Imperial Heights
Deedo IDDP-THN-JSKECompletion was pushed back 4 months, to Apr 2027; no MahaRERA orders on record; 25% of its units are booked.
Ambarnath (R), Thane 421501 · by Krishna Developers
Buying a flat here?
See every deed registered on it.
Completion was pushed back 4 months, to Apr 2027
- This projectRegistered 1 Apr 2023, completion promised 31 Dec 2026, revised to 30 Apr 2027.
No extension certificate on record.
1 registration · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales first, then rentals and mortgages matched to this project · the free view shows a price band
The building
Open a building to see every flat, floor by floor.
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrationP51700050323
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P51700050323 | 1 Apr 2023 | 31 Dec 2026 | 30 Apr 2027 | Krishna Developers | Project page |
Documents154
1 document held by Deedo, 153 filings listed on MahaRERA's project page
Finance
Legal
- Legal Title reportTitle report_11zon.pdf · uploaded 28 Oct 2022Source
- Declaration Form BForm B Landlord Declaration_11zon.pdf · uploaded 30 Nov 2022Source
- Other – LegalDevelopment aggrement_11zon.pdf · uploaded 3 Jan 2023Source
- Other – LegalPower of Atterny_11zon.pdf · uploaded 3 Jan 2023Source
- Other – LegalKrishna developers Partner deed-merged_11zon.pdf · uploaded 3 Jan 2023Source
Show all 154 documentsShow fewer documents
Migrated
- 1 PAN CardCompany Pan.pdf · uploaded 28 Oct 2022Source
- 1 Copy of the legal title reportTitle report_11zon.pdf · uploaded 28 Oct 2022Source
- 1 Commencement Certificates / NA Order for plotted developmentCommencement Certificate.pdf · uploaded 28 Oct 2022Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Certificate for Architect_11zon.pdf · uploaded 28 Oct 2022Source
- 1 a Details of encumbrances concerned to FinanceDeclaration Builder Enc-FinLegal.pdf · uploaded 30 Nov 2022Source
- 1 b Details of encumbrances concerned to LegalDeclaration Builder Enc-FinLegal.pdf · uploaded 30 Nov 2022Source
- 1 Copy of Layout Approval (in case of layout)Imperial Heights, Municipal Plan_11zon.pdf · uploaded 30 Nov 2022Source
- 1 Building Plan Approval / NA Order for plotted developmentImperial Heights, Municipal Plan_11zon.pdf · uploaded 30 Nov 2022Source
- 1 Declaration about Commencement CertificateFormat D dECLARATION ABOUT CC_11zon.pdf · uploaded 30 Nov 2022Source
- 1 Declaration in FORM BForm B Landlord Declaration_11zon.pdf · uploaded 30 Nov 2022Source
- 1 CERSAI detailsCersai undertaking letter scanned_11zon.pdf · uploaded 30 Nov 2022Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate_11zon.pdf · uploaded 5 Dec 2022Source
- 1 Deviation Report with respect to Allotment letterDeviation Agreement-Allotment.pdf · uploaded 5 Dec 2022Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Rera Form 3 Krishnadev_11zon.pdf · uploaded 3 Jan 2023Source
- 1 Other – LegalDevelopment aggrement_11zon.pdf · uploaded 3 Jan 2023Source
- 2 Other – LegalPower of Atterny_11zon.pdf · uploaded 3 Jan 2023Source
- 3 Other – LegalKrishna developers Partner deed-merged_11zon.pdf · uploaded 3 Jan 2023Source
- 1 Proforma of Allotment letterProforma Allotment Letter.pdf · uploaded 13 Jan 2023Source
- 1 Disclosure of Interest in Other Real Estate OrganizationsDisclosure of intrest in other real estate organizations_11zon.pdf · uploaded 23 Feb 2023Source
- 1 Proforma of Agreement for saleFLAT SALE AGREEMENT.pdf · uploaded 10 Mar 2023Source
- 2 Proforma of Agreement for saleDesk Comment Reply-10-03-23.pdf · uploaded 10 Mar 2023Source
