Patels Elysium
Deedo IDDP-THN-YTG2MahaRERA shows it completed; no MahaRERA orders on record; 100% of its units are booked.
Ambarnath(M Cl), Thane 421501 · by Apace Realty · 100% of its projects kept the RERA date
Buying a flat here?
See every deed registered on it.
MahaRERA shows it completed
- P51700006142Registered 14 Aug 2017, completion promised 30 Oct 2023.
- P51700005803Registered 14 Aug 2017, completion promised 30 Dec 2023.
- P51700009032Registered 19 Aug 2017, completion promised 30 Dec 2023.
- P51700008491Registered 19 Aug 2017, completion promised 30 Oct 2023.
- P51700009543Registered 22 Aug 2017, completion promised 31 Oct 2019.
- P51700010318Registered 24 Aug 2017, completion promised 30 Dec 2022.
Show 1 more registrations
- P51700010280Registered 24 Aug 2017, completion promised 30 Oct 2023.
No extension certificate on record.
7 registrations · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales, rentals and mortgages matched to this project · the free view shows a price band
9 buildings
Open a building to see every flat, floor by floor.
- PATELS ELYSIUM - 1 - A WING - G to 11th Floors13 floors · 43 units100% booked
- PATELS ELYSIUM - 1 - C and D WING - G to 11th Floors13 floors · 86 units100% booked
- PATELS ELYSIUM - 2 - A WING - 12th Floor1 floor · 4 units100% booked
- PATELS ELYSIUM - 2 - C and D WING - 12th Floor2 floors · 8 units100% booked
- PATELS ELYSIUM - 3 - B WING - G to 11th Floors13 floors · 65 units100% booked
- PATELS ELYSIUM - 4 - B WING - 12th Floor2 floors · 6 units100% booked
- PATELS ELYSIUM - 5 - E and F WING - G to 11th Floors13 floors · 86 units100% booked
- PATELS ELYSIUM - 6 - WING E and F - 12th Floor35% built2 floors
- PATELS ELYSIUM - 7 - G and H WING - G to 9th Floors11 floors · 70 units100% booked
Floors and units from the registration certificate annexures and MahaRERA's project page. Construction % is the average of the developer's own declared activity progress to MahaRERA, not an inspection.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrations7
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P51700006142 | 14 Aug 2017 | 30 Oct 2023 | 30 Oct 2023 | Apace Realty | Project page |
| P51700005803 | 14 Aug 2017 | 30 Dec 2023 | 30 Dec 2023 | Apace Realty | Project page |
| P51700009032 | 19 Aug 2017 | 30 Dec 2023 | — | Apace Realty | Project page |
| P51700008491 | 19 Aug 2017 | 30 Oct 2023 | 30 Oct 2023 | Apace Realty | Project page |
| P51700009543 | 22 Aug 2017 | 31 Oct 2019 | 31 Oct 2019 | Apace Realty | Project page |
| P51700010318 | 24 Aug 2017 | 30 Dec 2022 | 30 Dec 2022 | Apace Realty | Project page |
| P51700010280 | 24 Aug 2017 | 30 Oct 2023 | 30 Oct 2023 | Apace Realty | Project page |
Documents231
24 documents held by Deedo, 207 filings listed on MahaRERA's project page
Show all 231 documentsShow fewer documents
Registration certificate (7)
Other (4)
Occupancy / completion certificate
Layout plan (2)
Document library
- Copy of the legal title reportP51700009032 · Apace Title pdf_gRyoUh9u.pdf · uploaded 30 Jul 2017View
- Details of encumbrancesP51700009032 · RHFL Index II.pdf · uploaded 30 Jul 2017View
- Certificates of Engineer (Form 2)(Mandatory for only ongoing project)P51700009032 · Form-2 Phase-6.pdf · uploaded 30 Jul 2017View
- Certificates of Architect (Form 1)(Mandatory for only ongoing project)P51700009032 · phase6 form1.pdf · uploaded 30 Jul 2017View
- Copy of Layout Approval (in case of layout)P51700009032 · Elysium Wing EF Phase 6.pdf · uploaded 30 Jul 2017View
- Building Plan Approval (IOD)P51700009032 · Apace CC-E,F,G,H pdf_HnBaw1We.pdf · uploaded 30 Jul 2017View
