Alliaance Galaxy
Deedo IDDP-THN-830MIts promised completion date, Oct 2026, has passed and MahaRERA does not show it completed; no MahaRERA orders on record; 21% of its units are booked.
Airoli, Thane 400708 · by Aashutosh Enterprise
Buying a flat here?
See every deed registered on it.
Its promised completion date, Oct 2026, has passed and MahaRERA does not show it completed
- This projectRegistered 24 Jan 2023, completion promised 19 Oct 2026, and still not shown completed today.
No extension certificate on record.
1 registration · Source: MahaRERA registration and extension certificates
Latest registered deeds
Sales first, then rentals and mortgages matched to this project · the free view shows a price band
The building
Open a building to see every flat, floor by floor.
Floors and units from the registration certificate annexures and MahaRERA's project page.
Regulatory recordNone found
Deedo hasn't found this project's RERA number in any MahaRERA list or order it has read: deregistered, abeyance, NCLT, quarterly-report non-compliance, revoked, regulatory and suo motu orders.
Source: MahaRERA regulatory lists and orders, checked against each RERA number.
RERA registrationP51700048842
| Registration | Registered | Promised completion | Revised completion | Promoter | MahaRERA |
|---|---|---|---|---|---|
| P51700048842 | 24 Jan 2023 | 19 Oct 2026 | 19 Oct 2026 | Aashutosh Enterprise | Project page |
Documents139
2 documents held by Deedo, 137 filings listed on MahaRERA's project page
Show all 139 documentsShow fewer documents
Migrated
- 3 Building Plan Approval / NA Order for plotted development03_11zon.pdf · uploaded 9 Dec 2022Source
- 4 Building Plan Approval / NA Order for plotted development04_11zon.pdf · uploaded 9 Dec 2022Source
- 1 Commencement Certificates / NA Order for plotted developmentS013000270_2201280054000_11zon.pdf · uploaded 9 Dec 2022Source
- 1 Copy of the legal title reportLegal Title Report.pdf · uploaded 27 Dec 2022Source
- 1 a Details of encumbrances concerned to FinanceEncumberance.pdf · uploaded 27 Dec 2022Source
- 1 b Details of encumbrances concerned to LegalEncumberance.pdf · uploaded 27 Dec 2022Source
- 1 Copy of Layout Approval (in case of layout)01_11zon.pdf · uploaded 27 Dec 2022Source
- 1 Declaration about Commencement CertificateFormat D - Commencement Certificate.pdf · uploaded 27 Dec 2022Source
- 1 Declaration in FORM BForm B - Affidavit.pdf · uploaded 27 Dec 2022Source
- 1 CERSAI detailsCresai Report.pdf · uploaded 27 Dec 2022Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3.pdf · uploaded 27 Dec 2022Source
- 1 Proforma of Agreement for saleAgreement for Sale - Satyam Galaxy - v14.pdf · uploaded 27 Dec 2022Source
- 1 Proforma of Allotment letterDraft Allotment Letter - Alliaance Galaxy - v5 (1).pdf · uploaded 27 Dec 2022Source
- 1 Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFormat A - Bank Account.pdf · uploaded 27 Dec 2022Source
- 1 Deviation Report with respect to Allotment letterList of Differences in Allottment Letter_Revised.pdf · uploaded 27 Dec 2022Source
- 1 Deviation Report with respect to model copy of AgreementList of Differences in Agreement_Revised_compressed.pdf · uploaded 27 Dec 2022Source
- 2 a Details of encumbrances concerned to FinanceCresai and Encumberance.pdf · uploaded 9 Jan 2023Source
- 2 b Details of encumbrances concerned to LegalCresai and Encumberance.pdf · uploaded 9 Jan 2023Source
- 2 CERSAI detailsCresai and Encumberance.pdf · uploaded 9 Jan 2023Source
- 1 Disclosure of Interest in Other Real Estate OrganizationsAashutosh All Partners Annexure A.pdf · uploaded 9 Jan 2023Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCHITECT CERTIFICATE.pdf · uploaded 2 Aug 2023Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)ENGINEER'S CERTIFICATE.pdf · uploaded 2 Aug 2023Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Ashutosh Form 3 March.pdf · uploaded 2 Aug 2023Source