- 1 Deviation Report with respect to model copy of AgreementDeviation Report with respect to model copy of AOS-10-03-23.pdf · uploaded 10 Mar 2023Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameSeperate bank account declaration.pdf · uploaded 25 Mar 2023Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Q1 Form 2 - Krishna Developers - FY 23 24.pdf · uploaded 9 Oct 2024Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Q2 Form 2 - Krishna developers FY 23 24.pdf · uploaded 9 Oct 2024Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Q3 Form 2 - Krishna Developers - FY 23 24.pdf · uploaded 9 Oct 2024Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Q4 Form 2 - Krishna Developers - FY 23 24.pdf · uploaded 9 Oct 2024Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Q1 Form 3 - Krishna Developers-23 - 24_11zon.pdf · uploaded 9 Oct 2024Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Q2 Form 3 - Krishna Developers - 23 - 24_11zon.pdf · uploaded 9 Oct 2024Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Q3 Form 3 - Krishna Developers - 23 24_11zon.pdf · uploaded 9 Oct 2024Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Q4 Form 3 - Krishna Developers-FY 23-24_11zon.pdf · uploaded 9 Oct 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Q1 Form 1 - Krishna Deveopers-FY 23-24.pdf · uploaded 9 Oct 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Q2 Form 1 - Krishna Developers-FY 23-24.pdf · uploaded 9 Oct 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Q3 Form 1 - Krishna Developers-FY 23-24.pdf · uploaded 9 Oct 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Q4 Form 1 - Krishna Developers-FY 23-24.pdf · uploaded 9 Oct 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Q1 Form 1 - Krishna Deveopers-FY 23-24.pdf · uploaded 9 Oct 2024Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Q2 Form 1 - Krishna Developers-FY 23-24.pdf · uploaded 9 Oct 2024Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)Q3 Form 1 - Krishna Developers-FY 23-24.pdf · uploaded 9 Oct 2024Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Q4 Form 1 - Krishna Developers-FY 23-24.pdf · uploaded 9 Oct 2024Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)Q3 Form 3 - Krishna Developers - 23 24_11zon.pdf · uploaded 9 Oct 2024Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)Q4 Form 3 - Krishna Developers-FY 23-24_11zon.pdf · uploaded 9 Oct 2024Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Q2 Form 3 - Krishna Developers - 23 - 24_11zon.pdf · uploaded 9 Oct 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Q1 Form 3 - Krishna Developers-23 - 24_11zon.pdf · uploaded 9 Oct 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Q1 Form 2 - Krishna Developers - FY 23 24.pdf · uploaded 9 Oct 2024Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Q2 Form 2 - Krishna developers FY 23 24.pdf · uploaded 9 Oct 2024Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Q3 Form 2 - Krishna Developers - FY 23 24.pdf · uploaded 9 Oct 2024Source
- 5 Engineer’s Certificate on Cost Incurred on Project (Form 2)Q4 Form 2 - Krishna Developers - FY 23 24.pdf · uploaded 9 Oct 2024Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - FY 24 - 25 - Q1 Krishna Developers.pdf · uploaded 25 Dec 2024Source
- 7 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 - FY 24-25 - Q2 - Krishna Developers.pdf · uploaded 25 Dec 2024Source
- 7 CA Certificate on Project Cost & Fund withdrawal (Form 3)Krishna Developers Form 3 - Q2 - FY 24 25 (1).pdf · uploaded 25 Dec 2024Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)Krishna Developers Form 3 -Q1 FY 24 25 (1).pdf · uploaded 25 Dec 2024Source