- Commencement Certificates / NA Order for plotted developmentP51700009032 · Apace CC-E,F,G,H pdf_HnBaw1We.pdf · uploaded 30 Jul 2017View
- Declaration in FORM BP51700009032 · P6 - FORM B-1.pdf · uploaded 31 Jul 2017View
- Proforma of Allotment letterP51700009032 · P6 AFS.pdf · uploaded 31 Jul 2017View
- Copy of Layout Approval (in case of layout)P51700009032 · Future Developement Layout1.pdf · uploaded 31 Jul 2017View
- OtherP51700009032 · elysium disclosure.pdf · uploaded 31 Jul 2017View
- Certificates of CA (Form 5)P51700009032 · Apace Form 5 ELY 6 AS ON 31 MARCH 2018.pdf · uploaded 16 Feb 2019View
- Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)P51700009032 · APACE FORM5 MAR19-E-F_12th Floor-signed.pdf · uploaded 10 Jan 2020View
- Architect’s Certificate on Completion of Project (Form 4)P51700009032 · Form 4 EF Wing 6th Phase.pdf · uploaded 2 Mar 2020View
- Status of Formation of Legal Entity (Society/Co Op etc.)P51700009032 · Patels elysium wing EF co op hsg.pdf · uploaded 11 Mar 2020View
- Status of Formation of Legal Entity (Society/Co Op etc.)P51700009032 · APACE Society Certificate E F.pdf · uploaded 24 Jun 2021View
- Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentP51700009032 · Apace OC EFGH 04FEB20.pdf · uploaded 13 Aug 2021View
Promoter documents
Technical documents
Other legal documents
- OtherP51700009032 · elysium disclosure.pdfView
Proforma allotment letter
- Proforma allotment letterP51700009032 · P6 AFS.pdfView
Finance
- PAN CardP51700010280 · PAN.pdf · uploaded 29 Jul 2017Source
- PAN CardP51700006142 · PAN.pdf · uploaded 29 Jul 2017Source
- PAN CardP51700005803 · PAN.pdf · uploaded 29 Jul 2017Source
- PAN CardP51700008491 · PAN.pdf · uploaded 29 Jul 2017Source
- PAN CardP51700009543 · PAN.pdf · uploaded 29 Jul 2017Source
- PAN CardP51700010318 · PAN.pdf · uploaded 29 Jul 2017Source
Legal
- Legal Title reportP51700010280 · Apace Title pdf_gRyoUh9u.pdf · uploaded 29 Jul 2017Source
- Legal Title reportP51700006142 · Apace Title pdf_gRyoUh9u.pdf · uploaded 29 Jul 2017Source
- Legal Title reportP51700005803 · Apace Title pdf_gRyoUh9u.pdf · uploaded 29 Jul 2017Source
- Legal Title reportP51700008491 · Apace Title pdf_gRyoUh9u.pdf · uploaded 29 Jul 2017Source
- Legal Title reportP51700009543 · Apace Title pdf_gRyoUh9u.pdf · uploaded 29 Jul 2017Source
- Legal Title reportP51700010318 · Apace Title pdf_gRyoUh9u.pdf · uploaded 29 Jul 2017Source
- OtherP51700010280 · elysium disclosure.pdf · uploaded 31 Jul 2017Source
- Declaration Form BP51700010280 · P3 - FORM B-1.pdf · uploaded 31 Jul 2017Source
- OtherP51700006142 · elysium disclosure.pdf · uploaded 31 Jul 2017Source
- Declaration Form BP51700006142 · P4 - FORM B-1.pdf · uploaded 31 Jul 2017Source
- OtherP51700005803 · elysium disclosure.pdf · uploaded 31 Jul 2017Source
- Declaration Form BP51700005803 · P7 - FORM B-1.pdf · uploaded 31 Jul 2017Source
- OtherP51700008491 · elysium disclosure.pdf · uploaded 31 Jul 2017Source
- Declaration Form BP51700008491 · P2 - FORM B-1.pdf · uploaded 31 Jul 2017Source
- OtherP51700009543 · elysium disclosure.pdf · uploaded 31 Jul 2017Source
- Declaration Form BP51700009543 · P1 - FORM B-1.pdf · uploaded 31 Jul 2017Source
- OtherP51700010318 · elysium disclosure.pdf · uploaded 31 Jul 2017Source
- Declaration Form BP51700010318 · P5 - FORM B-1.pdf · uploaded 31 Jul 2017Source
- OtherP51700008491 · AMC COMPLETION CERTIFICATE C D WING .pdf · uploaded 25 Jun 2018Source
- OtherP51700009543 · AMC COMPLETION CERTIFICATE C D WING .pdf · uploaded 25 Jun 2018Source
- OtherP51700008491 · AMC- COMPLETION CERTIFICATE - C - D WING.pdf · uploaded 5 Apr 2019Source
- OtherP51700008491 · APACE - AMC - COMPLETION CERTIFICATE - A WING- 30-03-2019.pdf · uploaded 5 Apr 2019Source