- 3 CA Certificate on Project Cost & Fund withdrawal (Form 3)Signed Form3_compressed.pdf · uploaded 6 Nov 2023Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1_Certificate.pdf · uploaded 20 Nov 2023Source
- 3 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1_April to June.pdf · uploaded 20 Nov 2023Source
- 4 CA Certificate on Project Cost & Fund withdrawal (Form 3)Revised Form 3 June 2023_Signed.pdf · uploaded 20 Nov 2023Source
- 4 Architect’s Certificate of Percentage of Completion of Work (Form 1)ARCHITECT CERTIFICATE_Sep 2023.pdf · uploaded 18 Dec 2023Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)ENGINEER CERTIFICATE_Sep 2023.pdf · uploaded 18 Dec 2023Source
- 5 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3 - Aashutosh_compressed.pdf · uploaded 18 Dec 2023Source
- 5 Architect’s Certificate of Percentage of Completion of Work (Form 1)Form 1_Sep 2023.pdf · uploaded 19 Dec 2023Source
- 3 Engineer’s Certificate on Cost Incurred on Project (Form 2)Form 2_Sep 2023.pdf · uploaded 19 Dec 2023Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)Aashutosh_Form 5_signed.pdf · uploaded 1 Feb 2024Source
- 6 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architects Certifiacte.pdf · uploaded 21 Feb 2024Source
- 4 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineers Certificate.pdf · uploaded 21 Feb 2024Source
- 6 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3.pdf · uploaded 21 Feb 2024Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architects certificate 31 Mar 2024.pdf · uploaded 29 Oct 2024Source
- 2 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architects certificate 30 June 2024.pdf · uploaded 29 Oct 2024Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3_March 24.pdf · uploaded 29 Oct 2024Source
- 2 CA Certificate on Project Cost & Fund withdrawal (Form 3)Form 3_June 2024.pdf · uploaded 29 Oct 2024Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer's certificate 31 Mar 2024.pdf · uploaded 29 Oct 2024Source
- 2 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer's certificate 30 June 2024.pdf · uploaded 29 Oct 2024Source
- 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)Quality Assurance 31-3-2024.pdf · uploaded 29 Oct 2024Source
- 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)Form 5 aashutosh.pdf · uploaded 10 Jan 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architects Certificate Dec 2024.pdf · uploaded 18 Mar 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)RERA Form 3 Dec 24 Aashutosh Enterprises both signed.pdf · uploaded 18 Mar 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate 31-12-2024.pdf · uploaded 18 Mar 2025Source
- 1 Architect’s Certificate of Percentage of Completion of Work (Form 1)Architects Certificate Sep 2024.pdf · uploaded 13 May 2025Source
- 1 CA Certificate on Project Cost & Fund withdrawal (Form 3)RERA Form 3 Aashutosh Ent Sep 24.pdf · uploaded 13 May 2025Source
- 1 Engineer’s Certificate on Cost Incurred on Project (Form 2)Engineer Certificate 30-9-2024.pdf · uploaded 13 May 2025Source
- Form 1Architects certificate mar -2025.pdf · uploaded 30 Jul 2025Source
- Form 2Engineers Certificate 31-MAR 2025.pdf · uploaded 30 Jul 2025Source
- Form 3Form 3 signed.pdf · uploaded 30 Jul 2025Source
- Disclosure of Sold and Booked InventorySold Unsold Flat List 31-3-2025.pdf · uploaded 30 Jul 2025Source
- OthersQuality Assurance Certificate Mar - 2025.pdf · uploaded 30 Jul 2025Source
- Withdrawal Update Form 1Architects Certificate June 2025.pdf · uploaded 25 Dec 2025Source
- Withdrawal Update Form 2Engineers Certificate June 2025.pdf · uploaded 25 Dec 2025Source
- Withdrawal Update Form 3Form 3_June 2025.pdf · uploaded 25 Dec 2025Source
- Withdrawal Update Form 1Architects Certificate June 2025.pdf · uploaded 29 Dec 2025Source
- Withdrawal Update Form 2Engineers Certificate June 2025.pdf · uploaded 29 Dec 2025Source
- Withdrawal Update Form 3Withdrawal Application Form3 Signed.pdf · uploaded 29 Dec 2025Source
