Skip to content
Deedo home
Menu

Vasant Springwoods Phase 2

Completed

Badlapur (M Cl), Thane 421503 |Promoter: M/S Shree Constructions

19 Aug 2017Registered with MahaRERA
30 Jun 2019Promised completion
1Building
44Units registered
0MahaRERA listings and ordersNone found

Project summary

As registered with MahaRERA and published on its project page

Project type
Others
Status on MahaRERA
Completed
Buildings
1
Unit types
1 BHK, 1 RK, 2 BHK, Shop44 units in all
Land area for this project
1,972 sq m (21,226 sq ft)
Permissible built-up area
1,373 sq m (14,776 sq ft)
Sanctioned built-up area
1,373 sq m (14,776 sq ft)
Recreational open space
197 sq m (2,123 sq ft)
Address
Survey No 65 Hissa No 2 2 PPIN 421503
Designated bank account
Idbi Bank
Litigation declared by promoter
None declared
Financial encumbrance declared
None declared

Location

Coordinates as published by MahaRERA

View on OpenStreetMap 19.15139, 73.23662
Vasant Springwoods Phase 2 is at latitude 19.15139, longitude 73.23662.

Latest registered deals

No registered transactions matched to this project yetSales, resales and rentals appear here once registered documents from authorised IGR feeds are matched to this project.

Completion timeline

Registration date, the completion date promised at registration, and any extension since

Completion promised for 30 Jun 2019

The latest completion date on record passed 7 years and 4 months ago.

Registered
19 Aug 2017
Promised
30 Jun 2019

RERA registration

RegistrationRegisteredPromised completionRevised completionPromoterMahaRERA
P5170000862219 Aug 201730 Jun 2019—M/S Shree ConstructionsProject page

1 building

Buildings and wings named in the registration

BuildingSanctioned floorsUnits
Wing B Maple944

Source: registration certificate annexures and MahaRERA's project page. “Floors with CC” counts floors covered by a commencement certificate.

Units and parking

44 units registered

1 BHK · 21 units1 RK · 8 units2 BHK · 7 unitsShop · 8 units
TypeCarpet areaUnits
1 BHK27.52 sq m · 296 sq ft14
1 BHK33.47 sq m · 360 sq ft7
1 RK21.48 sq m · 231 sq ft1
1 RK22.61 sq m · 243 sq ft7
2 BHK38.74 sq m · 417 sq ft7
Shop9.16 sq m · 99 sq ft1
Shop10.83 sq m · 117 sq ft2
Shop12.87 sq m · 139 sq ft4
Shop13.17 sq m · 142 sq ft1

Parking

TypeTwo-wheelerFour-wheelerBusVisitorTotal
Closed/Covered00004
Open Space00000

Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.

Construction progress

Work completed, as the promoter reported it to MahaRERA (Form 1)

Wing B Maple

  • Excavation100%
  • Basement (if any)100%
  • Podiums (if any)0%
  • Plinth100%
  • Stilt Floor100%
  • Slabs of Super Structure100%
  • Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
  • Sanitary Fittings within the flats / premises100%
  • Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
  • External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
  • Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Common areas and amenities

  • Internal Roads & FootpathsNot applicable
  • Water SupplyWILL BE PROVIDED BY CONCERNED DEPT100%
  • Sewerage (Chamber, Lines, Septic Tank , STP)AT THE TIME OF COMPLETION100%
  • Storm Water DrainsAT THE TIME OF COMPLETION100%
  • Landscaping & Tree PlantingTREE PLANTING PROPOSED100%
  • Street LightingNot applicable
  • Community BuildingsNot applicable
  • Treatment And Disposal Of Sewage And Sullage WaterNot applicable
  • Solid Waste Management And DisposalNot applicable
  • Water conservation /Rain water harvestingNot applicable
  • Energy managemcntNot applicable
  • Fire protection and fire safety requirementsAT THE TIME OF COMPLETION100%
  • Electrical meter room, sub-station, receiving stationNot applicable
  • Aggregate area of recreational Open Space197.2 SQ. MT.100%
  • Open Parking308.5 SQ. MT.100%

Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.

Documents

22 documents held by Deedo, 20 filings listed on MahaRERA's project page

Title

Encumbrance

Form b

Form 1

Form 2

Allotment letters

Registration certificate

Form 5s

Form 4

Others

Layout plan

Building plan

Document library

  • Copy of the legal title reportTITLE REPORT.pdf · uploaded 26 Jul 2017View
  • Details of encumbrancesBANK LETTER - for no encumbrance.pdf · uploaded 26 Jul 2017View
  • Copy of Layout Approval (in case of layout)NEW LAYOUT FOR UPLOADING.pdf · uploaded 26 Jul 2017View
  • Proforma of Allotment letteragreement draft bdl.pdf · uploaded 26 Jul 2017View
  • Proforma of Allotment letterALLOTMENT LETTER BADLAPUR.pdf · uploaded 26 Jul 2017View
  • Declaration in FORM BAffidavit Satej Dalal.pdf · uploaded 26 Jul 2017View
  • Certificates of Architect (Form 1)(Mandatory for only ongoing project)ArchitecT CERT.pdf · uploaded 26 Jul 2017View
  • Building Plan Approval (IOD)cc.pdf · uploaded 26 Jul 2017View
  • Commencement Certificates / NA Order for plotted developmentcc.pdf · uploaded 26 Jul 2017View
  • Certificates of Engineer (Form 2)(Mandatory for only ongoing project)BDL ENGINEERS CERTIFICATE.pdf · uploaded 26 Jul 2017View
  • Certificates of CA (Form 5)Shree Construction.pdf · uploaded 13 Oct 2018View
  • Certificates of Architect (Form 4)Architect Letter form 4.pdf · uploaded 20 Feb 2019View
  • OtherOC.pdf · uploaded 20 Feb 2019View
  • Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)SHEE CONSRUCTIONS FORM 5.pdf · uploaded 27 Dec 2019View

Promoter documents

  • Legal Title reportTITLE REPORT.pdf · uploaded 26 Jul 2017View
  • Declaration Form BAffidavit Satej Dalal.pdf · uploaded 26 Jul 2017View

Technical documents

  • Building Plan Approvalcc.pdfView
  • Layout ApprovalNEW LAYOUT FOR UPLOADING.pdfView

Other legal documents

Proforma allotment letter

  • Proforma allotment letterALLOTMENT LETTER BADLAPUR.pdfView

Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.

Regulatory record

Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.

Source: MahaRERA regulatory lists and orders, checked against each RERA number.

Land

In Badlapur (M Cl), Ambarnath taluka

Survey, CTS, gat or plot numbers

SURVEY NO 65 HISSA NO 2 / 2 PSURVEY NO 65 HISSA NO 2 2 P

As published on MahaRERA's project page

SURVEY NO 65 HISSA NO 2 2 P

Boundaries

North
Survey No 61
South
Survey No 61 Hissa No 1
East
Survey No 65 Hissa No 2
West
Survey No 64

Source: registration certificates and MahaRERA's project page, as stated there.

Professionals

Architects, engineers, chartered accountants and agents named on the registration

RoleNameRegistration no.
ArchitectPramod Kamble—
EngineerAtul Kudtarkar—
OtherAnamika Pramodkumar Chaubey—
OtherPramodkumar Chaubey—
OtherV.b. Ghodvaidya—

Source: MahaRERA project page. Contact details are not shown.

Data through11 Oct 2026SourcesMahaRERA project search · registration certificates · MahaRERA project pageData through is when MahaRERA's project page was last read.Methodology