- OtherP51700009543 · APACE - AMC - COMPLETION CERTIFICATE - A WING- 30-03-2019.pdf · uploaded 5 Apr 2019Source
- OtherP51700009543 · AMC- COMPLETION CERTIFICATE - C - D WING.pdf · uploaded 5 Apr 2019Source
- OtherP51700010280 · APACE - AMC - COMPLETION CERTIFICATE - B WING- 16-04-2019.pdf · uploaded 19 Apr 2019Source
- OtherP51700006142 · APACE - AMC - COMPLETION CERTIFICATE - B WING- 16-04-2019.pdf · uploaded 19 Apr 2019Source
Migrated
- 1 PAN CardP51700010280 · PAN.pdf · uploaded 29 Jul 2017Source
- 1 Copy of the legal title reportP51700010280 · Apace Title pdf_gRyoUh9u.pdf · uploaded 29 Jul 2017Source
- 1 Details of encumbrancesP51700010280 · RHFL Index II.pdf · uploaded 29 Jul 2017Source
- 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)P51700010280 · phase3 form1.pdf · uploaded 29 Jul 2017Source
- 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)P51700010280 · Form-2 Phase-3.pdf · uploaded 29 Jul 2017Source
- 1 Certificates of CA (Form 3)P51700010280 · Form-3 Phase-3.pdf · uploaded 29 Jul 2017Source
- 1 PAN CardP51700006142 · PAN.pdf · uploaded 29 Jul 2017Source
- 1 Copy of the legal title reportP51700006142 · Apace Title pdf_gRyoUh9u.pdf · uploaded 29 Jul 2017Source
- 1 Details of encumbrancesP51700006142 · RHFL Index II.pdf · uploaded 29 Jul 2017Source
- 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)P51700006142 · phase4 form1.pdf · uploaded 29 Jul 2017Source
- 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)P51700006142 · Form-2 Phase-4.pdf · uploaded 29 Jul 2017Source
- 1 Certificates of CA (Form 3)P51700006142 · Form-3 Phase-4.pdf · uploaded 29 Jul 2017Source
- 1 PAN CardP51700005803 · PAN.pdf · uploaded 29 Jul 2017Source
- 1 Copy of the legal title reportP51700005803 · Apace Title pdf_gRyoUh9u.pdf · uploaded 29 Jul 2017Source
- 1 Details of encumbrancesP51700005803 · RHFL Index II.pdf · uploaded 29 Jul 2017Source
- 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)P51700005803 · phase7 form1.pdf · uploaded 29 Jul 2017Source
- 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)P51700005803 · Form-2 Phase-7.pdf · uploaded 29 Jul 2017Source
- 1 Certificates of CA (Form 3)P51700005803 · Form-3 Phase-7.pdf · uploaded 29 Jul 2017Source
- 1 PAN CardP51700008491 · PAN.pdf · uploaded 29 Jul 2017Source
- 1 Copy of the legal title reportP51700008491 · Apace Title pdf_gRyoUh9u.pdf · uploaded 29 Jul 2017Source
- 1 Details of encumbrancesP51700008491 · RHFL Index II.pdf · uploaded 29 Jul 2017Source
- 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)P51700008491 · phase 2 form 1.pdf · uploaded 29 Jul 2017Source
- 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)P51700008491 · Form-2 Phase-2.pdf · uploaded 29 Jul 2017Source
- 1 Certificates of CA (Form 3)P51700008491 · Form-3 Phase-2.pdf · uploaded 29 Jul 2017Source
- 1 PAN CardP51700009543 · PAN.pdf · uploaded 29 Jul 2017Source
- 1 Copy of the legal title reportP51700009543 · Apace Title pdf_gRyoUh9u.pdf · uploaded 29 Jul 2017Source
- 1 Details of encumbrancesP51700009543 · RHFL Index II.pdf · uploaded 29 Jul 2017Source
- 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)P51700009543 · phase 1 form1.pdf · uploaded 29 Jul 2017Source
- 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)P51700009543 · Form-2 Phase-1.pdf · uploaded 29 Jul 2017Source
- 1 Certificates of CA (Form 3)P51700009543 · Form-3 Phase-1.pdf · uploaded 29 Jul 2017Source
- 1 PAN CardP51700010318 · PAN.pdf · uploaded 29 Jul 2017Source
- 1 Copy of the legal title reportP51700010318 · Apace Title pdf_gRyoUh9u.pdf · uploaded 29 Jul 2017Source
- 1 Details of encumbrancesP51700010318 · RHFL Index II.pdf · uploaded 29 Jul 2017Source