- Withdrawal Update Form 1Architects certificate.pdf · uploaded 25 Feb 2026Source
- Withdrawal Update Form 2Engineering Certificate.pdf · uploaded 25 Feb 2026Source
- Withdrawal Update Form 3Withdrawal Application Form3.pdf · uploaded 25 Feb 2026Source
- Withdrawal Update Form 1Architect Certificate 31-03-26.pdf · uploaded 6 Jun 2026Source
- Withdrawal Update Form 2Engineers Certificate as on 31-3-26.pdf · uploaded 6 Jun 2026Source
- Withdrawal Update Form 3Form3 31-3-26.pdf · uploaded 6 Jun 2026Source
- Withdrawal Update Form 1Architech Certificate 07-04-2026.pdf · uploaded 11 Jun 2026Source
- Withdrawal Update Form 1Architech Certificate 07-04-2026.pdf · uploaded 11 Jun 2026Source
- Withdrawal Update Form 2Engineers Certificate as 07-04-26.pdf · uploaded 11 Jun 2026Source
- Withdrawal Update Form 2Engineers Certificate as 07-04-26.pdf · uploaded 11 Jun 2026Source
- Withdrawal Update Form 3Form 3 -07-04-2026.pdf · uploaded 11 Jun 2026Source
- Withdrawal Update Form 3Form 3 -07-04-2026.pdf · uploaded 11 Jun 2026Source
- Withdrawal Update Form 1Architech Certificate 07-04-2026.pdf · uploaded 16 Aug 2026Source
- Withdrawal Update Form 2Engineers Certificate as 07-04-26.pdf · uploaded 16 Aug 2026Source
- Withdrawal Update Form 3Form 3 -07-04-2026.pdf · uploaded 16 Aug 2026Source
- Form 1Form 1_Certificate.pdf · uploaded 17 Aug 2026Source
- Form 2ENGINEER CERTIFICATE.pdf · uploaded 17 Aug 2026Source
- Form 3Revised Form 3 March 23_SIGNED.pdf · uploaded 17 Aug 2026Source
- Disclosure of Sold and Booked InventoryRevised Form 3 March 23_SIGNED.pdf · uploaded 17 Aug 2026Source
- Form 1Form 1_April to June.pdf · uploaded 17 Aug 2026Source
- Form 2ENGINEER CERTIFICATE.pdf · uploaded 17 Aug 2026Source
- Form 3Revised Form 3 June 2023_Signed.pdf · uploaded 17 Aug 2026Source
- Disclosure of Sold and Booked InventoryRevised Form 3 June 2023_Signed.pdf · uploaded 17 Aug 2026Source
- Form 1Form 1_Sep 2023.pdf · uploaded 17 Aug 2026Source
- Form 2Form 2_Sep 2023.pdf · uploaded 17 Aug 2026Source
- Form 3Form 3 - Aashutosh_compressed.pdf · uploaded 17 Aug 2026Source
- Disclosure of Sold and Booked InventoryForm 3 - Aashutosh_compressed.pdf · uploaded 17 Aug 2026Source
- Form 1Architects Certifiacte.pdf · uploaded 17 Aug 2026Source
- Form 2Engineers Certificate.pdf · uploaded 17 Aug 2026Source
- Form 3Form 3.pdf · uploaded 17 Aug 2026Source
- Disclosure of Sold and Booked InventoryForm 3.pdf · uploaded 17 Aug 2026Source
- Form 1Architects certificate 31 Mar 2024.pdf · uploaded 17 Aug 2026Source
- Form 2Engineers certificate 31 Mar 2024.pdf · uploaded 17 Aug 2026Source
- Form 3Form 3_March 24.pdf · uploaded 17 Aug 2026Source
- Disclosure of Sold and Booked InventoryForm 3_March 24.pdf · uploaded 17 Aug 2026Source
- Form 1Architects certificate 30 June 2024.pdf · uploaded 17 Aug 2026Source
- Form 2Engineers certificate 30 June 2024.pdf · uploaded 17 Aug 2026Source
- Form 3Form 3_June 2024.pdf · uploaded 17 Aug 2026Source
- Disclosure of Sold and Booked InventoryForm 3_June 2024.pdf · uploaded 17 Aug 2026Source
- Form 1Architects Certificate Sep 2024.pdf · uploaded 17 Aug 2026Source
- Form 2Engineer Certificate 30-9-2024.pdf · uploaded 17 Aug 2026Source
- Form 3RERA Form 3 Aashutosh Ent Sep 24.pdf · uploaded 17 Aug 2026Source
- Disclosure of Sold and Booked InventoryRERA Form 3 Aashutosh Ent Sep 24.pdf · uploaded 17 Aug 2026Source
- Form 1Architects Certificate Dec 2024.pdf · uploaded 17 Aug 2026Source
- Form 2Engineer Certificate 31-12-2024.pdf · uploaded 17 Aug 2026Source
- Form 3RERA Form 3 Dec 24 Aashutosh Enterprises both signed.pdf · uploaded 17 Aug 2026Source
- Disclosure of Sold and Booked InventoryRERA Form 3 Dec 24 Aashutosh Enterprises both signed.pdf · uploaded 17 Aug 2026Source
- Form 2A (FY 2022-2023)ENGINEER CERTIFICATE.pdf · uploaded 17 Aug 2026Source
- Form 2A (FY 2023-2024)Quality Assurance 31-3-2024.pdf · uploaded 17 Aug 2026Source
- Form 2A (FY 2024-2025)Quality Assurance Certificate Mar - 2025.pdf · uploaded 17 Aug 2026Source