- 6 Engineer’s Certificate on Cost Incurred on Project (Form 2)Krishna Developers - Form 2- Q1 - FY 24 25.pdf · uploaded 25 Dec 2024Source
- 7 Engineer’s Certificate on Cost Incurred on Project (Form 2)Krishna Developers - Form 2 - Q2 - FY 24 25.pdf · uploaded 25 Dec 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1 -Krishna Developers FY 24 25 -Q3.pdf · uploaded 4 Feb 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 - Krishna Developers - FY 24 25 - Q3.pdf · uploaded 19 Feb 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2 - Krishna Developers FY 24 25 - Q3.pdf · uploaded 19 Feb 2025Source
- Withdrawal Update Form 1Form 1 - FY 24 - 25 - Q4 Krishna Developers.pdf · uploaded 3 Jun 2025Source
- Withdrawal Update Form 2Krishna Developers_Form 2_Q4-24-25.pdf · uploaded 3 Jun 2025Source
- Withdrawal Update Form 3Form 3 - Krishna Developers - FY 24 25 - Q4.pdf · uploaded 3 Jun 2025Source
- Form 1Q1 Form 1 - Krishna Deveopers-FY 23-24.pdf · uploaded 19 Sep 2025Source
- Form 1Q2 Form 1 - Krishna Developers-FY 23-24.pdf · uploaded 19 Sep 2025Source
- Form 1Q3 Form 1 - Krishna Developers-FY 23-24.pdf · uploaded 19 Sep 2025Source
- Form 1Q4 Form 1 - Krishna Developers-FY 23-24.pdf · uploaded 19 Sep 2025Source
- Form 1Form 1 - FY 24 - 25 - Q1 Krishna Developers.pdf · uploaded 19 Sep 2025Source
- Form 1Form 1 - FY 24 - 25 - Q2 Krishna Developers.pdf · uploaded 19 Sep 2025Source
- Form 1Form 1 - FY 24 - 25 - Q3 Krishna Developers.pdf · uploaded 19 Sep 2025Source
- Form 1Form 1 - FY 24 - 25 - Q4 Krishna Developers.pdf · uploaded 19 Sep 2025Source
- Form 2Q1 Form 2 - Krishna Developers - FY 23 24.pdf · uploaded 19 Sep 2025Source
- Form 2Q2 Form 2 - Krishna developers FY 23 24.pdf · uploaded 19 Sep 2025Source
- Form 2Q3 Form 2 - Krishna Developers - FY 23 24.pdf · uploaded 19 Sep 2025Source
- Form 2Q4 Form 2 - Krishna Developers - FY 23 24.pdf · uploaded 19 Sep 2025Source
- Form 2Form 2 - Krishna Developers - FY 24 25 - Q1.pdf · uploaded 19 Sep 2025Source
- Form 2Form 2 - Krishna Developers - FY 24 25 - Q2.pdf · uploaded 19 Sep 2025Source
- Form 2Form 2 - Krishna Developers FY 24 25 - Q3.pdf · uploaded 19 Sep 2025Source
- Form 2Form 2 - Krishna Developers FY 24 25 - Q4.pdf · uploaded 19 Sep 2025Source
- Form 3Q1 Form 3 - Krishna Developers-23 - 24.pdf · uploaded 19 Sep 2025Source
- Form 3Q2 Form 3 - Krishna Developers - 23 - 24.pdf · uploaded 19 Sep 2025Source
- Form 3Q3 Form 3 - Krishna Developers - 23 24.pdf · uploaded 19 Sep 2025Source
- Form 3Q4 Form 3 - Krishna Developers-FY 23-24.pdf · uploaded 19 Sep 2025Source
- Form 3Form 3 - Krishna Developers - FY 24 25 - Q1.pdf · uploaded 19 Sep 2025Source
- Form 3Form 3 - Krishna Developers - FY 24 25 - Q2.pdf · uploaded 19 Sep 2025Source
- Form 3Form 3 - Krishna Developers - FY 24 25 - Q3.pdf · uploaded 19 Sep 2025Source
- Form 3Form 3 - Krishna Developers - FY 24 25 - Q4.pdf · uploaded 19 Sep 2025Source
- Disclosure of Sold and Booked InventoryQ1 23- 24 Disclosure - KD.pdf · uploaded 19 Sep 2025Source
- Disclosure of Sold and Booked InventoryQ2 23-24 Disclosure - KD.pdf · uploaded 19 Sep 2025Source
- Disclosure of Sold and Booked InventoryQ3 23-24 Disclosure -KD.pdf · uploaded 19 Sep 2025Source
- Disclosure of Sold and Booked InventoryQ4 23-24 - Disclosure - KD.pdf · uploaded 19 Sep 2025Source
- Disclosure of Sold and Booked InventoryQ1 24-25 - Disclosure- KD.pdf · uploaded 19 Sep 2025Source
- Disclosure of Sold and Booked InventoryQ2 24-25 Disclosure - KD.pdf · uploaded 19 Sep 2025Source