- 1 Certificates of Architect (Form 1)(Mandatory for only ongoing project)P51700010318 · phase5 form1.pdf · uploaded 29 Jul 2017Source
- 1 Certificates of Engineer (Form 2)(Mandatory for only ongoing project)P51700010318 · Form-2 Phase-5.pdf · uploaded 29 Jul 2017Source
- 1 Certificates of CA (Form 3)P51700010318 · Form-3 Phase-5.pdf · uploaded 29 Jul 2017Source
- 1 Copy of Layout Approval (in case of layout)P51700010280 · Elysium Wing B Phase 3.pdf · uploaded 30 Jul 2017Source
- 1 Building Plan Approval (IOD)P51700010280 · Apace CC-E,F,G,H pdf_HnBaw1We.pdf · uploaded 30 Jul 2017Source
- 1 Commencement Certificates / NA Order for plotted developmentP51700010280 · Apace CC-E,F,G,H pdf_HnBaw1We.pdf · uploaded 30 Jul 2017Source
- 1 Copy of Layout Approval (in case of layout)P51700006142 · Elysium Wing B Phase 4.pdf · uploaded 30 Jul 2017Source
- 1 Building Plan Approval (IOD)P51700006142 · Apace CC-E,F,G,H pdf_HnBaw1We.pdf · uploaded 30 Jul 2017Source
- 1 Commencement Certificates / NA Order for plotted developmentP51700006142 · Apace CC-E,F,G,H pdf_HnBaw1We.pdf · uploaded 30 Jul 2017Source
- 1 Copy of Layout Approval (in case of layout)P51700005803 · Elysium Wing GH Phase 7.pdf · uploaded 30 Jul 2017Source
- 1 Building Plan Approval (IOD)P51700005803 · Apace CC-E,F,G,H pdf_HnBaw1We.pdf · uploaded 30 Jul 2017Source
- 1 Commencement Certificates / NA Order for plotted developmentP51700005803 · Apace CC-E,F,G,H pdf_HnBaw1We.pdf · uploaded 30 Jul 2017Source
- 1 Copy of Layout Approval (in case of layout)P51700008491 · Elysium Wing ACD Phase 2.pdf · uploaded 30 Jul 2017Source
- 1 Building Plan Approval (IOD)P51700008491 · Apace CC-E,F,G,H pdf_HnBaw1We.pdf · uploaded 30 Jul 2017Source
- 1 Commencement Certificates / NA Order for plotted developmentP51700008491 · Apace CC-E,F,G,H pdf_HnBaw1We.pdf · uploaded 30 Jul 2017Source
- 1 Copy of Layout Approval (in case of layout)P51700009543 · Elysium Wing ACD Phase 1.pdf · uploaded 30 Jul 2017Source
- 1 Building Plan Approval (IOD)P51700009543 · Apace CC-E,F,G,H pdf_HnBaw1We.pdf · uploaded 30 Jul 2017Source
- 1 Commencement Certificates / NA Order for plotted developmentP51700009543 · Apace CC-E,F,G,H pdf_HnBaw1We.pdf · uploaded 30 Jul 2017Source
- 1 Copy of Layout Approval (in case of layout)P51700010318 · Elysium Wing EF Phase 5.pdf · uploaded 30 Jul 2017Source
- 1 Building Plan Approval (IOD)P51700010318 · Apace CC-E,F,G,H pdf_HnBaw1We.pdf · uploaded 30 Jul 2017Source
- 1 Commencement Certificates / NA Order for plotted developmentP51700010318 · Apace CC-E,F,G,H pdf_HnBaw1We.pdf · uploaded 30 Jul 2017Source
- 2 Copy of Layout Approval (in case of layout)P51700010280 · Future Developement Layout1.pdf · uploaded 31 Jul 2017Source
- 1 Declaration in FORM BP51700010280 · P3 - FORM B-1.pdf · uploaded 31 Jul 2017Source
- 1 Proforma of Allotment letterP51700010280 · P3 AFS.pdf · uploaded 31 Jul 2017Source
- 1 OtherP51700010280 · elysium disclosure.pdf · uploaded 31 Jul 2017Source
- 2 Copy of Layout Approval (in case of layout)P51700006142 · Future Developement Layout1.pdf · uploaded 31 Jul 2017Source
- 1 Declaration in FORM BP51700006142 · P4 - FORM B-1.pdf · uploaded 31 Jul 2017Source
- 1 Proforma of Allotment letterP51700006142 · P4 AFS.pdf · uploaded 31 Jul 2017Source
- 1 OtherP51700006142 · elysium disclosure.pdf · uploaded 31 Jul 2017Source
- 2 Copy of Layout Approval (in case of layout)P51700005803 · Future Developement Layout1.pdf · uploaded 31 Jul 2017Source
- 1 Declaration in FORM BP51700005803 · P7 - FORM B-1.pdf · uploaded 31 Jul 2017Source
- 1 Proforma of Allotment letterP51700005803 · P7 AFS.pdf · uploaded 31 Jul 2017Source
