout)Layout-Phase-IV-Plan.pdf · uploaded 25 Aug 2022Source
  • 3 Building Plan Approval / NA Order for plotted developmentGround,-1st-to-7th,-8th--13th-Phase-IV-Plan.pdf · uploaded 25 Aug 2022Source
  • 4 Building Plan Approval / NA Order for plotted development(9th to 24th (excluding 13th floor) Phase IV Plan.pdf · uploaded 25 Aug 2022Source
  • 2 Declaration about Commencement CertificateDeclaration about commencemnt certificate.pdf · uploaded 29 Aug 2022Source
  • 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 20 Oct 2022Source
  • 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 20 Oct 2022Source
  • 6 Disclosure of sold/ booked inventoryDisclosure of Sold or Booked Inventory.pdf · uploaded 20 Oct 2022Source
  • 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3.pdf · uploaded 20 Oct 2022Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)Form 2A Anjani Pride.pdf · uploaded 26 Nov 2022Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)Form 5.pdf · uploaded 26 Nov 2022Source
  • 8 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 18 Jan 2023Source
  • 8 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 18 Jan 2023Source
  • 7 Disclosure of sold/ booked inventoryDiclosure Of Sold Booked Inventory - Anjani Pride_001.pdf · uploaded 18 Jan 2023Source
  • 8 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3.pdf · uploaded 19 Jan 2023Source
  • 9 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1_compressed.pdf · uploaded 20 Apr 2023Source
  • 9 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 20 Apr 2023Source
  • 8 Disclosure of sold/ booked inventoryForm 3.pdf · uploaded 20 Apr 2023Source
  • 9 Disclosure of sold/ booked inventoryDisclosure of sold - Booked Inventory Anjani Pride_001.pdf · uploaded 20 Apr 2023Source
  • 9 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3.pdf · uploaded 20 Apr 2023Source
  • 10 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 20 Jul 2023Source
  • 10 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 20 Jul 2023Source
  • 10 Disclosure of sold/ booked inventoryDisclouser of sold or Booked Inventory.pdf · uploaded 20 Jul 2023Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)Form -2A Engineer 's Certificate for Quality Assurance.pdf · uploaded 21 Jul 2023Source
  • 10 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3.pdf · uploaded 21 Jul 2023Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Form 5 pride.pdf · uploaded 30 Sep 2023Source
  • 11 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 18 Oct 2023Source
  • 12 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1_compressed.pdf · uploaded 18 Oct 2023Source
  • 11 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form - 2.pdf · uploaded 18 Oct 2023Source
  • 12 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form - 2 anjani pride_compressed.pdf · uploaded 18 Oct 2023Source
  • 11 Disclosure of sold/ booked inventoryDisclosure of sold -Inventoery Anandam.pdf · uploaded 18 Oct 2023Source
  • 12 Disclosure of sold/ booked inventoryDiscloure of Inventory Anjani pride.pdf · uploaded 18 Oct 2023Source
  • 11 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3.pdf · uploaded 20 Oct 2023Source
  • 13 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 19 Jan 2024Source
  • 13 Disclosure of sold/ booked inventoryDISCLOSURE OF SOLD Inventory of Anjani Pride.pdf · uploaded 19 Jan 2024Source
  • 12 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3.pdf · uploaded 19 Jan 2024Source
  • 13 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 23 Jan 2024Source
  • 14 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 19 Apr 2024Source
  • 14 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 19 Apr 2024Source
  • 14 Disclosure of sold/ booked inventoryDisclosure of Sold Booked Inventory.pdf · uploaded 19 Apr 2024Source
  • 13 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Anjani Pride.pdf · uploaded 20 Apr 2024Source
  • 15 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 Annexure A.pdf · uploaded 19 Jul 2024Source
  • 15 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2_compressed.pdf · uploaded 19 Jul 2024Source
  • 15 Disclosure of sold/ booked inventoryInventory - 1.pdf · uploaded 19 Jul 2024Source
  • 14 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Pride.pdf · uploaded 20 Jul 2024Source
  • 15 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 Anjani Pride.pdf · uploaded 20 Jul 2024Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1.pdf · uploaded 19 Oct 2024Source
  • 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3.pdf · uploaded 19 Oct 2024Source
  • 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 19 Oct 2024Source
  • 2 Disclosure of sold/ booked inventorySold Inventory Pride_compressed.pdf · uploaded 19 Oct 2024Source
  • 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form 5 .pdf · uploaded 28 Oct 2024Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3.pdf · uploaded 20 Jan 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2.pdf · uploaded 20 Jan 2025Source
  • 1 Disclosure of sold/ booked inventoryInventory.pdf · uploaded 20 Jan 2025Source
  • 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM 1.pdf · uploaded 19 Apr 2025Source
  • 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)FORM -1.pdf · uploaded 19 Apr 2025Source
  • 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)FORM 3.pdf · uploaded 19 Apr 2025Source
  • 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)FORM 2.pdf · uploaded 19 Apr 2025Source
  • 1 Disclosure of sold/ booked inventoryDISCLOSURE OF SOLD.pdf · uploaded 19 Apr 2025Source
  • 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Form 2A.pdf · uploaded 19 Apr 2025Source
  • 2 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)FORM 2A.pdf · uploaded 19 Apr 2025Source
  • Form 1FORM -1.pdf · uploaded 9 Jun 2025Source
  • Form 2FORM 2.pdf · uploaded 9 Jun 2025Source
  • Form 3FORM 3.pdf · uploaded 9 Jun 2025Source
  • Disclosure of Sold and Booked InventoryDISCLOSURE OF SOLD.pdf · uploaded 9 Jun 2025Source
  • Self-declaration of Quarterly ProgressSelf Declaratlon for Ouarterly Progress.pdf · uploaded 9 Jun 2025Source
  • Form 1FORM 1.pdf · uploaded 9 Jun 2025Source
  • Form 2Form 2.pdf · uploaded 9 Jun 2025Source
  • Form 3Form 3.pdf · uploaded 9 Jun 2025Source
  • Disclosure of Sold and Booked InventoryInventory.pdf · uploaded 9 Jun 2025Source
  • Self-declaration of Quarterly ProgressSelf Declaratlon for Ouarterly Progress.pdf · uploaded 9 Jun 2025Source
  • Form 1Form 1.pdf · uploaded 9 Jun 2025Source
  • Form 2Form 2.pdf · uploaded 9 Jun 2025Source
  • Form 3Form 3.pdf · uploaded 9 Jun 2025Source
  • Disclosure of Sold and Booked InventorySold Inventory Pride.pdf · uploaded 9 Jun 2025Source
  • Self-declaration of Quarterly ProgressSelf Declaratlon for Ouarterly Progress.pdf · uploaded 9 Jun 2025Source
  • Form 1Form 1 Annexure A.pdf · uploaded 9 Jun 2025Source
  • Form 2Form 2.pdf · uploaded 9 Jun 2025Source
  • Form 3Form 3 Pride.pdf · uploaded 9 Jun 2025Source
  • Disclosure of Sold and Booked InventoryInventory -.pdf · uploaded 9 Jun 2025Source
  • Self-declaration of Quarterly ProgressSelf Declaratlon for Ouarterly Progress.pdf · uploaded 9 Jun 2025Source
  • Withdrawal Update Form 1FORM -1.pdf · uploaded 14 Jun 2025Source
  • Withdrawal Update Form 2FORM 2.pdf · uploaded 14 Jun 2025Source
  • Withdrawal Update Form 3Form 3.pdf · uploaded 14 Jun 2025Source
  • Occupational CertificateOC Certificate.pdf · uploaded 24 Aug 2025Source