- Disclosure of Sold and Booked InventoryQ3 24-24 Disclosure- KD.pdf · uploaded 19 Sep 2025Source
- Disclosure of Sold and Booked InventoryQ4 24-25 - Disclosure-KD.pdf · uploaded 19 Sep 2025Source
- Self-declaration of Quarterly ProgressQ1 23-24 Self Deceleration - KD.pdf · uploaded 19 Sep 2025Source
- Self-declaration of Quarterly ProgressQ2 23-24 Self Deceleration - KD.pdf · uploaded 19 Sep 2025Source
- Self-declaration of Quarterly ProgressQ3 23-24 Self Deceleration- KD.pdf · uploaded 19 Sep 2025Source
- Self-declaration of Quarterly ProgressQ4 23-24 Self Deceleration - KD.pdf · uploaded 19 Sep 2025Source
- Self-declaration of Quarterly ProgressQ1 24-25 - Self Decleration - KD.pdf · uploaded 19 Sep 2025Source
- Self-declaration of Quarterly ProgressQ2 24-25 Self Deceleration- KD.pdf · uploaded 19 Sep 2025Source
- Self-declaration of Quarterly ProgressQ3 24-24 Self Deceleration- KD .pdf · uploaded 19 Sep 2025Source
- Self-declaration of Quarterly ProgressQ4 24-25- Self Deceleration-KD .pdf · uploaded 19 Sep 2025Source
- Withdrawal Update Form 1Form 1 Q1-25-26 - Krishna Developers.pdf · uploaded 4 Oct 2025Source
- Withdrawal Update Form 2Form 2 - Q1 - 25 26 - Krishna Developers .pdf · uploaded 4 Oct 2025Source
- Withdrawal Update Form 3Form 3 - Q1 - 25-26 Krishan Developers.pdf · uploaded 4 Oct 2025Source
- Form 5 (FY 2023-2024)Form 5 2024.pdf · uploaded 5 Dec 2025Source
- Withdrawal Update Form 1Form 1 - Krishan Develoeprs FY 25 26 - Q2.pdf · uploaded 16 Dec 2025Source
- Withdrawal Update Form 2Form 2 - Krishna Developers FY 25 26 -Q2.pdf · uploaded 16 Dec 2025Source
- Withdrawal Update Form 3Form 3 - Krishna Developers - Q2 - FY 25 26.pdf · uploaded 16 Dec 2025Source
- Form 2A (FY 2023-2024)Form 2A_FY 2023-24.pdf · uploaded 17 Dec 2025Source
- Form 2A (FY 2024-2025)Form 2A_FY 2024-25.pdf · uploaded 17 Dec 2025Source
- Form 5 (FY 2024-2025)Form 5 2025.pdf · uploaded 19 Dec 2025Source
- Withdrawal Update Form 1Form 1 - Krishna Developers - FY 25 26 - Q3.pdf · uploaded 20 Jan 2026Source
- Withdrawal Update Form 2Form 2 - Krishna Developers - FY 25 26 - Q3.pdf · uploaded 20 Jan 2026Source
- Withdrawal Update Form 3Form 3 - Krishan Developers - FY 25 26 - Q3.pdf · uploaded 20 Jan 2026Source
- Withdrawal Update Form 1Krishna Developers - Form 1 - FY 25 26 - Q4.pdf · uploaded 1 Jun 2026Source
- Withdrawal Update Form 2Krishna Developers - Form 2 - FY 25 26 - Q4.pdf · uploaded 1 Jun 2026Source
- Withdrawal Update Form 3Krishna Developers - Form 3 - FY 25 26 - Q4.pdf · uploaded 1 Jun 2026Source
- Withdrawal Update Form 1Form 1 - Krishna Developers - Q1 FY 26 27.pdf · uploaded 29 Sep 2026Source
- Withdrawal Update Form 2Form 2 - Krishna Developers - Q1 FY 26 27.pdf · uploaded 29 Sep 2026Source
- Withdrawal Update Form 3Form 3 - Krishna Developers - Q1 FY 26 27.pdf · uploaded 29 Sep 2026Source
Technical
- DocumentImperial Heights, Municipal Plan_11zon.pdf · uploaded 30 Nov 2022Source
- DocumentImperial Heights, Municipal Plan_11zon.pdf · uploaded 30 Nov 2022Source
- OthersForm 1 - FY 24 - 25 - Q4 Krishna Developers.pdf · uploaded 3 Jun 2025Source
- OthersForm 1 - Krishna Developers - FY 25 -26 Q1.pdf · uploaded 29 Aug 2025Source
Technical (Architect)
- DocumentQ1 Form 1 - Krishna Deveopers-FY 23-24.pdf · uploaded 9 Oct 2024Source
- DocumentQ2 Form 1 - Krishna Developers-FY 23-24.pdf · uploaded 9 Oct 2024Source
- DocumentQ3 Form 1 - Krishna Developers-FY 23-24.pdf · uploaded 9 Oct 2024Source
- DocumentQ4 Form 1 - Krishna Developers-FY 23-24.pdf · uploaded 9 Oct 2024Source
- DocumentQ1 Form 1 - Krishna Deveopers-FY 23-24.pdf · uploaded 9 Oct 2024Source