- 1 OtherP51700005803 · elysium disclosure.pdf · uploaded 31 Jul 2017Source
- 2 Copy of Layout Approval (in case of layout)P51700008491 · Future Developement Layout1.pdf · uploaded 31 Jul 2017Source
- 1 Declaration in FORM BP51700008491 · P2 - FORM B-1.pdf · uploaded 31 Jul 2017Source
- 1 Proforma of Allotment letterP51700008491 · P2 AFS.pdf · uploaded 31 Jul 2017Source
- 1 OtherP51700008491 · elysium disclosure.pdf · uploaded 31 Jul 2017Source
- 2 Copy of Layout Approval (in case of layout)P51700009543 · Future Developement Layout1.pdf · uploaded 31 Jul 2017Source
- 1 Declaration in FORM BP51700009543 · P1 - FORM B-1.pdf · uploaded 31 Jul 2017Source
- 1 Proforma of Allotment letterP51700009543 · P1 AFS.pdf · uploaded 31 Jul 2017Source
- 1 OtherP51700009543 · elysium disclosure.pdf · uploaded 31 Jul 2017Source
- 2 Copy of Layout Approval (in case of layout)P51700010318 · Future Developement Layout1.pdf · uploaded 31 Jul 2017Source
- 1 Declaration in FORM BP51700010318 · P5 - FORM B-1.pdf · uploaded 31 Jul 2017Source
- 1 Proforma of Allotment letterP51700010318 · P5 AFS.pdf · uploaded 31 Jul 2017Source
- 1 OtherP51700010318 · elysium disclosure.pdf · uploaded 31 Jul 2017Source
- 2 OtherP51700008491 · AMC COMPLETION CERTIFICATE C D WING .pdf · uploaded 25 Jun 2018Source
- 2 OtherP51700009543 · AMC COMPLETION CERTIFICATE C D WING .pdf · uploaded 25 Jun 2018Source
- 1 Certificates of CA (Form 5)P51700010280 · Apace Form 5 ELY 3 AS ON 31 MARCH 2018 .pdf · uploaded 16 Feb 2019Source
- 1 Certificates of CA (Form 5)P51700006142 · Apace Form 5 ELY 5 AS ON 31 MARCH 2018.pdf · uploaded 16 Feb 2019Source
- 2 Certificates of CA (Form 5)P51700006142 · Apace Form 5 ELY 4 AS ON 31 MARCH 2018.pdf · uploaded 16 Feb 2019Source
- 1 Certificates of CA (Form 5)P51700005803 · Apace Form 5 ELY 7 AS ON 31 MARCH 2018.pdf · uploaded 16 Feb 2019Source
- 1 Certificates of CA (Form 5)P51700008491 · Apace Form 5 ELY 2 AS ON 31 MARCH 2018.pdf · uploaded 16 Feb 2019Source
- 1 Certificates of CA (Form 5)P51700009543 · Apace Form 5 ELY 1 AS ON 31 MARCH 2018.pdf · uploaded 16 Feb 2019Source
- 1 Certificates of CA (Form 5)P51700010318 · Apace Form 5 ELY 5 AS ON 31 MARCH 2018.pdf · uploaded 16 Feb 2019Source
- 3 OtherP51700008491 · AMC- COMPLETION CERTIFICATE - C - D WING.pdf · uploaded 5 Apr 2019Source
- 4 OtherP51700008491 · APACE - AMC - COMPLETION CERTIFICATE - A WING- 30-03-2019.pdf · uploaded 5 Apr 2019Source
- 3 OtherP51700009543 · APACE - AMC - COMPLETION CERTIFICATE - A WING- 30-03-2019.pdf · uploaded 5 Apr 2019Source
- 4 OtherP51700009543 · AMC- COMPLETION CERTIFICATE - C - D WING.pdf · uploaded 5 Apr 2019Source
- 2 OtherP51700010280 · APACE - AMC - COMPLETION CERTIFICATE - B WING- 16-04-2019.pdf · uploaded 19 Apr 2019Source
- 2 OtherP51700006142 · APACE - AMC - COMPLETION CERTIFICATE - B WING- 16-04-2019.pdf · uploaded 19 Apr 2019Source
- 1 Certificates of Architect (Form 4)P51700010280 · form 4 phase 3.pdf · uploaded 3 Jul 2019Source
- 1 Certificates of Architect (Form 4)P51700006142 · form 4 phase 4.pdf · uploaded 3 Jul 2019Source
- 1 Certificates of Architect (Form 4)P51700008491 · form 4 phase 2.pdf · uploaded 3 Jul 2019Source
- 1 Certificates of Architect (Form 4)P51700009543 · form 4 phase 1.pdf · uploaded 3 Jul 2019Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)P51700005803 · APACE FORM5 MAR19-G-H_9 th Floor-signed.pdf · uploaded 10 Jan 2020Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)P51700010318 · APACE FORM5 MAR19-E-F_ Ground to 11th Floor-signed.pdf · uploaded 10 Jan 2020Source
- 1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentP51700010280 · APACE AMC COMPLETION CERTI B WING- 16-04-2019.pdf · uploaded 13 Jan 2020Source