Technical

  • Documentplan -I.pdf · uploaded 9 Jan 2020Source
  • Documentplan-II 2.pdf · uploaded 9 Jan 2020Source
  • Documentplan1-III.pdf · uploaded 9 Jan 2020Source
  • DocumentLayout-Phase-IV-Plan.pdf · uploaded 25 Aug 2022Source
  • DocumentGround,-1st-to-7th,-8th--13th-Phase-IV-Plan.pdf · uploaded 25 Aug 2022Source
  • Document(9th to 24th (excluding 13th floor) Phase IV Plan.pdf · uploaded 25 Aug 2022Source
  • OthersFORM -1.pdf · uploaded 9 Jun 2025Source
  • OthersForm 3.pdf · uploaded 14 Jun 2025Source
  • OthersDISCLOSURE OF SOLD - BOOKED INVENTORY (BUILDING WISE)_compressed.pdf · uploaded 14 Jun 2025Source

Technical (Architect)

  • DocumentForm 1.pdf · uploaded 19 Oct 2024Source
  • DocumentFORM 1.pdf · uploaded 19 Apr 2025Source
  • DocumentFORM -1.pdf · uploaded 19 Apr 2025Source
  • DocumentFORM -1.pdf · uploaded 9 Jun 2025Source

Technical (Engineer)

  • DocumentForm 2.pdf · uploaded 19 Oct 2024Source
  • DocumentForm 2.pdf · uploaded 20 Jan 2025Source
  • DocumentFORM 2.pdf · uploaded 19 Apr 2025Source
  • DocumentFORM 2.pdf · uploaded 9 Jun 2025Source

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Land & approvalsLand parcel Old S.No. 548 New S.No. 39 H. No. 4 pt. Bhayandar

As registered with MahaRERA and published on its project page

Project type
Residential / Group Housing
Status on MahaRERA
Certificate Signed
Unit types
1BHK, 2BHK280 units in all
Address
Old S.No. 548 New S.No. 39 H. No. 4 pt. Bhayandar, Kanungo Estate, Mira Road (East)PIN 401107
Village
Bhayandar, Thane taluka
Land area for this project
3,776 sq m (40,644 sq ft)
Permissible built-up area
18,200 sq m (1,95,903 sq ft)
Sanctioned built-up area
17,753 sq m (1,91,090 sq ft)
Recreational open space
533 sq m (5,737 sq ft)
Designated bank account
82
Developed in phases
Yes

Survey, CTS, gat or plot numbers

Old S.No. 548 New S.No. 39 H. No. 4 pt. Bhayandar

Land as published on MahaRERA's project page

Old S.No. 548 New S.No. 39 H. No. 4 pt. Bhayandar

Boundaries

North
Market Reservation H No 2 and Layout Garden
South
12 Meters Road
East
Nallah
West
Existing Layout Garden

Source: registration certificates and MahaRERA's project page, as stated there.

Units & parking280 units

180 of 280 units booked (64%), as the promoter reported to MahaRERA

1BHK · 136 units2BHK · 144 units
TypeCarpet areaUnitsBooked
1BHK36.86 sq m · 397 sq ft4030
1BHK37.14 sq m · 400 sq ft2117
1BHK40.35 sq m · 434 sq ft4833
1BHK40.6 sq m · 437 sq ft2716
2BHK55.25 sq m · 595 sq ft6326
2BHK60.9 sq m · 656 sq ft8158

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Professionals4

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectHemant Talaty talaty—
Chartered accountantPurshottam Bajaj—
Chartered accountantShivratan Agarwal—
EngineerRajesh Dubey—

Source: MahaRERA project page. Contact details are not shown.

Other projects in Bhayandar

All 118 projects in Bhayandar · Compare Anjani Pride with another project

Data through13 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Report a problemMethodology