- DocumentQ2 Form 1 - Krishna Developers-FY 23-24.pdf · uploaded 9 Oct 2024Source
- DocumentQ3 Form 1 - Krishna Developers-FY 23-24.pdf · uploaded 9 Oct 2024Source
- DocumentQ4 Form 1 - Krishna Developers-FY 23-24.pdf · uploaded 9 Oct 2024Source
- DocumentForm 1 - FY 24 - 25 - Q1 Krishna Developers.pdf · uploaded 25 Dec 2024Source
- DocumentForm 1 - FY 24-25 - Q2 - Krishna Developers.pdf · uploaded 25 Dec 2024Source
- DocumentForm 1 -Krishna Developers FY 24 25 -Q3.pdf · uploaded 4 Feb 2025Source
- DocumentForm 1 - Krishna Developers - Q1 FY 26 27.pdf · uploaded 29 Sep 2026Source
Technical (Engineer)
- DocumentQ1 Form 2 - Krishna Developers - FY 23 24.pdf · uploaded 9 Oct 2024Source
- DocumentQ2 Form 2 - Krishna developers FY 23 24.pdf · uploaded 9 Oct 2024Source
- DocumentQ3 Form 2 - Krishna Developers - FY 23 24.pdf · uploaded 9 Oct 2024Source
- DocumentQ4 Form 2 - Krishna Developers - FY 23 24.pdf · uploaded 9 Oct 2024Source
- DocumentQ1 Form 2 - Krishna Developers - FY 23 24.pdf · uploaded 9 Oct 2024Source
- DocumentQ2 Form 2 - Krishna developers FY 23 24.pdf · uploaded 9 Oct 2024Source
- DocumentQ3 Form 2 - Krishna Developers - FY 23 24.pdf · uploaded 9 Oct 2024Source
- DocumentQ4 Form 2 - Krishna Developers - FY 23 24.pdf · uploaded 9 Oct 2024Source
- DocumentKrishna Developers - Form 2- Q1 - FY 24 25.pdf · uploaded 25 Dec 2024Source
- DocumentKrishna Developers - Form 2 - Q2 - FY 24 25.pdf · uploaded 25 Dec 2024Source
- DocumentForm 2 - Krishna Developers FY 24 25 - Q3.pdf · uploaded 19 Feb 2025Source
- DocumentForm 2 - Krishna Developers - Q1 FY 26 27.pdf · uploaded 29 Sep 2026Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvalsLand parcel 8921, CTS NO. 8920
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Certificate Signed
- Unit types
- 1BHK, 2BHK, Office space, Shop, Tenent flat32 units in all
- Address
- S No 124, Cts No. 8920 & 8921, S No 8920-8921, AmbarnathPIN 421501
- Village
- Ambarnath(M Cl), Ambarnath taluka
- Land area for this project
- 1,780 sq m (19,162 sq ft)
- Permissible built-up area
- 1,739 sq m (18,721 sq ft)
- Sanctioned built-up area
- 1,739 sq m (18,721 sq ft)
- Recreational open space
- 0 sq m (0 sq ft)
- Designated bank account
- 85
- Developed in phases
- No
Survey, CTS, gat or plot numbers
Land as published on MahaRERA's project page
S NO 124, CTS NO. 8920 & 8921
Boundaries
- North
- Road
- South
- S No 124 A
- East
- S No 124 A Part
- West
- 24 Mtr Dp Road
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking32 units
8 of 32 units booked (25%), as the promoter reported to MahaRERA
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| 1BHK | 37.57 sq m · 404 sq ft | 14 | 0 |
| 2BHK | 52.26 sq m · 563 sq ft | 6 | 0 |
| 2BHK | 55.25 sq m · 595 sq ft | 0 | 0 |
| Office space | 28.67 sq m · 309 sq ft | 1 | 0 |
| Office space | 29.36 sq m · 316 sq ft | 1 | 0 |
| Shop | 35.66 sq m · 384 sq ft | 1 | 0 |
| Shop | 51.05 sq m · 549 sq ft | 1 | 0 |
| Tenent flat | 52.26 sq m · 563 sq ft | 1 | 1 |
| Tenent flat | 55.25 sq m · 595 sq ft | 7 | 7 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Other projects in Ambarnath (R)
- Shree Swanand ApartmentRERA PR1330002602633
- Maa ShardaRERA PR1330002602477
- Verma ExoticaRERA PR1330002602210
- Ishwar Jay Jay Shankara Co-Op. Housing Society Ltd.RERA PM1330002601833
- Yug ParadiseRERA PR1330002601419
- Sai Prasad ApartmentRERA PM1330002600764
- City CentreRERA PC1330002600743
- Hiral Paradise ChsRERA PR1330002502979
All 248 projects in Ambarnath (R) · Compare Imperial Heights with another project