- 1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentP51700006142 · APACE AMC COMPLETION CERTI B WING- 16-04-2019.pdf · uploaded 13 Jan 2020Source
- 1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentP51700008491 · APACE AMC COMPLETION CERTI A WING- 30-03-2019.pdf · uploaded 13 Jan 2020Source
- 2 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentP51700008491 · AMC COMPLETION CERTI CD WING.pdf · uploaded 13 Jan 2020Source
- 1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentP51700009543 · APACE AMC COMPLETION CERTI A WING- 30-03-2019.pdf · uploaded 13 Jan 2020Source
- 2 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentP51700009543 · AMC COMPLETION CERTI CD WING.pdf · uploaded 13 Jan 2020Source
- 1 Architect’s Certificate on Completion of Project (Form 4)P51700005803 · Form 4 GH Wing 7th Phase.pdf · uploaded 2 Mar 2020Source
- 1 Architect’s Certificate on Completion of Project (Form 4)P51700010318 · Form 4 EF Wing 5th Phase.pdf · uploaded 2 Mar 2020Source
- 1 Status of Formation of Legal Entity (Society/Co Op etc.)P51700010280 · Patels elysium wing AB co op hsg.pdf · uploaded 11 Mar 2020Source
- 1 Status of Formation of Legal Entity (Society/Co Op etc.)P51700006142 · Patels elysium wing AB co op hsg.pdf · uploaded 11 Mar 2020Source
- 1 Status of Formation of Legal Entity (Society/Co Op etc.)P51700005803 · Patels elysium wing GH co op hsg.pdf · uploaded 11 Mar 2020Source
- 1 Status of Formation of Legal Entity (Society/Co Op etc.)P51700008491 · Patels elysium wing AB co op hsg.pdf · uploaded 11 Mar 2020Source
- 2 Status of Formation of Legal Entity (Society/Co Op etc.)P51700008491 · patels elysium wing CD co op hsg.pdf · uploaded 11 Mar 2020Source
- 1 Status of Formation of Legal Entity (Society/Co Op etc.)P51700009543 · patels elysium wing CD co op hsg.pdf · uploaded 11 Mar 2020Source
- 2 Status of Formation of Legal Entity (Society/Co Op etc.)P51700009543 · Patels elysium wing AB co op hsg.pdf · uploaded 11 Mar 2020Source
- 1 Status of Formation of Legal Entity (Society/Co Op etc.)P51700010318 · Patels elysium wing EF co op hsg.pdf · uploaded 11 Mar 2020Source
- 2 Status of Formation of Legal Entity (Society/Co Op etc.)P51700010280 · APACE Society certificate A B.pdf · uploaded 24 Jun 2021Source
- 2 Status of Formation of Legal Entity (Society/Co Op etc.)P51700006142 · APACE Society certificate A B.pdf · uploaded 24 Jun 2021Source
- 2 Status of Formation of Legal Entity (Society/Co Op etc.)P51700005803 · Apace Socity Certificates G H .pdf · uploaded 24 Jun 2021Source
- 2 Status of Formation of Legal Entity (Society/Co Op etc.)P51700010318 · APACE Society Certificate E F.pdf · uploaded 24 Jun 2021Source
- 1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentP51700005803 · Apace OC EFGH 04FEB20.pdf · uploaded 13 Aug 2021Source
- 1 Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentP51700010318 · Apace OC EFGH 04FEB20.pdf · uploaded 13 Aug 2021Source
Technical
- DocumentP51700010280 · Elysium Wing B Phase 3.pdf · uploaded 30 Jul 2017Source
- DocumentP51700010280 · Apace CC-E,F,G,H pdf_HnBaw1We.pdf · uploaded 30 Jul 2017Source
- DocumentP51700006142 · Apace CC-E,F,G,H pdf_HnBaw1We.pdf · uploaded 30 Jul 2017Source
- DocumentP51700006142 · Elysium Wing B Phase 4.pdf · uploaded 30 Jul 2017Source
- DocumentP51700005803 · Apace CC-E,F,G,H pdf_HnBaw1We.pdf · uploaded 30 Jul 2017Source
- DocumentP51700005803 · Elysium Wing GH Phase 7.pdf · uploaded 30 Jul 2017Source
- DocumentP51700008491 · Apace CC-E,F,G,H pdf_HnBaw1We.pdf · uploaded 30 Jul 2017Source
- DocumentP51700008491 · Elysium Wing ACD Phase 2.pdf · uploaded 30 Jul 2017Source