- Form 5 (FY 2022-2023)Aashutosh_Form 5_signed.pdf · uploaded 17 Aug 2026Source
- Form 5 (FY 2023-2024)Form 5 aashutosh.pdf · uploaded 17 Aug 2026Source
- Form 5 (FY 2024-2025)Form 5_Aashutosh.pdf · uploaded 17 Aug 2026Source
- Form 5 (FY 2025-2026)Form 5 - Aashutosh.pdf · uploaded 18 Aug 2026Source
- Form 2A (FY 2025-2026)Form 2A.pdf · uploaded 19 Aug 2026Source
Technical
Technical (Architect)
- DocumentArchitects certificate 31 Mar 2024.pdf · uploaded 29 Oct 2024Source
- DocumentArchitects certificate 30 June 2024.pdf · uploaded 29 Oct 2024Source
- DocumentArchitects Certificate Dec 2024.pdf · uploaded 18 Mar 2025Source
- DocumentArchitects Certificate Sep 2024.pdf · uploaded 13 May 2025Source
- DocumentArchitech Certificate 07-04-2026.pdf · uploaded 11 Jun 2026Source
Technical (Engineer)
- DocumentEngineer's certificate 31 Mar 2024.pdf · uploaded 29 Oct 2024Source
- DocumentEngineer's certificate 30 June 2024.pdf · uploaded 29 Oct 2024Source
- DocumentEngineer Certificate 31-12-2024.pdf · uploaded 18 Mar 2025Source
- DocumentEngineer Certificate 30-9-2024.pdf · uploaded 13 May 2025Source
- DocumentEngineers Certificate as 07-04-26.pdf · uploaded 11 Jun 2026Source
Source: Certificates, orders and filings published by MahaRERA. Filings that can't be opened here are listed as they appear on MahaRERA's project page.
Land & approvalsLand parcel B-57A, B57A
As registered with MahaRERA and published on its project page
- Project type
- Residential / Group Housing
- Status on MahaRERA
- Certificate Signed
- Unit types
- 1BHK, 2BHK130 units in all
- Address
- Plot No B-57, B-57A, B-59, Sector 20B, , AiroliPIN 400708
- Village
- Navi Mumbai (M Corp.), Thane taluka
- Land area for this project
- 2,125 sq m (22,877 sq ft)
- Permissible built-up area
- 10,196 sq m (1,09,749 sq ft)
- Sanctioned built-up area
- 10,196 sq m (1,09,749 sq ft)
- Designated bank account
- 82
- Developed in phases
- No
Survey, CTS, gat or plot numbers
Land as published on MahaRERA's project page
Plot No B-57, B-57A, B-59
Boundaries
- North
- 9 Mtr Road
- South
- 11 Mtr Road
- East
- Plot No B-58
- West
- 11 Mtr Road
Source: registration certificates and MahaRERA's project page, as stated there.
Units & parking130 units
27 of 130 units booked (21%), as the promoter reported to MahaRERA
| Type | Carpet area | Units | Booked |
|---|---|---|---|
| 1BHK | 35.41 sq m · 381 sq ft | 22 | 5 |
| 2BHK | 58.49 sq m · 630 sq ft | 22 | 2 |
| 2BHK | 61.47 sq m · 662 sq ft | 21 | 10 |
| 2BHK | 61.69 sq m · 664 sq ft | 21 | 0 |
| 2BHK | 61.82 sq m · 665 sq ft | 42 | 8 |
| 2BHK | 77.31 sq m · 832 sq ft | 1 | 1 |
| 2BHK | 77.5 sq m · 834 sq ft | 1 | 1 |
Source: MahaRERA project page, as the promoter filed it. Carpet areas are per unit.
Professionals12
Architects, engineers, chartered accountants and agents named on the registration
| Role | Name | Registration no. |
|---|---|---|
| Architect | Triarch Design Studio | — |
| Chartered accountant | Arjun Singh Rajpoot | — |
| Chartered accountant | Mayur J Gosrani | — |
| Engineer | Structural Concepts | — |
| Other | Aaradya Enterprises | — |
| Other | AASA Enterprises | — |
| Other | Divine Enterprises | — |
| Other | Khodal Enterprises | — |
Show all 12 professionalsShow fewer professionals
| Role | Name | Registration no. |
|---|---|---|
| Other | K K Corporation | — |
| Other | Sai Agricultural Consultancy Landscaping & Garden Maintenance | — |
| Other | Sujit Enterprises | — |
| Other | Vashi Advocates | — |
Source: MahaRERA project page. Contact details are not shown.
Other projects in Airoli
- Alliaance SapphireRERA PR1330002602344
- Varsha VerveRERA PC1330002602264
- Varsha VerdeRERA PR1330002602195
- Millennium ParkRERA PR1330002600096
- Om Sai HeightsRERA PR1330002600071
- Shagun AvasaRERA PR1330002503024
- Alliaance SiddhiRERA PR1330002502922
- Superior PalaciaRERA PR1330002502803
All 24 projects in Airoli · Compare Alliaance Galaxy with another project