- DocumentP51700009543 · Apace CC-E,F,G,H pdf_HnBaw1We.pdf · uploaded 30 Jul 2017Source
- DocumentP51700009543 · Elysium Wing ACD Phase 1.pdf · uploaded 30 Jul 2017Source
- DocumentP51700010318 · Elysium Wing EF Phase 5.pdf · uploaded 30 Jul 2017Source
- DocumentP51700010318 · Apace CC-E,F,G,H pdf_HnBaw1We.pdf · uploaded 30 Jul 2017Source
- DocumentP51700010280 · Future Developement Layout1.pdf · uploaded 31 Jul 2017Source
- DocumentP51700006142 · Future Developement Layout1.pdf · uploaded 31 Jul 2017Source
- DocumentP51700005803 · Future Developement Layout1.pdf · uploaded 31 Jul 2017Source
- DocumentP51700008491 · Future Developement Layout1.pdf · uploaded 31 Jul 2017Source
- DocumentP51700009543 · Future Developement Layout1.pdf · uploaded 31 Jul 2017Source
- DocumentP51700010318 · Future Developement Layout1.pdf · uploaded 31 Jul 2017Source
Technical (Architect)
- DocumentP51700010280 · phase3 form1.pdf · uploaded 29 Jul 2017Source
- DocumentP51700006142 · phase4 form1.pdf · uploaded 29 Jul 2017Source
- DocumentP51700005803 · phase7 form1.pdf · uploaded 29 Jul 2017Source
- DocumentP51700008491 · phase 2 form 1.pdf · uploaded 29 Jul 2017Source
- DocumentP51700009543 · phase 1 form1.pdf · uploaded 29 Jul 2017Source
- DocumentP51700010318 · phase5 form1.pdf · uploaded 29 Jul 2017Source
Technical (Engineer)
- DocumentP51700010280 · Form-2 Phase-3.pdf · uploaded 29 Jul 2017Source
- DocumentP51700006142 · Form-2 Phase-4.pdf · uploaded 29 Jul 2017Source
- DocumentP51700005803 · Form-2 Phase-7.pdf · uploaded 29 Jul 2017Source
- DocumentP51700008491 · Form-2 Phase-2.pdf · uploaded 29 Jul 2017Source
- DocumentP51700009543 · Form-2 Phase-1.pdf · uploaded 29 Jul 2017Source
- DocumentP51700010318 · Form-2 Phase-5.pdf · uploaded 29 Jul 2017Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvalsLand parcel SURVEY NO 58 HISSA NO 4/2, SURVEY NO 58 HISSA NO 6B
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Certificate Signed
- Phases
- 7
- Unit types
- 1BHK WING A, 2BHK WING C, 2BHK WING D, 1BHK WING B, 1BHK WING E, 1BHK WING F, 1BHK WING G, 1BHK WING H368 units in all
- Address
- Survey No 58 Hissa No 4/2, Survey No 58 Hissa No 6b, Plot - CPIN 421501
- Village
- Ambarnath(M Cl), Ambarnath taluka
- Location
- 19.19017, 73.18093
- Land area for this project
- 367 sq m (3,954 sq ft)
- Permissible built-up area
- 10,146 sq m (1,09,213 sq ft)
- Sanctioned built-up area
- 2,761 sq m (29,721 sq ft)
- Recreational open space
- 964 sq m (10,379 sq ft)
- Designated bank account
- 82
- Developed in phases
- No
- Also registered as
- Patels Elysium - 3, Patels Elysium - 7, Patels Elysium - 2, Patels Elysium - 5, Patels Elysium - 1, Patels Elysium - 4, Patels Elysium - 6
Survey, CTS, gat or plot numbers
Land as published on MahaRERA's project page
SURVEY NO 58 HISSA NO 4/2, SURVEY NO 58 HISSA NO 6B, PLOT - C
Boundaries
- North
- Survey No 58
- South
- Survey No 62
- East
- Survey No 58
- West
- Survey No 58
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking368 units · 3 parking spaces
368 of 368 units booked (100%), as the promoter reported to MahaRERA
| RERA | Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|---|
| P51700009543 | PATELS ELYSIUM - 1 - A WING - G to 11th Floors | 1BHK WING A | 25.39 sq m · 273 sq ft | 43 | 43 |
| P51700009543 | PATELS ELYSIUM - 1 - C and D WING - G to 11th Floors | 2BHK WING C | 37.9 sq m · 408 sq ft | 22 | 22 |
| P51700009543 | PATELS ELYSIUM - 1 - C and D WING - G to 11th Floors | 2BHK WING C | 40.82 sq m · 439 sq ft | 21 | 21 |
| P51700009543 | PATELS ELYSIUM - 1 - C and D WING - G to 11th Floors | 2BHK WING D | 37.9 sq m · 408 sq ft | 22 | 22 |
| P51700009543 | PATELS ELYSIUM - 1 - C and D WING - G to 11th Floors | 2BHK WING D | 40.82 sq m · 439 sq ft | 21 | 21 |
| P51700008491 | PATELS ELYSIUM - 2 - A WING - 12th Floor | 1BHK WING A | 25.39 sq m · 273 sq ft | 4 | 4 |
| P51700008491 | PATELS ELYSIUM - 2 - C and D WING - 12th Floor | 2BHK WING C | 37.9 sq m · 408 sq ft | 2 | 2 |
| P51700008491 | PATELS ELYSIUM - 2 - C and D WING - 12th Floor | 2BHK WING C | 40.82 sq m · 439 sq ft | 2 | 2 |
Show all 24 unit rowsShow fewer unit rows
| RERA | Building | Type | Carpet area | Units | Booked |
|---|---|---|---|---|---|
| P51700008491 | PATELS ELYSIUM - 2 - C and D WING - 12th Floor | 2BHK WING D | 37.9 sq m · 408 sq ft | 2 | 2 |
| P51700008491 | PATELS ELYSIUM - 2 - C and D WING - 12th Floor | 2BHK WING D | 40.82 sq m · 439 sq ft | 2 | 2 |
| P51700010280 | PATELS ELYSIUM - 3 - B WING - G to 11th Floors | 1BHK WING B | 30.08 sq m · 324 sq ft | 9 | 9 |
| P51700010280 | PATELS ELYSIUM - 3 - B WING - G to 11th Floors | 1BHK WING B | 30.18 sq m · 325 sq ft | 34 | 34 |
| P51700010280 | PATELS ELYSIUM - 3 - B WING - G to 11th Floors | 1BHK WING B | 30.43 sq m · 328 sq ft | 22 | 22 |
| P51700006142 | PATELS ELYSIUM - 4 - B WING - 12th Floor | 1BHK WING B | 30.08 sq m · 324 sq ft | 2 | 2 |
| P51700006142 | PATELS ELYSIUM - 4 - B WING - 12th Floor | 1BHK WING B | 30.18 sq m · 325 sq ft | 2 | 2 |
| P51700006142 | PATELS ELYSIUM - 4 - B WING - 12th Floor | 1BHK WING B | 30.43 sq m · 328 sq ft | 2 | 2 |
| P51700010318 | PATELS ELYSIUM - 5 - E and F WING - G to 11th Floors | 1BHK WING E | 28.61 sq m · 308 sq ft | 22 | 22 |
| P51700010318 | PATELS ELYSIUM - 5 - E and F WING - G to 11th Floors | 1BHK WING E | 32.85 sq m · 354 sq ft | 21 | 21 |
| P51700010318 | PATELS ELYSIUM - 5 - E and F WING - G to 11th Floors | 1BHK WING F | 28.61 sq m · 308 sq ft | 22 | 22 |
| P51700010318 | PATELS ELYSIUM - 5 - E and F WING - G to 11th Floors | 1BHK WING F | 32.85 sq m · 354 sq ft | 21 | 21 |
| P51700005803 | PATELS ELYSIUM - 7 - G and H WING - G to 9th Floors | 1BHK WING G | 28.61 sq m · 308 sq ft | 18 | 18 |
| P51700005803 | PATELS ELYSIUM - 7 - G and H WING - G to 9th Floors | 1BHK WING G | 32.85 sq m · 354 sq ft | 17 | 17 |
| P51700005803 | PATELS ELYSIUM - 7 - G and H WING - G to 9th Floors | 1BHK WING H | 28.61 sq m · 308 sq ft | 18 | 18 |
| P51700005803 | PATELS ELYSIUM - 7 - G and H WING - G to 9th Floors | 1BHK WING H | 32.85 sq m · 354 sq ft | 17 | 17 |
Parking
| Type | Two-wheeler | Four-wheeler | Bus | Visitor | Total |
|---|---|---|---|---|---|
| Closed/Covered | 0 | 0 | 0 | 0 | 1 |
| Open Space | 0 | 0 | 0 | 0 | 2 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Construction progress2 buildings and areas
Work completed, as the promoter reported it to MahaRERA (Form 1)
PATELS ELYSIUM - 6 - WING E and F - 12th Floor
Show all 11 activitiesShow fewer activities
Common areas and amenities
Show all 15 activitiesShow fewer activities
Source: MahaRERA project page. Percentages are the promoter's own declaration, not an inspection.
Professionals7
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. | RERA |
|---|---|---|---|
| Architect | Jitendra S Patel Samarthya Engineers | — | P51700009032 |
| Architect | Jitendra S Patel Samarthya Engineers | — | P51700010280 |
| Architect | Jitendra S Patel Samarthya Engineers | — | P51700005803 |
| Architect | Jitendra S Patel Samarthya Engineers | — | P51700008491 |
| Architect | Jitendra S Patel Samarthya Engineers | — | P51700010318 |
| Architect | Jitendra S Patel Samarthya Engineers | — | P51700006142 |
| Architect | Jitendra S Patel Smarthya Engineers | — | P51700009543 |
Source: MahaRERA project page. Contact details are not shown.